CN213867995U - Desilting structure is administered in river course - Google Patents

Desilting structure is administered in river course Download PDF

Info

Publication number
CN213867995U
CN213867995U CN202022983396.XU CN202022983396U CN213867995U CN 213867995 U CN213867995 U CN 213867995U CN 202022983396 U CN202022983396 U CN 202022983396U CN 213867995 U CN213867995 U CN 213867995U
Authority
CN
China
Prior art keywords
frame
accomodating
river course
lateral wall
bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022983396.XU
Other languages
Chinese (zh)
Inventor
谷二腾
沈瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hansen Construction Engineering Co ltd
Original Assignee
Anhui Hansen Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hansen Construction Engineering Co ltd filed Critical Anhui Hansen Construction Engineering Co ltd
Priority to CN202022983396.XU priority Critical patent/CN213867995U/en
Application granted granted Critical
Publication of CN213867995U publication Critical patent/CN213867995U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a desilting structure is administered to river course relates to the field that the river course was administered, and it is including being used for placing the frame of accomodating in the inside river course, it places inside the river course to accomodate the frame slope, the top of accomodating the frame is to the one end slope that deviates from the river course water inlet, the internally mounted of accomodating the frame has the bag of accomodating that is used for collecting silt, the opening of accomodating the bag is towards water inlet one side of river course. This application has the effect that improves river course desilting efficiency.

Description

Desilting structure is administered in river course
Technical Field
The application relates to the field of river channel treatment, especially relates to a desilting structure is administered in river channel.
Background
At present, the main function of the river is drainage and navigation, and if silt siltation on the river bed is too much, the river bed can be lifted, so that the navigation and drainage capabilities can be influenced. Therefore, every few years, some river channels need to be desilted.
In the related technology, when sludge is cleaned, the river channel is built in a sectional mode, namely, dams are built along the river channel in a sectional mode, water between the two dams is pumped to expose a river bed, then the river bed is flushed by a high-pressure water gun, and a muddy water mixture is pumped into a nearby ditch or pond through a suction pump.
With respect to the related art in the above, the inventors consider that: the time spent for the whole dredging is longer, which causes the dredging efficiency of the river channel to be lower.
SUMMERY OF THE UTILITY MODEL
In order to improve the efficiency of river course desilting, this application provides a desilting structure is administered to river course.
The application provides a river course is administered desilting structure adopts following technical scheme:
the utility model provides a dredging structure is administered in river course, is including being used for placing the frame of accomodating in the river course inside, it places inside the river course to accomodate the frame slope, the top of accomodating the frame is to the one end slope that deviates from the river course water inlet, the internally mounted of accomodating the frame has the bag of accomodating that is used for collecting silt, the opening of accomodating the bag is towards water inlet one side in river course.
Through adopting above-mentioned technical scheme, inside rivers of river course and silt flow along the river course, and silt flows into to accomodating the bag along the river course inside, after using a period, will accomodate the frame and accomodate the bag and take out from the river course is inside can, accomodate the inside silt of bag alright follow the inside removal of river course to be the efficiency of the desilting of river course is higher.
Preferably, the storage bag comprises a square frame placed on one side of the storage frame, and a bag body mounted on the square frame and placed inside the storage frame.
Through adopting above-mentioned technical scheme, during the use, will accomodate the bag and divide into square frame and the bag body, square frame with accomodate the frame laminating to it is comparatively inseparable to make the bag body and accomodate to be connected between the frame, thereby makes the bag body better to the effect of accomodating of silt.
Preferably, be provided with on the lateral wall of accomodating the frame and carry out the mounting fixed to square frame, the mounting is including installing the articulated seat on accomodating the frame lateral wall, wear to be equipped with the articulated shaft that the level extends on the articulated seat, it establishes at the joint arc board to rotate the cover on the articulated shaft, the joint arc board deviates from the one end of articulated shaft and the lateral wall butt of accomodating the frame, install the cover on the square frame and establish the locking collar on the joint arc board, be provided with the retaining member that carries out locking to the joint arc board on the accomodating the frame.
By adopting the technical scheme, the square frame is stably placed on the containing frame due to the arrangement of the fixing piece, and the situation that the square frame is separated from the containing frame due to water flow impact is reduced, so that the stability of the square frame and the containing frame is good; when square frame was putd aside from accomodating the frame as needs, take off the retaining member from accomodating the frame, then rotate joint arc board along the articulated shaft, joint arc board just separates with the locking collar this moment, alright separate square frame with accomodating the frame.
Preferably, the retaining member is threaded connection and accomodates the first bolt on the frame, and the extending direction of first bolt is perpendicular with the extending direction of articulated shaft, and the lateral wall of first bolt is laminated with the lateral wall of joint arc board.
Through adopting above-mentioned technical scheme, first bolt threaded connection is inside accomodating the frame, and first bolt supports tightly the joint arc board to make the joint arc board deviate from the one end of articulated shaft and support tightly with the lateral wall of accomodating the frame, can make the relative joint arc board's of locking collar position comparatively stable.
Preferably, the lateral wall of the storage frame is provided with a positioning piece for positioning the storage bag, and the positioning piece comprises a fixing plate arranged on the lateral wall of the storage frame and a supporting rod arranged on one side of the fixing plate and extending into the storage bag.
Through adopting above-mentioned technical scheme, the bag of accomodating receives the impact of rivers and can take place to warp, and the collection effect that can lead to silt is relatively poor, so is provided with the setting element, and the setting element can fix a position the open range of bag of accomodating to reduce the probability that the bag of accomodating takes place to warp, thereby make the shape of bag of accomodating keep better.
Preferably, the support rod comprises a first rod arranged on the fixing plate and a second rod arranged on one side of the first rod, the first rod and the second rod are connected through a second bolt, and the tail end of the second bolt is in threaded connection with a nut.
Through adopting above-mentioned technical scheme, loosen the nut soon, can rotate the second pole to make the second pole accomodate the bottom to the first pole, make the bracing piece can fold in the transportation and accomodate, can reduce the cracked condition of bracing piece appearance.
Preferably, the river course up end installation carries out the driving piece that shifts up to accomodating the frame, the driving piece is including erectting the portal frame on the river course, rotate on the portal frame and install the dwang, install on the portal frame and carry out driven motor to the dwang, install two receipts bobbin on the dwang, the stay cord is all installed to the lateral wall of receiving the bobbin, the bottom of stay cord is installed on accomodating the frame.
Through adopting above-mentioned technical scheme, when needs will accomodate the frame and take out from the river course is inside, open the motor, the motor drives the dwang and rotates, and the dwang can drive and receive a line section of thick bamboo and rotate, receives a line section of thick bamboo and can wind the stay cord around rolling up on receiving a line section of thick bamboo when rotating, and the stay cord can drive accomodate the frame rebound.
Preferably, accomodate and install the montant on the frame deviates from the lateral wall of river course water inlet, the montant is placed on the interior bottom surface in river course.
Through adopting above-mentioned technical scheme, owing to accomodate the frame and be the slope form, accomodate the frame and receive the support of montant for accomodate the position in the relative river course of frame comparatively stable, thereby improved the collection efficiency of silt.
In summary, the present application includes at least one of the following beneficial technical effects:
according to the method, the storage frame and the storage bag are arranged in the river channel, when river water flows with silt, the silt falls into the storage bag, and then the silt collection work can be completed, so that the dredging efficiency of the river channel is high;
this application carries out the mounting fixed to square frame through setting up on accomodating the frame for the position of square frame relative accomodating the frame is comparatively stable, thereby reduces the square frame and breaks away from the appearance of the condition from accomodating frame upper portion.
This application is through setting up the setting element of carrying out the location to accomodating the bag on accomodating the frame for accomodate the bag and receive the impact of rivers under, accomodate the shape of bag and keep better.
Drawings
Fig. 1 is a schematic structural diagram of a river channel treatment dredging structure according to an embodiment of the present application.
Fig. 2 is a schematic structural diagram illustrating a supporting member and a receiving frame according to an embodiment of the present disclosure.
Fig. 3 is a schematic structural view illustrating a storage frame and a storage bag according to an embodiment of the present disclosure.
Fig. 4 is an enlarged schematic view of a portion a in fig. 1.
Description of reference numerals: 1. a river channel; 2. a storage frame; 3. a storage bag; 31. a square frame; 32. a bag body; 4. a support member; 41. a cross bar; 42. a vertical rod; 43. a base plate; 5. a fixing member; 51. a hinged seat; 52. hinging a shaft; 53. clamping the arc plate; 54. a locking ring; 55. a locking member; 6. a positioning member; 61. a fixing plate; 62. a support bar; 621. a first lever; 622. a second lever; 623. a second bolt; 7. a drive member; 71. a gantry; 72. rotating the rod; 73. a motor; 74. a take-up drum; 75. and pulling a rope.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses a dredging structure is administered in river course. Referring to fig. 1, the desilting structure is administered in the river course includes that the slope is placed at the frame 2 of accomodating of 1 inside in river course, and the top of accomodating frame 2 is to deviating from the one end slope of 1 water inlet in river course, and the middle part of accomodating frame 2 is installed through mounting 5 and is used for collecting the bag 3 of accomodating of silt.
Referring to fig. 1 and 2, accomodate and install support piece 4 on the lateral wall that frame 2 deviates from river course 1 water inlet, support piece 4 is including installing horizontal pole 41 on the lateral wall that accomodates frame 2 and deviates from river course 1 water inlet, the bottom fixedly connected with montant 42 of horizontal pole 41, and the bottom fixedly connected with of montant 42 places bottom plate 43 on bottom surface upper portion in river course 1, and bottom plate 43 is the horizontal extension.
Referring to fig. 1 and 3, the receiving bag 3 includes a square frame 31 disposed on one side of the receiving frame 2, and the extending direction of the square frame 31 is the same as the extending direction of the receiving frame 2; bag body 32 fixed connection is on the inside wall of square frame 31, and extends to the inside of accomodating frame 2, and the open end of bag body 32 is towards the water inlet one side of river course 1.
Referring to fig. 1 and 4, two fixing members 5 are provided, and are respectively located at the upper portion and the bottom portion of the square frame 31, and taking the fixing member 5 located at the upper portion of the square frame 31 as an example, the fixing member 5 includes a hinge seat 51, a hinge shaft 52, a snap-fit arc plate 53, a locking ring 54, and a locking member 55. The two hinge seats 51 are fixedly connected to the side wall of the storage frame 2 facing the water inlet of the river channel 1; the horizontal heights of the two hinge bases 51 are the same; the hinge shaft 52 is fixedly arranged on the two hinge seats 51 in a penetrating way and extends horizontally; one end of the clamping arc plate 53 is rotatably sleeved on the hinge shaft 52, the other end of the clamping arc plate is abutted against the side wall of the containing frame 2, and the axial line of the clamping arc plate 53 is the same as the extending direction of the containing frame 2; the upper end face of the square frame 31 is fixedly connected with a locking ring 54, the locking ring 54 is sleeved on the clamping arc plate 53, and the end face of the locking ring 54 is abutted against the side wall of the storage frame 2 facing the water inlet of the river channel 1.
Referring to fig. 1 and 4, a locking member 55 for locking the clamping arc plate 53 is installed on the receiving frame 2, so that the clamping arc plate 53 is relatively stable in position with respect to the locking ring 54; retaining member 55 is for taking in the first bolt on the frame 2 lateral wall from river course 1 water outlet end one side threaded connection, and the extending direction of first bolt is perpendicular with taking in frame 2, and the extending direction of first bolt is perpendicular with the extending direction of articulated shaft 52, and first bolt is located the upper portion of joint arc-shaped plate 53, and the lateral wall of first bolt is laminated with the lateral wall of joint arc-shaped plate 53.
Referring to fig. 1 and 3, the sidewall of the receiving frame 2 is provided with positioning members 6 for positioning the receiving bag 3, so that the shape of the bag body 32 can be kept well, and sludge can be conveniently received, and the four positioning members 6 are arranged, correspond to each other in pairs, and are symmetrical along the center line of the receiving frame 2; the positioning member 6 includes a fixing plate 61 fixed on the side wall of the receiving frame 2 facing the water inlet of the river channel 1, the bottom end of the fixing plate 61 extends to one side of the bag body 32, and a support rod 62 extending to the inside of the bag body 32 is installed on one side of the fixing plate 61 facing the bag body 32.
Referring to fig. 3, the supporting rod 62 includes a first rod 621 fixed to the fixing plate 61 on a side facing the bag body 32, the first rod 621 is perpendicular to the fixing plate 61 and extends into the bag body 32; a second bolt 623 horizontally penetrates through the bottom end of the first rod 621, a second rod 622 is rotatably sleeved on the second bolt 623, and the second rod 622 is positioned inside the bag body 32 and supports the bag body 32; a nut is threadedly coupled to a rear end of the second bolt 623. By adjusting the positions of the first rod 621 and the second rod 622, the shape of the bag body 32 expanded by the first rod 621 and the second rod 622 is different, and the flexibility is high.
Referring to fig. 1, two driving members 7 for moving up the receiving frame 2 are mounted on the upper end surface of the river channel 1, and the two driving members 7 are arranged at intervals along the length direction of the river channel 1; use one of them driving piece 7 as an example, driving piece 7 is including erectting portal frame 71 on river course 1, rotate between two vertical sections of portal frame 71 and install dwang 72, install on the lateral wall of the vertical section of portal frame 71 and carry out driven motor 73 to dwang 72, fixed cover is equipped with two receipts bobbin 74 on the dwang 72, equal rigid coupling has stay cord 75 on the extrados of receipts bobbin 74, the bottom of stay cord 75 is all installed on the lateral wall of accomodating frame 2 towards river course 1 water inlet. The two strings 75 are provided at intervals in the longitudinal direction of the storage frame 2.
The implementation principle of the dredging structure for treating the river channel 1 in the embodiment of the application is as follows: when using, rivers flow along 1 length direction in river course, the silt that the rivers bottom was carried collects to accomodating inside bag 3, after using a period, need will accomodate frame 2 and accomodate bag 3 and take out from river course 1 is inside, at first, open motor 73, motor 73 drives dwang 72 and rotates, dwang 72 can drive take-up reel 74 and rotate, take-up reel 74 can be when rotating with stay cord 75 around rolling up on take-up reel 74, stay cord 75 can drive accomodating frame 2 rebound.
When the storage bag 3 needs to be taken out of the storage frame 2, the positioning piece 6 needs to be taken down from the storage frame 2, then the second bolt 623 is taken down from the storage frame 2, then the clamping arc plate 53 rotates, the clamping arc plate 53 can be separated from the locking ring 54, the square frame 31 can be moved away from one side of the storage frame 2, and sludge in the storage bag 3 can be cleaned.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a desilting structure is administered to river course which characterized in that: including being used for placing frame (2) of accomodating in river course (1) inside, frame (2) slope is accomodate and is placed in river course (1) inside, the top of accomodating frame (2) is to deviating from the one end slope of river course (1) water inlet, the internally mounted of accomodating frame (2) has bag (3) of accomodating that is used for collecting silt, the opening of accomodating bag (3) is towards water inlet one side of river course (1).
2. The river channel treatment dredging structure of claim 1, wherein: the storage bag (3) comprises a square frame (31) arranged on one side of the storage frame (2) and a bag body (32) arranged on the square frame (31) and arranged inside the storage frame (2).
3. The river channel treatment dredging structure of claim 1, wherein: accomodate and be provided with on the lateral wall of frame (2) and carry out fixed mounting (5) to square frame (31), mounting (5) are including installing articulated seat (51) on accomodating frame (2) lateral wall, wear to be equipped with articulated shaft (52) that the level extends on articulated seat (51), it establishes at joint arc board (53) to rotate the cover on articulated shaft (52), joint arc board (53) deviate from the one end of articulated shaft (52) and the lateral wall butt of accomodating frame (2), install on square frame (31) and establish locking ring (54) of establishing on joint arc board (53), be provided with on accomodating frame (2) and carry out retaining member (55) locked to joint arc board (53).
4. The river channel treatment dredging structure of claim 3, wherein: retaining member (55) are threaded connection and accomodate the first bolt on frame (2), and the extending direction of first bolt is perpendicular with the extending direction of articulated shaft (52), the lateral wall of first bolt and the laminating of the lateral wall of joint arc board (53).
5. The river channel treatment dredging structure of claim 1, wherein: install on the lateral wall of accomodating frame (2) and carry out the setting element (6) of fixing a position to accomodating bag (3), setting element (6) are including installing fixed plate (61) on accomodating frame (2) lateral wall, installing at fixed plate (61) one side and extending to the bracing piece (62) of accomodating bag (3) inside.
6. The river channel treatment dredging structure of claim 5, wherein: the bracing piece (62) is including installing first pole (621) on fixed plate (61), setting up second pole (622) in first pole (621) one side, be connected through second bolt (623) between first pole (621) and second pole (622), the tail end threaded connection of second bolt (623) has the nut.
7. The river channel treatment dredging structure of claim 1, wherein: river course (1) up end installation is to accomodating driving piece (7) that frame (2) went on shifting up, driving piece (7) are including erectting portal frame (71) on river course (1), it installs dwang (72) to rotate on portal frame (71), install on portal frame (71) and carry out driven motor (73) to dwang (72), install two receipts line section of thick bamboo (74) on dwang (72), stay cord (75) are all installed to the lateral wall of receipts line section of thick bamboo (74), install on accomodating frame (2) the bottom of stay cord (75).
8. The river channel treatment dredging structure of claim 1, wherein: accomodate and install montant (42) on frame (2) deviate from the lateral wall of river course (1) water inlet, montant (42) are placed on the interior bottom surface of river course (1).
CN202022983396.XU 2020-12-08 2020-12-08 Desilting structure is administered in river course Active CN213867995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022983396.XU CN213867995U (en) 2020-12-08 2020-12-08 Desilting structure is administered in river course

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022983396.XU CN213867995U (en) 2020-12-08 2020-12-08 Desilting structure is administered in river course

Publications (1)

Publication Number Publication Date
CN213867995U true CN213867995U (en) 2021-08-03

Family

ID=77067566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022983396.XU Active CN213867995U (en) 2020-12-08 2020-12-08 Desilting structure is administered in river course

Country Status (1)

Country Link
CN (1) CN213867995U (en)

Similar Documents

Publication Publication Date Title
JPS6315381Y2 (en)
CN102725515B (en) The device of electric station
CN208159879U (en) The underwater fishing gear of shellfish
CN216156530U (en) Automatic water surface garbage collecting device
CN208578092U (en) Dredging device for water conservancy projects
CN211874550U (en) Movable tunnel construction relay water pumping and draining device
CN107178368B (en) Underwater suction filtration mining vehicle
CN213867995U (en) Desilting structure is administered in river course
CN112411651B (en) Quick desilting device of hydraulic engineering with stirring function
CN210766937U (en) River and lake bed surface layer dredging system
CN208965621U (en) A kind of dredging device for water conservancy projects
CN210621802U (en) Dredging device for building engineering
CN216276075U (en) Ecological green escape canal with desilting function
JP2001214879A (en) Bottom sampling strainer for submergible pump having excavating function
CN219690617U (en) River dredging device for water conservancy construction
CN220645826U (en) Step-by-step rectangular shallow hole drill with haunching horizontal cantilever and suitable for soil stratum
CN213539024U (en) Foundation pit dewatering structure
CN217379050U (en) River channel treatment dredging device
CN220538743U (en) Hydraulic engineering dredging device
CN218466553U (en) Energy-saving drainage structure for foundation pit construction
CN219118206U (en) Well point drainage machine
CN211735463U (en) Water-saving mechanism for building construction foundation pit water
CN114319495B (en) River channel dredging device at estuary
CN218091070U (en) Floating type middle and upper layer water taking device
CN220842894U (en) Inland river garbage cleaning ship

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant