CN204173767U - Cantilever type hoisting frame - Google Patents

Cantilever type hoisting frame Download PDF

Info

Publication number
CN204173767U
CN204173767U CN201420566159.5U CN201420566159U CN204173767U CN 204173767 U CN204173767 U CN 204173767U CN 201420566159 U CN201420566159 U CN 201420566159U CN 204173767 U CN204173767 U CN 204173767U
Authority
CN
China
Prior art keywords
leg
foreleg
girder
hound
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420566159.5U
Other languages
Chinese (zh)
Inventor
代金辉
郝俊峰
杨亚伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201420566159.5U priority Critical patent/CN204173767U/en
Application granted granted Critical
Publication of CN204173767U publication Critical patent/CN204173767U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A cantilever type hoisting frame is characterized in that a main beam is connected with a front leg and a rear leg together to serve as a main structure, a lifting lug is arranged at the front end of the main beam, a left auxiliary leg and a right auxiliary leg which are connected in a splayed shape are arranged on two sides of the front leg and the rear leg respectively, and a supporting leg base plate anchored with a foundation is arranged at the bottom of each leg to prevent the local pressure of the supporting leg to the foundation from being too high to damage and increase the stability. The utility model discloses can take one's place on the spot and carry out the dismouting, equipment back stability is good. The crane has the advantages of high hoisting height, large hoisting weight, simple and practical structure, better flexibility than a crane and a tower crane, and change of the defects of the existing hoisting method. The utility model discloses a cantilever type hoist and mount frame uses with other hoisting methods cooperations can satisfy overweight, the accurate quick hoist and mount of complex construction like the steel construction, has solved the difficult problem of superelevation and indoor hoist and mount. Compared with the traditional hoisting technology, the cantilever type hoisting frame has the advantages of easy movement, simple manufacture, low cost, economy and practicality, and can shorten the construction period and improve the economic benefit.

Description

Cantilevered mast-up
Technical field
The utility model relates to a kind of hoisting tooling, particularly relates to a kind of cantilevered mast-up.
Background technology
In building construction process, lifting is modal vertical transporting method.Movable crane is one common in lifting, and its shortcoming can not limit by the maximum hoisting height of movable crane at the height of indoor use, lifting; Floor type tower crane is also common one, and its shortcoming is subject to installation site restriction handling very flexible, lifting weight little.In actual building operation, construction of super highrise building often needs some heavy materials or component to be directly lifted in building, and above two kinds of frocks bring great difficulty to the demand in practice of construction.
Utility model content
The purpose of this utility model be provide that a kind of structure is simple, cost is low, easy to use, can in the random disassembly and assembly of architecture indoor and can by heavy material or lifting component to the high-rise arbitrarily cantilevered mast-up of super-high buildings.
The purpose of this utility model can realize.Cantilevered mast-up of the present utility model is by hanger, girder, foreleg, back leg, front right-leg, front left-leg, rear right-leg, rear left-leg, cantilever diagonal bracing bar, foreleg hound, back leg hound and some support leg liner plates are formed, the front end of described girder connects hanger, girder connects foreleg below center, back leg is connected below rear end, described foreleg is connected a front right-leg jointly with the right side of girder, foreleg is connected a front left-leg jointly with the left side of girder, described back leg is connected a rear right-leg jointly with the right side of girder, back leg is connected a rear left-leg jointly with the left side of girder, before described foreleg bottom with below kingpost cantalever end between be connected a cantilever diagonal bracing bar, after described foreleg bottom with below girder rear portion between be connected a foreleg hound, before described back leg bottom with below girder rear portion between be connected a back leg hound, described foreleg, back leg, front right-leg, front left-leg, rear right-leg, the bottom surface of rear left-leg is equipped with support leg liner plate.
The utility model cantilevered mast-up, wherein said front right-leg and front left-leg and rear right-leg and rear left-leg are all connected to the both sides of described foreleg and girder in splayed.
The utility model cantilevered mast-up, be the detachable unitized construction that high strength bolt connects between wherein said hanger, girder, foreleg, back leg, front right-leg, front left-leg, rear right-leg, rear left-leg, cantilever diagonal bracing bar, foreleg hound, back leg hound, or the stationary structure for welding.
The utility model cantilevered mast-up, wherein said foreleg, back leg, front right-leg, front left-leg, rear right-leg, rear left-leg, cantilever diagonal bracing bar, foreleg hound, back leg hound are formed by I-beam section.
The utility model cantilevered mast-up difference from prior art is that the utility model cantilevered mast-up is connected girder as main structure jointly by foreleg and back leg, lever principle is utilized to make girder front end hanger become stable suspension centre, front and back leg arranges secondary leg in left and right respectively, to strengthen the stability of level, each leg is connected with basis with basic plane junction support leg liner plate, prevent i shaped steel to the excessive destruction of causing of basic local pressure, each support leg liner plate is all connected with basic design by crab-bolt, increases its stability.The utility model is easy to dismounting, can in placely on the spot assemble, and assembling rear stability is good.Cantilevered mast-up hoisting height is high, lifting weight large, and simple structure is practical, has better alerting ability, lift, change the deficiency of existing hanging method with a kind of novel lifting form to superduty material and weight than crane, tower crane.Cantilevered mast-up and other hanging method, with the use of meeting the accurate fast hoisting of labyrinth as steel structure, solve a difficult problem for superelevation and indoor hoisting.Cantilevered mast-up has and is easy to mobile compared with traditional hoisting technology, makes simple cost low, economical and practical, can the reduction of erection time, the advantage of increasing economic efficiency.
Below in conjunction with accompanying drawing, cantilevered mast-up of the present utility model is described further.
Accompanying drawing explanation
Fig. 1 is the perspective view of the utility model cantilevered mast-up.
Fig. 2 is the structure schematic front view of the utility model cantilevered mast-up.
Fig. 3 is the right schematic side view of structure of the utility model cantilevered mast-up.
Fig. 4 is rotation 180 ° of structure schematic top plan view of the utility model cantilevered mast-up.
Fig. 5 is provided with the support leg liner plate of anchoring piece connecting bore and the connection diagram of any supporting leg.
Detailed description of the invention
As Figure 1-Figure 5, cantilevered mast-up of the present utility model is made up of hanger 1, girder 2, foreleg 3-2, back leg 3-1, front right-leg 4-1, front left-leg 4-2, rear right-leg 4-3, rear left-leg 4-4, cantilever diagonal bracing bar 5-1, foreleg hound 5-2, back leg hound 5-3 and some support leg liner plates 6.The front end of girder 2 connects hanger 1.Girder 2 connects foreleg 3-2 below center, below rear end, connect back leg 3-1.Foreleg 3-2 is connected a front right-leg 4-1 jointly with the right side of girder 2, and foreleg 3-2 is connected a front left-leg 4-2 jointly with the left side of girder 2; Back leg 3-1 is connected a rear right-leg 4-3 jointly with the right side of girder 2, and back leg 3-1 is connected a rear left-leg 4-4 jointly with the left side of girder 2.Before foreleg 3-2 bottom with below girder 2 cantilever end between be connected a cantilever diagonal bracing bar 5-1.After foreleg 3-2 bottom with below girder 2 rear portion between be connected a foreleg hound 5-2.Before back leg 3-1 bottom with below girder 2 rear portion between be connected a back leg hound 5-3.The bottom surface of foreleg 3-2, back leg 3-1, front right-leg 4-1, front left-leg 4-2, rear right-leg 4-3, rear left-leg 4-4 is equipped with support leg liner plate 6.Front right-leg 4-1 and front left-leg 4-2 and rear right-leg 4-3 and rear left-leg 4-4 is all connected to the both sides of described foreleg 3-2 and girder 2 in splayed.
The utility model cantilevered mast-up, wherein between hanger 1, girder 2, foreleg 3-2, back leg 3-1, front right-leg 4-1, front left-leg 4-2, rear right-leg 4-3, rear left-leg 4-4, cantilever diagonal bracing bar 5-1, foreleg hound 5-2, back leg hound 5-3 or for high strength bolt connect detachable unitized construction, or for welding stationary structure.
Foreleg 3-2 in the utility model cantilevered mast-up, back leg 3-1, front right-leg 4-1, front left-leg 4-2, rear right-leg 4-3, rear left-leg 4-4, cantilever diagonal bracing bar 5-1, foreleg hound 5-2, back leg hound 5-3 are formed by I-beam section.
The utility model cantilevered mast-up is a kind of hoisting bracket of cantilevered structure.Rack body utilizes leg-of-mutton stability, lifting power is converted to the axle power of each rod member, reduces the generation of moment of flexure, prevents hoisting structure unstability.Utilize anchoring piece to be anchored in the random layer structure of building by cantilevered mast-up of the present utility model by support leg liner plate, hanger connects suspender, cantilevered mast-up of the present utility model can be used.Cantilevered mast-up in use can flexible Application, can determine the shaped steel trade mark of concrete mast-up according to the size of cantilever part and lifting weight.The present embodiment lifting weight be 300KN, distance of encorbelmenting in 3400mm situation, HN496X199 selected by girder, and all the other all select HW200X204, and leg plate all selects 20mm plate iron to make.
Above-described embodiment is only be described preferred implementation of the present utility model; not scope of the present utility model is limited; under the prerequisite not departing from the utility model design spirit; the various distortion that those of ordinary skill in the art make the technical solution of the utility model and improvement, all should fall in protection domain that the utility model claims determine.

Claims (4)

1. a cantilevered mast-up, it is characterized in that: described cantilevered mast-up is by hanger (1), girder (2), foreleg (3-2), back leg (3-1), front right-leg (4-1), front left-leg (4-2), rear right-leg (4-3), rear left-leg (4-4), cantilever diagonal bracing bar (5-1), foreleg hound (5-2), back leg hound (5-3) and some support leg liner plates (6) are formed, the front end of described girder (2) connects hanger (1), girder (2) connects foreleg (3-2) below center, back leg (3-1) is connected below rear end, described foreleg (3-2) and the right side of girder (2) are connected a front right-leg (4-1) jointly, foreleg (3-2) and the left side of girder (2) are connected a front left-leg (4-2) jointly, described back leg (3-1) and the right side of girder (2) are connected a rear right-leg (4-3) jointly, back leg (3-1) and the left side of girder (2) are connected a rear left-leg (4-4) jointly, before described foreleg (3-2) bottom with below girder (2) cantilever end between be connected a cantilever diagonal bracing bar (5-1), after described foreleg (3-2) bottom with below girder (2) rear portion between be connected a foreleg hound (5-2), before described back leg (3-1) bottom with below girder (2) rear portion between be connected a back leg hound (5-3), described foreleg (3-2), back leg (3-1), front right-leg (4-1), front left-leg (4-2), rear right-leg (4-3), the bottom surface of rear left-leg (4-4) is equipped with support leg liner plate (6).
2. cantilevered mast-up according to claim 1, is characterized in that: described front right-leg (4-1) and front left-leg (4-2) and rear right-leg (4-3) and rear left-leg (4-4) are all connected to the both sides of described foreleg (3-2) and girder (2) in splayed.
3. cantilevered mast-up according to claim 1 and 2, it is characterized in that: be the detachable unitized construction that high strength bolt connects between described hanger (1), girder (2), foreleg (3-2), back leg (3-1), front right-leg (4-1), front left-leg (4-2), rear right-leg (4-3), rear left-leg (4-4), cantilever diagonal bracing bar 5-1, foreleg hound 5-2, back leg hound 5-3, or the stationary structure for welding.
4. cantilevered mast-up according to claim 3, is characterized in that: described foreleg (3-2), back leg (3-1), front right-leg (4-1), front left-leg (4-2), rear right-leg (4-3), rear left-leg (4-4), cantilever diagonal bracing bar 5-1, foreleg hound 5-2, back leg hound 5-3 are formed by I-beam section.
CN201420566159.5U 2014-09-29 2014-09-29 Cantilever type hoisting frame Expired - Fee Related CN204173767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420566159.5U CN204173767U (en) 2014-09-29 2014-09-29 Cantilever type hoisting frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420566159.5U CN204173767U (en) 2014-09-29 2014-09-29 Cantilever type hoisting frame

Publications (1)

Publication Number Publication Date
CN204173767U true CN204173767U (en) 2015-02-25

Family

ID=52562596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420566159.5U Expired - Fee Related CN204173767U (en) 2014-09-29 2014-09-29 Cantilever type hoisting frame

Country Status (1)

Country Link
CN (1) CN204173767U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109879185A (en) * 2019-03-11 2019-06-14 长沙中联恒通机械有限公司 A lifting device, fire fighting device and its mechanical equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109879185A (en) * 2019-03-11 2019-06-14 长沙中联恒通机械有限公司 A lifting device, fire fighting device and its mechanical equipment

Similar Documents

Publication Publication Date Title
CN203188589U (en) Rigid-frame continuous beam zero block construction bracket supporting system
CN103410101B (en) Tower crane conversion method for construction of parabola-shaped ultrahigh pier
CN103266778B (en) Detachable triangular scaffold and steel truss assembly construction method
CN203223003U (en) Detachable triangular jig frame for steel truss assembling
CN203891441U (en) Assembly type section steel overhung protective shed
CN203497959U (en) Support structure without inclined rod for tower crane
CN204173767U (en) Cantilever type hoisting frame
CN202899159U (en) Outer hanging type construction elevator foundation
CN203159027U (en) A prefabricated iron tower foundation spreader
CN207090788U (en) A kind of special tie-beam for being used for two cranes and synchronously lifting
CN202706508U (en) Overhanging strength bearing steel beam construction member of scaffold
CN204173802U (en) Attached hoisting frame
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN102677912A (en) Temporary supporting device
CN205688778U (en) A kind of elevating scaffold special over sling structure
CN204326487U (en) A kind of novel movable lift-type hoistway operation platform
CN204212069U (en) Hanging basket for building construction
CN207046675U (en) A kind of practical magazine attachment of construction site
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN204357138U (en) Simple steel structure hoisting frame
CN212507295U (en) Overhanging steel platform
CN211169608U (en) Hanging basket prismatic sheet hoisting device
CN208396326U (en) Concrete floor in due course construction material containing stage apparatus
CN201704698U (en) Detachable tower footing
CN207046738U (en) A kind of boom hoisting for loading and unloading and shifting suitable for equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Dai Jinhui

Inventor after: Hao Junfeng

Inventor after: Yang Yawei

Inventor before: Dai Jinhui

Inventor before: Hao Junfeng

Inventor before: Yang Yawei