CN211874550U - Movable tunnel construction relay water pumping and draining device - Google Patents

Movable tunnel construction relay water pumping and draining device Download PDF

Info

Publication number
CN211874550U
CN211874550U CN202020433976.9U CN202020433976U CN211874550U CN 211874550 U CN211874550 U CN 211874550U CN 202020433976 U CN202020433976 U CN 202020433976U CN 211874550 U CN211874550 U CN 211874550U
Authority
CN
China
Prior art keywords
fixedly connected
water pumping
water
tunnel construction
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020433976.9U
Other languages
Chinese (zh)
Inventor
赵宇
全斐
赵春杰
沈家君
高明成
李翔翔
刘继然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN202020433976.9U priority Critical patent/CN211874550U/en
Application granted granted Critical
Publication of CN211874550U publication Critical patent/CN211874550U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a drainage device is taken out in portable tunnel construction relay belongs to tunnel adverse slope construction technical field. A movable tunnel construction relay water pumping and draining device comprises a movable base, wherein a water collecting tank is fixedly connected to the upper surface of the movable base, a water pumping pump is fixedly connected to the inner bottom wall of the water collecting tank, a water pumping pipe is fixedly connected to the output end of the water pumping pump, and a joint is movably connected to one end of the water pumping pipe; the utility model discloses, through the setting of clearance brush and filter screen, the staff starts the rotation motor when carrying out drainage work, through driving the rotation band messenger clearance brush-stick and rotate in the inside of recess to make the clearance brush scrub the surface of filter screen, reduce the device and appear the problem of jam when carrying out discharge work, take place to block up when being favorable to preventing the drainage, improve the work efficiency of drainage work, can also be convenient for change and overhaul simultaneously, so that it is more convenient to use.

Description

Movable tunnel construction relay water pumping and draining device
Technical Field
The utility model relates to a tunnel adverse slope construction technical field especially relates to a drainage device is taken out in portable tunnel construction relay.
Background
The construction drainage is one of the important processes of tunnel construction, which is the key of tunnel safety construction, a reasonable drainage system and an ideal drainage effect are to realize the rapid construction of tunnels and guarantee the important guarantee of construction safety, along with the increase of railway construction engineering and the acceleration of railway construction speed, the construction of long and large tunnels is also increased in the railway construction engineering, in the tunnel construction, especially the slope-returning drainage is indispensable in the construction of inclined shaft tunnels, the drainage operation in the prior art is to dig a reservoir in the tunnel, the sewage in the tunnel is pumped to the reservoir by a water pump, and the water in the reservoir is discharged out of the tunnel by a steel pipe which is plugged by a drainage pump for treatment, so the lift of the water pump, the capacity of the reservoir and the drainage pump which is matched are required to be calculated.
At the drainage in-process, because the water pump function, drainage device takes place to rock easily, and whole steadiness can be relatively poor, needs to carry out the drainage operation to the water in the tunnel, and traditional drainage in-process need be discharged water liquid, and submarine often gathers mud, discharges through the water pump and has the problem of easy jam.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the sludge is often accumulated at the bottom of the water in the prior art, and the problem of easy blockage exists in the drainage through the water pump, and the provided mobile tunnel construction relay water pumping and draining device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a drainage device is taken out in portable tunnel construction relay, includes the removal base, the last fixed surface of removal base is connected with the header tank, the interior diapire fixedly connected with suction pump of header tank, the output fixedly connected with drinking-water pipe of suction pump, the one end swing joint of drinking-water pipe has the joint, the cell membrane fixedly connected with suction head that connects, the outer fixed surface of suction head is connected with the filter screen, the lower surface of suction head passes through connection pad fixed connection supporting baseplate, the last fixed surface of suction head is connected with the connecting block, the surface of connecting block is seted up flutedly, the inside swing joint of recess has the clearance brush-holder, the lower fixed surface of clearance brush-holder is connected with the clearance brush.
Preferably, the lower surface of the supporting bottom plate is fixedly connected with a balancing weight.
Preferably, the outer surface of the water suction head is provided with a plurality of water suction holes.
Preferably, the upper surface swing joint of connecting block has the rotation area, the last fixed surface in rotation area is connected with the clearance brush-holder stud, the surface swing joint in rotation area has a running gear, the upper surface of running gear rotates the motor through pivot fixedly connected with, the surface of rotating the motor passes through motor support fixed connection and connects at the surface that connects.
Preferably, the lower fixed surface of supporting baseplate is connected with the fixed block, the lower fixed surface of fixed block is connected with reset spring, reset spring keeps away from the one end fixedly connected with sleeve pipe of fixed block, sheathed tube lower fixed surface is connected with the support base, the lower fixed surface who supports the base is connected with the thorn axle.
Preferably, the outer surface of the water collecting tank is fixedly connected with a drain pipe.
Compared with the prior art, the utility model provides a portable tunnel construction relay drainage device possesses following beneficial effect:
1. the utility model discloses, through the setting of clearance brush and filter screen, the staff starts the rotation motor when carrying out drainage work, through driving the rotation band messenger clearance brush-stick and rotate in the inside of recess to make the clearance brush scrub the surface of filter screen, reduce the device and appear the problem of jam when carrying out discharge work, take place to block up when being favorable to preventing the drainage, improve the work efficiency of drainage work, can also be convenient for change and overhaul simultaneously, so that it is more convenient to use.
2. The utility model discloses, through the setting of supporting base and thorn axle, make the device when carrying out the drainage operation to the water in the foundation ditch, can place supporting baseplate in the tunnel and need drainage department, the bottom in drainage department is fixed to the thorn axle, the stability of operation has been strengthened, the distance accessible of suction head and drainage department bottom simultaneously increases the balancing weight and adjusts, make the drainage engineering under the adaptable different environment of the device, supporting baseplate can shelter from the silt of raising, the silt volume near the suction head has been reduced, thereby reduce the condition of taking place to block up, guarantee staff's work efficiency.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the cross section of the device of the present invention;
FIG. 3 is a schematic structural view of the water pumping pipe of the present invention;
fig. 4 is an enlarged schematic structural view of a point a in fig. 2 according to the present invention.
In the figure: 1. moving the base; 2. a water collection tank; 3. a water pump; 4. a water pumping pipe; 5. a suction head; 6. a filter screen; 7. a support base plate; 8. a balancing weight; 9. a fixed block; 10. a sleeve; 11. a support base; 12. pricking a shaft; 13. a return spring; 14. connecting blocks; 15. a groove; 16. cleaning the brush rod; 17. cleaning a brush; 18. a rotating belt; 19. a joint; 20. and a water discharge pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, a movable tunnel construction relay water pumping and draining device comprises a movable base 1, a water collecting tank 2 is fixedly connected to the upper surface of the movable base 1, a water pump 3 is fixedly connected to the inner bottom wall of the water collecting tank 2, a water pumping pipe 4 is fixedly connected to the output end of the water pump 3, a joint 19 is movably connected to one end of the water pumping pipe 4, a water suction head 5 is fixedly connected to the cell membrane of the joint 19, a filter screen 6 is fixedly connected to the outer surface of the water suction head 5, a plurality of water suction holes are formed in the outer surface of the water suction head 5, a supporting bottom plate 7 is fixedly connected to the lower surface of the water suction head 5 through a connecting disc, a connecting block 14 is fixedly connected to the upper surface of the water suction head 5, a rotating belt 18 is movably connected to the upper surface of the connecting block 14, a cleaning brush stick 16 is, the upper surface of the rotating gear is fixedly connected with a rotating motor through a rotating shaft, the outer surface of the rotating motor is fixedly connected with the outer surface of the joint 19 through a motor support, the outer surface of the connecting block 14 is provided with a groove 15, the interior of the groove 15 is movably connected with a cleaning brush rod 16, and the lower surface of the cleaning brush rod 16 is fixedly connected with a cleaning brush 17;
when the water drainage work is carried out, a worker starts the rotating motor, the cleaning brush rod 16 rotates in the groove 15 by driving the rotating belt 18, so that the cleaning brush 17 brushes the outer surface of the filter screen 6, the problem of blockage of the device during the drainage work is reduced, the blockage during the drainage work is prevented, the work efficiency of the drainage work is improved, and meanwhile, the replacement and the maintenance are facilitated, so that the use is more convenient;
the lower surface of the supporting bottom plate 7 is fixedly connected with a balancing weight 8, the lower surface of the supporting bottom plate 7 is fixedly connected with a fixed block 9, the lower surface of the fixed block 9 is fixedly connected with a return spring 13, one end, far away from the fixed block 9, of the return spring 13 is fixedly connected with a sleeve 10, the lower surface of the sleeve 10 is fixedly connected with a supporting base 11, the lower surface of the supporting base 11 is fixedly connected with a thorn shaft 12, and the outer surface of the water collecting tank 2 is fixedly connected with a water;
when carrying out the drainage operation to the water in the foundation ditch, can place supporting baseplate 7 in the tunnel needs drainage department, thorn axle 12 is fixed in the bottom of drainage department, the stability of operation has been strengthened, the distance accessible of suction head 5 and drainage department bottom simultaneously increases balancing weight 8 and adjusts, make the drainage engineering under the adaptable different environment of the device, supporting baseplate 7 can shelter from the silt of raising, the silt that is close to suction head 5 has been reduced, thereby reduce the condition that takes place to block up, guarantee staff's work efficiency.
In the utility model, when the water in the foundation pit is drained, the supporting bottom plate 7 can be placed at the position where the water needs to be drained in the tunnel, the barbed shaft 12 is fixed at the bottom of the drainage position, the operation stability is enhanced, and meanwhile, the distance between the water suction head 5 and the bottom of the drainage position can be adjusted by adding the balancing weight 8, so that the device can adapt to drainage engineering in different environments, the supporting bottom plate 7 can shield raised silt, the amount of silt close to the water suction head 5 is reduced, and the blocking condition is reduced;
the motor is rotated in the start-up simultaneously, through driving the rotating band 18 messenger clearance brush-stick 16 and rotating in the inside of recess 15 to make clearance brush 17 scrub filter screen 6's surface, reduce the device and appear the problem of jam when carrying out the discharge work, take place to block up when being favorable to preventing the drainage, improve the work efficiency of drainage work, can also be convenient for change and overhaul simultaneously, so that it is more convenient to use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a portable tunnel construction relay drainage device, includes and removes base (1), its characterized in that, the last fixed surface of removing base (1) is connected with header tank (2), the interior diapire fixedly connected with suction pump (3) of header tank (2), the output end fixedly connected with drinking-water pipe (4) of suction pump (3), the one end swing joint of drinking-water pipe (4) has joint (19), the cell membrane fixedly connected with suction head (5) of joint (19), the external surface fixedly connected with filter screen (6) of suction head (5), the lower surface of suction head (5) passes through connection pad fixed connection supporting baseplate (7), the last fixed surface of suction head (5) is connected with connecting block (14), the surface of connecting block (14) is seted up recess (15), the inside swing joint of recess (15) has clearance brush stick (16), the lower surface of the cleaning brush rod (16) is fixedly connected with a cleaning brush (17).
2. The mobile tunnel construction relay water pumping and draining device as claimed in claim 1, wherein a balancing weight (8) is fixedly connected to the lower surface of the supporting bottom plate (7).
3. The mobile tunnel construction relay water pumping and draining device as claimed in claim 1, wherein the outer surface of the water suction head (5) is provided with a plurality of water suction holes.
4. The mobile tunnel construction relay water pumping and draining device according to claim 1, wherein a rotating belt (18) is movably connected to the upper surface of the connecting block (14), a cleaning brush stick (16) is fixedly connected to the upper surface of the rotating belt (18), a rotating gear is movably connected to the outer surface of the rotating belt (18), a rotating motor is fixedly connected to the upper surface of the rotating gear through a rotating shaft, and the outer surface of the rotating motor is fixedly connected to the outer surface of the joint (19) through a motor bracket.
5. The mobile tunnel construction relay water pumping and draining device according to claim 1, wherein a fixed block (9) is fixedly connected to the lower surface of the supporting bottom plate (7), a return spring (13) is fixedly connected to the lower surface of the fixed block (9), a sleeve (10) is fixedly connected to one end, away from the fixed block (9), of the return spring (13), a supporting base (11) is fixedly connected to the lower surface of the sleeve (10), and a barbed shaft (12) is fixedly connected to the lower surface of the supporting base (11).
6. The mobile tunnel construction relay water pumping and draining device according to claim 1, wherein a water draining pipe (20) is fixedly connected to the outer surface of the water collecting tank (2).
CN202020433976.9U 2020-03-30 2020-03-30 Movable tunnel construction relay water pumping and draining device Expired - Fee Related CN211874550U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020433976.9U CN211874550U (en) 2020-03-30 2020-03-30 Movable tunnel construction relay water pumping and draining device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020433976.9U CN211874550U (en) 2020-03-30 2020-03-30 Movable tunnel construction relay water pumping and draining device

Publications (1)

Publication Number Publication Date
CN211874550U true CN211874550U (en) 2020-11-06

Family

ID=73255827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020433976.9U Expired - Fee Related CN211874550U (en) 2020-03-30 2020-03-30 Movable tunnel construction relay water pumping and draining device

Country Status (1)

Country Link
CN (1) CN211874550U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112856109A (en) * 2021-01-04 2021-05-28 微山金源煤矿 Automatic safety protection equipment for underground working surface of coal mine
CN113339061A (en) * 2021-07-12 2021-09-03 重庆国翔新材料有限公司 Stifled pipe prevention and cure device of tunnel drain pipe crystallization
CN114033486A (en) * 2021-11-04 2022-02-11 广西路桥工程集团有限公司 Tunnel construction drainage system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112856109A (en) * 2021-01-04 2021-05-28 微山金源煤矿 Automatic safety protection equipment for underground working surface of coal mine
CN112856109B (en) * 2021-01-04 2022-06-17 微山金源煤矿 Automatic safety protection equipment for underground working surface of coal mine
CN113339061A (en) * 2021-07-12 2021-09-03 重庆国翔新材料有限公司 Stifled pipe prevention and cure device of tunnel drain pipe crystallization
CN114033486A (en) * 2021-11-04 2022-02-11 广西路桥工程集团有限公司 Tunnel construction drainage system
CN114033486B (en) * 2021-11-04 2024-05-24 广西路桥工程集团有限公司 Tunnel construction drainage system

Similar Documents

Publication Publication Date Title
CN211874550U (en) Movable tunnel construction relay water pumping and draining device
CN211421208U (en) River silt clean-up equipment for hydraulic engineering
CN208701879U (en) A kind of pipe dredging machine people
CN208717990U (en) A kind of hydraulic engineering Accrete clearing device
CN116716898B (en) Hole collapse preventing mechanism for ultra-deep rotary pile digging construction and use method thereof
CN212200723U (en) Ditch wall cleaning device
CN215256861U (en) Energy-saving submersible pump for well capable of utilizing water wheel to store energy
CN213805781U (en) Hydraulic tunnel drainage device
CN213897269U (en) Hydraulic engineering desilting device
CN210857337U (en) Hydraulic and hydroelectric engineering is with high-efficient desilting equipment
CN212130546U (en) Movable pumping and drainage device for tunnel construction
CN220768308U (en) Municipal works construction drainage device
CN220686106U (en) Drainage device for hydraulic engineering construction
CN219570393U (en) Movable water pumping and draining machine
CN216741958U (en) High efficiency drainage equipment is used in hydraulic engineering construction
CN218713875U (en) Drainage pipe cutting desilting robot
CN218862669U (en) Tunnel ponding drainage device for mine construction
CN215352457U (en) System of recycling is collected to rainwater high efficiency
CN219653787U (en) Dredging device for ecological restoration of river channel
CN219547716U (en) Silt cleaning equipment for hydraulic engineering
CN219195794U (en) Waterproof drainage device for water conservancy construction
CN218843172U (en) Deep basal pit prevention of seepage water structure
CN213116390U (en) Drainage device for urban sunken tunnel
CN218373893U (en) A building site excavation supporting device for municipal works
CN217758701U (en) Water drainage structure is prevented to soft soil foundation basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201106

Termination date: 20210330

CF01 Termination of patent right due to non-payment of annual fee