CN101942961A - Conveyable light marine 90t workover rig - Google Patents

Conveyable light marine 90t workover rig Download PDF

Info

Publication number
CN101942961A
CN101942961A CN 201010214602 CN201010214602A CN101942961A CN 101942961 A CN101942961 A CN 101942961A CN 201010214602 CN201010214602 CN 201010214602 CN 201010214602 A CN201010214602 A CN 201010214602A CN 101942961 A CN101942961 A CN 101942961A
Authority
CN
China
Prior art keywords
seat
module
derrick
workover rig
workover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010214602
Other languages
Chinese (zh)
Inventor
苏一凡
谢玉洪
柯吕雄
唐广荣
俞进
刘策
卜华荣
温伟明
鲁献
张峙
宋立志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
SJ Petroleum Machinery Co
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
SJ Petroleum Machinery Co
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, SJ Petroleum Machinery Co, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN 201010214602 priority Critical patent/CN101942961A/en
Publication of CN101942961A publication Critical patent/CN101942961A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a conveyable light marine 90t workover rig, consisting of workover equipment modules with each weight controlled within 8t. Slide rails can be arranged according to distribution conditions of well head grooves of a series of marine oil-gas production platforms without a workover rig and flexibly installed and arranged. The workover rig can realize that the traditional spud legs satisfy well workover load requirements and workover operations of all oil-gas production platforms configured with a crane with the hoisting capacity of more than 10t and related well stimulation requirements, and has the advantages of reducing development costs of marginal oil fields at the same time and providing effective means for carrying out tapping potential measures of the similar simple production platforms and eliminating underground potential safety hazards. The workover rig has the characteristics of simple structure, short installation period, wide application, and the like.

Description

The light-duty workover rig of moving of ocean 90t
Technical field
The invention belongs to the light-duty workover rig of moving of a kind of ocean 90t
Background technology
Along with each Oilfield Group small-block oilfield rolling development project of offshore oil constantly increases, newly the no workover rig wellhead platform quantity on also increases at the same time.Break down after each electric pump well is gone into operation and to wait for self lift type semi girder offshore boring island operation reparation when stopping production, present offshore boring island resource-constrained, prospect pit, producing well workload are big, can't satisfy arrangement of time, and rent offshore boring island and will increase the oilfield operations cost greatly in the production platform workover treatment; Simultaneously, the well stimulation that need implement of no workover rig wellhead platform producing well also can't be carried out because of means are limited.For this reason, we do not have the workover rig wellhead platform at the offshore oil oil gas field and have carried out As-Is analysis, determine research, the light-duty modular type workover rig of moving of design 90t, can satisfy the workover treatment requirement of most oil gas wells, simultaneously, the loop wheel machine requirement of the above hoisting power of 10t (containing 10t) of each production platform common configuration is satisfied in the design of the weight of each module.
Summary of the invention
The purpose of this invention is to provide a kind of light-duty workover rig of moving, by ocean material supply ship is vehicle, satisfy resettlement between the oil production platforms that workover treatment load required, disposed the above hoisting power loop wheel machine of 10t (containing 10t), installation at existing oil and gas wellhead production platform spud leg enabling capabilities, it is big to overcome existing workover rig installation workload, the defective that needs large-scale floating crane to cooperate, save the oil field cost of investment, improve the utilization ratio of workover rig, thereby the workover treatment of the no workover rig production platform of realization requires and designs, builds.
Above-mentioned purpose is to be achieved by such scheme: the light-duty ocean workover rig of moving comprises a mobile seat guide rail, goes up compositions such as moving seat (rig floor), a dynamical system, winch assembly, and liquid gas circuit pipeline is with module arrangement, and the intermodule flexible pipe connects fast.To go up and move the direct seat of seat (rig floor) on the fixed guide that welds on the platform topsides deck, vertical mutually at the guide rail of upper bed-plate with the platform rail distribution arrangement, thus realize that the horizontal and vertical of workover rig moves, to arbitrary well location operation of platform.Each parts of workover rig all adopt modularized design, and the weight of individual module is no more than 8 tons.
According to the workover rig of said mechanism, simple in structure, complete machine is in light weight, can utilize Platform lifting devices to carry out dismounting and resettlement, improves the utilization ratio of workover rig.
The present invention compares with existing traditional ocean workover rig, and the advantage that it had is:
1. by the workover rig lower bottom base of type design, the direct seat of upper bed-plate is on the well head slide rail on the cancellation traditional sense.Because workover rig does not move seat down, designs simplification, complete machine is in light weight, satisfies horizontal and vertical mobile requirement.
2. rig floor structure and main removable workover rig adopt the little module design, and the individual module Weight control satisfies production platform 10t loop wheel machine Capability Requirement below 8t.Can utilize the loop wheel machine of platform to carry out dismounting, save the expense of renting large-scale floating crane, the property moved of workover rig, the utilization rate of raising workover rig, economy greatly improves.
3. can move movable part module and equipment and can disposable shipment finish, improve marine workover treatment efficient greatly with 6000 horsepowers of tugboats.
Description of drawings:
Fig. 1 is a front view of the present invention;
Fig. 2 is a vertical view of the present invention;
Fig. 3 is a lateral view of the present invention
Fig. 4 is the derrick of the present invention state diagram of falling;
Fig. 5 is part 1 detailed view of the present invention;
Fig. 6 is part 6 detailed views of the present invention;
Fig. 7 is part 5 detailed views of the present invention.
The specific embodiment
Workover rig of the present invention is described further according to erection sequence below in conjunction with accompanying drawing
Referring to Fig. 1, Fig. 2, this workover rig comprises a mobile seat guide rail 1, it is the structural member that is welded by shaped steel, stepped aperture (referring to Fig. 5) when having in groups rectangular to keep supplying above to move seat mobile, be placed on the deck rail guide piece 15, connect deck guide rail 15 and go up guide pad 16 and the latch segment 17 that moves between seat, the anterior module 2 of last mobile seat is lifted on the last mobile seat guide rail 1, last mobile seat rear module 3 is lifted on the last mobile seat guide rail 1, connect mobile anterior module 2 of seat and last mobile seat rear module 3 with bolt 18 nuts 19, supporting 4 before the derrick is fixed on the anterior module 2 of mobile seat, power plant module 5 is fastened on by bolt and moves on the anterior module 2 of seat, winch sledge 6 also is fixed on and moves on the seat power plant module 2, derrick base 7 is fixed on and moves on the seat rear module 3, and lift oil tank 8 is connected and moves on anterior module 2 of seat and the last mobile seat rear module 3; Derrick supports 10 and is connected with derrick body 9;
Referring to Fig. 2, aisle 11 and aisle 12 and the anterior module 2 of last mobile seat, rear module 3 are connected by bearing pin, power plant module 5 is connected by shaft coupling 20 with winch sledge 6, the rotating disk transmission system 21 that connection is made up of power transmission shaft, rig floor ladder 13, drilling rod slideway 14 are connected with last mobile seat rear module 3;
Referring to Fig. 4, derrick body 9 is placed on preceding support 4 of derrick and the derrick base 7, that puts on derrick body 9 and derrick base 7 is connected bearing pin 22, connect lift oil tank 8 and derrick body, derrick support 10 and derrick body 9, lift oil tank 8 work to the upright position, connect 9 jackings of derrick body the derrick body and are positioned at the derrick supporting seat that moves the seat rear module.Workover rig installation, the unloading process of workover rig are the inverse process of installing.
Main effect of the present invention:
1) the light-duty workover rig Structural module design, compact arrangement of equipment, cost of investment moved of 90t is low, at the bottom of production of hydrocarbons platform field conditional request, transportation and installation maneuverability, quick and easy need not to be equipped with in addition special transport boats and ships and marine large-scale floating crane, and operating cost is low.
2) realize that a cover workover rig to the oil gas field enforcement workover treatment of a plurality of no workover rig configurations, need not to call large-scale self-elevating drilling platform and implements workover treatment, reduce the oil gas field running cost, improve oil gas field production efficiency, have good economic benefit.
3) lay a good foundation for exploring the development investment threshold that reduces marginal oil field.
4) will for the measure of taping the latent power of similar simple and easy production of hydrocarbons platform is implemented, elimination downhole safety hidden danger etc. provides effective means, have comparatively widely dissemination.

Claims (4)

1. light-duty workover rig of moving of ocean 90t, form by last mobile seat guide rail, upward mobile seat, dynamical system, winch assembly, it is characterized in that each parts adopts the little module design, individual module weight is no more than 8t, liquid gas circuit pipeline is with module arrangement, the intermodule flexible pipe connects fast, and upward mobile directly seat is on the fixed guide that welds on the platform topsides deck, and it is vertical mutually with deck guide rail (15) distribution arrangement to become a upward mobile guide rail (1).
2. according to the light-duty workover rig of moving of the described ocean 90t of claim 1, it is characterized in that moving seat guide rail (1), it is the structural member that is welded by shaped steel, stepped aperture when having in groups rectangular to keep supplying above to move seat mobile, be placed on the deck rail guide piece (15), connect deck guide rail (15) and go up guide pad (16) and the latch segment (17) that moves between seat, the last mobile anterior module of seat (2) is lifted on the last mobile seat guide rail (1), last mobile seat rear module (3) is lifted on the last mobile seat guide rail (1), connect mobile seat anterior module (2) and last mobile seat rear module (3) with bolt (18) nut (19), supporting (4) before the derrick is fixed on the mobile anterior module of seat (2), power plant module (5) is fastened on by bolt and moves on the anterior module of seat (2), winch sledge (6) also is fixed on and moves on the seat power plant module (2), derrick base (7) is fixed on and moves on the seat rear module (3), and lift oil tank (8) is connected and moves on seat anterior module (2) and the last mobile seat rear module (3); Derrick supports (10) and is connected with derrick body (9).
3. according to the light-duty workover rig of moving of the described ocean 90t of claim 1, it is characterized in that aisle (11) is connected by bearing pin with last mobile seat anterior module (2), rear module (3) with aisle (12), power plant module (5) is connected by shaft coupling (20) with winch sledge (6), the rotating disk transmission system (21) that connection is made up of power transmission shaft, rig floor ladder (13), drilling rod slideway (14) are connected with last mobile seat rear module (3).
4. according to the light-duty workover rig of moving of the described ocean 90t of claim 1, it is characterized in that supporting on (4) and the derrick base (7) before derrick body (9) is placed on derrick, that puts on derrick body (9) and derrick base (7) is connected bearing pin (22), connect lift oil tank (8) and derrick body, derrick supports (10) and derrick body (9), lift oil tank (8) work to the upright position, connects derrick body (9) jacking the derrick body and is positioned at the derrick supporting seat that moves the seat rear module.
CN 201010214602 2010-06-23 2010-06-23 Conveyable light marine 90t workover rig Pending CN101942961A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010214602 CN101942961A (en) 2010-06-23 2010-06-23 Conveyable light marine 90t workover rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010214602 CN101942961A (en) 2010-06-23 2010-06-23 Conveyable light marine 90t workover rig

Publications (1)

Publication Number Publication Date
CN101942961A true CN101942961A (en) 2011-01-12

Family

ID=43435143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010214602 Pending CN101942961A (en) 2010-06-23 2010-06-23 Conveyable light marine 90t workover rig

Country Status (1)

Country Link
CN (1) CN101942961A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639894A (en) * 2016-12-27 2017-05-10 天时集团能源有限公司 Stepping type self-balancing derrick workover rig
CN108729856A (en) * 2012-04-17 2018-11-02 国民油井华高有限合伙公司 Drilling derrick construction system and the method for setting up drilling derrick
CN110593771A (en) * 2019-10-30 2019-12-20 宝鸡宏信石油机械有限公司 Novel petroleum drilling machine for sea heavy oil region artificial island well factory
CN111911084A (en) * 2020-07-14 2020-11-10 辽宁瀚石机械制造有限公司 Earth source hot water well drilling machine
CN112761533A (en) * 2020-12-30 2021-05-07 中油国家油气钻井装备工程技术研究中心有限公司 Derrick lifting oil cylinder turnover mechanism and turnover method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040226712A1 (en) * 2003-05-14 2004-11-18 Hood John Charles Portable memory device for mobile workover rig
CN2698968Y (en) * 2004-02-23 2005-05-11 中海石油(中国)有限公司天津分公司 Box type base of ocean well repairing machine
CN201273141Y (en) * 2008-09-04 2009-07-15 中国石化集团江汉石油管理局第四机械厂 Self-tightening rope type drilling workover rig
CN201794516U (en) * 2010-06-23 2011-04-13 中国海洋石油总公司 Light-weight removable 90-ton workover rig in sea

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040226712A1 (en) * 2003-05-14 2004-11-18 Hood John Charles Portable memory device for mobile workover rig
CN2698968Y (en) * 2004-02-23 2005-05-11 中海石油(中国)有限公司天津分公司 Box type base of ocean well repairing machine
CN201273141Y (en) * 2008-09-04 2009-07-15 中国石化集团江汉石油管理局第四机械厂 Self-tightening rope type drilling workover rig
CN201794516U (en) * 2010-06-23 2011-04-13 中国海洋石油总公司 Light-weight removable 90-ton workover rig in sea

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729856A (en) * 2012-04-17 2018-11-02 国民油井华高有限合伙公司 Drilling derrick construction system and the method for setting up drilling derrick
CN106639894A (en) * 2016-12-27 2017-05-10 天时集团能源有限公司 Stepping type self-balancing derrick workover rig
CN106639894B (en) * 2016-12-27 2018-08-14 天时集团能源有限公司 Step-by-step movement self-balancing derrick workover rig
CN110593771A (en) * 2019-10-30 2019-12-20 宝鸡宏信石油机械有限公司 Novel petroleum drilling machine for sea heavy oil region artificial island well factory
CN110593771B (en) * 2019-10-30 2024-06-07 宝鸡宏信石油机械有限公司 Novel petroleum drilling machine for artificial island well factory in sea area thick oil region
CN111911084A (en) * 2020-07-14 2020-11-10 辽宁瀚石机械制造有限公司 Earth source hot water well drilling machine
CN111911084B (en) * 2020-07-14 2022-06-10 辽宁瀚石机械制造有限公司 Earth source hot water well drilling machine
CN112761533A (en) * 2020-12-30 2021-05-07 中油国家油气钻井装备工程技术研究中心有限公司 Derrick lifting oil cylinder turnover mechanism and turnover method thereof
CN112761533B (en) * 2020-12-30 2024-02-06 中油国家油气钻井装备工程技术研究中心有限公司 Derrick lifting oil cylinder overturning mechanism and overturning method thereof

Similar Documents

Publication Publication Date Title
CN105203301B (en) A kind of day car owner passively combines heave compensation experimental rig
CN102127899B (en) System for lifting and sliding large-tonnage steel box girder in land area and shoal area and construction method thereof
CN104444840B (en) Mining hydraulic boom hoisting
CN106381870B (en) A kind of deep concrete mixture ship pile frame system and pile making method
DE69928112D1 (en) HYDRAULIC PETROLEUM PLANT
CN101942961A (en) Conveyable light marine 90t workover rig
CN204532126U (en) Supporting platform module drilling machine
CN102337736A (en) Installation process of upper module on offshore oil platform
CN201794516U (en) Light-weight removable 90-ton workover rig in sea
CN202557745U (en) Multifunctional wind power engineering catamaran for offshore high-altitude heavy-load hoisting and installation operation
CN101774511B (en) Climbing type hoist and using method thereof
CN102720432A (en) Self-propelled underground boring jumbo
CN201874475U (en) Low-position installation sleeve-type derrick
CN104805821A (en) Self-elevating platform for compressing offshore oil field gas
CN102582786A (en) Building process for deep sea spar platform
CN103359626A (en) Marine riser crane
CN102514690A (en) Multifunctional twin-hull wind power engineering ship for offshore high-altitude heavy-duty lifting installation operation
CN113581416B (en) Tie-back device for installing multiple steel catenary risers on single side
CN206174871U (en) From installing module ization ocean drilling rig
CN201151904Y (en) Large-sized pile leg structure pulling and moving chute device for water borne mounting
CN102206938A (en) Novel method for installing upper part block of offshore platform
CN206279527U (en) A kind of deep concrete mixture ship pile frame system
CN102190072B (en) Intertidal zone self-elevating self-propelled type work boat
CN201610054U (en) Intertidal zone self-elevating self-propelled type work boat
CN102704952B (en) Self-propelled tunnel grouting trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110112