CN211169615U - Steel construction hoisting accessory - Google Patents

Steel construction hoisting accessory Download PDF

Info

Publication number
CN211169615U
CN211169615U CN201922090858.2U CN201922090858U CN211169615U CN 211169615 U CN211169615 U CN 211169615U CN 201922090858 U CN201922090858 U CN 201922090858U CN 211169615 U CN211169615 U CN 211169615U
Authority
CN
China
Prior art keywords
fixedly connected
wall
adjusting
hoisting accessory
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922090858.2U
Other languages
Chinese (zh)
Inventor
杨锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Jinqiao Steel Structure Co Ltd
Original Assignee
Qingdao Jinqiao Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jinqiao Steel Structure Co Ltd filed Critical Qingdao Jinqiao Steel Structure Co Ltd
Priority to CN201922090858.2U priority Critical patent/CN211169615U/en
Application granted granted Critical
Publication of CN211169615U publication Critical patent/CN211169615U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction equipment technical field just discloses a steel construction hoisting accessory, the camera includes a supporting plate, the fixed first pillar in bottom of backup pad, the one end fixedly connected with connecting rod of first pillar, the outer wall swing joint of connecting rod has the gyro wheel, the top fixedly connected with hoisting accessory body of backup pad, the top fixedly connected with second pillar of hoisting accessory body, the outer wall fixedly connected with horizontal pole of second pillar, the outer wall swing joint of second pillar has first lifting rope, the outer wall fixedly connected with dead lever of first lifting rope. This steel construction hoisting accessory can reach the purpose that steel construction hoisting accessory is convenient for adjust length, has solved the problem that general steel construction hoisting accessory adjusts length difficulty for the distance between two couples of regulation that the staff can be rapid, thereby leads to steel construction hoisting accessory can be applicable to all steel constructions, thereby provides convenience for constructor's use.

Description

Steel construction hoisting accessory
Technical Field
The utility model relates to a construction equipment technical field specifically is a steel construction hoisting accessory.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted. The components or parts are typically joined by welds, bolts or rivets. Because of its light dead weight, and construction is simple and convenient, widely apply to fields such as large-scale factory building, venue and super high-rise. The steel has the characteristics of high strength, light dead weight, good integral rigidity and strong deformation resistance, so the steel is particularly suitable for building large-span, ultrahigh and super-heavy buildings, has good material homogeneity and isotropy, belongs to an ideal elastomer, best meets the basic assumption of general engineering mechanics, has good material plasticity and toughness, can have larger deformation, can well bear power load, has short construction period and high industrialization degree, and can be used for professional production with high mechanization degree.
Most structures of steel structure hoisting devices used in the market are fixed, the distance between lifting hooks cannot be adjusted, the lengths of most structures of steel structures are different, and the steel structure hoisting devices needing to be different can be hoisted, so that inconvenience is brought to use of workers, and the practicability of the steel structure hoisting devices is reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a steel construction hoisting accessory possesses steel construction hoisting accessory and is convenient for adjust advantages such as length, has solved the problem that general steel construction hoisting accessory adjusts the length difficulty.
(II) technical scheme
For realizing the purpose of above-mentioned steel construction hoisting accessory be convenient for adjust length, the utility model provides a following technical scheme: a steel structure hoisting device comprises a support plate, wherein a first support column is fixed at the bottom of the support plate, a connecting rod is fixedly connected at one end of the first support column, a roller is movably connected to the outer wall of the connecting rod, a hoisting device body is fixedly connected to the top of the support plate, a second support column is fixedly connected to the top of the hoisting device body, a cross rod is fixedly connected to the outer wall of the second support column, a first lifting rope is movably connected to the outer wall of the second support column, a fixed rod is fixedly connected to the outer wall of the first lifting rope, an adjusting plate is fixedly connected to one end of the first lifting rope, an adjusting groove is formed in the bottom of the adjusting plate, an adjusting rod is fixedly connected to the inner wall of the adjusting groove, a cushion pad is movably connected to the outer wall of the adjusting rod, a sliding block is fixedly connected to, the one end fixedly connected with couple of second lifting rope, first fixed orifices has been seted up in the front of sliding block, the second fixed orifices has been seted up in the front of regulating plate, the positive swing joint of regulating plate has the packing ring, the positive swing joint of packing ring has fixing bolt.
Preferably, the height of the first strut is twenty centimeters and the diameter of the first strut is seven centimeters.
Preferably, the number of the fixing rods is two, and the two fixing rods are symmetrically arranged by taking the vertical center line of the adjusting plate as a symmetry axis.
Preferably, the thickness of the buffer pad is one centimeter, and the buffer pad is a rubber buffer pad.
Preferably, the length of the adjusting rod is thirty centimeters, and the diameter of the adjusting rod is five centimeters.
Preferably, the number of the first fixing holes is four, every two first fixing holes form a group, and the two groups of first fixing holes are symmetrically arranged by taking the vertical center line of the adjusting rod as a symmetry axis.
Preferably, the diameter of the connecting rod is ten centimeters, and the connecting rod is an alloy steel connecting rod.
(III) advantageous effects
Compared with the prior art, the utility model provides a steel construction hoisting accessory possesses following beneficial effect:
1. this steel construction hoisting accessory, regulating plate, adjustment tank, regulation pole, blotter, sliding block, second lifting rope, couple and first lifting rope through setting up can reach the purpose that steel construction hoisting accessory was convenient for adjust length, has solved the problem that general steel construction hoisting accessory adjusted length difficulty for the distance between two couples of regulation that the staff can be rapid, thereby lead to steel construction hoisting accessory can be applicable to all steel constructions, thereby provide convenience for constructor's use.
2. This steel construction hoisting accessory through first fixed orifices, packing ring, fixing bolt and the second fixed orifices that sets up, can reach the good purpose of steel construction hoisting accessory stability for the couple can not remove at the in-process that lifts by crane, thereby has avoided leading to the steel construction to drop the phenomenon on ground because of the couple removes, thereby has improved steel construction hoisting accessory's practicality.
3. This steel construction hoisting accessory through backup pad, first pillar, connecting rod and the gyro wheel that sets up, can reach the purpose that steel construction hoisting accessory is convenient for remove for constructor can be convenient remove steel construction hoisting accessory's position, thereby practiced thrift the time that steel construction hoisting accessory changed the position, thereby further facilitate for constructor's use.
Drawings
FIG. 1 is a front sectional view of the structure of the present invention;
FIG. 2 is an enlarged view of the structure A of FIG. 1 according to the present invention;
fig. 3 is a connection diagram of the adjusting plate and the washer of the present invention.
In the figure: 1. a support plate; 2. a first support; 3. a connecting rod; 4. a roller; 5. a hoisting device body; 6. a second support; 7. a first lifting rope; 8. a cross bar; 9. fixing the rod; 10. an adjusting plate; 11. an adjustment groove; 12. adjusting a rod; 13. a second lifting rope; 14. hooking; 15. a cushion pad; 16. a slider; 17. a first fixing hole; 18. a gasket; 19. fixing the bolt; 20. and a second fixing hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a steel structure lifting device comprises a support plate 1, a first support column 2 is fixed at the bottom of the support plate 1, the height of the first support column 2 is twenty centimeters, the diameter of the first support column 2 is seven centimeters, one end of the first support column 2 is fixedly connected with a connecting rod 3, the diameter of the connecting rod 3 is ten centimeters, the connecting rod 3 is an alloy steel connecting rod, the alloy steel connecting rod has good wear resistance and high strength and toughness, the outer wall of the connecting rod 3 is movably connected with a roller 4, the steel structure lifting device can be moved conveniently through the support plate 1, the first support column 2, the connecting rod 3 and the roller 4, so that a constructor can move the position of the steel structure lifting device conveniently, the time for changing the position of the steel structure lifting device is saved, and convenience is further provided for the constructors, the top of the supporting plate 1 is fixedly connected with a lifting device body 5, the top of the lifting device body 5 is fixedly connected with a second pillar 6, the outer wall of the second pillar 6 is fixedly connected with a cross rod 8, the outer wall of the second pillar 6 is movably connected with a first lifting rope 7, the outer wall of the first lifting rope 7 is fixedly connected with a fixed rod 9, one end of the first lifting rope 7 is fixedly connected with an adjusting plate 10, the number of the fixed rods 9 is two, the two fixed rods 9 are symmetrically arranged by taking the vertical central line of the adjusting plate 10 as a symmetry axis, the bottom of the adjusting plate 10 is provided with an adjusting groove 11, the inner wall of the adjusting groove 11 is fixedly connected with an adjusting rod 12, the length of the adjusting rod 12 is thirty centimeters, the diameter of the adjusting rod 12 is five centimeters, the outer wall of the adjusting rod 12 is movably connected with a cushion 15, the thickness of the cushion, the price of the rubber buffer cushion is low, the outer wall of the buffer cushion 15 is fixedly connected with a sliding block 16, the bottom of the sliding block 16 is fixedly connected with a second lifting rope 13, one end of the second lifting rope 13 is fixedly connected with a hook 14, the purpose that the steel structure lifting device is convenient to adjust the length can be achieved through an adjusting plate 10, an adjusting groove 11, an adjusting rod 12, the buffer cushion 15, the sliding block 16, the second lifting rope 13, the hook 14 and the first lifting rope 7, the problem that the length of the common steel structure lifting device is difficult to adjust is solved, a worker can rapidly adjust the distance between the two hooks 14, the steel structure lifting device can be suitable for all steel structures, convenience is brought to the use of the constructors, the front side of the sliding block 16 is provided with four first fixing holes 17, and every two first fixing holes 17 are in one group, and two sets of first fixed orificess 17 use the perpendicular central line of adjusting pole 12 as symmetry axis symmetry setting, second fixed orifices 20 has been seted up in the front of regulating plate 10, the front swing joint of regulating plate 10 has packing ring 18, the front swing joint of packing ring 18 has fixing bolt 19, through the first fixed orificess 17 that sets up, packing ring 18, fixing bolt 19 and second fixed orifices 20, can reach the good mesh of steel construction hoisting accessory stability, make couple 14 can not remove at the in-process of lifting by crane, thereby avoided leading to the phenomenon that the steel construction drops on ground because of couple 14 removes, thereby the practicality of steel construction hoisting accessory has been improved.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When the adjusting plate is used, the sliding blocks 16 slide on the adjusting rod 12 according to the length difference of the steel structure, the distance between the two sliding blocks 16 is adjusted, so that the two hooks 14 can lift the steel structure, the fixing bolts 19 are screwed in the first fixing holes 17 and the second fixing holes 20, and the relative positions of the sliding blocks 16 and the adjusting plate 10 are fixed.
In conclusion, the steel structure hoisting device can achieve the purpose that the length of the steel structure hoisting device can be adjusted conveniently, and the problem that the length of a common steel structure hoisting device is difficult to adjust is solved, so that the steel structure hoisting device can be suitable for all steel structures.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a steel construction hoisting accessory, includes backup pad (1), its characterized in that: a first support column (2) is fixed at the bottom of the support plate (1), a connecting rod (3) is fixedly connected at one end of the first support column (2), rollers (4) are movably connected to the outer wall of the connecting rod (3), a lifting device body (5) is fixedly connected at the top of the support plate (1), a second support column (6) is fixedly connected at the top of the lifting device body (5), a cross rod (8) is fixedly connected to the outer wall of the second support column (6), a first lifting rope (7) is movably connected to the outer wall of the second support column (6), a fixing rod (9) is fixedly connected to the outer wall of the first lifting rope (7), an adjusting plate (10) is fixedly connected to one end of the first lifting rope (7), an adjusting groove (11) is formed in the bottom of the adjusting plate (10), and an adjusting rod (12) is fixedly connected to the inner wall of the adjusting groove, the utility model discloses an adjusting rod, including adjusting pole (12), outer wall swing joint have blotter (15), the outer wall fixedly connected with sliding block (16) of blotter (15), the bottom fixedly connected with second lifting rope (13) of sliding block (16), the one end fixedly connected with couple (14) of second lifting rope (13), first fixed orifices (17) have been seted up in the front of sliding block (16), second fixed orifices (20) have been seted up in the front of regulating plate (10), the front swing joint of regulating plate (10) has packing ring (18), the front swing joint of packing ring (18) has fixing bolt (19).
2. The steel structure hoisting device of claim 1, wherein: the height of the first support column (2) is twenty centimeters, and the diameter of the first support column (2) is seven centimeters.
3. The steel structure hoisting device of claim 1, wherein: the number of the fixing rods (9) is two, and the two fixing rods (9) are symmetrically arranged by taking the vertical central line of the adjusting plate (10) as a symmetry axis.
4. The steel structure hoisting device of claim 1, wherein: the thickness of blotter (15) is one centimetre, and blotter (15) is the rubber blotter.
5. The steel structure hoisting device of claim 1, wherein: the length of the adjusting rod (12) is thirty centimeters, and the diameter of the adjusting rod (12) is five centimeters.
6. The steel structure hoisting device of claim 1, wherein: the number of the first fixing holes (17) is four, every two first fixing holes (17) form a group, and the two groups of first fixing holes (17) are symmetrically arranged by taking the vertical center line of the adjusting rod (12) as a symmetry axis.
7. The steel structure hoisting device of claim 1, wherein: the diameter of the connecting rod (3) is ten centimeters, and the connecting rod (3) is an alloy steel connecting rod.
CN201922090858.2U 2019-11-27 2019-11-27 Steel construction hoisting accessory Active CN211169615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922090858.2U CN211169615U (en) 2019-11-27 2019-11-27 Steel construction hoisting accessory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922090858.2U CN211169615U (en) 2019-11-27 2019-11-27 Steel construction hoisting accessory

Publications (1)

Publication Number Publication Date
CN211169615U true CN211169615U (en) 2020-08-04

Family

ID=71829027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922090858.2U Active CN211169615U (en) 2019-11-27 2019-11-27 Steel construction hoisting accessory

Country Status (1)

Country Link
CN (1) CN211169615U (en)

Similar Documents

Publication Publication Date Title
CN101169001A (en) Quadrangular pyramid sphere net case falsework-free constructing and mounting method and hoisting machine tool
CN211173027U (en) Steel construction removes construction platform
CN211169615U (en) Steel construction hoisting accessory
CN214611105U (en) Steel construction shoulder pole roof beam that can hoist fast
CN213979843U (en) Prefabricated staircase safety operation platform of assembled structure
CN211813305U (en) Steel structure mounting bracket
CN211037746U (en) Device for mounting climbing frame
CN212689494U (en) Construction platform for building construction
CN109835828A (en) A kind of both arms building tooling crane
CN206784593U (en) A kind of steel construction coupled column
CN213979581U (en) Steel structure column for building
CN205224263U (en) Symmetry steel construction
CN206279855U (en) Rod-adjurstable formula steel column correcting structure
CN205153118U (en) Steel construction
CN109505234A (en) A kind of bridge vase pier connecting frame structure and its construction method
CN216105611U (en) Connecting and fixing device for hoisting steel structure for building
CN215977718U (en) Assembled steel structure frame
CN202299407U (en) Supporting device for floor slab template
CN211229589U (en) Device for adjusting displacement of any node in space
CN211548707U (en) A portable shaped steel hanging basket for steel construction installation
CN201151628Y (en) Quadrangular pyramid spherical face net shell hoist tool constructing without scaffold
CN109835827A (en) A kind of method and building suitable for frame structure building underground increasing layer
CN217627270U (en) Hoisting equipment for building construction based on narrow space
CN213204443U (en) Steel structure supporting piece of outdoor air conditioner
CN211816900U (en) Ready-package steel construction based on building energy saving technology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant