CN211173027U - Steel construction removes construction platform - Google Patents

Steel construction removes construction platform Download PDF

Info

Publication number
CN211173027U
CN211173027U CN201921507236.9U CN201921507236U CN211173027U CN 211173027 U CN211173027 U CN 211173027U CN 201921507236 U CN201921507236 U CN 201921507236U CN 211173027 U CN211173027 U CN 211173027U
Authority
CN
China
Prior art keywords
plate
connecting seat
moving assembly
fixed
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921507236.9U
Other languages
Chinese (zh)
Inventor
张栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Jinqiao Steel Structure Co Ltd
Original Assignee
Qingdao Jinqiao Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jinqiao Steel Structure Co Ltd filed Critical Qingdao Jinqiao Steel Structure Co Ltd
Priority to CN201921507236.9U priority Critical patent/CN211173027U/en
Application granted granted Critical
Publication of CN211173027U publication Critical patent/CN211173027U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a steel structure mobile construction platform, which relates to the field of buildings and mainly aims to solve the problem of poor stability and safety of the existing steel structure mobile platform; the steel structure moving construction platform comprises a steel beam upper wing plate, wherein a first moving assembly and a second connecting assembly are arranged on the steel beam upper wing plate, the first moving assembly and the second moving assembly are fixed through a second fastening bolt, the second moving assembly comprises a connecting plate fixedly connected with the first moving assembly, a second pulley is fixed at the bottom of the connecting plate, one side of the first moving assembly is connected with an adapter plate through a third fastening bolt, a hanging basket is fixed on the adapter plate, the adapter plate and the hanging basket are placed on a supporting base, a first connecting seat is further arranged on the supporting base, and the first connecting seat is rotatably connected with the back of the adapter plate through a connecting rod; the second removes the subassembly and is connected with the hanging flower basket through fixed subassembly, has improved the stability and the security of hanging flower basket.

Description

Steel construction removes construction platform
Technical Field
The utility model relates to a building field specifically is a steel construction removes construction platform.
Background
One of the main building structure types of steel structural engineering. Is one of the more common structural forms in modern building engineering. China is the earliest country where load bearing structures are made of iron, and steel structural engineering is mainly made of steel. The steel has the characteristics of high strength, light dead weight, good integral rigidity and strong deformability, so the steel is particularly suitable for building large-span, ultrahigh and overweight buildings; the material has good homogeneity and isotropy, belongs to an ideal elastomer and most conforms to the basic assumption of general engineering mechanics; the material has good plasticity and toughness, can deform greatly and can bear dynamic load well; the construction period is short; the method has high industrialization degree and can be used for professional production with high mechanization degree.
The grant notice number CN207513140U discloses a steel structure moving construction platform, which comprises a flat plate and a hanging basket, wherein the flat plate is positioned on an upper flange plate of a steel beam, the hanging basket is fixedly connected with one end of the flat plate through a hanging basket fixing rod, the steel structure moving construction platform also comprises an upper roller and a lower roller which are positioned on the upper side and the lower side of the upper flange plate of the steel beam, the upper roller is positioned between the flat plate and the upper flange plate, and is fixedly connected with the upper roller fixing plate and the flat plate in sequence through an upper roller fastening piece; lower gyro wheel passes through lower gyro wheel fastener and last gyro wheel fixed plate fixed connection, through gyro wheel fixed plate fastener fixed connection between last gyro wheel fixed plate and the lower gyro wheel fixed plate, and this kind of structure is great making the in-process pressure to pterygoid lamina on the girder steel, and stability and security itself are also relatively poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction removes construction platform solves the relatively poor problem of current steel construction moving platform stability and security.
In order to achieve the above object, the utility model provides a following technical scheme:
a steel structure moving construction platform comprises a steel beam upper wing plate, wherein a first moving assembly and a second connecting assembly are arranged on the steel beam upper wing plate, the first moving assembly and the second moving assembly are fixed through a second fastening bolt, the second moving assembly comprises a connecting plate fixedly connected with the first moving assembly, a second pulley is fixed at the bottom of the connecting plate, one side of the first moving assembly is connected with a transfer plate through a third fastening bolt, a hanging basket is fixed on the transfer plate, the transfer plate and the hanging basket are placed on a supporting base, a convex block is arranged on the back surface of the transfer plate and inserted into a groove in the supporting base, a first connecting seat is further arranged on the supporting base, and the first connecting seat is rotatably connected with the back surface of the transfer plate through a connecting rod; the second moving assembly is connected with the hanging basket through the fixing assembly.
In one alternative: the fixing component comprises a second connecting seat fixed on the connecting plate, a third connecting seat and a fourth connecting seat fixed on the adapter plate, the second connecting seat, the third connecting seat and the fourth connecting seat are connected through steel ropes, and a fixing shaft for fixing the steel ropes is arranged in the hanging basket.
In one alternative: the number of the first moving assemblies is two, and the first moving assemblies are symmetrically arranged on two sides of the second moving assembly.
In one alternative: the first moving assembly comprises an upper fixing plate and a lower fixing plate, the upper fixing plate and the lower fixing plate are connected through a first fastening bolt, and pulley assemblies are arranged in the upper fixing plate and the lower fixing plate.
In one alternative: the pulley assembly comprises a limiting plate and a first pulley, the limiting plate is fixed on the upper fixing plate and the lower fixing plate, and the limiting plate is rotatably connected with the first pulley through a rotating shaft.
In one alternative: and the upper fixing plate and the lower fixing plate are provided with a plurality of threaded holes.
In one alternative: the third fastening bolts are a plurality of in number, and the adapter plate is connected with the hanging basket through the supporting rods.
In one alternative: the support base bottom is equipped with the universal wheel, still is equipped with the handle on the support base, supports base one end and still is equipped with people's step.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the upper fixing plate and the lower fixing plate are provided with a plurality of threaded holes, the first fastening bolts are placed on different threaded holes, the distance between the upper fixing plate and the lower fixing plate can be adjusted, the upper fixing plate and the lower fixing plate are applicable to steel beam upper wing plates with different thicknesses, and the practicability is very good;
2. by arranging the supporting base, the stability of the hanging basket is improved, and the safety of workers is further improved; the back of the adapter plate is provided with a convex block which is inserted into the groove on the support base, so that the stability of the adapter plate and the support base is improved;
3. the second removes the subassembly and is connected with the hanging flower basket through fixed subassembly, and fixed subassembly is including fixing the second connecting seat on the connecting plate, fixing third connecting seat and fourth connecting seat on the keysets, and second connecting seat, third connecting seat and fourth connecting seat pass through steel cable connection, are equipped with the fixed axle of fixed steel cable in the hanging flower basket, remove the subassembly through the steel cable and are connected with the hanging flower basket for holistic stability is better.
Drawings
Fig. 1 is a schematic structural diagram of a steel structure mobile construction platform.
FIG. 2 is a perspective view of a basket and a support base in the steel structure mobile construction platform.
Notations for reference numerals: 1-steel beam upper wing plate, 2-first moving component, 3-second moving component, 4-adapter plate, 5-hanging basket, 6-supporting base, 7-fixing component, 8-step, 21-upper fixing plate, 22-lower fixing plate, 23-first fastening bolt, 24-pulley component, 241-limiting plate, 242-first pulley, 31-second fastening bolt, 32-connecting plate, 33-second pulley, 41-third fastening bolt, 42-lug, 43-supporting rod, 61-groove, 62-first connecting seat, 63-connecting rod, 64-universal wheel, 65-handle, 71-second connecting seat, 72-steel rope, 73-third connecting seat, 74-fourth connecting seat, And 75, fixing the shaft.
Detailed Description
The present invention will be described in detail with reference to the following embodiments, wherein like or similar elements are designated by like reference numerals throughout the drawings or description, and wherein the shape, thickness or height of the various elements may be expanded or reduced in practical applications. The embodiments of the present invention are provided only for illustration, and not for limiting the scope of the present invention. Any obvious and obvious modifications or alterations to the present invention can be made without departing from the spirit and scope of the present invention.
Example 1
Please refer to fig. 1-2, in the embodiment of the utility model, a steel construction removes construction platform, including pterygoid lamina 1 on the girder steel, be equipped with first removal subassembly 2 and second coupling assembling 3 on the girder steel pterygoid lamina 1, through first removal subassembly 2 and second coupling assembling 3, conveniently remove on pterygoid lamina 1 on the girder steel, first removal subassembly 2 and second removal subassembly 3 are fixed through second fastening bolt 31, can improve the stability between first removal subassembly 2 and the second removal subassembly 3 through second fastening bolt 31 to improve holistic security.
Further, the number of the first moving assemblies 2 is two, the first moving assemblies 2 are symmetrically arranged on two sides of the second moving assembly 3, each first moving assembly 2 comprises an upper fixing plate 21 and a lower fixing plate 22, the upper fixing plate 21 and the lower fixing plate 22 are connected through a first fastening bolt 23, the stability of the upper fixing plate 21 and the lower fixing plate 22 is improved through the first fastening bolt 23, pulley assemblies 24 are arranged in the upper fixing plate 21 and the lower fixing plate 22, the pulley assemblies 24 are arranged to facilitate the first moving assemblies 2 to move on the steel beam upper wing plate 1, each pulley assembly 24 comprises a limiting plate 241 and a first pulley 242, the limiting plates 241 are fixed on the upper fixing plate 21 and the lower fixing plate 22, and the limiting plates 241 are rotatably connected with the first pulley 242 through rotating shafts, so that the first pulley 242 can move on the steel beam upper wing plate 1 conveniently, and the stability between the first moving assemblies 2 and the steel beam upper wing plate 1 is also improved, the practicability is very good.
Further, be equipped with a plurality of screw holes on upper fixed plate 21 and the bottom plate 22, place first fastening bolt 23 on the screw hole of difference, can adjust the distance between upper fixed plate 21 and the bottom plate 22, all can be suitable for on the girder steel of different thickness pterygoid lamina 1, the practicality is very good.
Further, the second movable assembly 3 comprises a connecting plate 32 fixedly connected with the first movable assembly 2, a second pulley 33 is fixed at the bottom of the connecting plate 32, and the second pulley 33 is arranged, so that the stability and the moving capacity of the first movable assembly 2 and the second movable assembly 3 on the steel beam upper wing plate 1 are improved, and the practicability is very strong.
Furthermore, one side of the first moving assembly 2 is connected with the adapter plate 4 through a third fastening bolt 41, the adapter plate 4 is L-shaped, the hanging basket 5 is fixed on the adapter plate 4, the adapter plate 4 is fixedly connected with the hanging basket 5, when the adapter plate 4 moves, the hanging basket 5 can be driven to move, and therefore the hanging basket 5 can work conveniently, the stability of the adapter plate 4 and the first moving assembly 2 is enhanced due to the fact that the number of the third fastening bolts 41 is large, the adapter plate 4 is connected with the hanging basket 5 through a supporting rod 43, and the stability of the adapter plate 4 and the hanging basket 5 is further improved.
Furthermore, the adapter plate 4 and the hanging basket 5 are placed on the supporting base 6, and the stability of the hanging basket 5 is improved by arranging the supporting base 6, so that the safety of workers is improved; the back of the adapter plate 4 is provided with a convex block 42, and the convex block 42 is inserted into the groove 61 on the support base 6, so that the stability of the adapter plate 4 and the support base 6 is improved; still be equipped with first connecting seat 62 on the support base 6, first connecting seat 62 passes through connecting rod 63 and is connected with the 4 back rotations of keysets for the stability of keysets 4 is better, can not rock in disorder on supporting base 6.
Furthermore, the bottom of the supporting base 6 is provided with a universal wheel 64, and the supporting base 6 can move conveniently by arranging the universal wheel 64; the supporting base 6 is also provided with a handle 65, the supporting base 6 is conveniently driven to move through the handle 65, and the position of the hanging basket 5 is adjusted through a manual push-pull mode, so that although certain labor is consumed, the safety is better, and the adjusting capacity is very strong; support 6 one end of base and still be equipped with people's step 8, make things convenient for the staff to go up in hanging flower basket 5 through people's step 8, it is very practical.
Example 2
The embodiment of the utility model is different from embodiment 1 in that, the second removes the subassembly 3 and is connected with hanging flower basket 5 through fixed subassembly 7, has improved the stability that the second removed subassembly 3 and fixed subassembly 7, fixed subassembly 7 is including fixing second connecting seat 71 on connecting plate 32, fixing third connecting seat 73 and fourth connecting seat 74 on keysets 4, and second connecting seat 71, third connecting seat 73 and fourth connecting seat 74 pass through steel cable 72 and connect, are equipped with the fixed axle 75 of fixed steel cable 72 in the hanging flower basket 5, remove subassembly 3 and hanging flower basket 5 through the steel cable 72 with the second and connect for holistic stability is better.
The utility model discloses a theory of operation is: when a worker hangs up to work, the supporting base 6 is driven to move through the handle 65 and the universal wheel 64, and when the supporting base 6 moves, the adapter plate 4 and the hanging basket 5 are driven to move, so that the first pulley 242 and the second pulley 33 on the first moving component 2 and the second moving component 3 are driven to move on the steel beam upper wing plate 1.
The above description is only for the specific embodiments of the present disclosure, but the scope of the present disclosure is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present disclosure, and all the changes or substitutions should be covered within the scope of the present disclosure. Therefore, the protection scope of the present disclosure shall be subject to the protection scope of the claims.

Claims (8)

1. A steel structure moving construction platform comprises a steel beam upper wing plate (1), wherein a first moving assembly (2) and a second moving assembly (3) are arranged on the steel beam upper wing plate (1), the first moving assembly (2) and the second moving assembly (3) are fixed through a second fastening bolt (31), the steel structure moving construction platform is characterized in that the second moving assembly (3) comprises a connecting plate (32) fixedly connected with the first moving assembly (2), a second pulley (33) is fixed at the bottom of the connecting plate (32), one side of the first moving assembly (2) is connected with an adapter plate (4) through a third fastening bolt (41), a hanging basket (5) is fixed on the adapter plate (4), the adapter plate (4) and the hanging basket (5) are placed on a supporting base (6), a convex block (42) is arranged on the back of the adapter plate (4), and the convex block (42) is inserted into a groove (61) on the supporting base (6), the supporting base (6) is also provided with a first connecting seat (62), and the first connecting seat (62) is rotatably connected with the back of the adapter plate (4) through a connecting rod (63); the second moving assembly (3) is connected with the hanging basket (5) through a fixing assembly (7).
2. The steel structure moving construction platform of claim 1, wherein the fixing assembly (7) comprises a second connecting seat (71) fixed on the connecting plate (32), a third connecting seat (73) and a fourth connecting seat (74) fixed on the adapter plate (4), the second connecting seat (71), the third connecting seat (73) and the fourth connecting seat (74) are connected through a steel rope (72), and a fixing shaft (75) for fixing the steel rope (72) is arranged in the hanging basket (5).
3. The steel structure mobile construction platform according to claim 1, characterized in that the number of the first mobile assemblies (2) is two, and the first mobile assemblies are symmetrically arranged on two sides of the second mobile assembly (3).
4. The steel structure moving construction platform according to claim 1 or 3, wherein the first moving assembly (2) comprises an upper fixing plate (21) and a lower fixing plate (22), the upper fixing plate (21) and the lower fixing plate (22) are connected through a first fastening bolt (23), and pulley assemblies (24) are arranged in the upper fixing plate (21) and the lower fixing plate (22).
5. The steel structure moving construction platform of claim 4, wherein the pulley assembly (24) comprises a limiting plate (241) and a first pulley (242), the limiting plate (241) is fixed on the upper fixing plate (21) and the lower fixing plate (22), and the limiting plate (241) is rotatably connected with the first pulley (242) through a rotating shaft.
6. The steel structure mobile construction platform of claim 5, wherein the upper fixing plate (21) and the lower fixing plate (22) are provided with a plurality of threaded holes.
7. The steel structure mobile construction platform of claim 1, wherein the number of the third fastening bolts (41) is multiple, and the adapter plate (4) and the hanging basket (5) are connected through a support rod (43).
8. The steel structure moving construction platform as claimed in claim 1, wherein the bottom of the supporting base (6) is provided with universal wheels (64), the supporting base (6) is further provided with a handle (65), and one end of the supporting base (6) is further provided with a step (8).
CN201921507236.9U 2019-09-11 2019-09-11 Steel construction removes construction platform Active CN211173027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921507236.9U CN211173027U (en) 2019-09-11 2019-09-11 Steel construction removes construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921507236.9U CN211173027U (en) 2019-09-11 2019-09-11 Steel construction removes construction platform

Publications (1)

Publication Number Publication Date
CN211173027U true CN211173027U (en) 2020-08-04

Family

ID=71807770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921507236.9U Active CN211173027U (en) 2019-09-11 2019-09-11 Steel construction removes construction platform

Country Status (1)

Country Link
CN (1) CN211173027U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980392A (en) * 2020-08-31 2020-11-24 中国二十二冶集团有限公司 Crown block sliding contact line installation device and construction method thereof
CN113898165A (en) * 2021-11-02 2022-01-07 中国建筑一局(集团)有限公司 Hanging basket assembly and hanging basket construction method
CN114235337A (en) * 2021-12-14 2022-03-25 长安大学 Wave pushing plate type wave making machine and working method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980392A (en) * 2020-08-31 2020-11-24 中国二十二冶集团有限公司 Crown block sliding contact line installation device and construction method thereof
CN113898165A (en) * 2021-11-02 2022-01-07 中国建筑一局(集团)有限公司 Hanging basket assembly and hanging basket construction method
CN114235337A (en) * 2021-12-14 2022-03-25 长安大学 Wave pushing plate type wave making machine and working method thereof

Similar Documents

Publication Publication Date Title
CN211173027U (en) Steel construction removes construction platform
CN201843324U (en) Shaping lifting operation platform
CN206784592U (en) A kind of steel structure support beam
CN210563355U (en) Scaffold board for lifting scaffold
CN215484554U (en) Attached lifting scaffold with guide rail
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN211037746U (en) Device for mounting climbing frame
CN212450250U (en) Special lifting appliance for outdoor construction of transformer substation
CN214302750U (en) Supporting platform for steel structure installation
CN210064893U (en) Steel reinforcement cage flat lifting tool
CN211169615U (en) Steel construction hoisting accessory
CN207110500U (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN217692461U (en) Support frame for power cable protective sleeve
CN206539037U (en) A kind of air transport device in Steel Structure Installation
CN216238973U (en) Beam column reinforcing and connecting structure for steel structure
CN214495485U (en) Electrical manufacturing detachable and randomly assembled movable gantry
CN213805823U (en) Combined steel structure
CN221030981U (en) Steel construction building beam template
CN212428129U (en) Structure is rectified in steel construction installation
CN216105611U (en) Connecting and fixing device for hoisting steel structure for building
CN213358924U (en) Steel structure beam column convenient to installation is fixed
CN217894815U (en) Exempt from to climb ware mounting structure
CN205259554U (en) A mount for installation of light steel joist gypsum -lath furred ceiling
CN215711092U (en) A material lifting device for building
CN215564328U (en) Mechanical cleaning platform of settling tank for producing aluminum oxide

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant