CN213841424U - Refrigerant injection device for air conditioner production line - Google Patents

Refrigerant injection device for air conditioner production line Download PDF

Info

Publication number
CN213841424U
CN213841424U CN202022387950.8U CN202022387950U CN213841424U CN 213841424 U CN213841424 U CN 213841424U CN 202022387950 U CN202022387950 U CN 202022387950U CN 213841424 U CN213841424 U CN 213841424U
Authority
CN
China
Prior art keywords
refrigerant injection
production line
injection device
refrigerant
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022387950.8U
Other languages
Chinese (zh)
Inventor
郭真珠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Wantailian Environmental Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022387950.8U priority Critical patent/CN213841424U/en
Application granted granted Critical
Publication of CN213841424U publication Critical patent/CN213841424U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an air conditioner production line refrigerant injection device, the on-line screen storage device comprises a base, install first band conveyer and second band conveyer on the base, the base top is connected with the roof through the bracing piece, be equipped with the installing port in the roof, be equipped with moving mechanism in the installing port, moving mechanism is connected with the pneumatic cylinder, the flexible end of pneumatic cylinder is fixed with the mounting panel, the bottom of mounting panel is equipped with fixture, refrigerant injection mechanism is installed to the upper end of mounting panel, the baffle is installed to first band conveyer's transport end. The utility model discloses rational in infrastructure, its can last and automatic completion refrigerant pour into, improve production efficiency greatly.

Description

Refrigerant injection device for air conditioner production line
Technical Field
The utility model relates to an air conditioner production technical field especially relates to an air conditioner production line refrigerant injection device.
Background
An air conditioner, i.e., an air conditioner, is a device that manually adjusts and controls parameters such as temperature, humidity, cleanliness, and flow rate of ambient air in a building/structure.
Air conditioner product fills when filling the refrigerant on the assembly line, generally all is that the developments fill to fill and annotate, need artifical real-time supervision, fill in time after accomplishing with the refrigerant fill rifle and product separation, degree of automation is low, influences production efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the air conditioner production line refrigerant injection device that proposes, its can last and automatic completion refrigerant pour into, improve production efficiency greatly.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an air conditioner production line refrigerant injection device, includes the base, install first band conveyer and second band conveyer on the base, the base top is connected with the roof through the bracing piece, be equipped with the installing port in the roof, be equipped with moving mechanism in the installing port, moving mechanism is connected with the pneumatic cylinder, the flexible end of pneumatic cylinder is fixed with the mounting panel, the bottom of mounting panel is equipped with fixture, refrigerant injection mechanism is installed to the upper end of mounting panel, the baffle is installed to first band conveyer's transport end.
Preferably, the first belt conveyor and the second belt conveyor have the same conveying direction, and the conveying tail end of the first belt conveyor is flush with the starting end of the second belt conveyor.
Preferably, moving mechanism is including installing the first motor on the roof lateral wall, the output shaft end of first motor extends to in the installing port and is fixed with the threaded rod, threaded connection has the slider on the threaded rod, the lateral wall and the installing port inner wall sliding connection of slider, the pneumatic cylinder runs through the slider setting.
Preferably, fixture is including installing the second motor on the mounting panel lateral wall, the bottom of mounting panel is equipped with the bar groove, the output shaft end of second motor extends to the bar inslot and is fixed with double threaded screw, the equal threaded connection in both sides of double threaded screw has splint, the upper end and the bar inslot wall sliding connection of splint, the lateral wall of splint bonds and has the slipmat.
Preferably, the refrigerant injection mechanism comprises an air cylinder installed at the upper end of the mounting plate, a connecting plate is fixed at the telescopic tail end of the air cylinder, an injection pipe is fixed on the connecting plate, and the bottom of the injection pipe is connected with an injection head through a buffer mechanism.
Preferably, buffer gear is including fixing many guide bars in the injection head upper end, the bottom of filling tube is equipped with the guide way that corresponds with the guide bar, many the peripheral cover of guide bar is equipped with the spring, the peripheral cover of spring is equipped with the bellows.
Compared with the prior art, the utility model, its beneficial effect does:
1. through setting up two band conveyer, cooperation fixture and moving mechanism can transport the air conditioner, reserves abundant time for the injection of refrigerant simultaneously.
2. Through setting up refrigerant injection mechanism, can lead the air conditioner under fixture and baffle effect and just grasp, make the injection head can be accurate insert the injection port in accomplish the injection of refrigerant.
Drawings
Fig. 1 is a schematic structural view of a refrigerant injection device of an air conditioner production line according to the present invention;
fig. 2 is a schematic top view of a refrigerant injection device of an air conditioner production line according to the present invention;
fig. 3 is the utility model provides an enlarged schematic diagram of a structure of air conditioner production line refrigerant injection device.
In the figure: the device comprises a base 1, a first motor 2, a top plate 3, a second belt conveyor 4, a first belt conveyor 5, a baffle 6, a sliding block 7, a hydraulic cylinder 8, a mounting port 9, a threaded rod 10, a second motor 11, a double-head screw 12, a mounting plate 13, an injection pipe 14, an air cylinder 15, a clamping plate 16, a corrugated pipe 17, a guide rod 18, an injection head 19 and a spring 20.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention can be embodied in many different forms other than those specifically described herein, and it will be apparent to those skilled in the art that similar modifications can be made without departing from the spirit and scope of the invention, and it is therefore not to be limited to the specific embodiments disclosed below.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only and do not represent the only embodiments.
Referring to fig. 1-3, a refrigerant injection device for an air conditioner production line comprises a base 1, a first belt conveyor 5 and a second belt conveyor 4 are mounted on the base 1, the conveying directions of the first belt conveyor 5 and the second belt conveyor 4 are the same, the conveying end of the first belt conveyor 5 is flush with the starting end of the second belt conveyor 4, a top plate 3 is connected above the base 1 through a supporting rod, a mounting opening 9 is arranged in the top plate 3, a moving mechanism is arranged in the mounting opening 9 and comprises a first motor 2 mounted on the side wall of the top plate 3, the end of an output shaft of the first motor 2 extends into the mounting opening 9 and is fixed with a threaded rod 10, a slider 7 is in threaded connection with the threaded rod 10, the side wall of the slider 7 is in sliding connection with the inner wall of the mounting opening 9, a hydraulic cylinder 8 penetrates through the slider 7 and is arranged to start the first motor 2 to drive the threaded rod 10 to rotate, the threaded rod 10 drives the sliding block 7 to move, the air conditioner is driven to move to the position above the second belt conveyor 4, and the refrigerant can be injected in the process.
Moving mechanism is connected with pneumatic cylinder 8, pneumatic cylinder 8's telescopic end is fixed with mounting panel 13, mounting panel 13's bottom is equipped with fixture, fixture is including installing second motor 11 on mounting panel 13 lateral wall, mounting panel 13's bottom is equipped with the bar groove, second motor 11's output shaft end extends to the bar inslot and is fixed with double threaded screw 12, the equal threaded connection in both sides of double threaded screw 12 has splint 16, splint 16's upper end and bar inslot wall sliding connection, splint 16's lateral wall bonds there is the slipmat, it drives two splint 16 relative movement and presss from both sides the air conditioner to start second motor 11, because splint 16 are the simultaneous movement, from the position that can be with the air conditioner centre gripping in mounting panel 13 is positive, make injection head 19 to this refrigerant filling opening.
Refrigerant injection mechanism is installed to mounting panel 13's upper end, refrigerant injection mechanism is including installing cylinder 15 in mounting panel 13 upper end, cylinder 15's flexible end is fixed with the connecting plate, be fixed with injection tube 14 on the connecting plate, injection tube 14's bottom is connected with injection head 19 through buffer gear, buffer gear is including fixing many guide bars 18 in injection head 19 upper end, injection tube 14's bottom is equipped with the guide way that corresponds with guide bar 18, the peripheral cover of many guide bars 18 is equipped with spring 20, the peripheral cover of spring 20 is equipped with bellows 17, start-up cylinder 15, it inserts the interior injection refrigerant of injection head 19 insertion injection port to drive, spring 20 can provide the buffering, baffle 6 is installed to first band conveyer 5's transport end.
In the utility model, the air conditioner is continuously transported by the first belt conveyor 5, the tail end is transported to abut against the baffle 6, the baffle 6 can guide the air conditioner, the hydraulic cylinder 8 is started to drive the mounting plate 13 to descend, the two clamp plates 16 are respectively positioned at two sides of the air conditioner, the second motor 11 is started to drive the two clamp plates 16 to move relatively to clamp the air conditioner, the clamp plates 16 move simultaneously, the air conditioner can be clamped at the right middle position of the mounting plate 13, the injection head 19 is opposite to the refrigerant injection opening, the air conditioner is lifted by the hydraulic cylinder 8, the first motor 2 is started to drive the threaded rod 10 to rotate, the threaded rod 10 drives the slide block 7 to move, the air conditioner is driven to move to the upper part of the second belt conveyor 4, the cylinder 15 is started in the required time in the process, the injection head 19 is driven to be inserted into the injection opening to inject the refrigerant, the spring 20 can provide buffering, the injection is placed on the second belt conveyor 4 for transportation, the continuous injection of the refrigerant can be realized without stopping the machine.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides an air conditioner production line refrigerant injection device, includes base (1), its characterized in that, install first band conveyer (5) and second band conveyer (4) on base (1), base (1) top is connected with roof (3) through the bracing piece, be equipped with installing port (9) in roof (3), be equipped with moving mechanism in installing port (9), moving mechanism is connected with pneumatic cylinder (8), the flexible end of pneumatic cylinder (8) is fixed with mounting panel (13), the bottom of mounting panel (13) is equipped with fixture, refrigerant injection mechanism is installed to the upper end of mounting panel (13), baffle (6) are installed to the transport end of first band conveyer (5).
2. The refrigerant injection device of claim 1, wherein the first belt conveyor (5) and the second belt conveyor (4) have the same conveying direction, and the conveying end of the first belt conveyor (5) is flush with the starting end of the second belt conveyor (4).
3. The refrigerant injection device of an air conditioning production line according to claim 1, wherein the moving mechanism comprises a first motor (2) installed on a side wall of the top plate (3), an output shaft end of the first motor (2) extends into the installation opening (9) and is fixed with a threaded rod (10), a sliding block (7) is connected to the threaded rod (10) in a threaded mode, the side wall of the sliding block (7) is connected with an inner wall of the installation opening (9) in a sliding mode, and the hydraulic cylinder (8) penetrates through the sliding block (7).
4. The refrigerant injection device of an air conditioning production line according to claim 1, wherein the clamping mechanism comprises a second motor (11) installed on a side wall of the installation plate (13), a strip-shaped groove is formed in the bottom of the installation plate (13), the tail end of an output shaft of the second motor (11) extends into the strip-shaped groove and is fixed with a double-threaded screw (12), clamping plates (16) are connected to two sides of the double-threaded screw (12) in a threaded mode, the upper end of each clamping plate (16) is connected with the inner wall of the strip-shaped groove in a sliding mode, and anti-slip pads are bonded to the side wall of each clamping plate (16).
5. The refrigerant injection device of the air conditioning production line according to claim 1, wherein the refrigerant injection mechanism comprises an air cylinder (15) installed at the upper end of the mounting plate (13), a connecting plate is fixed at the telescopic tail end of the air cylinder (15), an injection pipe (14) is fixed on the connecting plate, and the bottom of the injection pipe (14) is connected with an injection head (19) through a buffer mechanism.
6. The refrigerant injection device of an air conditioning production line according to claim 5, wherein the buffer mechanism comprises a plurality of guide rods (18) fixed at the upper end of the injection head (19), the bottom of the injection pipe (14) is provided with guide grooves corresponding to the guide rods (18), the periphery of the plurality of guide rods (18) is sleeved with a spring (20), and the periphery of the spring (20) is sleeved with a corrugated pipe (17).
CN202022387950.8U 2020-10-24 2020-10-24 Refrigerant injection device for air conditioner production line Active CN213841424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022387950.8U CN213841424U (en) 2020-10-24 2020-10-24 Refrigerant injection device for air conditioner production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022387950.8U CN213841424U (en) 2020-10-24 2020-10-24 Refrigerant injection device for air conditioner production line

Publications (1)

Publication Number Publication Date
CN213841424U true CN213841424U (en) 2021-07-30

Family

ID=77010791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022387950.8U Active CN213841424U (en) 2020-10-24 2020-10-24 Refrigerant injection device for air conditioner production line

Country Status (1)

Country Link
CN (1) CN213841424U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115289728A (en) * 2022-08-08 2022-11-04 湖州弗德里希制冷设备有限公司 Refrigerant filling system based on large-scale air conditioner installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115289728A (en) * 2022-08-08 2022-11-04 湖州弗德里希制冷设备有限公司 Refrigerant filling system based on large-scale air conditioner installation
CN115289728B (en) * 2022-08-08 2023-12-08 浙江科麦人工环境有限公司 Refrigerant filling system based on large-scale air conditioner after installation

Similar Documents

Publication Publication Date Title
CN108331362A (en) A kind of energy-saving wall-building machine that the effect of building a wall based on Internet of Things is good
CN213841424U (en) Refrigerant injection device for air conditioner production line
CN110127335B (en) Automatic stirrup feeding machine
CN106927074A (en) A kind of intelligent paper tube recrater
CN114749513A (en) Correction equipment for steel structure correction processing
CN105398814B (en) A kind of moving feeder of power source aging line
CN217755231U (en) Lifting storage bin device
CN208005766U (en) A kind of cutter device for polyurethane thermal insulation board
CN208645940U (en) Manipulator of injection machine fixture
CN206901314U (en) A kind of double-deck conveying mechanism
CN208680640U (en) Section steel cutting equipment
CN112591211A (en) Automatic feeding and discharging equipment for brick tower type sorting machine
CN111515675B (en) Truss stirrup mounting equipment and mounting method
CN107662091A (en) Automatic reed pipe assembly machine
CN207508610U (en) Automatic reed pipe assembly machine
CN207756651U (en) Automatic charging rolls up arc equipment and corrugated culvert system of processing
CN208380119U (en) A kind of energy-saving wall-building machine that the effect of building a wall based on Internet of Things is good
CN206885403U (en) A kind of heparin tube boxing apparatus
CN220700433U (en) Automatic assembling mechanism of connector
CN219946666U (en) Adobe mud strip cutting device
CN212241544U (en) Sleeper stirrup and sleeper fixing frame placing device
CN218193616U (en) AB foot assembly mechanism
CN215965577U (en) Feeding manipulator for processing aluminum profile extruder
CN218989109U (en) Hollow glass drier filling system
CN218765427U (en) Full-automatic lid installing the system of diaphragm type gas table

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220614

Address after: 430000 room 901-2, building 15, zone a, Gaonong Biological Park, No. 888, Gaoxin Avenue, East Lake New Technology Development Zone, Wuhan City, Hubei Province

Patentee after: Wuhan wantailian Environmental Technology Co.,Ltd.

Address before: 362000 No. 65, Fuguan Middle Road, Guanqiao Town, Nan'an City, Quanzhou City, Fujian Province

Patentee before: Guo Zhenzhu