CN213709840U - PC precast concrete double-deck air conditioner position - Google Patents
PC precast concrete double-deck air conditioner position Download PDFInfo
- Publication number
- CN213709840U CN213709840U CN202021467527.2U CN202021467527U CN213709840U CN 213709840 U CN213709840 U CN 213709840U CN 202021467527 U CN202021467527 U CN 202021467527U CN 213709840 U CN213709840 U CN 213709840U
- Authority
- CN
- China
- Prior art keywords
- air conditioner
- angle steel
- steel
- main body
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model mainly relates to a pc precast concrete double-layer air conditioner position, which comprises an air conditioner position main body, wherein the air conditioner position main body is provided with an upper double-layer machine position frame and a lower double-layer machine position frame; the upper end and the lower end of the air conditioner main body are respectively connected and fixed with a first steel beam and a second steel beam of the floor main body structure; the first steel beam is provided with a first angle steel, and the upper end of the main body of the air conditioner position is matched with the first angle steel through a bolt group to realize fixation; a matching steel part is welded on the second steel beam, a second angle steel is arranged on the matching steel part, a pendant is embedded at the lower end of the main body of the air conditioner position, a slot is formed at the lower end of the pendant, one end of the second angle steel is matched and fixed with the matching steel part, and the other end of the second angle steel is inserted into the slot for installation; sleeves are welded on two sides of the hanging piece, a first bolt is arranged in each sleeve in a matched mode, and the top end of each first bolt is in contact fit with one end, inserted into the slot, of the corresponding second angle steel; the design not only solves the difficult problem of the double-layer air conditioner position, but also has prefabricated assembly type production, safety and firmness, and quicker construction and installation, and can further shorten the building construction period.
Description
Technical Field
The utility model relates to a pc precast concrete double-deck air conditioner position belongs to the building industrialization field.
Background
At present, the assembly type installation of buildings is greatly promoted in China; in the traditional pc concrete wallboard, if an air conditioner position is required to be set, a sleeve is usually pre-embedded in the pc concrete wallboard, and the air conditioner position is externally hung; due to the dead weight of the air conditioner and the vibration in the working process, the method is only suitable for single-layer air conditioner positions; when a double-layer air conditioner is needed, the load-bearing capacity of the method cannot meet the specified requirement, and a method needs to be additionally found.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a pc precast concrete double-deck air conditioner position, this design has not only solved the difficult problem of double-deck air conditioner position, and prefabricated assembled production moreover, it is safe firm, construction and installation are more swift, can make the building construction cycle further shorten.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a pc precast concrete double-layer air conditioner position comprises an air conditioner position main body, wherein the air conditioner position main body is provided with an upper double-layer position frame and a lower double-layer position frame; the upper end and the lower end of the air conditioner main body are respectively connected and fixed with a first steel beam and a second steel beam of the floor main body structure; the first steel beam is provided with a first angle steel, and the upper end of the main body of the air conditioner position is matched with the first angle steel through a bolt group to realize fixation; a matching steel part is welded on the second steel beam, a second angle steel is arranged on the matching steel part, a pendant is embedded at the lower end of the main body of the air conditioner position, a slot is formed at the lower end of the pendant, one end of the second angle steel is matched and fixed with the matching steel part, and the other end of the second angle steel is inserted into the slot for installation; the sleeve is welded on the two sides of the hanging piece, the axis of the sleeve is aligned with one end, inserted into the slot, of the second angle steel, a first bolt is arranged in the sleeve in a matched mode, the top end of the first bolt is in contact fit with one end, inserted into the slot, of the second angle steel, the first bolt abuts against the end portion of the second angle steel, the upper portion and the lower portion of the air conditioner position main body are fixed in a limiting mode, the length is screwed in through a first adjusting bolt, and the upper.
The bolt group comprises a second bolt and a barrel, the barrel is embedded in the upper end of the air conditioner position main body, one end of the first angle steel is fixedly welded with the first steel beam, and the other end of the first angle steel is fixedly matched with the barrel through the second bolt.
The second angle steel on be equipped with the bar hole with cooperation steel part complex one end, the downthehole cooperation of bar is installed bolt three, the angle steel two-pass is realized fixing with the cooperation steel part through bolt three, the spacing regulation of air conditioner position main part fore-and-aft direction can be realized in the bar hole.
And reinforcing ribs are welded on the second angle steel and connected with the hanging piece through a fourth bolt.
The utility model discloses following beneficial effect has:
a pc precast concrete double-layer air conditioner position comprises a precast concrete air conditioner position main body, wherein an upper layer machine position frame and a lower layer machine position frame are arranged on the air conditioner position main body to meet the requirements of users; the upper end and the lower end of the air conditioner main body are respectively connected and fixed with a first steel beam and a second steel beam of the floor main body structure; the first steel beam is provided with a first angle steel, and the upper end of the main body of the air conditioner position is matched with the first angle steel through a bolt group to realize fixation; a matching steel part is welded on the second steel beam, a second angle steel is arranged on the matching steel part, a pendant is embedded at the lower end of the main body of the air conditioner position, a slot is formed at the lower end of the pendant, one end of the second angle steel is matched and fixed with the matching steel part, and the other end of the second angle steel is inserted into the slot for installation; as shown in the combined drawing, sleeves are welded on two sides of the pendant, the axis of each sleeve is aligned to one end, inserted into the slot, of the corresponding angle steel II, a first bolt is arranged in each sleeve in a matched mode, the top end of each first bolt is in contact fit with one end, inserted into the slot, of the corresponding angle steel II, the first bolt abuts against the end portions of the angle steel II, the upper limiting and the lower limiting of the air conditioner position main body are achieved, and the upper position and the lower position of the air conditioner position main body are; the design not only solves the difficult problem of the double-layer air conditioner position, but also has prefabricated assembly type production, safety and firmness, and quicker construction and installation, and can further shorten the building construction period.
Drawings
Fig. 1 is a cross-sectional view of the present invention;
FIG. 2 is an enlarged view of A in FIG. 1 according to the present invention;
FIG. 3 is an enlarged view of B of FIG. 1 according to the present invention;
fig. 4 is a top view of the hanging member of the present invention.
Reference numbers in the figures: 1. an air conditioner main body; 2. a machine frame; 3. a first steel beam; 4. a second steel beam; 5. angle steel I; 6. a bolt group; 61. a second bolt; 62. a screw cylinder; 7. matching the steel piece; 8. angle steel II; 81. reinforcing ribs; 9. hanging parts; 91. a slot; 10. a sleeve; 11. a first bolt; 12. a third bolt; 13. and a fourth bolt.
Detailed Description
As shown in fig. 1, 2 and 3, a pc precast concrete double-layer air conditioner position comprises a precast concrete air conditioner position main body 1, wherein the air conditioner position main body 1 is provided with an upper layer machine position frame and a lower layer machine position frame 2 which meet the requirements of users, the air conditioner position main body 1 is manufactured by adopting a vertical die during the precast processing of factories, and concrete is vibrated and compacted by a vibration pump; the upper end and the lower end of the air conditioner position main body 1 are respectively connected and fixed with a steel beam I3 and a steel beam II 4 of the floor main body structure; an angle steel I5 is arranged on the steel beam I3, and the upper end of the air conditioner position main body 1 is matched with the angle steel I5 through a bolt group 6 to realize fixation; a matching steel part 7 is welded on the second steel beam 4, a second angle steel 8 is arranged on the matching steel part 7, a pendant 9 is embedded at the lower end of the air conditioner position main body 1, a slot 91 is formed in the lower end of the pendant 9, one end of the second angle steel 8 is matched and fixed with the matching steel part 7, and the other end of the second angle steel 8 is inserted into the slot 91 for installation; referring to fig. 4, sleeves 10 are welded on two sides of a pendant 9, the axis of each sleeve 10 is aligned with one end, inserted into a slot 91, of a second angle steel 8, a first bolt 11 is arranged in each sleeve 10 in a matched mode, the top end of each first bolt 11 is in contact fit with one end, inserted into the slot 91, of the second angle steel 8, each first bolt 11 abuts against the end of the second angle steel 8, the upper limiting and the lower limiting and fixing of the air conditioner position main body 1 are achieved, and the upper position and the lower position of the air conditioner position main body 1 are adjusted by adjusting; the design not only solves the difficult problem of the double-layer air conditioner position, but also has prefabricated assembly type production, safety and firmness, and quicker construction and installation, and can further shorten the building construction period.
Referring to fig. 2, the bolt group 6 includes a second bolt 61 and a barrel 62, the barrel 62 is embedded in the upper end of the air conditioner main body 1, one end of the first angle steel 5 is welded and fixed with the first steel beam 3, and the other end of the first angle steel 5 is fixed by the second bolt 61 and the barrel 62.
Combine shown in fig. 3, be equipped with the bar hole with cooperation steel 7 complex one end on the angle steel two 8, the downthehole cooperation of bar installs bolt three 12, and angle steel two 8 realizes through bolt three 12 and is fixed with cooperation steel 7, and the spacing regulation of 1 fore-and-aft direction in air conditioner position main part can be realized in the bar hole.
The second angle steel 8 is welded with a reinforcing rib 81, and the reinforcing rib 81 is connected with the hanging part 9 through the fourth bolt 13 to reinforce the connection firmness.
Above is the utility model discloses preferred embodiment the utility model discloses make a plurality of other simple replacements and changes under the design prerequisite, all should regard as belonging to the utility model discloses a protection category.
Claims (4)
1. The utility model provides a pc precast concrete double-deck air conditioner position which characterized in that: the air conditioner position main body is provided with an upper layer of position frame and a lower layer of position frame; the upper end and the lower end of the air conditioner main body are respectively connected and fixed with a first steel beam and a second steel beam of the floor main body structure; the first steel beam is provided with a first angle steel, and the upper end of the main body of the air conditioner position is matched with the first angle steel through a bolt group to realize fixation; a matching steel part is welded on the second steel beam, a second angle steel is arranged on the matching steel part, a pendant is embedded at the lower end of the main body of the air conditioner position, a slot is formed at the lower end of the pendant, one end of the second angle steel is matched and fixed with the matching steel part, and the other end of the second angle steel is inserted into the slot for installation; the sleeve is welded on the two sides of the hanging piece, the axis of the sleeve is aligned with one end, inserted into the slot, of the second angle steel, a first bolt is arranged in the sleeve in a matched mode, the top end of the first bolt is in contact fit with one end, inserted into the slot, of the second angle steel, the first bolt abuts against the end portion of the second angle steel, the upper portion and the lower portion of the air conditioner position main body are fixed in a limiting mode, the length is screwed in through a first adjusting bolt, and the upper.
2. A pc precast concrete double deck air conditioner station according to claim 1, characterized in that: the bolt group comprises a second bolt and a barrel, the barrel is embedded in the upper end of the air conditioner position main body, one end of the first angle steel is fixedly welded with the first steel beam, and the other end of the first angle steel is fixedly matched with the barrel through the second bolt.
3. A pc precast concrete double deck air conditioner station according to claim 1, characterized in that: the second angle steel is provided with a strip hole in one end matched with the matched steel part, a third bolt is installed in the strip hole in a matched mode, the second angle steel is fixed with the matched steel part through the third bolt, and the strip hole can achieve limiting adjustment in the front-back direction of the main body of the air conditioner.
4. A pc precast concrete double deck air conditioner station according to claim 1, characterized in that: the second angle steel is welded with a reinforcing rib, and the reinforcing rib is connected with the hanging piece through a fourth bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021467527.2U CN213709840U (en) | 2020-07-23 | 2020-07-23 | PC precast concrete double-deck air conditioner position |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021467527.2U CN213709840U (en) | 2020-07-23 | 2020-07-23 | PC precast concrete double-deck air conditioner position |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213709840U true CN213709840U (en) | 2021-07-16 |
Family
ID=76766551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021467527.2U Active CN213709840U (en) | 2020-07-23 | 2020-07-23 | PC precast concrete double-deck air conditioner position |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213709840U (en) |
-
2020
- 2020-07-23 CN CN202021467527.2U patent/CN213709840U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206567423U (en) | A kind of straight tube Bending Mould | |
CN111075024B (en) | Flying saucer building steel beam mounting structure and construction method thereof | |
CN213709840U (en) | PC precast concrete double-deck air conditioner position | |
CN215716109U (en) | Crossbeam connecting piece of steel structure house | |
CN204662717U (en) | A kind of staircase prefabricated reinforced concrete fire barrier structure | |
CN214120238U (en) | Modular assembly type air conditioner board PC component | |
CN212026701U (en) | Prefabricated shear wall horizontal connection structure with W-shaped joint | |
CN114250965A (en) | Climbing frame wall-attaching device for variable cross-section construction of high-rise building and construction method thereof | |
CN113700319A (en) | Positioning guider for assembly type building | |
CN209874262U (en) | Full grout sleeve and connection structure for building | |
CN210194906U (en) | Concrete formwork for fabricated building | |
CN209277287U (en) | A kind of assembly concrete-filled steel tube wall frame building integrated morphology | |
CN208486441U (en) | A kind of prefabricated panel and assembled architecture wallboard longitudinal connection structure | |
CN214402557U (en) | A easy installing support for stores pylon | |
CN205853043U (en) | A kind of mould lower limb assembly of brick-making mould | |
CN205399102U (en) | Special support frame of urban railway railway roadbed template | |
CN2604485Y (en) | Assembling scaffold for construction use | |
CN214835236U (en) | Structure for reinforcing communication rod body | |
CN218375393U (en) | Superimposed sheet installation check structure of taking one's place | |
CN217051203U (en) | Building construction elevator car of scalable length and degree of depth | |
CN213390791U (en) | Core barrel gypsum board wall and furred ceiling binding off connected node structure | |
CN218438241U (en) | Hyperboloid arch passageway template | |
CN217734512U (en) | Assembled superimposed sheet board holds in palm | |
CN214696066U (en) | Assembled building beam column node | |
CN209817401U (en) | Combined building template for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |