CN215995448U - Simulation climbing ferry rescue technology training facility - Google Patents

Simulation climbing ferry rescue technology training facility Download PDF

Info

Publication number
CN215995448U
CN215995448U CN202122156988.9U CN202122156988U CN215995448U CN 215995448 U CN215995448 U CN 215995448U CN 202122156988 U CN202122156988 U CN 202122156988U CN 215995448 U CN215995448 U CN 215995448U
Authority
CN
China
Prior art keywords
training
standing platform
rescue
training device
ferry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122156988.9U
Other languages
Chinese (zh)
Inventor
王帅涛
田毅
胡晓刚
张恩奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Fulem Technology Co ltd
Original Assignee
Henan Fulem Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Fulem Technology Co ltd filed Critical Henan Fulem Technology Co ltd
Priority to CN202122156988.9U priority Critical patent/CN215995448U/en
Application granted granted Critical
Publication of CN215995448U publication Critical patent/CN215995448U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a simulation climbing ferry rescue technique training facility, which comprises a plurality of support columns installed on the ground, wherein the shape of the support columns assembled is rectangular, the support columns are composed of two detachable second support columns, the upper and lower ends of the two second support columns are fixedly connected with first flange plates, the two adjacent second support columns are evenly provided with three layers of detachable support cross rods from top to bottom, the support columns are evenly provided with three groups of first connecting devices from top to bottom, the simulation climbing ferry rescue technique training facility can be rapidly disassembled and installed by arranging the first flange plates and the first connecting devices, when a person installs the simulation climbing ferry rescue technique training facility, the person can reserve a prepared second flange plate when the training subject device is installed by arranging the three first connecting short rods and the second flange plates, therefore, the person can increase or decrease the training subjects at any time.

Description

Simulation climbing ferry rescue technology training facility
Technical Field
The utility model relates to a fire control training equipment technical field specifically is a rescue technical training facility is ferried to in simulation climbing.
Background
With the further improvement of urban construction, urban fire control is also concerned by government functional departments and general people, and the appearance of fire-fighting training equipment greatly improves the technical level and psychological quality of fire fighters.
At present, current fire control training equipment kind is many, has training speed rock climbing, shaft rescue, underground rescue to be controlled training and rope cross training etc. but current device is when the aggregate erection, and the most is all directly welds consequently very inconvenient personnel together and dismantles to inconvenient personnel increase or reduce the training subject.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a rescue technique training facility is ferried in simulation climbing has solved the problem of proposing in the above-mentioned background art.
The utility model discloses technical scheme as follows:
in order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a simulation climbing ferry rescue technology training facility comprises a plurality of support columns arranged on the ground, wherein the support columns are respectively arranged on four edges of a rectangle and consist of two detachable second support columns, the upper ends and the lower ends of the two second support columns are fixedly connected with first flange plates, two adjacent second support columns are uniformly provided with three layers of detachable support cross rods from top to bottom, the support columns are uniformly provided with three groups of first connecting devices from top to bottom, each group of first connecting devices consists of a plurality of first connecting parts on the same horizontal plane, each first connecting part comprises a first connecting short rod fixedly connected on the second support columns, one end, far away from the second support columns, of each first connecting short rod is fixedly connected with a second flange plate, the two ends of each support cross rod are fixedly connected with a third flange plate, one side of each third flange plate is arranged on the second flange plate, the second flange plate and the third flange plate are stabilized through bolts;
the multifunctional stair climbing training device is characterized in that detachable auxiliary stairs are arranged between every two layers of supporting cross rods, the auxiliary stairs are also arranged between the bottom supporting cross rod and the ground, a standing platform is arranged on the top supporting cross rod, a second training device is arranged right behind the standing platform, a rope crossing training device is arranged between the standing platform and the second training device, and a speed rock climbing training device is arranged on the front side of the second training device.
Optionally, the left ends of two adjacent supporting cross rods in the three layers are provided with detachable crisscross stabilizing parts.
Optionally, the crisscross stabilizing part includes a plurality of connecting plates fixedly connected to the support column, the connecting plates are diagonally provided with four stabilizing connecting rods having one ends close to each other, and the four stabilizing connecting rods have one ends close to each other provided with the stabilizing disc.
Optionally, a shaft rescue device is arranged right below the right end of the topmost supporting cross rod, the shaft rescue device comprises a second standing platform arranged between the topmost supporting cross rod and the second supporting cross rod, and a shaft device with one end arranged on the ground is arranged in the center of the second standing platform.
Optionally, the rear side of the standing platform and the right side of the second standing platform are both provided with an underground rescue training device with one end perpendicular to the ground, and the underground rescue training device comprises a first fixed frame arranged on the supporting column and the supporting cross rod and a training plate arranged on the right side of the first fixed frame.
Optionally, the standing platform and the upper surface of the second standing platform are both provided with a fence, the rope crossing training device comprises a rope arranged between the second training device and the standing platform, and a protection device is arranged right below the rope.
Optionally, the top of the standing platform and the top end of the second training device are both provided with a protective cover plate, and the second training device is installed in a splicing manner.
Advantageous effects
The utility model provides a rescue technology training facility is ferried to in simulation climbing possesses following beneficial effect:
this rescue technique training facility is crossed in simulation climbing through the setting of first ring flange and first connecting part, personnel when this rescue technique training facility is crossed in simulation climbing of installation, dismantlement and installation that can be quick through the setting of three first connection quarter butt and second ring flange simultaneously, still can reserve prepared second ring flange when the installation is accomplished training subject device, therefore personnel can increase at any time or reduce the training subject.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural diagram of the shaft device of the present invention;
FIG. 3 is a schematic structural view of the connection between the support cross bar and the first connecting short bar of the present invention;
fig. 4 is a schematic view of a rope according to the present invention in a top view;
fig. 5 is a schematic view of the structure of the stabilizing disc connected to the stabilizing connecting rod of the present invention.
In the figure: 1. a support pillar; 2. a support rail; 3. a criss-cross stabilizing member; 4. an auxiliary stair; 5. a protective cover plate; 6. a rope; 7. a speed rock climbing training device; 8. a shaft device; 9. an underground rescue training device; 10. a first connecting stub; 11. a second flange plate; 12. a stabilizing connecting rod; 13. and stabilizing the disc.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 5, the present invention provides a technical solution: a simulation climbing ferry rescue technology training facility comprises a plurality of support columns 1 which are arranged on the ground, the support columns 1 are assembled and arranged on the ground in a rectangular shape, each support column 1 consists of two detachable second support columns, the two second support columns are the same in length, first flange plates are welded at the upper ends and the lower ends of the two second support columns, three layers of detachable support cross rods 2 are uniformly arranged on the two adjacent second support columns 1 from top to bottom, each layer of support cross rod 2 is arranged on the support columns 1 in a rectangular shape, so that after the assembly and the assembly of each layer of support cross rod and the plurality of support columns 1 are completed, the support columns are rectangular in six views, meanwhile, the second layer of support cross rods 2 are arranged at the bottom ends of the second support columns arranged on the support columns, and three groups of first connecting devices are uniformly arranged on the support columns from top to bottom, each set of first connecting means consists of a plurality of first connecting parts in the same horizontal plane, wherein the bottom end of the second supporting column above each supporting column 1 is also provided with three first connecting parts, and the angle between two adjacent of the three first connecting parts is 180 degrees, the other two being 90 degrees, said first connecting means comprising a first connecting stub 10 welded to a second supporting post, a second flange plate 11 is welded at one end of the first connecting short rod 10 far away from the second supporting column, third flange discs with one sides arranged on the second flange discs 11 are welded at the two ends of the supporting cross rod 2, the second flange plate 11 and the third flange plate are stabilized by bolts, and the tail ends of the bolts are connected with nuts by screw threads, therefore, when people disassemble or assemble the simulated climbing ferry rescue technology training facility, only the bolts need to be disassembled;
the detachable auxiliary stairs 4 are arranged between the supporting cross rods 2 of each layer, the auxiliary stairs 4 are also arranged between the supporting cross rods 2 at the bottommost layer and the ground, the number of the auxiliary stairs 4 is three from top to bottom, the bottom end of the last auxiliary stair 4 is fixed on the ground, the rest two auxiliary stairs 4 are respectively arranged between the three layers of the supporting cross rods 2, the joints of the auxiliary stairs 4 and the supporting cross rods 2 are fixed through second bolts, so that the auxiliary stairs are convenient for personnel to disassemble and assemble, a standing platform is arranged on the supporting cross rod 2 at the topmost layer, the personnel can walk on the standing platform, meanwhile, the personnel can stand on the standing platform to check the training condition of the training personnel, a support is arranged on the supporting cross rod 2 at the topmost layer, the standing platform is arranged on the support through the support arranged on the standing platform, and a second training device is arranged right behind the standing platform, and a rope crossing training device is arranged between the standing platform and the second training device, and a speed rock climbing training device 7 is arranged on the front side of the second training device.
The left end between two adjacent supporting cross rods 2 of the three layers is provided with a detachable crisscross stabilizing part 3, the crisscross stabilizing part comprises a plurality of connecting plates welded on supporting columns 1, the opposite corners of the connecting plates are provided with four stabilizing connecting rods 12 with one ends close to each other, the ends of the four stabilizing connecting rods 12 close to each other are provided with stabilizing discs 13 through third bolts, so that the overall stability of the simulated climbing ferry rescue training facility can be improved through the crisscross stabilizing part 3, meanwhile, the number of personnel can be greatly increased, a shaft rescue device is arranged under the right end of the topmost supporting cross rod 2 and comprises a second standing platform arranged between the topmost layer and the second supporting cross rod 2 through fourth bolts, wherein the four corners of the standing platform are respectively arranged on the supporting columns 1 corresponding to the positions of the four corners, the center of the second standing platform is provided with a vertical shaft device 8 with one end arranged on the ground through a fourth bolt, wherein an inlet and an outlet are arranged at the bottom end of the vertical shaft device 8, the rear side of the standing platform and the right side of the second standing platform are both provided with an underground rescue training device 9 with one end perpendicular to the ground, the underground rescue training device 9 comprises a first fixed frame arranged on a support column 1 and a support cross rod 2 and a training plate arranged on the right side of the first fixed frame, wherein the joints of the first fixed frame, the support column 1 and the support cross rod 2 are fixed through bolts, the joints of the first fixed frame and the training plate are also fixed through bolts, the upper surfaces of the standing platform and the second standing platform are both provided with fenders, the fenders are composed of protective connecting rods with different lengths, and the two ends of the protective connecting rods are both stabilized on the support column 1 through flange plates, the rope crossing training device comprises a rope 6 arranged between a second training device and a standing platform, a protection device is arranged under the rope, a protective cover plate 5 is arranged above the standing platform and on the top end of the second training device, the second training device is installed in a splicing mode, the structure of the second training device is the same as that of the support column 1 and the three-layer support cross rod 2, the standing platform and the enclosure are arranged at the top of the second training device, meanwhile, two ends of the rope 6 are arranged on the front enclosure and the rear enclosure respectively, and the protection device is a common training protection net on the market.
In conclusion, when the simulation climbing training facility is used for crossing the rescue technology training facility, personnel can carry out various different training on the personnel, and when the personnel want to add other training items, the personnel can directly install the second flange plate 11 reserved in advance.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a rescue technology training facility is ferried in simulation climbing, includes a plurality of support columns of installing subaerial, and is a plurality of four edges at a rectangle are installed respectively to the support column, its characterized in that: the supporting columns are composed of two detachable second supporting columns, the upper ends and the lower ends of the two second supporting columns are fixedly connected with first flange plates, three layers of detachable supporting cross rods are uniformly arranged on the two adjacent second supporting columns from top to bottom, three groups of first connecting devices are uniformly arranged on the supporting columns from top to bottom, each group of first connecting devices is composed of a plurality of first connecting parts on the same horizontal plane, each first connecting part comprises a first connecting short rod fixedly connected to the second supporting column, one end, far away from the second supporting columns, of each first connecting short rod is fixedly connected with a second flange plate, the two ends of each supporting cross rod are fixedly connected with a third flange plate, one side of each third flange plate is arranged on the second flange plate, and the second flange plates and the third flange plates are stabilized through bolts;
the multifunctional stair climbing training device is characterized in that detachable auxiliary stairs are arranged between every two layers of supporting cross rods, the auxiliary stairs are also arranged between the bottom supporting cross rod and the ground, a standing platform is arranged on the top supporting cross rod, a second training device is arranged right behind the standing platform, a rope crossing training device is arranged between the standing platform and the second training device, and a speed rock climbing training device is arranged on the front side of the second training device.
2. The simulated climbing ferry rescue technology training facility of claim 1, wherein: the left ends between two adjacent supporting cross rods of the three layers are provided with detachable crisscross stabilizing parts.
3. The simulated climbing ferry rescue technique training facility of claim 2, wherein: the crisscross stabilizing component comprises a plurality of connecting plates fixedly connected to the supporting columns, four stabilizing connecting rods with one ends close to each other are arranged on opposite corners of the connecting plates, and stabilizing discs are arranged at one ends, close to each other, of the four stabilizing connecting rods.
4. The simulated climbing ferry rescue technology training facility of claim 1, wherein: a shaft rescue device is arranged right below the right end of the topmost supporting cross rod and comprises a second standing platform arranged between the topmost supporting cross rod and the second supporting cross rod, and a shaft device with one end arranged on the ground is arranged at the center of the second standing platform.
5. The simulated climbing ferry rescue technology training facility of claim 1, wherein: the rear side of the standing platform and the right side of the second standing platform are both provided with an underground rescue training device with one end perpendicular to the ground, and the underground rescue training device comprises a first fixed frame arranged on a support column and a support cross rod and a training plate arranged on the right side of the first fixed frame.
6. The simulated climbing ferry rescue technique training facility of claim 5, wherein: the upper surfaces of the standing platform and the second standing platform are both provided with a fence, the rope crossing training device comprises a rope arranged between the second training device and the standing platform, and a protection device is arranged right below the rope.
7. The simulated climbing ferry rescue technology training facility of claim 1, wherein: the top of the standing platform and the top end of the second training device are both provided with protective cover plates, and the second training device is installed in a splicing mode.
CN202122156988.9U 2021-09-07 2021-09-07 Simulation climbing ferry rescue technology training facility Active CN215995448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122156988.9U CN215995448U (en) 2021-09-07 2021-09-07 Simulation climbing ferry rescue technology training facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122156988.9U CN215995448U (en) 2021-09-07 2021-09-07 Simulation climbing ferry rescue technology training facility

Publications (1)

Publication Number Publication Date
CN215995448U true CN215995448U (en) 2022-03-11

Family

ID=80592066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122156988.9U Active CN215995448U (en) 2021-09-07 2021-09-07 Simulation climbing ferry rescue technology training facility

Country Status (1)

Country Link
CN (1) CN215995448U (en)

Similar Documents

Publication Publication Date Title
CN206110319U (en) Modular unit of modularization steel construction building structure system
CN104577876A (en) Plug-in hanging basket for live working of helicopter
CN215995448U (en) Simulation climbing ferry rescue technology training facility
CN111927071A (en) Movable operating platform
CN109098338A (en) A kind of assembled abnormity structural system of roof and its construction method
CN106504674A (en) Billboard
CN112502279B (en) Large-span cantilever frame and construction method thereof
CN212154307U (en) Overhauling platform
CN210002826U (en) detachable welding platform for steel column construction
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN211201184U (en) Assembled steel structure system
CN208981607U (en) A kind of assembled abnormity structural system of roof
CN207194334U (en) Double race stair built in the special assembly type of container house
JP3177005U (en) Self-propelled parking lot and temporary housing facility using it
CN203755717U (en) Assembly type up and down pedestrian path for deep foundation pit
CN212376223U (en) Movable operating platform
CN212688719U (en) Bridge vase-shaped pier body protective bracket
CN217680702U (en) Construction is with facing limit guardrail convenient to transportation and dismouting
CN219240289U (en) Temporary operation platform for bridge pier construction
CN213806760U (en) Novel construction packway
CN214006718U (en) Novel steel structure type fire-fighting training tower
CN213572717U (en) Stair railing
CN215351951U (en) Firm type castle slide
CN217353430U (en) Detachable movable scaffold
JP4257153B2 (en) Outdoor staircase and construction method of outdoor staircase

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant