CN112031172B - Reverse assembly method for container prefabricated house - Google Patents

Reverse assembly method for container prefabricated house Download PDF

Info

Publication number
CN112031172B
CN112031172B CN202010894490.XA CN202010894490A CN112031172B CN 112031172 B CN112031172 B CN 112031172B CN 202010894490 A CN202010894490 A CN 202010894490A CN 112031172 B CN112031172 B CN 112031172B
Authority
CN
China
Prior art keywords
container
positioning
house
roof
upright post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010894490.XA
Other languages
Chinese (zh)
Other versions
CN112031172A (en
Inventor
吴云飞
陈海生
杨佳华
夏明�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202010894490.XA priority Critical patent/CN112031172B/en
Publication of CN112031172A publication Critical patent/CN112031172A/en
Application granted granted Critical
Publication of CN112031172B publication Critical patent/CN112031172B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34384Assembling details for foldable, separable, collapsible or retractable structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Abstract

The invention discloses an assembling method of a container prefabricated house structure, which adopts a reverse assembling method from top to bottom to fix a vertical column fast positioning, aligning and fixing device in the ground or a pit; when assembling, firstly, the upright post of the container portable house is placed on the quick positioning, aligning and fixing device of the upright post for positioning and verticality, then the roof of the container portable house is hung above the upright post, and the orientation is adjusted; connecting the upright post with the roof; and the crane lifts the hook to lift the roof upright post assembly to the bottom plate and connect the upright posts and the bottom plate into a whole. The method does not need to frequently move and carry operation ladders and the like during assembly, and improves the assembly efficiency. The vertical columns are vertically fixed according to the size of the container by using the vertical column quick positioning, aligning and fixing device, the direction and the position of a roof component only need to be simply adjusted during assembly, and manual matching in-place work during assembly is reduced. The method can install the components such as the fixing groove on the top of the light partition wall of the container movable board house and the like together, reduce the workload of the roof area of the subsequent construction and accelerate the speed.

Description

Reverse assembly method for container prefabricated house
Technical Field
The invention belongs to the technical field of container prefabricated houses, and particularly relates to a reverse assembling method of a container prefabricated house.
Background
The container prefabricated house is similar to a container in structural size and appearance, is composed of a light steel structural frame and a sandwich color steel plate wall, is used as an office, a temporary dormitory and other facilities in temporary engineering in recent years, and is constructed in a fire mountain hospital in 2020 new crown epidemic situation, so that the advantages of high construction speed, flexible assembly and convenience in combination are further exhibited.
The frame structure of the container prefabricated house comprises a bottom plate, a stand column and a roof, internal threads are tapped at bolt connecting holes at the roof and the bottom plate and are connected into a whole by bolts and the stand column, at present, when the container prefabricated house is assembled, a construction method adopts screws at the lower end of the fixed stand column on the bottom plate, then the roof is hung to the top end of the stand column, and screws at the upper end of the fixed stand column form a whole.
The height of the container prefabricated house is about 3m, the height of the middle upright post is about 2.7m, at present, the assembly mode of the container prefabricated house adopts the assembly mode from bottom to top, namely, the bottom plate of the container prefabricated house is paved → the installation of the upright posts and the bottom plate connecting bolts → the lifting of the roof to the top end of the upright posts → the installation of the upright posts and the roof connecting bolts → the completion of the frame installation, and the lifting is carried to the field for assembly. In such an operation flow, there are the following problems:
1) when the upright post and the bottom plate are installed manually, people are needed to cooperate with the upright post to centralize the bolt holes to align, then the connecting bolts are installed, after the upright post and the bottom plate are fixed, the verticality slightly deviates, and when the upright post and the roof connecting bolt are installed, an operator is needed to perform adjustment processing in the air;
2) the height of the upright column is 2.7m, when the upright column and the roof connecting bolt are installed, an operator can operate the upright column and the roof connecting bolt only by standing on a ladder or an operation platform, the operator needs to move the ladder or the operation platform to the bottom plate, after the upright column and the roof connecting bolt are installed, the ladder or the operation platform needs to be moved out before the frame is hoisted, and too many measures are taken in the working procedure.
In normal engineering, the assembling quantity of the container prefabricated houses is small, the construction period requirement is relatively loose, and the construction according to the schedule cannot be influenced. However, in epidemic situations, the construction of an emergency hospital needs to be carried out in time of seconds, the assembly of the container prefabricated house frame is taken as the first installation procedure, conditions must be created for subsequent construction as soon as possible, and a faster and better assembly method of the container prefabricated house becomes a necessary requirement.
Disclosure of Invention
The invention aims to provide an assembling method of a container prefabricated house.
The technical scheme adopted by the invention for solving the technical problems is as follows:
a method for assembling the movable plate house structure of container includes such steps as assembling the roof of movable plate house with the vertical columns of movable plate house to form a combined roof-column, and connecting the combined roof-column with the bottom plate of movable plate house.
The assembling method of the container prefabricated house structure specifically comprises the following steps:
(1) positioning according to the size of the container prefabricated house, leveling on the ground, pouring upright columns to quickly position and align the foundation of the fixing device, and arranging an operation platform which does not need to be moved;
(2) according to the size of the container prefabricated house, the fixed upright posts are quickly positioned, aligned and fixed;
(3) when the container portable house is assembled, firstly, the upright post of the container portable house is placed on the upright post rapid positioning, aligning and fixing device, the positioning and the verticality of the upright post of the container portable house are ensured by using the device, then, the roof of the container portable house is hung above the upright post of the container portable house by a crane and is adjusted to a required position;
(4) the upright post of the container prefabricated house and the roof of the container prefabricated house are firmly connected by a connecting piece;
(5) the crane rises the hook once more, hangs the roof stand combination body to container activity board house bottom plate on, assembles the operation personnel and operates on container activity board house bottom plate, uses bolted connection with container activity board house stand and container activity board house bottom plate, forms container activity board house frame wholly.
The assembling method of the container prefabricated house structure can also change the step (1) into the following steps: the method is characterized in that a vertical column auxiliary assembly pit is dug under the ground, the pit depth is determined according to the proper height of an assembly operator capable of standing on the ground to complete the assembly operation of the vertical column and the roof, a container prefabricated house vertical column quick positioning, aligning and fixing device is fixed at the pit bottom, and a backfill leveling hardened ground layer is used as an operation area of the assembly operator. Both methods overcome the defects of frequent transportation and movement of the traditional method using a ladder and the like.
According to the assembling method of the container prefabricated house structure, the upright post rapid positioning, aligning and fixing device comprises a bottom plate, at least two outer positioning wheel assemblies and a spring clamping wheel assembly, wherein the outer positioning wheel assemblies are connected to the bottom plate and are perpendicular to each other, and the spring clamping wheel assembly is positioned on the inner side of the outer positioning wheel assembly and is used for clamping.
The assembling method of the container prefabricated house structure comprises the steps that at least two spring clamping wheel assemblies are arranged, a rectangular space is defined by the spring clamping wheel assemblies and the outer side positioning wheel assemblies, the outer side positioning wheel assemblies are used for fixing the two outer sides of the rectangular space, and the spring clamping wheel assemblies are used for tightly pushing the two inner sides of the rectangular space.
According to the assembling method of the container prefabricated house structure, the outer side positioning wheel assembly comprises the positioning wheel upright post, the positioning wheel shaft and the positioning wheel, the positioning wheel upright post is connected to the bottom plate, two ends of the positioning wheel shaft are respectively connected to two opposite sides of the top of the positioning wheel upright post, and the positioning wheel is rotatably connected to the positioning wheel shaft.
According to the assembling method of the container prefabricated house structure, the spring clamping wheel assembly comprises the elastic clamping wheel stand column, the clamping wheel shaft and the clamping wheel, the elastic clamping wheel stand column is connected to the bottom plate, two ends of the clamping wheel shaft are respectively connected to two opposite sides of the top of the elastic clamping wheel stand column, and the clamping wheel is rotatably connected to the clamping wheel shaft.
In the assembling method of the container prefabricated house structure, the number of the clamping wheel shafts and the number of the clamping wheels are two, and the clamping wheel shafts are respectively connected to the top and the middle lower part of the elastic clamping wheel upright post.
According to the assembling method of the container prefabricated house structure, the vertical column quick positioning, aligning and fixing device further comprises a bottom positioning block, wherein a right-angle groove is formed in the bottom positioning block and used for supporting two sides of the outer side of the L-shaped vertical column.
In the assembling method of the container prefabricated house structure, the elastic clamping wheel column piece is made of spring steel.
According to the assembling method of the container prefabricated house structure, the outer positioning wheel assembly is fixedly connected to the bottom plate, and the spring clamping wheel assembly is detachably connected to the bottom plate.
In the assembling method of the container prefabricated house structure, the connecting piece in the steps (4) and (5) is a fixing bolt.
In the assembling method of the container prefabricated house structure, 4 vertical column quick positioning, aligning and fixing devices are arranged and are respectively used for fixing four corners of the container prefabricated house.
In the assembling method of the container prefabricated house structure, the elastic clamping wheel upright post is composed of two elastic clamping wheel upright post pieces.
The invention uses the rapid positioning, aligning and fixing device of the upright column as a construction auxiliary tool.
The invention has the beneficial effects that:
(1) the assembly of the container prefabricated house is carried out by adopting a mode of reversely assembling from top to bottom.
(2) The method for assembling the container prefabricated house has the advantages that the assembling operation personnel do not need to frequently move the temporary operation ladder and the operation platform during the assembling operation of the container prefabricated house, and do not need to carry the operation ladder or the operation platform, so that the assembling construction operation intensity is reduced, and the assembling efficiency is improved. The method is particularly suitable for emergency construction scenes of a large number of container prefabricated house combined buildings.
(3) The vertical column can be vertically fixed according to the size of the container prefabricated house by using the vertical column quick positioning, aligning and fixing device, the roof member direction and the position can be simply adjusted when the roof member is assembled, the vertical column adjustment is not needed, and the manual matching in-place work during the assembly is reduced.
(4) On the basis of the method, the components such as the top fixing groove of the light partition wall of the container movable board house and the like can be installed together during assembly, the workload of semi-overhead operation at the roof of subsequent construction is reduced, and the construction speed of the whole building is accelerated.
(5) By adopting the method, emergency hospitals and the like have tight time requirements during epidemic, and a large amount of container prefabricated houses are assembled and constructed for engineering application, so that the assembling speed of the container prefabricated houses can be effectively increased by more than 10%, and the overall construction speed can be further increased.
Drawings
The invention is described in detail below with reference to the accompanying drawings:
FIG. 1 is a schematic view of a device for rapidly positioning, aligning and fixing a column on a ground layer according to the present invention;
FIG. 2 is a schematic diagram of the embodiment of the present invention for assembling the vertical columns and the roof when the vertical column quick positioning, aligning and fixing device is installed on the ground;
FIG. 3 is a schematic view of the operation of hoisting the roof-upright-column assembly to the bottom plate after the assembly of the roof-upright-column assembly is completed when the quick positioning, aligning and fixing device for the upright columns is arranged on the ground;
FIG. 4 is a schematic view of the assembly of the roof and the upright post assembly and the base plate when the present invention is installed with the upright post quick positioning and aligning fixture on the ground;
FIG. 5 is a schematic view of the present invention with the vertical post auxiliary assembly pit arranged to position, align and fix the vertical post quickly underground;
FIG. 6 is a schematic diagram of the present invention showing a worker assembling a roof and a pillar on the ground when the pillar is used to fix the pillar in the assembly pit;
FIG. 7 is a schematic view of the assembly of the roof and the upright post assembly and the bottom plate when the upright post is used for fixing the upright post in the auxiliary assembly pit according to the present invention;
FIG. 8 is a schematic perspective view of the device for rapidly positioning, aligning and fixing the vertical column;
FIG. 9 is a top plan view of FIG. 8;
FIG. 10 is a schematic view of the structure of the column of the present invention inserted into the column positioning and aligning fixture;
FIG. 1-upright; 2-a roof; 3-a bottom plate; 4-a vertical column quick positioning, aligning and fixing device; 5-operating platform without moving; 6-column auxiliary assembly pit; 7-splicing operation personnel; 8-positioning wheel upright column; 9-positioning the wheel shaft; 10-a positioning wheel; 11-a base plate; 12-elastic clamping wheel column piece; 13-clamping the wheel shaft; 14-a clamping wheel; 15-positioning block.
Detailed Description
Example 1
A method for assembling a container prefabricated house structure adopts a reverse assembling mode from top to bottom, firstly, a roof 2 of the container prefabricated house and upright posts 1 of the container prefabricated house are assembled together to form a roof upright post assembly, and then the roof upright post assembly and a bottom plate 3 of the container prefabricated house are connected into a whole.
Example 2
Based on embodiment 1, embodiment 2 further defines the above assembling method for the container prefabricated house structure, and specifically includes the following steps:
(1) as shown in fig. 1, a proper position is selected in an engineering field to be used as a centralized splicing operation position of the container portable house, the container portable house is positioned according to the size of the container portable house, the ground is leveled, the upright post is poured, the fixing device foundation is quickly positioned and aligned, and an operation platform 5 which does not need to be moved is arranged;
(2) referring to fig. 2, the vertical column is fixed at a proper position according to the installation operation requirement of the vertical column to fix the vertical column fast positioning and aligning fixing device 4. Of course, the quick positioning, aligning and fixing device is not needed, but the crane and the assembling operator need to be matched and adjusted for many times, and the invention is simpler and more labor-saving. The quick location alignment fixing device of stationary mast 4 can only be 4 for the four corners of container activity board house, if the container activity board house stand uses more, correspondingly increase the stand quick location alignment fixing device 4 the quantity can.
(3) When the container portable house is assembled, firstly, the upright post 1 of the container portable house is placed on the upright post quick positioning, aligning and fixing device 4, the positioning and the verticality of the upright post 1 of the container portable house are ensured by using the device, then, a roof 2 of the container portable house is hung above the upright post 1 of the container portable house by a crane and is adjusted to a required position, and an assembling operator stands on an operation platform 5 which does not need to be moved for assembling;
(4) the upright post 1 of the container portable house and the roof 2 of the container portable house are firmly connected by a connecting piece; the connecting piece can be a fixing bolt, and other connecting pieces which can achieve corresponding effects in the prior art can also be used.
(5) The loop wheel machine rises the hook once more, hangs roof stand combination body to container activity board house bottom plate 3 on, assembles operation personnel 7 and operates on container activity board house bottom plate 3, uses the connecting piece to connect container activity board house stand 1 and container activity board house bottom plate 3, forms container activity board house frame wholly. The connecting piece can be a fixing bolt, and other connecting pieces which can achieve corresponding effects in the prior art can also be used.
Example 3
Based on embodiment 1, embodiment 3 provides an assembling method different from embodiment 2, and further defines the assembling method of the container prefabricated house structure, and specifically includes the following steps:
(1) selecting a proper position in an engineering field to serve as a centralized assembling operation position of the container portable house, positioning according to the size of the container portable house, arranging a stand column auxiliary assembling pit 6 at the assembling position, fixing a stand column quick positioning, aligning and fixing device 4 at the bottom of the pit, and backfilling, compacting or hardening the ground to serve as an assembling operation personnel activity area.
(2) The assembly operation personnel can insert the stand column into the stand column quick alignment device 4 in the stand column auxiliary assembly pit 6 on the ground to realize the fixation of the stand column.
(3) The crane lifts the container movable plate house roof 2 to the top end of the upright post, and the assembling operators lift up on the ground to complete the bolt fixation of the upright post and the roof.
(4) After the container prefabricated house upright post and the container prefabricated house roof are assembled, the roof upright post assembly is vertically lifted out of the upright post auxiliary assembling pit 6 and then placed on the container prefabricated house bottom plate 3, and the container prefabricated house upright post and the container prefabricated house bottom plate are connected through bolts. In the whole operation process, the assembly operation personnel operate at the ground height without devices such as ladders and operation platforms.
This embodiment is provided as a preferred embodiment of the present invention.
Example 4
The invention discloses a quick aligning device for a container prefabricated house upright post, which is an auxiliary device used for reducing manual operation and improving construction efficiency in the implementation of the invention.
A quick positioning, aligning and fixing device for a container prefabricated house upright column comprises a bottom plate 3, a bottom positioning block 15, an outer side positioning wheel assembly and a spring clamping wheel assembly. The outside positioning wheel assembly comprises a positioning wheel upright post 8, a positioning wheel shaft 9 and a positioning wheel 10, the positioning wheel upright post 8 is connected to the bottom plate 11, two ends of the positioning wheel shaft 9 are respectively connected to two sides of the top of the positioning wheel upright post 8, and the positioning wheel 10 is rotatably connected to the positioning wheel shaft 9. The spring clamping wheel assembly comprises two elastic clamping wheel upright pieces, two clamping wheel shafts 13 and two clamping wheels 14, the two elastic clamping wheel upright pieces are connected to the bottom plate 11, the two clamping wheel shafts 13 are respectively connected to the middle lower part and the top of the two elastic clamping wheel upright pieces 12, and the two clamping wheels 14 are rotatably connected to the two clamping wheel shafts 13. Bottom locating piece 15 welds on bottom plate 11, locating piece 15 is "L" type, inboard both sides are used for fixing a position container activity board house L type stand outside both sides, the interior limit of locating piece is on a perpendicular with the interior contact point of outside positioning wheel, the outside positioning wheel passes through rigid positioning wheel stand 8 with the bottom plate and is connected, two upper and lower spring chucking wheels 14 pass through the chucking shaft and fix on elasticity chucking wheel stand piece, the lower round position is less than the height of outside positioning wheel, it is the same with outside positioning wheel height to go up round position, its position slightly squints to the stand region, make the size between the positioning wheel slightly be less than the stand size. When the number of the container prefabricated house upright columns is 4, correspondingly, 4 upright column quick positioning, aligning and fixing devices are arranged.
The bottom positioning block 15 is positioned on the bottom plate 11 and used for fixing the bottom end of the L-shaped upright post of the container prefabricated house, the outer side positioning wheel 10 is used for controlling the outer side verticality of the L-shaped upright post of the container prefabricated house, and the spring clamping wheel assembly comprises an upper spring clamping wheel 14 and a lower spring clamping wheel 14.
When the stand is inserted, the outside positioning wheel 10 can guarantee that the stand 1 freely moves downwards, the bottom positioning block 15 is positioned at the bottom of the stand to guarantee that the stand does not deviate outwards, the spring clamping wheel tightly pushes the stand to the side of the positioning wheel through the stress of the stand piece of the spring clamping wheel, the bottom positioning block and the outside positioning wheel of the stand guarantee the verticality of the stand, the spring steel of the clamping wheel guarantees that the stand is clamped not to be inclined, the design of the wheel guarantees that the stand freely moves up and down, and the surface coating of the stand is not damaged by lifting.
As shown in figures 9 and 10, the upright post of the container prefabricated house is L-shaped, the positioning wheels of the device are arranged corresponding to the L-shaped upright post, two sides of the L-shaped upright post are fixed, and the spring clamping wheels are used for fixing the end part of the L-shaped upright post. As shown in fig. 10, when the stand column is inserted, the outer side positioning wheel can ensure the stand column to move freely downwards, the guiding function is realized, the positioning block is used for positioning the outer side of the bottom of the stand column, the stand column is ensured not to be deviated outwards, the spring clamping wheel tightly pushes the stand column to the side of the positioning wheel through the stress of the elastic clamping wheel stand column sheet, the verticality of the stand column is ensured by the bottom positioning block and the outer side positioning wheel of the stand column, the elastic clamping wheel stand column sheet of the clamping wheel ensures that the stand column is not clamped to be inclined, the design of the wheel ensures that the stand column freely moves up and down, and the surface coating of the stand column is not damaged by lifting. The upright post rapid positioning, aligning and fixing device 4 is arranged at an upright post auxiliary assembly pit or an operation platform which does not need to be moved, can ensure the verticality of the upright post 1 and the size positioning of the platform, enables a person to conveniently operate the upright post top connecting position to connect the upright post 1 and the roof 2 without the height of the movable operation platform 5 or the depth of the upright post auxiliary assembly pit, and finally integrally hoists the upright post 1 and the roof 2 to the bottom plate 11.

Claims (4)

1. The assembling method of the container prefabricated house structure is characterized in that a reverse assembling mode from top to bottom is adopted, firstly, a roof of the container prefabricated house and upright posts of the container prefabricated house are assembled together to form a roof upright post assembly, and then the roof upright post assembly and a bottom plate of the container prefabricated house are connected into a whole, and the assembling method specifically comprises the following steps:
(1) positioning according to the size of the container prefabricated house, leveling on the ground, pouring upright columns to quickly position and align the foundation of the fixing device, and arranging an operation platform which does not need to be moved;
(2) the fixing device is used for quickly positioning, aligning and fixing the upright column;
(3) placing the container portable house upright column on the upright column quick positioning, aligning and fixing device, ensuring the positioning and the verticality of the container portable house upright column by using the device, then hoisting the container portable house roof to the upper part of the container portable house upright column by using a crane, and adjusting the container portable house upright column to a required position;
(4) the upright post of the container prefabricated house and the roof of the container prefabricated house are firmly connected by a connecting piece;
(5) the crane is hooked again, the roof upright post combination body is hoisted to the container portable plank house bottom plate, the assembly operation personnel operates on the container portable plank house bottom plate, and the container portable plank house upright post and the container portable plank house bottom plate are connected by a connecting piece to form a container portable plank house frame whole body;
the device comprises a bottom plate, at least two outer positioning wheel assemblies and a spring clamping wheel assembly, wherein the outer positioning wheel assemblies are connected to the bottom plate and are perpendicular to each other;
the spring clamping wheel assemblies are at least two, a rectangular space is defined by the spring clamping wheel assemblies and the outer positioning wheel assemblies, the outer positioning wheel assemblies are used for fixing two outer sides of the rectangular space, and the spring clamping wheel assemblies are used for tightly propping two inner sides of the rectangular space;
the outer positioning wheel assembly comprises a positioning wheel stand column, a positioning wheel shaft and a positioning wheel, the positioning wheel stand column is connected to the bottom plate, two ends of the positioning wheel shaft are respectively connected to two opposite sides of the top of the positioning wheel stand column, and the positioning wheel is rotatably connected to the positioning wheel shaft;
the spring clamping wheel assembly comprises an elastic clamping wheel stand column, a clamping wheel shaft and a clamping wheel, the elastic clamping wheel stand column is connected to the bottom plate, two ends of the clamping wheel shaft are respectively connected to two opposite sides of the top of the elastic clamping wheel stand column, and the clamping wheel is rotatably connected to the clamping wheel shaft.
2. The assembly method of the container prefabricated house structure according to claim 1, wherein the step (1) is as follows: the method comprises the steps of positioning according to the size of a container prefabricated house, leveling on the ground, pouring a stand column quick positioning and aligning fixing device foundation, digging a stand column auxiliary assembly pit under the ground, and fixing the stand column quick positioning and aligning fixing device at the bottom of the pit.
3. The method for assembling a container prefabricated house structure according to claim 1, wherein two clamping wheel shafts and two clamping wheels are respectively arranged, and the clamping wheel shafts are respectively connected to the top and the middle lower parts of the elastic clamping wheel upright columns.
4. The method as claimed in claim 1, wherein the device for quickly positioning, aligning and fixing the columns further comprises a bottom positioning block, and the bottom positioning block is provided with a right-angle groove.
CN202010894490.XA 2020-08-31 2020-08-31 Reverse assembly method for container prefabricated house Active CN112031172B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010894490.XA CN112031172B (en) 2020-08-31 2020-08-31 Reverse assembly method for container prefabricated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010894490.XA CN112031172B (en) 2020-08-31 2020-08-31 Reverse assembly method for container prefabricated house

Publications (2)

Publication Number Publication Date
CN112031172A CN112031172A (en) 2020-12-04
CN112031172B true CN112031172B (en) 2022-03-22

Family

ID=73586557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010894490.XA Active CN112031172B (en) 2020-08-31 2020-08-31 Reverse assembly method for container prefabricated house

Country Status (1)

Country Link
CN (1) CN112031172B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112922352B (en) * 2021-02-01 2022-07-15 青岛穗禾集成房屋有限公司 Construction and assembly method for light steel structure prefabricated house

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1609434A1 (en) * 1966-03-28 1970-05-06 Arpad Kolozsvary Component and space enclosure formed from this component
CN202227696U (en) * 2011-10-14 2012-05-23 中国二十二冶集团有限公司 Fabricated concrete structural sleeve fixing device
CN106348170B (en) * 2016-08-29 2017-10-20 中车长春轨道客车股份有限公司 EMUs headwall column is lifted and positioning assisting tooling
CN106522373B (en) * 2016-11-30 2018-10-23 中国一冶集团有限公司 multi-layer container house construction method
CN106677349B (en) * 2017-03-17 2022-04-12 中国人民解放军32181部队 Modular combined movable house and building method

Also Published As

Publication number Publication date
CN112031172A (en) 2020-12-04

Similar Documents

Publication Publication Date Title
KR19990072014A (en) Lift-up method for building buildings from above to the ground
KR102115380B1 (en) Hydraulic slipform safety locking device and virtical structure and slab construction method using the same
CN112031172B (en) Reverse assembly method for container prefabricated house
CN109057309B (en) Suspension type operating platform and assembling and disassembling method thereof
KR100475544B1 (en) Wall form climbing system for constructing concrete wall of high-rise buldings
KR200366291Y1 (en) Wall form climbing system for constructing concrete wall of high-rise buldings
KR102156971B1 (en) Gang form lifting device and outdoor wall construction method of building using the same
JP3453181B2 (en) Working steel stand and method of assembling tower-like structure using the working steel stand
CN113788383B (en) Jacking process and jacking mechanism for existing house with additionally-installed elevator
JPH03125755A (en) Constructing method for cylindrical multistoried structure
CN220412648U (en) Lifting appliance for building construction
CN216889835U (en) Device for fixing bearing steel beam of internal climbing tower crane
CN110847616B (en) Method for mounting large-volume steel frame flue
CN215801666U (en) Pit module strutting arrangement
CN219472110U (en) Shaft formwork sliding formwork
CN214091082U (en) Road lighting base embedded part positioning device
CN110759237B (en) Hoisting method
CN210457366U (en) High-rise ALC wallboard corollary equipment
JP2946372B2 (en) Construction method of structure
WO2000070159A1 (en) Building and building system
CN114772439A (en) Installation method of large oil cylinder
JP3002054U (en) Tower crane with multiple main columns as tower mast
JP2590671B2 (en) Construction method of steel frame using overhead crane frame
CN112554580A (en) Road lighting base embedded part positioning device
JPH04323467A (en) Building method for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant