CN102454163B - Circulating synchronous hydraulic lifting process of upper module ultra-large offshore oil platform - Google Patents

Circulating synchronous hydraulic lifting process of upper module ultra-large offshore oil platform Download PDF

Info

Publication number
CN102454163B
CN102454163B CN 201010530133 CN201010530133A CN102454163B CN 102454163 B CN102454163 B CN 102454163B CN 201010530133 CN201010530133 CN 201010530133 CN 201010530133 A CN201010530133 A CN 201010530133A CN 102454163 B CN102454163 B CN 102454163B
Authority
CN
China
Prior art keywords
upper chunk
lifting
supporting leg
hydraulic
lifting appliance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010530133
Other languages
Chinese (zh)
Other versions
CN102454163A (en
Inventor
李淑民
宋峥嵘
李林
杨风艳
阮庆
翟永安
杨伟华
王可民
陈品
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN 201010530133 priority Critical patent/CN102454163B/en
Publication of CN102454163A publication Critical patent/CN102454163A/en
Application granted granted Critical
Publication of CN102454163B publication Critical patent/CN102454163B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a circulating synchronous hydraulic lifting process of an upper module of an ultra-large offshore oil platform, comprising the following steps: (1) installing a lifting device and a supporting device in the positions of supporting legs; (2) arranging the lifting device in the supporting leg arranging positions, and clamping; (3) controlling the lifting device to apply lifting force, and lifting the supporting legs of the upper module by one set height stroke; (4) arranging temporary supporting pipe sections on a temporary supporting base at the bottom, lowering the lifting device, and abutting the supporting legs and the temporary supporting pipe sections; (5) dismounting the lifting device, lowering the lifting device, and clamping the temporary supporting pipe sections: (6) continuing lifting the upper module by one set height stroke; (7) repeating the circulating lifting work in the steps (4), (5) and (6), and lifting the upper module to a preset height; and (8) transporting the lower structure of the upper module to the lower part of the upper module, abutting the lower structure to the lower part of the upper module, dismounting the lifting device, and dismantling the lifting device. In the invention, the upper module of the ultra-large offshore oil platform and the lower structure of the upper module can be separated and arranged in the lower position to be prefabricated separately, and the circulating synchronous hydraulic lifting of the upper module can be realized.

Description

Ultra-large type offshore platform upper chunk circulation synchronous hydraulic promotes technology
Technical field
The present invention relates to a kind of lifting technology of large structure, relate in particular to ultra-large type offshore platform upper chunk circulation synchronous hydraulic and promote technology, belong to the ocean engineering field.
Background technology
The exploitation of marine oil and gas resource need be arranged the offshore platform of some at sea.Offshore platform mainly contains two types: fixed platform, floating platform.
The offshore oil fixed platform generally comprises: upper chunk and fixed support structure under water.This type of offshore platform generally be with upper chunk and under water fixed support structure build separately on land, and adopt floating holder method to carry out marine installation exercise.In the shipping process of large-scale upper chunk, need between its underpart and ship deck, arrange the lower support structure usually.For floating platform, it generally is made up of upper chunk and bottom buoyancy aid, before Qi Xiashui, usually needs in the place or dock is finished the group of its upper chunk and bottom buoyancy aid to work.
For the construction of offshore platform, traditional handicraft generally is that earlier substructure is prefabricated finishes with lower support structure, bottom buoyancy aid etc., then, proceeds the construction of upper chunk again.In the building course, need usually to adopt loop wheel machine to finish lifting operation.Along with continuous the striding forward to the deep water field of marine petroleum development, the volume and weight of offshore platform is also in continuous increase, when adopting existing technology to carry out the construction of ultra-large type offshore platform upper chunk, can make it in whole building course, be in the higher position always, mainly have the following disadvantages:
1, increases construction plant loop wheel machine use amount and loop wheel machine task difficulty, particularly needed to increase the access times of large-scale loop wheel machine;
2, overall dimension and the precision control difficulty of upper chunk have been increased;
3, increased construction plant scaffold building workload;
4, increased the consumption of the interim supporting member in the upper chunk building course;
5, the construction of upper chunk need be treated can carry out after substructure is finished, and is unfavorable for the control of duration.
The content of invention
Main purpose of the present invention is to overcome the above-mentioned shortcoming that existing technology exists, and providing a kind of ultra-large type offshore platform upper chunk circulation synchronous hydraulic to promote technology, it can with ultra-large type offshore platform upper chunk and its underpart structure be separated and place lower position prefabricated separately; Reduced monomer lifting operation workload and monomer hoisting height during ultra-large type offshore platform upper chunk is built effectively, reduced the place resources such as loop wheel machine of building the place and be equipped with requirement; Simultaneously, adopt hydraulic rockshaft to promote operation, can realize the effective control to hoisting velocity, displacement accuracy; And adopt the remote central control system to control promoting operation process, can realize that the multiple spot of upper chunk promotes synchronously.
The objective of the invention is to be realized by following technical scheme:
A kind of ultra-large type offshore platform upper chunk circulation synchronous hydraulic promotes technology, it is characterized in that: following steps are adopted in the lifting of upper chunk and the installation of substructure:
The first step is arranged the installation lifting appliance and is promoted bracing or strutting arrangement at each supporting leg place of upper chunk;
Second step rose to setting place of upper chunk supporting leg with lifting appliance, and clamped the supporting leg of upper chunk;
The 3rd step: the control lifting appliance applies lifting force, and corresponding upper chunk supporting leg is promoted a setting height stroke;
The 4th step: will support pipeline section temporarily and place on the temporary support of bottom, the readjustment lifting appliance docks the upper chunk supporting leg to setting height with the interim pipeline section that supports;
The 5th step: the lifting appliance unloading is reduced to the bottom of interim support pipeline section with the lifting appliance height, and clamps the interim pipeline section that supports;
The 6th step: lifting appliance continues to promote a setting height stroke with the upper chunk supporting leg;
The 7th step: repeat above-mentioned the 4th step to the 6th step, upper chunk is carried out the circularly enhancing operation, upper chunk is risen to predetermined altitude;
The 8th step: substructure is transported to precalculated position, upper chunk bottom;
The 9th step: turn down lifting appliance, upper chunk is docked with substructure;
The tenth step: the lifting appliance unloading, remove lifting appliance and promote bracing or strutting arrangement.
Described upper chunk and its underpart structure are separated and are placed lower position prefabricated separately, during construction, arrange several interim supports in the bottom of upper chunk.
Described lifting appliance comprises: hydraulic rockshaft, lift frame and hydraulic clamp, hydraulic rockshaft are installed in and promote on the bracing or strutting arrangement, and are connected with lift frame, pumping plant and remote central control device, and hydraulic clamp is installed on the lift frame; Hydraulic rockshaft is to carry out synchronization job by the remote central control device by hydraulic power unit control, when promoting operation, hydraulic rockshaft rises to lift frame setting place of upper chunk supporting leg, and make lift frame clamp the supporting leg of upper chunk by hydraulic clamp, the upper chunk supporting leg is promoted a setting height stroke; Then, by adjusting back, the upper chunk supporting leg being promoted after pipeline section docks with interim the support again, the multiple spot of realization upper chunk circulates and promotes synchronously.
Described remote central control device is computer.
Described lifting bracing or strutting arrangement is the frame type braced structures, is connected with the reinforcement diagonal brace on the frame type braced structures.
Beneficial effect of the present invention:
1, can be with ultra-large type offshore platform upper chunk and its underpart structure separately and place lower position prefabricated separately, reduced monomer lifting operation workload and monomer hoisting height during ultra-large type offshore platform upper chunk is built effectively, reduced the place resources such as loop wheel machine of building the place and be equipped with requirement.
2, adopt hydraulic rockshaft to promote operation, can realize the effective control to hoisting velocity, displacement accuracy;
3, adopt the remote central control system to control promoting operation process, can realize that the multiple spot of upper chunk promotes synchronously;
4, be primarily aimed at the original design supporting leg of upper chunk and promote operation, need not that chunk is promoted operating mode and carry out extra intensity, rigidity check;
5, its support system height that adopts is less, and the stability of whole lifting process is convenient to control;
6, weight and the scale error to ultra-large type offshore platform upper chunk control effectively.
7, country is carried out the deep water hydrocarbon development of resources important technology support is provided; And, have important reference meanings for the construction of the large structure of other types.
Description of drawings:
Fig. 1 arranges schematic diagram for lifting appliance of the present invention.
Fig. 2 is the local enlarged diagram of supporting leg of the present invention.
Fig. 3 be among Fig. 2 A-A to schematic diagram.
Fig. 4 be among Fig. 3 B-B to schematic diagram.
Fig. 5 be among Fig. 2 C-C to schematic diagram.
Fig. 6 be among Fig. 2 D-D to schematic diagram.
Fig. 7 clamps chunk supporting leg schematic diagram for lift frame of the present invention.
Fig. 8 promotes first height stroke schematic diagram of upper chunk supporting leg for the present invention.
Fig. 9 is first height stroke general illustration of the present invention.
Figure 10 supports pipeline section schematic diagram in place for the present invention temporarily.
Figure 11 is supporting leg of the present invention and the interim pipeline section connection diagram that supports.
Figure 12 is the interim pipeline section schematic diagram that supports for lift frame of the present invention clamps.
Figure 13 is a height of interim support pipeline section stroke schematic diagram for the present invention promotes.
Figure 14 promotes second height of upper chunk stroke general illustration for the present invention.
Figure 15 promotes upper chunk to the predetermined altitude general illustration for the present invention.
Figure 16 transports substructure to chunk bottom schematic diagram for the present invention.
Figure 17 is upper chunk of the present invention and its underpart structure scheme of installation.
Figure 18 promotes and installs the completion schematic diagram for upper chunk of the present invention.
Major label description in figure:
1 support temporarily, 2 promotes bracing or strutting arrangements, 3 and strengthens diagonal braces, 4 hydraulic rockshafts, 5 steel strand, 6 lift frames, 7 hydraulic clamps, 8 bottom temporary supports, 9 interim pipeline sections, 10 substructures, 11 upper chunk of supporting.
The specific embodiment
As Fig. 1, Figure 16, Figure 17, shown in Figure 180, upper chunk 11 of the present invention and its underpart structure 10 are separated and are placed lower position prefabricated separately.As shown in Figure 1, when upper chunk 11 is built, several interim supports 1 are arranged in the bottom of upper chunk 11, has the certain altitude space to guarantee upper chunk 11 and to build between the ground, place, make upper chunk 11 after construction is finished, promote bracing or strutting arrangement 2 and lifting appliance and can enter the bottom of upper chunk 11 smoothly.
Following steps are adopted in the installation of upper chunk 11 and its underpart structure 10:
The first step as Fig. 2-shown in Figure 6, is 1. arranged lifting appliances, is promoted bracing or strutting arrangement 2 and bottom temporary support 8 at upper chunk 11 each supporting leg place; 2. lifting appliance comprises: hydraulic rockshaft 4, lift frame 6 and hydraulic clamp 7, hydraulic rockshaft 4 is installed on the lifting bracing or strutting arrangement 2, and hydraulic clamp 7 is installed on the lift frame 6; The steel strand 5 of hydraulic rockshaft 4 are connected with lift frame 6, and simultaneously, hydraulic rockshaft 4 is connected with pumping plant and remote central control device; 3. finish the debugging work of whole hydraulic control device.
Above-mentioned lifting bracing or strutting arrangement 2 is the frame type braced structures, is connected with on the frame type braced structures to strengthen diagonal brace 3; The remote central control device is computer.
Second step: as shown in Figure 7, by hydraulic rockshaft 4 lift frame 6 is risen to setting place of supporting leg bottom, by the hydraulic clamp 7 on the lift frame 6, make lift frame 6 clamp the supporting leg of upper chunk 11.
The 3rd step: as Fig. 8, shown in Figure 9, send the lifting job command by the remote central control device, hydraulic rockshaft 4 transmits pulling force by steel strand 5, lift frame 6 is applied lifting force, corresponding upper chunk supporting leg is promoted a height stroke, and this hoisting depth stroke is greater than hydraulic rockshaft 4 self stroke, hydraulic rockshaft 4 has continuous lifting work capacity, so for single height stroke, can realize promoting continuously operation.In this process, central control unit is controlled the fuel delivery of each hydraulic rockshaft 4 by hydraulic power unit, can realize the synchronization job of all hydraulic lifter 4, thereby speed and the precision of whole lifting operation control effectively.Simultaneously, realize the multiple spot circulation lifting synchronously of upper chunk 11.
The 4th step: as Figure 10, shown in Figure 11, on-the-spot haulage devices such as employing fork truck will support pipeline section 9 temporarily and place on the temporary support 8 of bottom, and fuel delivery readjustment lift frame 6 certain altitudes of control pumping plant make the upper chunk supporting leg dock with interim support pipeline section 9.Then, carry out upper chunk supporting leg and the interim work that is connected of supporting pipeline section 9.
The 5th step: as shown in figure 12, hydraulic rockshaft 4 unloadings highly are reduced to the bottom of interim support pipeline section 9 with lift frame 6, and the hydraulic clamp of regulating on the lift frame 67 makes lift frame 6 clamp the interim pipeline section 9 that supports.
The 6th step: shown in Figure 13,14, by hydraulic rockshaft 4 upper chunk 11 is promoted a height stroke.
The 7th step: as shown in figure 15, repeat above-mentioned the 4th step to the 6th step, upper chunk 11 is carried out the circularly enhancing operation, thereby upper chunk 11 is risen to predetermined altitude.In this process, each hydraulic rockshaft 4 is by central control unit the hoisting velocity of upper chunk to be controlled, and promotes synchronously with the multiple spot circulation that realizes upper chunk 11.
The 8th step: as shown in figure 16, substructure 10 is transported to the precalculated position, and ready work.
The 9th step: as shown in figure 17, turn down lift frame 6 by the fuel delivery of control hydraulic rockshaft 4, thereby make upper chunk 11 dock with substructure 10, and the group of finishing upper chunk 11 and substructure 10 is to working.
The tenth step: as shown in figure 18, hydraulic rockshaft 4 unloadings promote operation and finish, and remove and promote operation device therefor and support.
Hydraulic rockshaft, lift frame, hydraulic clamp, computer are existing product.
The above, it only is preferred embodiment of the present invention, be not that the present invention is done any pro forma restriction, every foundation technical spirit of the present invention all still belongs in the scope of technical solution of the present invention any simple modification, equivalent variations and modification that above embodiment does.

Claims (5)

1. a ultra-large type offshore platform upper chunk circulation synchronous hydraulic promotes technology, it is characterized in that: following steps are adopted in the lifting of upper chunk and the installation of substructure:
The first step is arranged the installation lifting appliance and is promoted bracing or strutting arrangement at each supporting leg place of upper chunk;
Second step rose to setting place of upper chunk supporting leg with lifting appliance, and clamped the supporting leg of upper chunk;
The 3rd step: the control lifting appliance applies lifting force, and corresponding upper chunk supporting leg is promoted a setting height stroke;
The 4th step: will support pipeline section temporarily and place on the temporary support of bottom, the readjustment lifting appliance docks the upper chunk supporting leg to setting height with the interim pipeline section that supports;
The 5th step: the lifting appliance unloading is reduced to the bottom of interim support pipeline section with the lifting appliance height, and clamps the interim pipeline section that supports;
The 6th step: lifting appliance continues to promote a setting height stroke with the upper chunk supporting leg;
The 7th step: repeat above-mentioned the 4th step to the 6th step, upper chunk is carried out the circularly enhancing operation, upper chunk is risen to predetermined altitude;
The 8th step: substructure is transported to precalculated position, upper chunk bottom;
The 9th step: turn down lifting appliance, upper chunk is docked with substructure;
The tenth step: the lifting appliance unloading, remove lifting appliance and promote bracing or strutting arrangement.
2. ultra-large type offshore platform upper chunk circulation synchronous hydraulic according to claim 1 promotes technology, it is characterized in that: described upper chunk and its underpart structure are separated and are placed lower position prefabricated separately, during construction, arrange several interim supports in the bottom of upper chunk.
3. ultra-large type offshore platform upper chunk circulation synchronous hydraulic according to claim 1 promotes technology, it is characterized in that: described lifting appliance comprises: hydraulic rockshaft, lift frame and hydraulic clamp, hydraulic rockshaft is installed in and promotes on the bracing or strutting arrangement, and be connected with lift frame, pumping plant and remote central control device, hydraulic clamp is installed on the lift frame; Hydraulic rockshaft is to carry out synchronization job by the remote central control device by hydraulic power unit control, when promoting operation, hydraulic rockshaft rises to lift frame setting place of upper chunk supporting leg, and make lift frame clamp the supporting leg of upper chunk by hydraulic clamp, the upper chunk supporting leg is promoted a setting height stroke; Then, by adjusting back, the upper chunk supporting leg being promoted after pipeline section docks with interim the support again, the multiple spot of realization upper chunk circulates and promotes synchronously.
4. ultra-large type offshore platform upper chunk circulation synchronous hydraulic according to claim 3 promotes technology, and it is characterized in that: described remote central control device is computer.
5. promote technology according to claim 1 or 3 described ultra-large type offshore platform upper chunk circulation synchronous hydraulics, it is characterized in that: described lifting bracing or strutting arrangement is the frame type braced structures, is connected with the reinforcement diagonal brace on the frame type braced structures.
CN 201010530133 2010-10-29 2010-10-29 Circulating synchronous hydraulic lifting process of upper module ultra-large offshore oil platform Expired - Fee Related CN102454163B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010530133 CN102454163B (en) 2010-10-29 2010-10-29 Circulating synchronous hydraulic lifting process of upper module ultra-large offshore oil platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010530133 CN102454163B (en) 2010-10-29 2010-10-29 Circulating synchronous hydraulic lifting process of upper module ultra-large offshore oil platform

Publications (2)

Publication Number Publication Date
CN102454163A CN102454163A (en) 2012-05-16
CN102454163B true CN102454163B (en) 2013-10-09

Family

ID=46037810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010530133 Expired - Fee Related CN102454163B (en) 2010-10-29 2010-10-29 Circulating synchronous hydraulic lifting process of upper module ultra-large offshore oil platform

Country Status (1)

Country Link
CN (1) CN102454163B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104528412B (en) * 2014-11-28 2017-01-25 博迈科海洋工程股份有限公司 High-built large structure based shipment assembly method
CN110171783A (en) * 2019-05-13 2019-08-27 中国电建集团山东电力建设第一工程有限公司 A kind of tower boiler hoisting of slab beam method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0039590A2 (en) * 1980-05-02 1981-11-11 Global Marine Inc. Offshore platform and method of constructing, erecting and dismantling same
JP3048548B2 (en) * 1993-11-04 2000-06-05 鹿島建設株式会社 Push-up device for steel structure
CN101280631A (en) * 2008-04-02 2008-10-08 中铁建工集团有限公司 Supporting apparatus for building
KR100877596B1 (en) * 2008-03-03 2009-01-07 제일구조건설(주) Building repairing method using column reinforcing member
CN101736907A (en) * 2008-11-21 2010-06-16 上海天演建筑物移位工程有限公司 Jacking cushion block for building
SE0950357A1 (en) * 2009-05-19 2010-07-06 Gva Consultants Ab Method of installing a top module on an offshore support structure
CN101781887A (en) * 2009-12-30 2010-07-21 天津市海王星海上工程技术有限公司 Overhang installation method for upper structure of offshore platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0039590A2 (en) * 1980-05-02 1981-11-11 Global Marine Inc. Offshore platform and method of constructing, erecting and dismantling same
JP3048548B2 (en) * 1993-11-04 2000-06-05 鹿島建設株式会社 Push-up device for steel structure
KR100877596B1 (en) * 2008-03-03 2009-01-07 제일구조건설(주) Building repairing method using column reinforcing member
CN101280631A (en) * 2008-04-02 2008-10-08 中铁建工集团有限公司 Supporting apparatus for building
CN101736907A (en) * 2008-11-21 2010-06-16 上海天演建筑物移位工程有限公司 Jacking cushion block for building
SE0950357A1 (en) * 2009-05-19 2010-07-06 Gva Consultants Ab Method of installing a top module on an offshore support structure
CN101781887A (en) * 2009-12-30 2010-07-21 天津市海王星海上工程技术有限公司 Overhang installation method for upper structure of offshore platform

Also Published As

Publication number Publication date
CN102454163A (en) 2012-05-16

Similar Documents

Publication Publication Date Title
CN100523388C (en) Large-scale trussed-beam spud leg waterborne transmitting and mounting method
CN106381870B (en) A kind of deep concrete mixture ship pile frame system and pile making method
CN103738481B (en) Removable self-mounting type drilling processes oil storage platform
CN205257825U (en) Offshore platform fan hoist and mount system
CN202175469U (en) Supporting device for cable coil
CN101804849A (en) Construction program of semi-submersible platform for offshore oil and gas development
CN104210627B (en) Build the device and method of lower water for jack-up unit level land
CN102582786A (en) Building process for deep sea spar platform
CN102409650A (en) Method for mounting shallow water ocean jacket platform
CN105003232B (en) A kind of ultra-deep sea marine oil and gas dry type production system and its installation evacuation method
CN102454163B (en) Circulating synchronous hydraulic lifting process of upper module ultra-large offshore oil platform
CN201817802U (en) Ocean platform hydraulic lifting device
CN102561289B (en) Around synchronization hydraumatic jacking process of upper module of ultra-large marine oil platform
CN101844606B (en) Shallow sea wind power construction system, shallow sea wind power platform and shallow sea wind power construction method
CN204491564U (en) A kind of jacket for offshore structure
CN214524328U (en) Semi-submersible type immersed tube transporting and installing integrated ship
CN102720386A (en) Inversing method of inner side clustering hoop of vertical storage tank
CN103171976B (en) Hoisting method for shipyard gantry crane
CN204023540U (en) A kind of drilling platform
CN201151904Y (en) Large-sized pile leg structure pulling and moving chute device for water borne mounting
CN201794516U (en) Light-weight removable 90-ton workover rig in sea
CN101942961A (en) Conveyable light marine 90t workover rig
KR20120103930A (en) Movable marine power generation plant and management method of it
CN211006604U (en) Offshore wind turbine generator system positioning support guide frame
CN104476055B (en) A kind of spud leg manufacture method of meter of font stay tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131009