CN212428129U - Structure is rectified in steel construction installation - Google Patents

Structure is rectified in steel construction installation Download PDF

Info

Publication number
CN212428129U
CN212428129U CN202020753853.3U CN202020753853U CN212428129U CN 212428129 U CN212428129 U CN 212428129U CN 202020753853 U CN202020753853 U CN 202020753853U CN 212428129 U CN212428129 U CN 212428129U
Authority
CN
China
Prior art keywords
supporting plate
steel construction
fixedly connected
fixing plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020753853.3U
Other languages
Chinese (zh)
Inventor
张亮亮
曾卫军
黄慧
钟生平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Second Construction Engineering Co ltd
Original Assignee
Beijing Urban Construction Second Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Second Construction Engineering Co ltd filed Critical Beijing Urban Construction Second Construction Engineering Co ltd
Priority to CN202020753853.3U priority Critical patent/CN212428129U/en
Application granted granted Critical
Publication of CN212428129U publication Critical patent/CN212428129U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a structure is rectified in steel construction installation, including the layer board: the supporting plate is characterized in that a connecting groove is formed in one side of the supporting plate, a rotating block is rotatably connected to an inner cavity of the connecting groove, a fixing plate is fixedly connected to the bottom of the rotating block, and four symmetrically-arranged through holes are formed in one side of the fixing plate. The utility model discloses a fastening bolt is with fixed plate and steel construction fixed connection, the backup pad has played the effect of interim auxiliary stay, open the power structure, the output shaft of power structure drives the layer board and takes place relative upset with the fixed plate, take place to contact until layer board and backup pad, can accomplish the correction, this steel construction installation correction structure possesses the advantage of convenient regulation, simple to operate in the in-service use process, the dismouting is nimble, be fit for carrying out the vertical adjustment to the higher steel construction of position relatively, made things convenient for the user to use, the practicality of steel construction installation correction structure has been improved.

Description

Structure is rectified in steel construction installation
Technical Field
The utility model belongs to the technical field of the steel construction, especially, relate to steel construction installation correction structure.
Background
The steel has the characteristics of high strength, light dead weight, good integral rigidity and strong deformation resistance, so the steel is particularly suitable for building large-span, ultrahigh and overweight buildings; the material has good homogeneity and isotropy, belongs to an ideal elastomer and most conforms to the basic assumption of general engineering mechanics; the material has good plasticity and toughness, can deform greatly and can bear dynamic load well; the construction period is short; the method has high industrialization degree and can be used for professional production with high mechanization degree.
The steel structure needs to research high-strength steel, so that the yield point strength of the steel structure is greatly improved; in addition, new types of section steel, such as H-section steel (also called wide-flange section steel), T-section steel, profiled steel sheet, etc., are rolled to meet the needs of large-span structures and super high-rise buildings.
The steel construction is installing and fixed in-process, because the physical characteristics of some steel constructions, steel construction crossbeam position is very easily taking place certain deformation under the effect of gravity, consequently need rectify the steel construction, and current steel construction installation is rectified the structure and is in the in-service use in-process, hardly carries out auxiliary stay to some higher steel construction positions relatively to reach the purpose of rectifying, is unfavorable for the user to use, has reduced the practicality of steel construction installation rectification structure.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a structure is rectified in steel structure installation has the advantage of convenient regulation, has solved current steel structure installation and has rectified the structure in the in-service use, hardly carries out the auxiliary stay to some relatively higher steel construction positions in position to reach the purpose of rectifying, be unfavorable for the user to use, reduced the problem that structure practicality was rectified in the steel structure installation.
The utility model provides an above-mentioned technical problem's technical scheme as follows: steel construction installation correction structure, its characterized in that includes the layer board: one side of the supporting plate is provided with a connecting groove, the inner cavity of the connecting groove is rotatably connected with a rotating block, the bottom of the rotating block is fixedly connected with a fixed plate, one side of the fixed plate is provided with four symmetrically arranged through holes, the inner cavity of each through hole is provided with a fastening bolt, and a power structure is arranged between the supporting plate and the fixed plate; the power structure comprises a first rotating frame fixedly connected with the fixed plate, a connecting seat is rotatably connected to the inner cavity of the first rotating frame, a hydraulic lifting rod is fixedly connected to one side of the connecting seat, the output end of the hydraulic lifting rod is rotatably connected with a second rotating frame, and the top of the second rotating frame is fixedly connected with the supporting plate.
The utility model discloses as above be used for steel construction installation to rectify the structure, further: the top of layer board is provided with the backup pad, the equal fixedly connected with spacing in both sides of backup pad bottom, one side and the fixed plate fixed connection of spacing, the rotation groove has been seted up to one side of spacing, the inner chamber swing joint in rotation groove has the connecting block, one side and layer board fixed connection of connecting block.
The utility model discloses as above be used for steel construction installation to rectify the structure, further: the top of the supporting plate is provided with a groove matched with the supporting plate, and the width of the groove is larger than that of the supporting plate.
The utility model discloses as above be used for steel construction installation to rectify the structure, further: the angle between the supporting plate and the fixing plate is ninety degrees, and the supporting plate are positioned on the same horizontal line.
The utility model discloses as above be used for steel construction installation to rectify the structure, further: the outer surface of the supporting plate is fixed with anti-skid rubber bulges arranged at intervals in a bonding mode. The outer surface of the fixing plate is fixed with anti-skid rubber bulges arranged at intervals in a bonding mode.
The utility model has the advantages that:
1. the utility model fixedly connects the fixed plate with the steel structure through the fastening bolt, the supporting plate plays a role of temporary auxiliary support, the power structure is opened, the output shaft of the power structure drives the supporting plate and the fixed plate to relatively overturn until the supporting plate contacts with the supporting plate, the steel structure installation and correction structure can finish correction, has the advantages of convenient adjustment, convenient installation in the actual use process, flexible disassembly and assembly, is suitable for vertically adjusting the steel structure with relatively higher position, is convenient for users to use, improves the practicability of the steel structure installation and correction structure, solves the problem that the prior steel structure installation and correction structure is difficult to carry out auxiliary support on the steel structure parts with relatively higher position in the actual use process, in order to reach the purpose of rectifying, be unfavorable for the user to use, reduced the problem that the structure practicality was rectified in the steel construction installation.
2. The utility model discloses a power that hydraulic lifting rod produced is utilized in the setting of power structure, provides power for the upset of layer board.
3. The utility model discloses a setting of recess for the backup pad provides the space, makes backup pad and layer board can be located same water flat line.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
fig. 1 is a schematic perspective view of an embodiment of the present invention;
fig. 2 is a rear perspective view of an embodiment of the present invention;
fig. 3 is a schematic bottom perspective view of an embodiment of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. the supporting plate comprises a supporting plate body, 2 parts of connecting grooves, 3 parts of rotating blocks, 4 parts of fixing plates, 5 parts of through holes, 6 parts of fastening bolts, 7 parts of supporting plates, 8 parts of limiting frames, 9 parts of rotating grooves, 10 parts of connecting blocks, 11 parts of power structures, 111 parts of first rotating frames, 112 parts of connecting seats, 113 parts of hydraulic lifting rods, 114 parts of second rotating frames, 12 parts of grooves.
Detailed Description
Hereinafter, embodiments of the present invention of a steel structure installation correction structure will be described with reference to the accompanying drawings.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
Fig. 1-3 show the utility model relates to a steel construction installation of embodiment rectifies structure, a serial communication port, including layer board 1: one side of the supporting plate 1 is provided with a connecting groove 2, the inner cavity of the connecting groove 2 is rotatably connected with a rotating block 3, the bottom of the rotating block 3 is fixedly connected with a fixed plate 4, the top of the supporting plate 1 is provided with a supporting plate 7, both sides of the bottom of the supporting plate 7 are fixedly connected with a limiting frame 8, one side of the limiting frame 8 is fixedly connected with the fixed plate 4, one side of the limiting frame 8 is provided with a rotating groove 9, the inner cavity of the rotating groove 9 is movably connected with a connecting block 10, one side of the connecting block 10 is fixedly connected with the supporting plate 1, the top of the supporting plate 1 is provided with a groove 12 matched with the supporting plate 7, the width of the groove 12 is larger than that of the supporting plate 7, space is provided for the supporting plate 7 through the arrangement of the groove 12, the supporting plate 7 and the supporting plate 1 can be positioned on the same, through-hole 5 that four symmetries set up is seted up to one side of fixed plate 4, the inner chamber of through-hole 5 is provided with fastening bolt 6, be provided with power structure 11 between layer board 1 and the fixed plate 4, power structure 11 includes a rotating turret 111 with fixed plate 4 fixed connection, the inner chamber of rotating turret 111 rotates and is connected with connecting seat 112, one side fixedly connected with hydraulic lifting rod 113 of connecting seat 112, hydraulic lifting rod 113's output rotates and is connected with rotating turret two 114, the top and the layer board 1 fixed connection of rotating turret two 114, setting through power structure 11, utilize the power that hydraulic lifting rod 113 produced, provide power for the upset of layer board 1.
When the tool is used, the friction force of the metal piece is small, and when the correcting structure is installed and placed, the position of the correcting structure is easy to move, so that the correcting structure is difficult to correct. The above embodiment is further improved, and the outer surface of the supporting plate 1 is fixed with anti-skid rubber bulges arranged at intervals in a bonding mode. The outer surface of the fixing plate 4 is fixed with anti-skid rubber bulges arranged at intervals in a bonding mode. The problem of displacement can be reduced by the contact of the rubber bumps with the contact surface.
The working principle is as follows: through the steel construction one side that warp under because of the action of gravity, use the screw-thread fit between fastening bolt 6 and the through-hole 5, fix fixed plate 4 and steel construction, open hydraulic lifting rod 113, hydraulic lifting rod 113's output shaft drives layer board 1 through rotating turret two 114 and takes place the upset, upwards holds up the bottom of steel construction, and connecting block 10 rotates in the inner chamber that rotates groove 9 simultaneously, and then has realized the purpose of rectifying the straightness that hangs down of steel construction.
In summary, the following steps: the utility model discloses a fastening bolt 6 is with fixed plate 4 and steel construction fixed connection, backup pad 7 has played the effect of interim auxiliary stay, open power structure 11, power structure 11's output shaft drives layer board 1 and takes place relative upset with fixed plate 4, until layer board 1 and backup pad 7 take place the contact, can accomplish the correction, this steel construction installation correction structure possesses the advantage of convenient regulation, simple to operate in the in-service use, the dismouting is nimble, be fit for carrying out the vertical adjustment to the steel construction that the position is relatively higher, the use of the user is made things convenient for, the practicality of steel construction installation correction structure has been improved, solved current steel construction installation correction structure at the in-service use in-process, hardly carry out auxiliary stay to some steel construction positions that the position is relatively higher, in order to reach the purpose of rectifying.
The technical features disclosed above are not limited to the combinations with other features disclosed, and other combinations between the technical features can be performed by those skilled in the art according to the purpose of the invention to achieve the aim of the invention.

Claims (6)

1. Steel construction installation correction structure, its characterized in that includes layer board (1): one side of the supporting plate (1) is provided with a connecting groove (2), the inner cavity of the connecting groove (2) is rotatably connected with a rotating block (3), the bottom of the rotating block (3) is fixedly connected with a fixing plate (4), one side of the fixing plate (4) is provided with four through holes (5) which are symmetrically arranged, the inner cavity of each through hole (5) is provided with a fastening bolt (6), and a power structure (11) is arranged between the supporting plate (1) and the fixing plate (4); the power structure (11) comprises a first rotating frame (111) fixedly connected with the fixing plate (4), the inner cavity of the first rotating frame (111) is rotatably connected with a connecting seat (112), one side of the connecting seat (112) is fixedly connected with a hydraulic lifting rod (113), the output end of the hydraulic lifting rod (113) is rotatably connected with a second rotating frame (114), and the top of the second rotating frame (114) is fixedly connected with the supporting plate (1).
2. The steel structure installation correcting structure of claim 1, wherein a supporting plate (7) is arranged at the top of the supporting plate (1), limiting frames (8) are fixedly connected to two sides of the bottom of the supporting plate (7), one side of each limiting frame (8) is fixedly connected with the fixing plate (4), a rotating groove (9) is formed in one side of each limiting frame (8), a connecting block (10) is movably connected to an inner cavity of each rotating groove (9), and one side of each connecting block (10) is fixedly connected with the supporting plate (1).
3. The steel structure installation correcting structure of claim 2, wherein the top of the supporting plate (1) is provided with a groove (12) matched with the supporting plate (7), and the width of the groove (12) is larger than that of the supporting plate (7).
4. The steel structure installation correcting structure of claim 3, wherein the angle between the supporting plate (1) and the fixing plate (4) is ninety degrees, and the supporting plate (7) is located on the same horizontal line with the supporting plate (1).
5. The steel structure installation correcting structure of claim 1, wherein the outer surface of the supporting plate (1) is fixed with anti-skid rubber bulges arranged at intervals by bonding.
6. The steel structure installation correcting structure of claim 1, wherein the outer surface of the fixing plate (4) is fixed with anti-skid rubber bulges arranged at intervals by means of bonding.
CN202020753853.3U 2020-05-09 2020-05-09 Structure is rectified in steel construction installation Active CN212428129U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020753853.3U CN212428129U (en) 2020-05-09 2020-05-09 Structure is rectified in steel construction installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020753853.3U CN212428129U (en) 2020-05-09 2020-05-09 Structure is rectified in steel construction installation

Publications (1)

Publication Number Publication Date
CN212428129U true CN212428129U (en) 2021-01-29

Family

ID=74288610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020753853.3U Active CN212428129U (en) 2020-05-09 2020-05-09 Structure is rectified in steel construction installation

Country Status (1)

Country Link
CN (1) CN212428129U (en)

Similar Documents

Publication Publication Date Title
CN218204924U (en) Large-span anti-seismic steel structure
CN212428129U (en) Structure is rectified in steel construction installation
CN211178942U (en) Steel construction detection device for construction
CN202922313U (en) Tool magazine support frame
CN211922703U (en) High-rise building with basement top plate embedded and fixed on first floor of building
CN209742221U (en) High-strength box column convenient to install
CN213358924U (en) Steel structure beam column convenient to installation is fixed
CN213654340U (en) Safe and reliable's steel construction temporary support
CN216238973U (en) Beam column reinforcing and connecting structure for steel structure
CN215977718U (en) Assembled steel structure frame
CN214194948U (en) Steel construction with fixed establishment
CN210947706U (en) Shaping template at deformation joint of constructional engineering
CN211371667U (en) Adjustable steel structure mounting foot brace
CN220247204U (en) Building steel structure frame
CN221031675U (en) Supporting structure for steel structure building assembly
CN204980794U (en) Elevator landing door jamb spare
CN215368905U (en) Large-span steel house room bearing structure
CN212026851U (en) Steel construction reinforcing apparatus for architectural design
CN213015550U (en) Support frame for high-rise building construction
CN211621245U (en) Template of pier stud construction usefulness
CN218264311U (en) Adjustable profiled steel structure connecting piece for building construction
CN216892833U (en) Combined steel structure building frame
CN213360941U (en) Strong pipe area quick-witted steel construction of stability
CN218562658U (en) Easy-to-recover shear wall structure with steel-concrete combined wall footing connecting piece
CN215888576U (en) Supporting device for steel structure with good anti-seismic effect

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant