CN214611105U - Steel construction shoulder pole roof beam that can hoist fast - Google Patents

Steel construction shoulder pole roof beam that can hoist fast Download PDF

Info

Publication number
CN214611105U
CN214611105U CN202120230238.9U CN202120230238U CN214611105U CN 214611105 U CN214611105 U CN 214611105U CN 202120230238 U CN202120230238 U CN 202120230238U CN 214611105 U CN214611105 U CN 214611105U
Authority
CN
China
Prior art keywords
fixedly connected
beam body
pole beam
shoulder pole
portal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120230238.9U
Other languages
Chinese (zh)
Inventor
贺明涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120230238.9U priority Critical patent/CN214611105U/en
Application granted granted Critical
Publication of CN214611105U publication Critical patent/CN214611105U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel structure carrying pole beam capable of being hoisted quickly, which comprises a carrying pole beam body, the left side and the right side of the top of the shoulder pole beam body are both fixedly connected with first reinforcing plates, the tops of the two first reinforcing plates are fixedly connected with a portal frame, the left side and the right side of the inner cavity of the portal frame are rotationally connected with a positive and negative threaded rod through bearings, the left side and the right side of the outer surface of the positive and negative threaded rod are both in threaded connection with a sleeve, the utility model can move the lifting hook by arranging the shoulder pole beam body, the first reinforcing plate, the portal frame, the positive and negative threaded rod, the sleeve, the servo motor, the bearing plate, the connecting column and the lifting hook, thereby adjusting the hoisting position of the lifting hook, and when the carrying pole beam body is used, the advantage that can hoist fast has solved original shoulder pole roof beam body when using, the problem that can not hoist fast to staff's the work degree of difficulty has been reduced.

Description

Steel construction shoulder pole roof beam that can hoist fast
Technical Field
The utility model relates to a shoulder pole roof beam technical field specifically is a but quick hoist and mount's steel construction shoulder pole roof beam.
Background
The steel structure is a structure formed by steel materials, and the steel materials have the characteristics of high strength, light dead weight, good integral rigidity and strong deformation resistance, so the steel structure is particularly suitable for building large-span, ultrahigh and extra-heavy buildings; the material has good homogeneity and isotropy, belongs to an ideal elastomer and most conforms to the basic assumption of general engineering mechanics; the material has good plasticity and toughness, can deform greatly and can bear dynamic load well; the construction period is short; the steel structure is one of main building structure types, the structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and adopts the processes of rust removal and rust prevention such as silanization, pure manganese phosphating, washing drying, galvanization and the like, all the members or parts are usually connected by welding lines, bolts or rivets, because the dead weight is light, the construction is simple and convenient, the steel structure is widely applied to the fields of large-scale factory buildings, venues, super high-rise buildings and the like, the steel structure is easy to rust, the steel structure generally needs rust removal, galvanization or coating, regular maintenance is needed, a shoulder pole beam is usually adopted in the steel structure for auxiliary hoisting, the shoulder pole beam plays the role of uniformly distributing transmission force and reducing the deformation amount of the members during hoisting, when the existing shoulder pole beam is used, the lifting hooks on two sides are mostly fixed, and the mode can not be according to the specification size of an actual hoisted object, the hoisting position of the lifting hook is adjusted, so that hoisted objects of different specifications and sizes need to be adjusted in a hoisting balance mode by means of external facilities, the defect that the hoisting speed is slow is caused, the labor difficulty of workers is increased, the steel structure shoulder pole beam capable of being hoisted rapidly is provided, and the problems are solved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a but quick hoist and mount's steel construction shoulder pole roof beam possesses the shoulder pole roof beam body when using, and the problem of hoist and mount fast has been solved to the advantage that can hoist fast when using to original shoulder pole roof beam body.
In order to achieve the above object, the utility model provides a following technical scheme: a steel structure carrying pole beam capable of being hoisted quickly comprises a carrying pole beam body, wherein the left side and the right side of the top of the carrying pole beam body are fixedly connected with first reinforcing plates, the tops of the two first reinforcing plates are fixedly connected with a portal frame, the left side and the right side of the inner cavity of the portal frame are rotatably connected with a positive and negative threaded rod through a bearing, the left side and the right side of the outer surface of the positive and negative threaded rod are both in threaded connection with a sleeve, the right side of the portal frame is fixedly connected with a servo motor through a supporting plate, the output end of the servo motor penetrates through the portal frame and is rotatably connected with the joint of the positive threaded rod and the negative threaded rod, bearing plates are slidably connected on the left side and the right side of the top of the shoulder pole beam body and between the two first reinforcing plates, the top of the bearing plate is fixedly connected with the joint of the sleeve, the bottom of the bearing plate is fixedly connected with a connecting column, and the bottom of the connecting column penetrates through the shoulder pole beam body and is fixedly connected with a lifting hook.
Preferably, the top of the sleeve is fixedly connected with a guide plate, guide grooves matched with the guide plate are formed in the left side and the right side of the top of the inner cavity of the portal frame, and the outer surface of the guide plate is connected with the inner surface of each guide groove in a sliding mode.
Preferably, the front and rear positions of the top of the carrying pole beam body are fixedly connected with sliding rails, and the outer surfaces of the sliding rails are in sliding connection with the inner surface of the bearing plate.
Preferably, the left side and the right side of the top of the shoulder pole beam body are provided with moving grooves matched with the connecting columns for use.
Preferably, the left side and the right side of the top of the gantry are fixedly connected with second reinforcing plates, and the top of each second reinforcing plate is fixedly connected with a hoisting plate.
Preferably, the front surface of the shoulder pole beam body is fixedly connected with a warning plate.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up shoulder pole roof beam body, first reinforcing plate, portal frame, positive and negative threaded rod, sleeve, servo motor, loading board, spliced pole and lifting hook, can make the lifting hook remove to the hoist and mount position of adjustment lifting hook through setting up above structure, possesses the shoulder pole roof beam body when using, advantage that can hoist fast has solved original shoulder pole roof beam body when using, the problem that can not hoist fast, thereby has reduced staff's the work degree of difficulty.
2. The utility model can guide the sleeve and limit the sleeve simultaneously by arranging the guide plate and the guide groove;
by arranging the slide rail, the bearing plate can be conveniently moved and guided and supported;
the connecting column can be conveniently moved by arranging the moving groove;
the device can be conveniently moved by arranging the second reinforcing plate and the hoisting plate;
through setting up warning board, can play the effect of warning to constructor.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a perspective view of the bearing plate structure of the present invention;
FIG. 3 is a perspective view of the connection between the positive and negative threaded rods and the sleeve structure of the present invention;
fig. 4 is a front view of the portal frame structure of the present invention.
In the figure: 1. a shoulder pole beam body; 2. a first reinforcing plate; 3. a gantry; 4. a positive and negative threaded rod; 5. a sleeve; 6. a servo motor; 7. a carrier plate; 8. connecting columns; 9. a hook; 10. a guide plate; 11. a guide groove; 12. a slide rail; 13. a moving groove; 14. a second reinforcing plate; 15. hoisting the plate; 16. a warning panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, a steel structure carrying pole beam capable of being hoisted rapidly comprises a carrying pole beam body 1, wherein the left side and the right side of the top of the carrying pole beam body 1 are fixedly connected with first reinforcing plates 2, the tops of the two first reinforcing plates 2 are fixedly connected with a portal frame 3, the left side and the right side of the inner cavity of the portal frame 3 are rotatably connected with a positive and negative threaded rod 4 through bearings, the left side and the right side of the outer surface of the positive and negative threaded rod 4 are respectively connected with a sleeve 5 in a threaded manner, the right side of the portal frame 3 is fixedly connected with a servo motor 6 through a supporting plate, the output end of the servo motor 6 penetrates through the portal frame 3 and is rotatably connected with the joint of the positive and negative threaded rod 4, the left side and the right side of the top of the carrying pole beam body 1 and is positioned between the two first reinforcing plates 2 and is respectively connected with a bearing plate 7 in a sliding manner, the joint of the top of the bearing plate 7 is fixedly connected with the sleeve 5, the bottom of the bearing plate 7 is fixedly connected with a connecting column 8, carrying pole roof beam body 1 and fixedly connected with lifting hook 9 are run through to spliced pole 8's bottom, through setting up carrying pole roof beam body 1, first reinforcing plate 2, portal frame 3, positive and negative threaded rod 4, sleeve 5, servo motor 6, loading board 7, spliced pole 8 and lifting hook 9, can make lifting hook 9 remove, thereby adjustment lifting hook 9's hoist and mount position, through setting up above structure, possess carrying pole roof beam body 1 when using, the advantage of hoist and mount fast, original carrying pole roof beam body 1 when using has been solved, the problem of hoist and mount fast can not be fast, thereby staff's the work degree of difficulty has been reduced.
Referring to fig. 1, a guide plate 10 is fixedly connected to the top of the sleeve 5, guide grooves 11 matched with the guide plate 10 are formed in the left side and the right side of the top of an inner cavity of the portal frame 3, the outer surface of the guide plate 10 is slidably connected with the inner surface of the guide grooves 11, and the sleeve 5 can be guided and limited by the guide plate 10 and the guide grooves 11.
Referring to fig. 1 and 2, the front and rear positions of the top of the carrying pole beam body 1 are fixedly connected with slide rails 12, the outer surfaces of the slide rails 12 are slidably connected with the inner surface of the bearing plate 7, and the bearing plate 7 can be conveniently moved and guided and supported by the slide rails 12.
Referring to fig. 1, the left and right sides of the top of the shoulder pole beam body 1 are provided with moving grooves 13 used in cooperation with the connecting column 8, and the connecting column 8 can be conveniently moved by the moving grooves 13.
Referring to fig. 1, the left side and the right side of the top of the portal frame 3 are fixedly connected with second reinforcing plates 14, the top of each second reinforcing plate 14 is fixedly connected with a hoisting plate 15, and the device can be moved conveniently by arranging the second reinforcing plates 14 and the hoisting plates 15.
Referring to fig. 4, a warning plate 16 is fixedly connected to the front surface of the shoulder pole beam body 1, and the warning plate 16 is provided to warn the constructors.
When in use, the device is arranged at a designated position through the second reinforcing plates 14 and the hoisting plates 15 at two sides, then according to the specification and size of the hoisting object, the plug of the servo motor 6 is electrified, the external controller of the servo motor 6 is started, the output end of the servo motor 6 drives the positive and negative threaded rod 4 to rotate on the inner surface of the sleeve 5 through threads, meanwhile, the sleeve 5 drives the guide plate 10 to slide on the inner surface of the guide groove 11, and the sleeve 5 drives the bearing plate 7 to slide on the outer surface of the slide rail 12, so that the bearing plate 7 drives the connecting column 8 to move, the connecting column 8 drives the lifting hook 9 to move, thereby completing the adjustment of the hoisting positions of the lifting hooks 9 at the two sides, hoisting the hoisted object through the lifting hooks 9 and the external steel wire rope, the device easy operation for the staff can be quick hoist and mount the hoist and mount thing of different specifications size, the effectual work degree of difficulty that has reduced the staff.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a but quick hoist and mount's steel construction shoulder pole roof beam, includes shoulder pole roof beam body (1), its characterized in that: the left side and the right side of the top of the shoulder pole beam body (1) are fixedly connected with first reinforcing plates (2), the top of the two first reinforcing plates (2) is fixedly connected with a portal frame (3), the left side and the right side of an inner cavity of the portal frame (3) are rotatably connected with a positive and negative threaded rod (4) through bearings, the left side and the right side of the outer surface of the positive and negative threaded rod (4) are respectively in threaded connection with a sleeve (5), the right side of the portal frame (3) is fixedly connected with a servo motor (6) through a supporting plate, the output end of the servo motor (6) penetrates through the portal frame (3) and is rotatably connected with the joint of the positive and negative threaded rod (4), the left side and the right side of the top of the shoulder pole beam body (1) are positioned between the two first reinforcing plates (2) and are respectively in sliding connection with a bearing plate (7), and the top of the bearing plate (7) is fixedly connected with the joint of the sleeve (5), the bottom of the bearing plate (7) is fixedly connected with a connecting column (8), and the bottom of the connecting column (8) penetrates through the shoulder pole beam body (1) and is fixedly connected with a lifting hook (9).
2. The steel structure carrying pole beam capable of being hoisted quickly according to claim 1, which is characterized in that: the top fixedly connected with deflector (10) of sleeve (5), guide way (11) that use with deflector (10) cooperation are all seted up to the left and right sides at portal frame (3) inner chamber top, the surface of deflector (10) and the internal surface sliding connection of guide way (11).
3. The steel structure carrying pole beam capable of being hoisted quickly according to claim 1, which is characterized in that: the front and rear positions of the top of the carrying pole beam body (1) are fixedly connected with sliding rails (12), and the outer surfaces of the sliding rails (12) are in sliding connection with the inner surfaces of the bearing plates (7).
4. The steel structure carrying pole beam capable of being hoisted quickly according to claim 1, which is characterized in that: the left side and the right side of the top of the shoulder pole beam body (1) are provided with moving grooves (13) matched with the connecting columns (8).
5. The steel structure carrying pole beam capable of being hoisted quickly according to claim 1, which is characterized in that: the left side and the right side of the top of the portal frame (3) are fixedly connected with second reinforcing plates (14), and the top of each second reinforcing plate (14) is fixedly connected with a hoisting plate (15).
6. The steel structure carrying pole beam capable of being hoisted quickly according to claim 1, which is characterized in that: the front surface of the shoulder pole beam body (1) is fixedly connected with a warning plate (16).
CN202120230238.9U 2021-01-27 2021-01-27 Steel construction shoulder pole roof beam that can hoist fast Expired - Fee Related CN214611105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120230238.9U CN214611105U (en) 2021-01-27 2021-01-27 Steel construction shoulder pole roof beam that can hoist fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120230238.9U CN214611105U (en) 2021-01-27 2021-01-27 Steel construction shoulder pole roof beam that can hoist fast

Publications (1)

Publication Number Publication Date
CN214611105U true CN214611105U (en) 2021-11-05

Family

ID=78437578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120230238.9U Expired - Fee Related CN214611105U (en) 2021-01-27 2021-01-27 Steel construction shoulder pole roof beam that can hoist fast

Country Status (1)

Country Link
CN (1) CN214611105U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114229668A (en) * 2021-12-28 2022-03-25 新疆维泰开发建设(集团)股份有限公司 Steel structure carrying pole beam capable of being hoisted quickly and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114229668A (en) * 2021-12-28 2022-03-25 新疆维泰开发建设(集团)股份有限公司 Steel structure carrying pole beam capable of being hoisted quickly and using method thereof

Similar Documents

Publication Publication Date Title
CN113789948B (en) Large-span atrium side wall sliding rail hanging basket with roof and construction method thereof
CN214611105U (en) Steel construction shoulder pole roof beam that can hoist fast
CN113184713A (en) Self-rotating steel coil lifting appliance of unmanned automatic crane
CN208163977U (en) Deformed bar automatic Tensioning system
CN105645260A (en) Suspended walking combined gantry crane
CN206328062U (en) A kind of novel cantilever is hung
CN110723642A (en) Device and method for horizontally lifting equipment in closed workshop in place
CN206720680U (en) A kind of roofing color corrugated sheet steel lifting device
CN209193389U (en) A kind of loop wheel machine structure of shield machine segment
CN210797292U (en) Six-direction positioning and quick adjusting device for realizing prefabricated section beam
CN210029813U (en) Hoisting device
CN210122446U (en) 150 ton remote control leveling bridge floor hoist
CN209703983U (en) Move back composite roof truss adhesion type hoisting frame under desk-top special-shaped operating condition
CN207684738U (en) Bending track band cantilever single-beam suspension raising running gear can be crossed
CN209685121U (en) A kind of suspender with the main hanging beam of truss-like
CN207062782U (en) A kind of cast-in-situ box girder prestressed stretch-draw support
CN202170231U (en) Mobile pulling bar
CN218950776U (en) Adjustable lifting device for steel structure
CN216105611U (en) Connecting and fixing device for hoisting steel structure for building
CN205153118U (en) Steel construction
CN205603085U (en) Two girder large -span upset bridge crane of four rails
CN219990927U (en) Hoisting device for steel structure production
CN211169615U (en) Steel construction hoisting accessory
CN213763582U (en) Integral bending forming device for arc-shaped reinforcing steel bar net piece
CN221027345U (en) Crane jib

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211105

CF01 Termination of patent right due to non-payment of annual fee