CN214008277U - Steel construction engineering construction pipeline laying device - Google Patents

Steel construction engineering construction pipeline laying device Download PDF

Info

Publication number
CN214008277U
CN214008277U CN202023046007.7U CN202023046007U CN214008277U CN 214008277 U CN214008277 U CN 214008277U CN 202023046007 U CN202023046007 U CN 202023046007U CN 214008277 U CN214008277 U CN 214008277U
Authority
CN
China
Prior art keywords
pipeline
fixedly connected
cylinder
laying device
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023046007.7U
Other languages
Chinese (zh)
Inventor
涓ョゥ
严祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Hongye Heavy Industry Co ltd
Original Assignee
Nantong Hongye Heavy Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Hongye Heavy Industry Co ltd filed Critical Nantong Hongye Heavy Industry Co ltd
Priority to CN202023046007.7U priority Critical patent/CN214008277U/en
Application granted granted Critical
Publication of CN214008277U publication Critical patent/CN214008277U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a steel construction engineering construction pipeline laying device, including the base, the support frame fixedly connected with rodless cylinder is passed through at the base top, and the bottom fixedly connected with fixed plate of rodless cylinder movable block, the equal fixedly connected with electric putter in the left and right sides of fixed plate bottom, and electric putter's below is equipped with first half drum, the utility model relates to a steel construction engineering construction technical field. This steel construction engineering construction pipeline laying device, it makes first half drum and second half drum fold with the pipeline centre gripping to rotate to drive the threaded rod through the motor and rotate, position about reciprocating motion adjusts the pipeline through rodless cylinder, position about through two electric putter lift adjustment pipeline, and through two electric putter lift adjustment pipeline inclination, the pipeline butt joint under the adaptation complex environment, the suitability of equipment has been improved, and through the setting of ball, the pipeline has been made things convenient for droing, the damage of friction to the pipeline surface has been reduced.

Description

Steel construction engineering construction pipeline laying device
Technical Field
The utility model relates to a steel construction engineering construction technical field specifically is a steel construction engineering construction pipeline laying device.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and adopts rust removing and preventing processes of silanization, pure manganese phosphating, washing drying, galvanization and the like, and all the members or parts are usually connected by welding seams, bolts or rivets. Because of its dead weight is lighter, and the construction is simple and convenient, wide application in fields such as large-scale factory building, venue, super high-rise, need lay the pipeline during current steel construction engineering construction, for this reason, the utility model provides a steel construction engineering pipeline laying device.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a steel construction engineering construction pipe laying device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a steel structure engineering construction pipeline laying device comprises a base, wherein the top of the base is fixedly connected with a rodless cylinder through a support frame, the bottom of the movable block of the rodless cylinder is fixedly connected with a fixed plate, the left side and the right side of the bottom of the fixed plate are both fixedly connected with electric push rods, a first semi-cylinder is arranged below the electric push rod, a second semi-cylinder is arranged below the first semi-cylinder, the front side and the rear side of the first semi-cylinder and the second semi-cylinder are both fixedly connected with a folding plate, the periphery of the top of the first semi-cylinder is fixedly connected with a motor through a supporting frame, the bottom end of an output shaft of the motor is fixedly connected with a threaded rod through a coupler, and the bottom of the threaded rod penetrates through and extends to the lower part of the folding plate, the bottom end of the threaded rod is fixedly connected with a limiting ring, and the inner walls of the first semi-cylinder and the second semi-cylinder are connected with a plurality of balls in a rolling manner.
Preferably, the periphery of the base is fixedly connected with universal wheels.
Preferably, the bottom end of the output shaft of the electric push rod is hinged with the top of the first semi-cylinder.
Preferably, the periphery of the threaded rod is in threaded connection with the penetrating position of the folding plate.
Advantageous effects
The utility model provides a steel construction engineering construction pipeline laying device. Compared with the prior art, the method has the following beneficial effects:
this steel construction engineering construction pipeline laying device, it makes first half drum and second half drum fold with the pipeline centre gripping to rotate to drive the threaded rod through the motor and rotate, position about reciprocating motion adjusts the pipeline through rodless cylinder, position about through two electric putter lift adjustment pipeline, and through two electric putter lift adjustment pipeline inclination, the pipeline butt joint under the adaptation complex environment, the suitability of equipment has been improved, and through the setting of ball, the pipeline has been made things convenient for droing, the damage of friction to the pipeline surface has been reduced.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a cross-sectional view of the first semi-cylinder and the second semi-cylinder of the present invention.
In the figure: 1. a base; 2. a rodless cylinder; 3. a fixing plate; 4. an electric push rod; 5. a first half cylinder; 6. a second semi-cylinder; 7. folding the plates; 8. a motor; 9. a threaded rod; 10. a limiting ring; 11. a ball bearing; 12. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a steel structure engineering construction pipeline laying device comprises a base 1, universal wheels 12 are fixedly connected around the base 1, a rodless cylinder 2 is fixedly connected to the top of the base 1 through a support frame, a fixed plate 3 is fixedly connected to the bottom of a movable block of the rodless cylinder 2, electric push rods 4 are fixedly connected to the left side and the right side of the bottom of the fixed plate 3, a first half cylinder 5 is arranged below the electric push rods 4, the bottom end of an output shaft of the electric push rods 4 is hinged to the top of the first half cylinder 5, a second half cylinder 6 is arranged below the first half cylinder 5, closure plates 7 are fixedly connected to the front side and the rear side of the first half cylinder 5 and the front side and the rear side of the second half cylinder 6, a motor 8 is fixedly connected to the periphery of the top of the first half cylinder 5 through the support frame, a threaded rod 9 is fixedly connected to the bottom end of an output shaft of the motor 8 through a coupler, and the bottom end of the threaded rod 9 penetrates and extends to the lower side of the closure plates 7, the periphery of threaded rod 9 is threaded connection with the department of running through of folding board 7, the bottom fixedly connected with spacing ring 10 of threaded rod 9, and the equal roll connection of the inner wall of first half drum 5 and second half drum 6 has a plurality of balls 11, it rotates to drive threaded rod 9 through motor 8 and rotates and make first half drum 5 and second half drum 6 fold with the pipeline centre gripping, position about reciprocating motion regulation pipeline about through rodless cylinder 2, position about through two electric putter 4 lift adjustment pipeline, and through two electric putter 4 lift adjustment pipeline inclination, the adaptation is the pipeline butt joint under the complex environment, the suitability of equipment has been improved, and setting through ball 11, make things convenient for droing of pipeline, the damage of friction to the pipeline surface has been reduced.
And those not described in detail in this specification are well within the skill of those in the art.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a steel construction engineering construction pipe laying device, includes base (1), its characterized in that: the top of the base (1) is fixedly connected with a rodless cylinder (2) through a support frame, the bottom of a movable block of the rodless cylinder (2) is fixedly connected with a fixed plate (3), the left side and the right side of the bottom of the fixed plate (3) are fixedly connected with electric push rods (4), a first half cylinder (5) is arranged below the electric push rods (4), a second half cylinder (6) is arranged below the first half cylinder (5), the front side and the rear side of the first half cylinder (5) and the front side and the rear side of the second half cylinder (6) are both fixedly connected with folding plates (7), a motor (8) is fixedly connected with the periphery of the top of the first half cylinder (5) through the support frame, the bottom end of an output shaft of the motor (8) is fixedly connected with a threaded rod (9) through a coupler, the bottom end of the threaded rod (9) penetrates through and extends to the lower side of the folding plates (7), and a bottom end of the threaded rod (9) is fixedly connected with a limit ring (10), and the inner walls of the first semi-cylinder (5) and the second semi-cylinder (6) are connected with a plurality of balls (11) in a rolling way.
2. The pipe laying device for steel structure engineering construction according to claim 1, characterized in that: the periphery of the base (1) is fixedly connected with universal wheels (12).
3. The pipe laying device for steel structure engineering construction according to claim 1, characterized in that: the bottom end of the output shaft of the electric push rod (4) is hinged with the top of the first semi-cylinder (5).
4. The pipe laying device for steel structure engineering construction according to claim 1, characterized in that: the periphery of the threaded rod (9) is in threaded connection with the penetrating position of the folding plate (7).
CN202023046007.7U 2020-12-16 2020-12-16 Steel construction engineering construction pipeline laying device Active CN214008277U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023046007.7U CN214008277U (en) 2020-12-16 2020-12-16 Steel construction engineering construction pipeline laying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023046007.7U CN214008277U (en) 2020-12-16 2020-12-16 Steel construction engineering construction pipeline laying device

Publications (1)

Publication Number Publication Date
CN214008277U true CN214008277U (en) 2021-08-20

Family

ID=77312178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023046007.7U Active CN214008277U (en) 2020-12-16 2020-12-16 Steel construction engineering construction pipeline laying device

Country Status (1)

Country Link
CN (1) CN214008277U (en)

Similar Documents

Publication Publication Date Title
CN108149929B (en) Crawler-type floor concrete distribution system and construction method thereof
CN107575652A (en) A kind of support frame set up for petroleum pipeline
CN107100309A (en) A kind of construction method for the large-scale multi-angular cantilever frame of integral hoisting
CN217122297U (en) Engineering steel structure welding turnover device
CN214008277U (en) Steel construction engineering construction pipeline laying device
CN209922647U (en) Cable unwinding device for electric power engineering
CN214834516U (en) Construction platform with movable steel structure
CN205935197U (en) House housing system and beam column T shape node that includes thereof
CN210023339U (en) Steel construction processing of preventing running off is with equipment of bending
CN214611105U (en) Steel construction shoulder pole roof beam that can hoist fast
CN218082303U (en) Clamp for machining steel structure beam
CN212475766U (en) Plate hoisting equipment
CN114633342A (en) Automatic plastering device for tunnel shield segment concrete
CN212295587U (en) Horizontal annular welding construction platform for bin
CN210131923U (en) Concrete pipe pile wire drawing machine
CN210286121U (en) Coiling mechanism of carbon cloth production usefulness
CN211310654U (en) Pipeline hoisting device for steel structure
CN206784593U (en) A kind of steel construction coupled column
CN217102814U (en) Pipeline lifting device
CN211540114U (en) 360-degree rolling device for butt welding of pipelines
CN211569966U (en) Lifting device for steel structure installation
CN221312711U (en) Steel structure cutting machine
CN211949207U (en) Reinforced structure of steel structure column
CN217028238U (en) Steel construction girder steel is with embracing roof beam support
CN217411166U (en) Supporting device for wind power bearing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant