CN213806470U - Climbing frame for building construction - Google Patents

Climbing frame for building construction Download PDF

Info

Publication number
CN213806470U
CN213806470U CN202022707965.8U CN202022707965U CN213806470U CN 213806470 U CN213806470 U CN 213806470U CN 202022707965 U CN202022707965 U CN 202022707965U CN 213806470 U CN213806470 U CN 213806470U
Authority
CN
China
Prior art keywords
pavement
backing plate
climbing
ladder
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022707965.8U
Other languages
Chinese (zh)
Inventor
杨哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022707965.8U priority Critical patent/CN213806470U/en
Application granted granted Critical
Publication of CN213806470U publication Critical patent/CN213806470U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a building construction is with climbing frame relates to building construction technical field, and it is not fine to do to the region of upper and lower floor in the use for the most frame of climbing among the solution prior art, can not directly through climbing from top to bottom, but go on with the help of other equipment from top to bottom, to the input fund of increase equipment like this, the construction cost of improvement to the workman installs also complicacy, has increased workman's intensity of labour's problem. Climb the inside of a main frame and be provided with first pavement backing plate, and first pavement backing plate has a plurality ofly, first pavement backing plate passes through the bolted rotation with climbing a main frame and is connected, one side of first pavement backing plate is provided with the second pavement backing plate, and the second pavement backing plate has a plurality ofly, the bottom of second pavement backing plate is provided with the ladder, the ladder passes through the bolted rotation with climbing a main frame and is connected, the ladder is including branch, and branch is provided with two sets ofly, branch is total four.

Description

Climbing frame for building construction
Technical Field
The utility model relates to a construction technical field specifically is a construction is with climbing frame.
Background
The climbing frame is also called a lifting frame, and can be classified into hydraulic, electric, manual and hand-pulling types according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can climb up or down along the building. This system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; and secondly, the dismounting and mounting process of the scaffold is eliminated, the scaffold is not limited by the height of a building, and manpower and materials are greatly saved. And also has a great improvement on the traditional scaffold in the safety angle. Has great development advantages in high-rise buildings.
However, most of the existing climbing frames do not well work for the areas of the upper layer and the lower layer in the using process, and can not directly go up and down through the climbing frames but go up and down by means of other equipment, so that the investment of the equipment is increased, the building cost is increased, the installation of workers is also complicated, and the labor intensity of the workers is increased; therefore, the existing requirements are not met, and the climbing frame for building construction is provided for the existing requirements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building construction is with climbing frame to it is not fine to the region of upper and lower floor in the use to solve the most frame of climbing that proposes in the above-mentioned background art, can not directly through climbing from top to bottom, but go on with the help of other equipment from top to bottom, to the input fund of increase equipment like this, the construction cost of improvement, and the workman installs also complicacy, has increased workman's intensity of labour's problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction is with climbing frame, is including climbing a main frame, the inside of climbing a main frame is provided with first pavement backing plate, and first pavement backing plate has a plurality ofly, first pavement backing plate passes through the bolted rotation with climbing a main frame and is connected, one side of first pavement backing plate is provided with the second pavement backing plate, and the second pavement backing plate has a plurality ofly, the bottom of second pavement backing plate is provided with the ladder, the ladder passes through the bolted rotation with climbing a main frame and is connected, the ladder is including branch, and branch is provided with two sets ofly, branch is total four.
Preferably, two sets of be provided with the ladder between the branch, and the ladder has a plurality ofly, the ladder is connected through the pivot rotation with branch.
Preferably, the two ends of the supporting rod are provided with fixing blocks, the supporting rod is fixedly connected with the fixing blocks, and the fixing blocks are provided with threaded holes.
Preferably, the second walkways backing plate comprises a fixed plate, the fixed plate is rotatably connected with the main frame of the climbing frame through a bolt, and a rotating plate is arranged on one side of the fixed plate.
Preferably, the fixed plate is rotatably connected with the rotating plate through a rotating shaft, the rotating plate is attached to and connected with the main frame of the climbing frame, and handles are arranged on the upper side and the lower side of one end, far away from the fixed plate, of the rotating plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an add the ladder in climbing the frame, let the workman pass through every layer of climbing frame about the ladder, can reduce the input fund of newly-increased equipment, and still be provided with the second pavement backing plate above every ladder, the second pavement backing plate is the state of closing at ordinary times, can prevent that the workman from stepping on the sky carelessly and dropping the injury when walking on the pavement of climbing frame, when using the ladder, can hold the handle on the second pavement backing plate, open the rotor plate on the second pavement backing plate, and close the rotor plate after arriving, prevent that the hole on the second pavement backing plate from producing harm, protection workman's safety;
2. the utility model discloses a design into the ladder about being used for by two sets of branches and branch is total four, all connect on climbing a main frame four branch from top to bottom, fixed ladder that can be more stable, and when the part that the transportation climbing used, can remove the position between a set of branch of ladder, let the ladder of being connected with branch rotation can the flat one-tenth plane of spreading, thereby change the ladder shape, practice thrift the transportation space, the workman transports also more conveniently, has reduced workman's intensity of labour.
Drawings
FIG. 1 is an overall front view of the present invention;
FIG. 2 is a schematic view of a second walkway backing plate mechanism of the present invention;
fig. 3 is a schematic view of the ladder of the present invention.
In the figure: 1. a creeper main frame; 2. a first walkway backing plate; 3. a second walkway backing plate; 4. a ladder; 5. a fixing plate; 6. a rotating plate; 7. a handle; 8. a strut; 9. a fixed block; 10. a step.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: a climbing frame for building construction comprises a climbing frame main frame 1, a first walking base plate 2 is arranged in the climbing frame main frame 1, a plurality of first walking base plates 2 are arranged, the first walking base plates 2 can form a path for workers to walk on, and the workers can carry out building construction activities on the climbing frame, the first walking base plates 2 are rotatably connected with the climbing frame main frame 1 through bolts, the bolts can be disassembled after one building construction is completed through rotating connection, so that the climbing frame can be repeatedly used at a plurality of places, the resource-saving environment is protected, a second walking base plate 3 is arranged on one side of each first walking base plate 2, the second walking base plates 3 are provided with a plurality of second walking base plates 3, each layer of climbing frame is only provided with one second walking base plate 3 which is used as a passage of an upper layer and a lower layer, the second walking base plates 3 are in a closed state at ordinary times, and the workers can be prevented from carelessly stepping on the walking of the climbing frame to fall off, the safety of protection workman, the bottom of second pavement backing plate 3 is provided with ladder 4, and ladder 4 passes through the bolt rotation with climbing frame main frame 1 and is connected, and ladder 4 includes branch 8, and branch 8 is provided with two sets ofly, and branch 8 is total four, all connects on climbing frame main frame four branches 8 from top to bottom, and fixed ladder that can be more stable effectively guarantees upper and lower layer workman's safety.
Further, be provided with ladder 10 between two sets of branches 8, and ladder 10 has a plurality ofly, and ladder 10 rotates through the pivot with branch 8 to be connected, when the transportation climbing part that uses, can remove the position between a set of branch 8 on ladder 4, lets step 10 of rotating with branch 8 and being connected can the tiling become a plane to change ladder 4 shape, practice thrift the transportation space, the workman transports also more conveniently, has reduced workman's intensity of labour.
Further, the two ends of the supporting rod 8 are provided with fixing blocks 9, the supporting rod 8 is fixedly connected with the fixing blocks 9, threaded holes are formed in the fixing blocks 9, the fixing blocks 9 on the supporting rod 8 are connected, the structure is simple, operation is convenient, and labor intensity of workers is reduced.
Further, second pavement backing plate 3 includes fixed plate 5, fixed plate 5 with climb a main frame 1 and pass through bolted connection, one side of fixed plate 5 is provided with rotor plate 6, when using ladder 4, can hold handle 7 on the second pavement backing plate 3, open rotor plate 6 on the second pavement backing plate 3 to turn rotor plate 6 off after reacing, prevent that the hole on the second pavement backing plate 3 from producing harm, protection workman's safety.
Further, fixed plate 5 rotates through the pivot with rotor plate 6 to be connected, and rotor plate 6 is connected with climbing a 1 laminating of frame main frame, and the upper and lower both sides of keeping away from fixed plate 5 one end of rotor plate 6 all are provided with handle 7, and two upper and lower handles 7 can make things convenient for the workman to operate second pavement backing plate 3 in upper and lower both sides, and are more convenient when letting second pavement backing plate 3 use.
The working principle is as follows: when in use, a main frame 1 of the climbing frame is laid, then the first walkway backing plate 2 is taken out, the first walkway backing plate 2 is rotatably installed on a proper position of a first layer of the main frame 1 of the climbing frame by using bolts and nuts, a position for installing a second walkway backing plate 3 required by a ladder 4 is reserved, the second walkway backing plate 3 is installed on the position, the bolts penetrate through threaded holes of a fixed plate 5 on the second walkway backing plate 3 and are installed on the main frame 1 of the climbing frame, a rotating plate 6 on the second walkway backing plate 3 is directly attached on the main frame 1 of the climbing frame, the rotating plate 6 is connected with the fixed plate 5 through a rotating shaft, so that a handle 7 on the rotating plate 6 is held by hands to rotate to open the second walkway backing plate 3, the climbing frame is provided with an upper passage and a lower passage, the ladder 4 can be taken out by installing the first walkway backing plate 2 and the second walkway backing plate 3 on the first layer, both ends of support pole 8 all have fixed block 9 on ladder 4, install ladder 4 through the screw hole on the fixed block 9 and climb on the frame main frame 1, fix ladder 4, climb and install second pavement backing plate 3 on the second layer of frame main frame 1 on ladder 4, the first pavement backing plate 2 of other installations in two layers in the end, several layers above so installing, all install the back, the workman can be through ladder 4 and the second pavement backing plate 3 on the 6 passageway of the rotor plate that the rotation was opened every layer climb the frame from top to bottom.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (5)

1. The utility model provides a frame that climbs for construction, includes frame main frame (1) of climbing, its characterized in that: climb the inside of a main frame (1) and be provided with first pavement backing plate (2), and first pavement backing plate (2) have a plurality ofly, first pavement backing plate (2) with climb a main frame (1) and be connected through the bolt rotation, one side of first pavement backing plate (2) is provided with second pavement backing plate (3), and second pavement backing plate (3) have a plurality ofly, the bottom of second pavement backing plate (3) is provided with ladder (4), ladder (4) are connected through the bolt rotation with climbing a main frame (1), ladder (4) include branch (8), and branch (8) are provided with two sets ofly, branch (8) total four.
2. The climbing frame for building construction according to claim 1, characterized in that: two sets of be provided with ladder (10) between branch (8), and ladder (10) have a plurality ofly, ladder (10) are connected through the pivot rotation with branch (8).
3. The climbing frame for building construction according to claim 1, characterized in that: the two ends of the supporting rod (8) are provided with fixing blocks (9), the supporting rod (8) is fixedly connected with the fixing blocks (9), and threaded holes are formed in the fixing blocks (9).
4. The climbing frame for building construction according to claim 1, characterized in that: the second walkway backing plate (3) comprises a fixing plate (5), the fixing plate (5) is rotatably connected with the climbing frame main frame (1) through a bolt, and a rotating plate (6) is arranged on one side of the fixing plate (5).
5. The climbing frame for building construction according to claim 4, wherein: the fixed plate (5) is rotatably connected with the rotating plate (6) through a rotating shaft, the rotating plate (6) is attached to the main frame (1) of the climbing frame, and handles (7) are arranged on the upper side and the lower side of the rotating plate (6) far away from one end of the fixed plate (5).
CN202022707965.8U 2020-11-20 2020-11-20 Climbing frame for building construction Expired - Fee Related CN213806470U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022707965.8U CN213806470U (en) 2020-11-20 2020-11-20 Climbing frame for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022707965.8U CN213806470U (en) 2020-11-20 2020-11-20 Climbing frame for building construction

Publications (1)

Publication Number Publication Date
CN213806470U true CN213806470U (en) 2021-07-27

Family

ID=76936813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022707965.8U Expired - Fee Related CN213806470U (en) 2020-11-20 2020-11-20 Climbing frame for building construction

Country Status (1)

Country Link
CN (1) CN213806470U (en)

Similar Documents

Publication Publication Date Title
US11655641B2 (en) Construction building equipment and construction method thereof
CN210918154U (en) Take scaffold frame of material lift platform
CN213806470U (en) Climbing frame for building construction
CN206053827U (en) A kind of extending insulating ladder
CN207905334U (en) A kind of construction equipment convenient for External Wall and inner wall decoration engineering construction
CN110422772A (en) Climbing machine device device and method
CN210002827U (en) Climbing frame gap bridge of connection tower cranes
CN211775570U (en) Decoration trolley
CN213297070U (en) Large-span ultrahigh-degree steel structure net rack construction work platform
CN212105041U (en) Scaffold for architectural engineering decoration
CN217894815U (en) Exempt from to climb ware mounting structure
CN213710312U (en) Support for building engineering
CN211850683U (en) Combined scaffold for civil engineering
CN214834510U (en) Steel construction platform of adjustable usable floor area
CN211366635U (en) Construction elevator well protective structure is built to building room
CN221298560U (en) Safety protection type attached scaffold
CN217840841U (en) High-altitude movable ladder-hanging type auxiliary construction system
CN114232963B (en) Steel construction building wall mounting platform
CN213837625U (en) Civil engineering construction is with construction support
CN215167771U (en) Novel concrete placement workstation is built in room
CN220909094U (en) Construction support with safeguard function
CN213572900U (en) Civil engineering safety scaffold
CN212507263U (en) Multifunctional construction platform
CN220415237U (en) Climbing device with protective structure for building construction
CN217379701U (en) Protective bracket for curtain wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210727

CF01 Termination of patent right due to non-payment of annual fee