CN210002827U - A climbing frame crossing bridge connecting tower cranes - Google Patents

A climbing frame crossing bridge connecting tower cranes Download PDF

Info

Publication number
CN210002827U
CN210002827U CN201920658307.9U CN201920658307U CN210002827U CN 210002827 U CN210002827 U CN 210002827U CN 201920658307 U CN201920658307 U CN 201920658307U CN 210002827 U CN210002827 U CN 210002827U
Authority
CN
China
Prior art keywords
climbing frame
tower crane
building
walkway board
crossing bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920658307.9U
Other languages
Chinese (zh)
Inventor
廖星彪
刘祝平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Shanjian Construction Co ltd
Original Assignee
Guangdong Shanjian Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Shanjian Construction Co ltd filed Critical Guangdong Shanjian Construction Co ltd
Priority to CN201920658307.9U priority Critical patent/CN210002827U/en
Application granted granted Critical
Publication of CN210002827U publication Critical patent/CN210002827U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a building climbs the passageway field between frame and tower crane, more specifically says, it relates to kinds of climbing frame gap bridges of connecting the tower crane, and its technical scheme main points are including being used for fixed connection to climb the horizontal guidance tape of walking of frame, keep away from the building and climb the frame walk guidance tape end and be close to the tower crane and climb the frame, walk the guidance tape and keep away from the both sides that building climbed end and the building and climb the frame and be located all fixed being provided with the link on walking the guidance tape top, be located the link between guidance tape and the building climbing frame and hang and be equipped with wire rope, the utility model discloses a kind of climbing frame gap bridges of connecting the tower crane have the advantage of tower crane about the staff of convenience.

Description

一种连接塔吊的爬架过桥A climbing frame crossing bridge connecting tower cranes

技术领域technical field

本实用新型涉及建筑爬架与塔吊间通道领域,更具体地说,它涉及一种连接塔吊的爬架过桥。The utility model relates to the field of a passage between a building climbing frame and a tower crane, in particular to a climbing frame crossing bridge connecting a tower crane.

背景技术Background technique

随着社会的发展,塔吊在城市中随处可见,同时塔吊也是建筑工地上最常用的一种起重设备又名“塔式起重机”,以一节一节的接长,用来吊施工用的钢筋、木楞、混凝土、钢管等施工的原材料,塔吊是工地上一种必不可少的设备,然而在工作人员攀爬和下塔吊时,存在着极大的安全隐患,针对攀爬和下塔吊方面,也没有必要的安全措施。With the development of society, tower cranes can be seen everywhere in the city. At the same time, tower cranes are also the most commonly used lifting equipment on construction sites, also known as "tower cranes". The raw materials for construction such as steel bars, corrugated wood, concrete, steel pipes, etc., tower cranes are an indispensable equipment on the construction site. However, when the staff climbs and descends the tower cranes, there are great potential safety hazards. On the other hand, there are no necessary security measures.

针对上述问题,目前,公告号为CN208726656U的中国专利公开了一种,其技术方案要点是:包括竖杆和弧形防护栏,若干个弧形防护栏的内表面均与防护栏固定板焊接,防护栏固定板远离弧形防护栏的一侧开设有滑槽,滑槽的内壁滑动连接有滑块,滑块的一侧与第一钢丝绳的一端固定连接,第一钢丝绳的另一端固定连接有固定块,固定块的一侧固定连接有背带固定板,背带固定板的两侧均固定连接有背带,固定块的一侧与第二钢丝绳的一端固定连接,第二钢丝绳的另一端穿插连接有登山扣。In view of the above-mentioned problems, at present, the Chinese patent with the publication number CN208726656U discloses a kind of technical solution, the main points of which are: including vertical rods and arc-shaped guardrails, and the inner surfaces of several arc-shaped guardrails are welded with guardrail fixing plates, The side of the guardrail fixing plate away from the arc-shaped guardrail is provided with a chute, the inner wall of the chute is slidably connected with a sliding block, one side of the sliding block is fixedly connected with one end of the first steel wire rope, and the other end of the first steel wire rope is fixedly connected with a sliding block. A fixing block, one side of the fixing block is fixedly connected with a strap fixing plate, both sides of the strap fixing plate are fixedly connected with a strap, one side of the fixing block is fixedly connected with one end of the second wire rope, and the other end of the second wire rope is interspersed and connected with a Carabiner.

上述方案通过爬杆上设有防滑纹,可以防止手滑和脚滑等情况发生,工作人员戴上背带,可以防止在攀爬时意外的发生。但是由于塔吊较高,工作人员通过攀爬的方式上下塔吊费时费力。The above solution can prevent hand slippage and foot slippage through the anti-skid pattern on the climbing pole, and the staff wears a strap to prevent accidental occurrence when climbing. However, due to the high tower crane, it is time-consuming and laborious for the staff to climb up and down the tower crane.

实用新型内容Utility model content

针对现有技术存在的不足,本实用新型的目的在于提供一种连接塔吊的爬架过桥,具有方便工作人员上下塔吊的优点。In view of the deficiencies in the prior art, the purpose of the present utility model is to provide a climbing frame crossing bridge connected to a tower crane, which has the advantage of being convenient for staff to get on and off the tower crane.

本实用新型的上述技术目的是通过以下技术方案得以实现的:一种连接塔吊的爬架过桥,包括用于固定连接在建筑爬架上水平的走道板,远离建筑爬架的所述走道板一端靠近塔吊爬架,所述走道板远离建筑爬架一端的两侧以及建筑爬架位于走道板上方上均固定设置有挂环,位于走道板和建筑爬架之间的挂环挂设有钢丝绳。The above-mentioned technical purpose of the present utility model is achieved through the following technical solutions: a climbing frame crossing bridge connecting a tower crane, including a horizontal walkway board for being fixedly connected on the building climbing frame, and the walkway board far away from the building climbing frame One end is close to the tower crane climbing frame, the two sides of the one end of the walkway board away from the building climbing frame and the building climbing frame are fixedly provided with hanging rings on the upper part of the walkway board, and the hanging rings located between the walkway board and the building climbing frame are hung with steel wire ropes .

通过采用上述技术方案,塔吊工作人员先通过货梯上升到建筑好的高楼层上,然后再通过连接在建筑爬架和塔吊爬架之间的走道板进入到塔吊操作室进行工作,与现有技术中通过爬梯慢慢上爬进入到塔吊操作室相比,极大的方便了工作人员上下塔吊。By adopting the above technical solution, the tower crane workers first ascend to the high floor of the building through the freight elevator, and then enter the tower crane operating room through the walkway board connected between the building climbing frame and the tower crane climbing frame to work, which is different from the existing technology. Compared with climbing the ladder slowly and entering the tower crane operation room, it is greatly convenient for the staff to get on and off the tower crane.

本实用新型进一步设置为:所述走道板两侧均设置有防护栏。The utility model is further configured as follows: both sides of the walkway board are provided with guardrails.

通过采用上述技术方案,通过设置在走板道两侧的防护栏,从而提高工作人员通过走道板的安全系数。By adopting the above technical scheme, the safety factor of the staff passing through the walkway is improved by the guard rails arranged on both sides of the walkway.

本实用新型进一步设置为:所述建筑爬架处安装有防护门,所述防护门通过锁具与建筑爬架固定。The utility model is further configured as follows: a protective door is installed at the building climbing frame, and the protective door is fixed with the building climbing frame through a lock.

通过采用上述技术方案,通过防护门以及安装在防护门上的锁具,从而避免非工作人员通过走道板进出塔吊。By adopting the above technical solution, the protective door and the locks installed on the protective door are used to prevent non-workers from entering and exiting the tower crane through the walkway board.

本实用新型进一步设置为:所述走道板下表面两侧与建筑爬架之间倾斜设置有支撑杆。The utility model is further arranged as follows: supporting rods are inclined between two sides of the lower surface of the walkway board and the building climbing frame.

通过采用上述技术方案,通过设置在走道板与建筑爬架之间的支撑杆,从而进一步提高走道板安装的稳定性。By adopting the above technical solution, the stability of the installation of the walkway board is further improved by the support rod arranged between the walkway board and the building climbing frame.

本实用新型进一步设置为:所述支撑杆包括安装座、螺杆以及螺纹套筒,所述螺杆和螺纹套筒螺纹连接,所述安装座设置两个,两个所述安装座分别与螺杆和螺纹套筒的端部铰接,两个安装座分别安装在走道板下表面和建筑爬架上,所述螺纹套筒包括转动部和连接部,所述转动部和连接部转动连接,所述转动部另一端与螺杆螺纹连接,所述连接部一端铰接在安装座上。The utility model is further provided as follows: the support rod includes a mounting seat, a screw rod and a threaded sleeve, the screw rod and the screw thread sleeve are threadedly connected, two mounting seats are provided, and the two mounting seats are respectively connected with the screw rod and the screw thread. The ends of the sleeve are hinged, and the two mounting seats are respectively installed on the lower surface of the walkway board and the building climbing frame. The threaded sleeve includes a rotating part and a connecting part. The rotating part and the connecting part are rotatably connected. The other end is connected with the screw thread, and one end of the connecting part is hinged on the mounting seat.

通过采用上述技术方案,通过转动螺纹套筒,从而调节螺杆的长度,进而调节支撑强度。By adopting the above technical solution, the length of the screw is adjusted by rotating the threaded sleeve, thereby adjusting the support strength.

本实用新型进一步设置为:所述转动部的侧壁对称设置有转动把手。The utility model is further provided as follows: a rotating handle is symmetrically arranged on the side wall of the rotating part.

通过采用上述技术方案,通过转动把手,方便螺纹套筒的旋转。By adopting the above technical solution, the rotation of the threaded sleeve is facilitated by turning the handle.

本实用新型进一步设置为:所述走道板下表面以及建筑爬架的侧壁均开设有供安装座放入的嵌槽,所述嵌槽侧壁开设有供安装座插入的安装槽,所述走道板和建筑爬架上开设有与安装槽相通的让位孔。The utility model is further configured as follows: the lower surface of the walkway board and the side wall of the building climbing frame are provided with inserting grooves into which the mounting seat is placed, and the sidewall of the inserting groove is provided with a mounting groove for the mounting seat to be inserted into, the The walkway board and the building climbing frame are provided with an escape hole which is communicated with the installation groove.

通过采用上述技术方案,安装座通过嵌槽插入到安装槽中进行安装,从而,从而提高安装座安装的稳定性。By adopting the above technical solution, the mounting seat is inserted into the mounting groove through the insert groove for installation, thereby improving the installation stability of the mounting seat.

本实用新型进一步设置为:所述嵌槽内插接有嵌块,所述嵌块通过螺栓固定连接在嵌槽内。The utility model is further configured as follows: an insert block is inserted into the insert groove, and the insert block is fixedly connected in the insert groove by means of bolts.

通过采用上述技术方案,当安装座安装在安装槽内时,通过螺栓将嵌块安装在嵌槽中,从而进一步提高安装座安装的稳定性。By adopting the above technical solution, when the mounting seat is installed in the mounting groove, the insert block is installed in the insert groove by means of bolts, thereby further improving the installation stability of the mounting seat.

综上所述,本实用新型具有以下有益效果:To sum up, the utility model has the following beneficial effects:

其一,塔吊工作人员先通过货梯上升到建筑好的高楼层上,然后再通过连接在建筑爬架和塔吊爬架之间的走道板进入到塔吊操作室进行工作,与现有技术中通过爬梯慢慢上爬进入到塔吊操作室相比,极大的方便了工作人员上下塔吊;First, the tower crane staff first ascends to the high floor of the building through the freight elevator, and then enters the tower crane operation room through the walkway board connected between the building climbing frame and the tower crane climbing frame to work, which is different from the existing technology. Compared with climbing slowly into the tower crane operation room, it is greatly convenient for the staff to get on and off the tower crane;

其二,通过设置在走道板与建筑爬架之间的支撑杆,从而进一步提高走道板安装的稳定性。Second, through the support rod arranged between the walkway board and the building climbing frame, the stability of the walkway board installation is further improved.

附图说明Description of drawings

图1是本实施例中过桥与建筑爬架的安装结构示意图;Fig. 1 is the installation structure schematic diagram of bridge and building climbing frame in the present embodiment;

图2是本实施例中走道板、建筑爬架和安装座剖开后的部分安装结构示意图。FIG. 2 is a schematic diagram of a part of the installation structure after the walkway board, the building climbing frame and the installation seat are cut away in this embodiment.

图中:1、建筑爬架;2、走道板;3、高层楼板;4、吊环;5、钢丝绳;6、防护栏;7、防护门;8、锁具;9、支撑杆;10、安装座;11、螺杆;12、螺纹套筒;13、转动部;14、连接部;15、限位环;16、转动把手;17、嵌槽;18、安装槽;19、让位孔;20、嵌块。In the picture: 1. Building climbing frame; 2. Walkway slab; 3. High-rise floor slab; 4. Lifting ring; 5. Steel wire rope; 6. Guard rail; 7. Guard door; 8. Lock; ;11, screw; 12, threaded sleeve; 13, rotating part; 14, connecting part; 15, limit ring; 16, rotating handle; 17, insert groove; 18, installation groove; 19, give way hole; 20, slug.

具体实施方式Detailed ways

下面结合附图和实施例,对本实用新型进行详细描述。The present utility model will be described in detail below with reference to the accompanying drawings and embodiments.

一种连接塔吊的爬架过桥,如图1所示,包括用于固定连接在建筑爬架1上水平的走道板2,走道板2通过螺栓固定在建筑爬架1上,远离建筑爬架1的走道板2一端靠近塔吊爬架,走道板2与建好的高层楼板3平齐。走道板2远离建筑爬架1一端的两侧以及建筑爬架1位于走道板2上方上均固定设置有挂环,位于走道板2和建筑爬架1之间的挂环挂设有钢丝绳5。建筑爬架1主要运用于高层剪力墙式楼盘,可以随着建筑物往上攀升。塔吊工作人员先通过货梯上升到建筑好的高楼层上,然后再通过连接在建筑爬架1和塔吊爬架之间的走道板2进入到塔吊操作室进行工作,与现有技术中通过爬梯慢慢上爬进入到塔吊操作室相比,极大的方便了工作人员上下塔吊。A climbing frame crossing bridge connected to a tower crane, as shown in Figure 1, includes a horizontal walkway board 2 for fixing and connecting on a building climbing frame 1, and the walkway board 2 is fixed on the building climbing frame 1 by bolts, away from the building climbing frame. One end of the walkway slab 2 of 1 is close to the tower crane climbing frame, and the walkway slab 2 is flush with the built high-rise floor slab 3. Hanging rings are fixed on both sides of the end of the walkway board 2 away from the building climbing frame 1 and on the building climbing frame 1 above the walkway board 2 . The building climbing frame 1 is mainly used in high-rise shear wall type real estate, and can climb up with the building. The tower crane staff first ascends to the high floor of the building through the freight elevator, and then enters the tower crane operation room through the walkway plate 2 connected between the building climbing frame 1 and the tower crane climbing frame to work, which is slower than the existing technology. Compared with climbing slowly into the tower crane operating room, it is greatly convenient for the staff to get on and off the tower crane.

如图1所示,进一步的,走道板2两侧均竖直设置有防护栏6,通过设置在走板道两侧的防护栏6,从而提高工作人员通过走道板2的安全系数。且位于走道板2处的建筑爬架1安装有防护门7,防护门7通过锁具8与建筑爬架1固定,通过防护门7以及安装在防护门7上的锁具8,从而避免非工作人员通过走道板2进出塔吊。As shown in FIG. 1 , further, guard rails 6 are vertically arranged on both sides of the walkway board 2 , and the safety factor of the staff passing the walkway board 2 is improved by the guard rails 6 arranged on both sides of the walkway board. And the building climbing frame 1 located at the walkway board 2 is equipped with a protective door 7, and the protective door 7 is fixed with the building climbing frame 1 through the lock 8, and the protective door 7 and the lock 8 installed on the protective door 7 are used to avoid non-workers. Enter and exit the tower crane through the walkway board 2.

如图1和图2所示,走道板2下表面两侧与建筑爬架1之间倾斜设置有支撑杆9,具体的,支撑杆9包括安装座10、螺杆11以及螺纹套筒12,螺杆11和螺纹套筒12螺纹连接,安装座10设置两个,两个安装座10分别与螺杆11和螺纹套筒12的端部铰接,两个安装座10分别安装在走道板2下表面和建筑爬架1上,螺纹套筒12包括转动部13和连接部14,转动部13和连接部14通过固定设置在连接部14上的限位环15转动连接,转动部13另一端与螺杆11螺纹连接,转动部13的侧壁对称设置有转动把手16,连接部14一端铰接在安装座10上,通过转动螺纹套筒12,从而调节螺杆11的长度,进而调节支撑强度。As shown in FIG. 1 and FIG. 2 , support rods 9 are inclined between two sides of the lower surface of the walkway board 2 and the building climbing frame 1 . Specifically, the support rods 9 include a mounting seat 10 , a screw rod 11 and a threaded sleeve 12 . 11 and the threaded sleeve 12 are threadedly connected, two mounting seats 10 are provided, the two mounting seats 10 are hinged with the ends of the screw 11 and the threaded sleeve 12 respectively, and the two mounting seats 10 are respectively installed on the lower surface of the walkway board 2 and the building On the climbing frame 1 , the threaded sleeve 12 includes a rotating part 13 and a connecting part 14 , the rotating part 13 and the connecting part 14 are rotatably connected by a limit ring 15 fixed on the connecting part 14 , and the other end of the rotating part 13 is threaded with the screw 11 The side wall of the rotating part 13 is symmetrically provided with a rotating handle 16, one end of the connecting part 14 is hinged on the mounting seat 10, and the length of the screw 11 is adjusted by rotating the threaded sleeve 12, thereby adjusting the supporting strength.

如图2所示,走道板2下表面以及建筑爬架1的侧壁均开设有供安装座10放入的嵌槽17,嵌槽17侧壁开设有供安装座10插入的安装槽18,走道板2和建筑爬架1上开设有与安装槽18相通的让位孔19。安装座10通过嵌槽17插入到安装槽18中进行安装,从而提高安装座10安装的稳定性。且嵌槽17内插接有嵌块20,嵌块20通过螺栓固定连接在嵌槽17内,当安装座10安装在安装槽18内时,通过螺栓将嵌块20安装在嵌槽17中,从而进一步提高安装座10安装的稳定性。As shown in FIG. 2 , the lower surface of the walkway board 2 and the side wall of the building climbing frame 1 are provided with inserting grooves 17 for inserting the mounting seat 10, and the side wall of the inserting groove 17 is provided with a mounting groove 18 for the mounting seat 10 to be inserted into, The walkway board 2 and the building climbing frame 1 are provided with an escape hole 19 which communicates with the installation groove 18 . The mounting seat 10 is inserted into the mounting groove 18 through the insert groove 17 for installation, thereby improving the installation stability of the mounting seat 10 . And the inserting block 20 is inserted into the inserting groove 17, and the inserting block 20 is fixedly connected in the inserting groove 17 by bolts. When the mounting seat 10 is installed in the mounting groove 18, the inserting block 20 is installed in the inserting groove 17 by bolts. Thus, the installation stability of the mounting seat 10 is further improved.

本具体实施方式的实施例均为本实用新型的较佳实施例,并非依此限制本实用新型的保护范围,故:凡依本实用新型的结构、形状、原理所做的等效变化,均应涵盖于本实用新型的保护范围之内。The examples of this specific embodiment are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention are not It should be covered within the protection scope of the present invention.

Claims (8)

1.一种连接塔吊的爬架过桥,其特征在于:包括用于固定连接在建筑爬架(1)上水平的走道板(2),远离建筑爬架(1)的所述走道板(2)一端靠近塔吊爬架,所述走道板(2)远离建筑爬架(1)一端的两侧以及建筑爬架(1)位于走道板(2)上方上均固定设置有挂环,位于走道板(2)和建筑爬架(1)之间的挂环挂设有钢丝绳(5)。1. a climbing frame crossing bridge connecting a tower crane is characterized in that: comprising a horizontal walkway board (2) for being fixedly connected on the building climbing frame (1), away from the described walkway board (2) of the building climbing frame (1). 2) One end is close to the tower crane climbing frame, and the two sides of the walkway board (2) away from one end of the building climbing frame (1) and the building climbing frame (1) are fixedly provided with hanging rings on the top of the walkway board (2), which are located in the walkway A wire rope (5) is hung on the hanging ring between the board (2) and the building climbing frame (1). 2.根据权利要求1所述的一种连接塔吊的爬架过桥,其特征在于:所述走道板(2)两侧均设置有防护栏(6)。2 . A climbing frame crossing bridge connected to a tower crane according to claim 1 , characterized in that: both sides of the walkway board ( 2 ) are provided with guardrails ( 6 ). 3 . 3.根据权利要求1所述的一种连接塔吊的爬架过桥,其特征在于:所述建筑爬架(1)处安装有防护门(7),所述防护门(7)通过锁具(8)与建筑爬架(1)固定。3. A kind of climbing frame crossing bridge connecting tower crane according to claim 1 is characterized in that: a protective door (7) is installed at the building climbing frame (1), and the protective door (7) passes through a lock ( 8) Fix it with the building climbing frame (1). 4.根据权利要求1所述的一种连接塔吊的爬架过桥,其特征在于:所述走道板(2)下表面两侧与建筑爬架(1)之间倾斜设置有支撑杆(9)。4. A kind of climbing frame crossing bridge connecting tower crane according to claim 1, is characterized in that: between the two sides of the lower surface of the walkway board (2) and the building climbing frame (1), a support rod (9) is inclined and arranged ). 5.根据权利要求4所述的一种连接塔吊的爬架过桥,其特征在于:所述支撑杆(9)包括安装座(10)、螺杆(11)以及螺纹套筒(12),所述螺杆(11)和螺纹套筒(12)螺纹连接,所述安装座(10)设置两个,两个所述安装座(10)分别与螺杆(11)和螺纹套筒(12)的端部铰接,两个安装座(10)分别安装在走道板(2)下表面和建筑爬架(1)上,所述螺纹套筒(12)包括转动部(13)和连接部(14),所述转动部(13)和连接部(14)转动连接,所述转动部(13)另一端与螺杆(11)螺纹连接,所述连接部(14)一端铰接在安装座(10)上。5. A climbing frame crossing bridge connected to a tower crane according to claim 4, characterized in that: the support rod (9) comprises a mounting seat (10), a screw (11) and a threaded sleeve (12), so The screw (11) and the threaded sleeve (12) are threadedly connected, two mounting seats (10) are provided, and the two mounting seats (10) are respectively connected with the ends of the screw (11) and the threaded sleeve (12). The two mounting seats (10) are respectively mounted on the lower surface of the walkway board (2) and the building climbing frame (1), and the threaded sleeve (12) includes a rotating part (13) and a connecting part (14), The rotating part (13) is rotatably connected with the connecting part (14), the other end of the rotating part (13) is threadedly connected with the screw (11), and one end of the connecting part (14) is hinged on the mounting seat (10). 6.根据权利要求5所述的一种连接塔吊的爬架过桥,其特征在于:所述转动部(13)的侧壁对称设置有转动把手(16)。6. A climbing frame crossing bridge connected to a tower crane according to claim 5, wherein a rotating handle (16) is symmetrically arranged on the side wall of the rotating part (13). 7.根据权利要求5所述的一种连接塔吊的爬架过桥,其特征在于:所述走道板(2)下表面以及建筑爬架(1)的侧壁均开设有供安装座(10)放入的嵌槽(17),所述嵌槽(17)侧壁开设有供安装座(10)插入的安装槽(18),所述走道板(2)和建筑爬架(1)上开设有与安装槽(18)相通的让位孔(19)。7. A kind of climbing frame crossing bridge connecting tower crane according to claim 5 is characterized in that: the lower surface of the walkway board (2) and the side wall of the building climbing frame (1) are provided with mounting seats (10). ) into the embedded groove (17), the side wall of the embedded groove (17) is provided with a mounting groove (18) for the mounting seat (10) to be inserted into, and the walkway board (2) and the building climbing frame (1) are on the An escape hole (19) communicated with the installation groove (18) is opened. 8.根据权利要求7所述的一种连接塔吊的爬架过桥,其特征在于:所述嵌槽(17)内插接有嵌块(20),所述嵌块(20)通过螺栓固定连接在嵌槽(17)内。8. A climbing frame crossing bridge connecting a tower crane according to claim 7, characterized in that: an insert block (20) is inserted into the insert groove (17), and the insert block (20) is fixed by bolts Connected in the insert groove (17).
CN201920658307.9U 2019-05-08 2019-05-08 A climbing frame crossing bridge connecting tower cranes Active CN210002827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920658307.9U CN210002827U (en) 2019-05-08 2019-05-08 A climbing frame crossing bridge connecting tower cranes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920658307.9U CN210002827U (en) 2019-05-08 2019-05-08 A climbing frame crossing bridge connecting tower cranes

Publications (1)

Publication Number Publication Date
CN210002827U true CN210002827U (en) 2020-01-31

Family

ID=69306235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920658307.9U Active CN210002827U (en) 2019-05-08 2019-05-08 A climbing frame crossing bridge connecting tower cranes

Country Status (1)

Country Link
CN (1) CN210002827U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113120785A (en) * 2021-04-30 2021-07-16 坤发建筑有限公司 Safety device attached to climbing frame for people on tower crane
CN113174808A (en) * 2021-04-16 2021-07-27 江苏宏基铝业科技股份有限公司 Pavement slab splicing ultrathin aluminum profile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113174808A (en) * 2021-04-16 2021-07-27 江苏宏基铝业科技股份有限公司 Pavement slab splicing ultrathin aluminum profile
CN113120785A (en) * 2021-04-30 2021-07-16 坤发建筑有限公司 Safety device attached to climbing frame for people on tower crane

Similar Documents

Publication Publication Date Title
CN103206074B (en) Elevator shaft template construction method, platform and support
CN206174437U (en) Be applied to gallows of super high overlength cantilevered member construction
CN202509754U (en) High-altitude steel structure node construction working platform
CN103806645B (en) Light intelligent hydraulic climbing formwork device with good wind-resistant and fireproof performances
CN210002827U (en) A climbing frame crossing bridge connecting tower cranes
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN207609153U (en) A kind of elevator liftable construction operation platform
CN212249184U (en) Electric creeping formwork device for building construction
CN104695848B (en) A kind of novel silo emergency staircase
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN209723438U (en) A kind of novel coagulation body precast stair plate
CN206928624U (en) A kind of heavy ladder cage for high-altitude building
CN203531352U (en) Hanging type movable working platform for storage tank maintenance
JP3950800B2 (en) Suspension scaffold
CN204940824U (en) A kind of overhanging type mobile decorative finishing operating platform
CN209568688U (en) A lifting construction platform
CN108824803B (en) Giant column climbing formwork device
CN207846427U (en) A kind of upper and lower walkway of assembled foundation pit
CN217708455U (en) Safety channel device for construction elevator
CN212802412U (en) Tower type scaffold for artificial passage
CN205314595U (en) Elevartor shaft protection frame
CN215485841U (en) Prevent mistake and step on shutting cat ladder
CN210914908U (en) Construction elevator turns over board
CN211713710U (en) Special work platform is assisted to portable bridge
CN208856819U (en) Convenient stereotyped tower crane upper access

Legal Events

Date Code Title Description
GR01 Patent grant