CN213806760U - Novel construction packway - Google Patents

Novel construction packway Download PDF

Info

Publication number
CN213806760U
CN213806760U CN202022702068.8U CN202022702068U CN213806760U CN 213806760 U CN213806760 U CN 213806760U CN 202022702068 U CN202022702068 U CN 202022702068U CN 213806760 U CN213806760 U CN 213806760U
Authority
CN
China
Prior art keywords
platform
layer
novel construction
fairway
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022702068.8U
Other languages
Chinese (zh)
Inventor
臧可心
靳培英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Langfang Liangsheng Machinery Equipment Co ltd
Original Assignee
Langfang Liangsheng Machinery Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Langfang Liangsheng Machinery Equipment Co ltd filed Critical Langfang Liangsheng Machinery Equipment Co ltd
Priority to CN202022702068.8U priority Critical patent/CN213806760U/en
Application granted granted Critical
Publication of CN213806760U publication Critical patent/CN213806760U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a novel construction packway, including base, stand, first floor platform, emergency exit, second floor platform, stair, guardrail, protection network, three-layer platform, four-layer platform, the base is through pre-buried M20 rag bolt fixed mounting on the ground, first floor platform horizontal installation is in on the base, the stand passes through M20 the high strength bolt of 130 and installs perpendicularly on the first floor platform, first floor platform the second floor platform the three-layer platform four layers of platform have been constituteed from bottom to top in proper order, the stair are installed through M20 the high strength bolt of 40 between the upper and lower platform of four platforms, the guardrail is installed respectively the left and right marginal inboard of stair, the protection network is installed between the stand, the emergency exit is installed in the lower part. The bearing capacity is strong, and is efficient, simple structure, simple to operate, elegant appearance, safety protection facility is reliable, can be better satisfy the needs of various safe constructions.

Description

Novel construction packway
Technical Field
The utility model relates to a novel construction packway field, concretely relates to novel construction packway.
Background
The packway that traditional deep basal pit was used is set up with steel pipe fastener mostly, and the randomness is great, sets up also to waste time and energy relatively to pleasing to the eye degree, normative are not enough.
Disclosure of Invention
In view of the above-mentioned deficiencies or inadequacies in the prior art, it would be desirable to provide a new construction fairway.
According to the technical scheme provided by the embodiment of the application, the novel construction berm comprises a base, a stand column, a first-layer platform, a safety door, a second-layer platform, a stair, a guardrail, a protective net, a third-layer platform and a fourth-layer platform, wherein the base is fixedly installed on a foundation through pre-embedded M20 anchor bolts, the first-layer platform is horizontally installed on the base, the stand column is vertically installed on the first-layer platform through M20 high-strength bolts, the bottom of the second-layer platform is connected with the upper part of the stand column and is adjusted to be horizontal, the first-layer platform, the second-layer platform, the third-layer platform and the fourth-layer platform sequentially form four platforms from bottom to top, the stair is installed between the upper platform and the lower platform of the four platforms through M20 high-strength bolts, the protective net is installed on the inner sides of the left edge and the right edge of the stair respectively, the protective net is installed between the stand columns, the safety door is arranged at the lower part and is positioned on the first-layer platform.
The utility model discloses in, the base is 4 the same steel construction spares, is furnished with the rag bolt mounting hole, plays the supporting role, guarantees the platform level, enlarges the bearing surface and passes power for the basis.
The utility model discloses in, the stand has a plurality of roots, installs 4 respectively between every layer of platform, adopts the square steel preparation, adopts bolted connection between each component, can bear the vertical direction load.
The utility model discloses in, the first floor platform the second floor platform the three-layer platform with four layers of platforms are 4 steel of isostructure.
The utility model discloses in, the protection network has a plurality of, installs respectively the stand with in the frame that upper and lower platform was built, there are the straight close mesh of ligature and bridging steel structure in the protection network, form safety protecting wire net all around for guarantee constructor safety.
The utility model discloses in, the guardrail has a plurality of, installs respectively on every layer of platform the inboard, the current safety protection component about constructor.
The utility model discloses in, there are straight close mesh net of ligature and horizontal pole steel construction spare in the safety door, make things convenient for constructor business turn over.
To sum up, the beneficial effect of this application: the bearing capacity is strong, and is efficient, simple structure, simple to operate, elegant appearance, safety protection facility is reliable, can be better satisfy the needs of various safe constructions.
Drawings
Other features, objects and advantages of the present application will become more apparent upon reading of the following detailed description of non-limiting embodiments thereof, made with reference to the accompanying drawings in which:
FIG. 1 is a front view of the present invention;
FIG. 2 is a perspective view of the present invention;
FIG. 3 is a schematic view of a staircase with a guardrail according to the present invention;
fig. 4 is a schematic view of the safety door of the present invention;
fig. 5 is a schematic view of the middle protective net of the present invention.
Reference numbers in the figures: the safety door comprises a base-1, a stand column-2, a first-layer platform-3, a safety door-4, a second-layer platform-5, a stair-6, a guardrail-7, a protective net-8, a third-layer platform-9 and a fourth-layer platform-10.
Detailed Description
The present application will be described in further detail with reference to the following drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the relevant invention and not restrictive of the invention. It should be noted that, for convenience of description, only the portions related to the present invention are shown in the drawings.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
As shown in fig. 1-5, the novel construction corridors include a base 1, a column 2, a first platform 3, a safety door 4, a second platform 5, a stair 6, a guardrail 7, a protective net 8, a third platform 9 and a fourth platform 10, wherein the base 1 is fixedly mounted on a foundation through pre-embedded M20 anchor bolts, the first platform 3 is horizontally mounted on the base 1, the column 2 is vertically mounted on the first platform 3 through M20 130 high-strength bolts, the bottom of the second platform 5 is connected with the upper part of the column 2 and is adjusted to be horizontal, the first platform 3, the second platform 5, the third platform 9 and the fourth platform 10 sequentially form four platforms from bottom to top, the stair 6 is mounted between the upper and lower platforms of the four platforms through M20 40 high-strength bolts, the guardrail 7 is respectively mounted between the left platform and the lower platform of the stair 6, The right edge is inboard, protection network 8 is installed between the stand 2, emergency exit 4 is installed in the lower part, and is located on the first floor platform 3. The base 1 is 4 same steel structure spare, is furnished with rag bolt mounting hole. The upright column 2 is provided with a plurality of upright columns, 4 upright columns are respectively arranged between every two layers of platforms and are made of square steel, and all components are connected through bolts. The first layer platform 3, the second layer platform 5, the third layer platform 9 and the fourth layer platform 10 are made of 4 steel materials with the same structure. The protective net 8 is provided with a plurality of protective nets which are respectively arranged in the upright posts 2 and the frames built by the upper platform and the lower platform, and the protective net 8 is internally provided with a dense mesh net and a cross bracing steel structural member which are bound straightly. The guardrails 7 are arranged on the inner sides of the stairs 6 on each layer of platform respectively. And a dense mesh net and a cross bar steel structural member which are bound to be straight are arranged in the safety door 4. The utility model discloses bearing capacity is strong, and is efficient, simple structure, simple to operate, elegant appearance, safety protection facility is reliable, the needs of the various safe constructions of satisfying that can be better.
The foregoing description is only exemplary of the preferred embodiments of the application and is provided for the purpose of illustrating the general principles of the technology and the like. Meanwhile, the scope of the invention according to the present application is not limited to the technical solutions in which the above-described technical features are combined in a specific manner, and also covers other technical solutions in which the above-described technical features or their equivalent are combined arbitrarily without departing from the inventive concept described above. For example, the above features may be replaced with (but not limited to) features having similar functions disclosed in the present application.

Claims (7)

1. Novel construction packway, including base (1), stand (2), first floor platform (3), emergency exit (4), second floor platform (5), stair (6), guardrail (7), protection network (8), three-layer platform (9), four layers of platform (10), characterized by: the base (1) is fixedly installed on a foundation through pre-buried M20 anchor bolts, the first-layer platform (3) is horizontally installed on the base (1), the upright post (2) is vertically installed on the first-layer platform (3) through M20 130 high-strength bolts, the bottom of the second-layer platform (5) is connected with the upper part of the upright post (2) and is adjusted to the level, the first-layer platform (3), the second-layer platform (5), the three-layer platform (9) and the four-layer platform (10) sequentially form four platforms from bottom to top, the stairs (6) are installed between the upper and lower platforms of the four platforms through M20 40 high-strength bolts, the guardrails (7) are respectively installed on the inner sides of the left and right edges of the stairs (6), the protective net (8) is installed between the upright posts (2), and the safety door (4) is installed on the lower part, and is located on the first deck platform (3).
2. The novel construction fairway as claimed in claim 1, characterized in that: the base (1) is 4 same steel structural members and is provided with foundation bolt mounting holes.
3. The novel construction fairway as claimed in claim 1, characterized in that: the upright columns (2) are provided with a plurality of columns, 4 columns are respectively arranged between every two layers of platforms and are made of square steel, and all components are connected through bolts.
4. The novel construction fairway as claimed in claim 1, characterized in that: the first layer of platform (3), the second layer of platform (5), the third layer of platform (9) and the fourth layer of platform (10) are 4 steel materials with the same structure.
5. The novel construction fairway as claimed in claim 1, characterized in that: the protective net (8) is provided with a plurality of protective nets which are respectively arranged in the upright posts (2) and the frames built by the upper platform and the lower platform, and the protective net (8) is internally provided with a dense mesh net and a cross bracing steel structural member which are bound to be straight.
6. The novel construction fairway as claimed in claim 1, characterized in that: the guardrails (7) are arranged on the inner sides of the stairs (6) on each layer of platform respectively.
7. The novel construction fairway as claimed in claim 1, characterized in that: and a dense mesh net and a cross bar steel structural member which are bound straightly are arranged in the safety door (4).
CN202022702068.8U 2020-11-20 2020-11-20 Novel construction packway Expired - Fee Related CN213806760U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022702068.8U CN213806760U (en) 2020-11-20 2020-11-20 Novel construction packway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022702068.8U CN213806760U (en) 2020-11-20 2020-11-20 Novel construction packway

Publications (1)

Publication Number Publication Date
CN213806760U true CN213806760U (en) 2021-07-27

Family

ID=76936844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022702068.8U Expired - Fee Related CN213806760U (en) 2020-11-20 2020-11-20 Novel construction packway

Country Status (1)

Country Link
CN (1) CN213806760U (en)

Similar Documents

Publication Publication Date Title
CN201250038Y (en) Wall-attached elevator hoistway
CN201835512U (en) Turning folding scaffold unit
JP5028561B2 (en) Evacuation device
CN202000684U (en) Outwards extending horizontal safety net system used in construction of main body structure of high-rise building
CN213806760U (en) Novel construction packway
JP2007239451A (en) Evacuation device
CN204876578U (en) Building construction system
CN212103679U (en) A construction platform for installation of assembled tower
CN204876577U (en) Building construction system
CN207892092U (en) A kind of curtain wall support structure
KR20210019302A (en) Self-assembly swimming pool for easy to installation
RU106552U1 (en) GAME COMPLEX
CN212700508U (en) Leaf paradise for children
JP4844913B2 (en) Evacuation device from tsunami
CN204876579U (en) Building construction system
CN210947825U (en) Protective bracket for building construction
CN208039787U (en) High-altitude edge-facing operation assembly operation platform
CN106193283A (en) Multilayer large-span modified model concrete comb shape space lattice box structure and preparation method
CN209413381U (en) A kind of three-dimensional parking device support frame
CN211037737U (en) Pier shaft protection platform
CN206015875U (en) Multilayer large-span modified concrete comb shape space lattice box structure
CN204432947U (en) Based on the boats and ships of defence pirate staircase
CN215995448U (en) Simulation climbing ferry rescue technology training facility
CN206205475U (en) A kind of vertical opening protective device of shear wall structure
CN206513072U (en) Tent hotel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210727