CN213691338U - Property management service publicity column - Google Patents

Property management service publicity column Download PDF

Info

Publication number
CN213691338U
CN213691338U CN202022338038.3U CN202022338038U CN213691338U CN 213691338 U CN213691338 U CN 213691338U CN 202022338038 U CN202022338038 U CN 202022338038U CN 213691338 U CN213691338 U CN 213691338U
Authority
CN
China
Prior art keywords
welded
wall
supporting
property management
management service
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022338038.3U
Other languages
Chinese (zh)
Inventor
朱艺丹
赵杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Siwei Space Electronic Technology Co.,Ltd.
Original Assignee
Nanjing Yishang Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yishang Information Technology Co ltd filed Critical Nanjing Yishang Information Technology Co ltd
Priority to CN202022338038.3U priority Critical patent/CN213691338U/en
Application granted granted Critical
Publication of CN213691338U publication Critical patent/CN213691338U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a property management service publicity column relates to publicity column facility technical field, property management service publicity column, including four supporting legs, four first sleeve pipe, two have all been welded on the top of supporting leg the joint pipe has all been cup jointed to first sheathed tube inner wall, two the joint pipe has the second backup pad jointly welded on the top, the second sleeve pipe has all been welded in the four corners department at second backup pad top, four protective mechanism, two have been cup jointed jointly to the sheathed tube inner wall of second the outer wall of supporting leg passes through two slope anchor rods of the common fixedly connected with of bolt. The utility model discloses a setting of horizontal anchor strut, first backup pad and first backup pad can be fixed first backup pad on horizontal anchor strut through the fixed hook to make first backup pad and second backup pad be the echelonment and distribute, can make things convenient for the propaganda fence about the staff, prevent to fall and hinder the staff, realize reducing the effect of potential safety hazard.

Description

Property management service publicity column
Technical Field
The utility model relates to a property management technical field specifically is property management service publicity column.
Background
The property management means that a property owner selects and hires a property service enterprise, the property owner and the property service enterprise maintain, maintain and manage a house, matched facility equipment and a related site according to the property service contract agreement, the environmental sanitation and related order activities in a property management area are maintained, the property right law is stipulated, the property owner can manage the property by himself or entrust the property service enterprise or other managers to manage, and the property management has narrow meaning and broad sense; the narrow-sense property management refers to the maintenance and repair activities of house buildings and equipment thereof, municipal utilities, landscaping, sanitation, traffic, living order, environmental appearance and other management projects which are carried out by property service enterprises entrusted by owners according to entrustment contracts; the broad property management shall include processes commonly managed by property owners and management processes entrusted to property service enterprises or other managers.
The prior property management service publicity column has the advantages that the structure is single, the safety is low, in the actual use process, certain publicity columns with relatively high display positions are not provided with protection measures, the publicity information is not convenient for workers to change from top to bottom, the workers are easily damaged when the publicity columns are arranged up and down, and potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a property management service publicity column to solve the problem of proposing among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the property management service publicity column comprises four supporting legs, wherein first sleeves are welded at the top ends of the four supporting legs, clamping pipes are sleeved on the inner walls of the two first sleeves, a second supporting plate is welded at the top ends of the two clamping pipes together, second sleeves are welded at the four corners of the top of the second supporting plate, a protection mechanism is sleeved on the inner walls of the four second sleeves together, two inclined reinforcing rods are fixedly connected to the outer walls of the two supporting legs together through bolts, the supporting mechanism consists of the four supporting legs and the two inclined reinforcing rods, two transverse reinforcing rods are fixedly connected to the two sides of the outer wall of the supporting mechanism, the publicity column is fixedly connected to the tops of the second supporting plate and the front transverse reinforcing rods, fixing hooks are clamped on the outer walls of the two transverse reinforcing rods, and the first supporting plate is welded at one end of the two fixing hooks together, four the fixed plate has all been welded to the bottom of supporting leg, the top welding of fixed plate outer wall has fixation nut, fixation nut's inner wall threaded connection has fixing bolt, and fixation nut's inner wall sets up the internal thread identical with the fixing bolt surface, fixing bolt's top and bottom have welded respectively rotatory handle and support base.
Preferably, the bottom of the fixed plate is provided with a universal wheel, and a wheel fixer is arranged at the central rotating shaft of the universal wheel.
Preferably, the protection mechanism comprises four vertical guardrail rods, three guardrail cross rods are welded at the top ends of the four vertical guardrail rods, and the outer walls of the guardrail cross rods are all sleeved with sliding rings.
Preferably, the centers of the two inclined reinforcing rod walls are hinged with each other through a rotating shaft.
Preferably, the wall body of fixed plate has seted up the lift hole, fixing bolt's screw thread end runs through in the inner wall in fixation nut and lift hole and welds in the top that supports the base outer wall.
Preferably, a rubber block is adhered to the bottom of the second support plate.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) property management service publicity column through the setting of horizontal anchor strut, first backup pad and first backup pad, can fix first backup pad on horizontal anchor strut through the fixed hook to make first backup pad and second backup pad be the echelonment and distribute, can make things convenient for publicity column about the staff, prevent to fall and hinder the staff, realize reducing the effect of potential safety hazard.
(2) Property management service publicity column through the setting of universal wheel, can diversely remove the publicity column, through protection machanism's setting, can strengthen the security performance of publicity column, through two articulated settings of slope anchor strut, can play the triangular supports effect, can strengthen the stability of publicity column, through fixing bolt's setting, can be on the slope road surface, adjust the publicity column to the flat state through adjusting rotatory fixing bolt, through the setting of rubber piece, can assist the stability that increases the second backup pad.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a schematic side view of the present invention;
fig. 3 is a schematic top view of the guardrail mechanism of the present invention.
In the figure: 1. supporting legs; 2. a guardrail cross bar; 3. a guardrail vertical bar; 4. clamping the connecting pipe; 5. a fixed hook; 6. inclining the reinforcing rod; 7. rotating the handle; 8. a rubber block; 9. fixing a nut; 10. a support base; 11. a universal wheel; 12. a slip ring; 13. a wheel holder; 14. fixing the bolt; 15. a first support plate; 16. a second support plate; 17. a first sleeve; 18. a second sleeve; 19. a fixing plate; 20. and transverse reinforcing rods.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the property management service publicity column comprises four supporting legs 1, first sleeves 17 are welded at the top ends of the four supporting legs 1, clamping pipes 4 are sleeved on the inner walls of the two first sleeves 17, second supporting plates 16 are welded at the top ends of the two clamping pipes 4 together, second sleeves 18 are welded at the four corners of the tops of the second supporting plates 16, protective mechanisms are sleeved on the inner walls of the four second sleeves 18 together, two inclined reinforcing rods 6 are fixedly connected to the outer walls of the two supporting legs 1 together through bolts, the supporting mechanisms are composed of the four supporting legs 1 and the two inclined reinforcing rods 6, two transverse reinforcing rods 20 are fixedly connected to the two sides of the outer wall of each supporting mechanism, publicity columns 21 are fixedly connected to the tops of the second supporting plates 16 and the front transverse reinforcing rods 20, fixing hooks 5 are clamped on the outer walls of the two transverse reinforcing rods 20, and first supporting plates 15 are welded at one ends of the two fixing hooks 5 together, the first supporting plate 15 can be fixed on the transverse reinforcing rod 20 through the fixing hook 5, so that the first supporting plate 15 and the second supporting plate 16 are distributed in a ladder shape, the propaganda column can be conveniently carried by a worker, the bottom ends of the four supporting legs 1 are welded with the fixing plates 19, the top of the outer wall of each fixing plate 19 is welded with the fixing nut 9, the inner wall of each fixing nut 9 is in threaded connection with the fixing bolt 14, the inner wall of each fixing nut 9 is provided with an internal thread matched with the outer surface of the corresponding fixing bolt 14, the top end and the bottom end of each fixing bolt 14 are respectively welded with the rotating handle 7 and the supporting base 10, the bottom of each fixing plate 19 is provided with the universal wheel 11, the propaganda column can be moved in multiple directions, the wheel fixer 13 is arranged at the central rotating shaft of the universal wheel 11, the protection mechanism comprises four guardrail vertical rods 3, slip ring 12 has all been cup jointed to the outer wall of three guardrail horizontal pole 2, and the center department of 6 wall bodies of two slope anchor strut is articulated each other through the pivot, and the lift hole has been seted up to the wall body of fixed plate 19, and fixing bolt 14's screw thread end runs through to weld in the top of supporting base 10 outer wall in the inner wall in fixation nut 9 and lift hole, can be on the slope road surface, can adjust the publicity column to the level and smooth state through adjusting rotatory fixing bolt 14, and the bottom of second backup pad 16 is pasted and is had block rubber 8.
The working principle is as follows: the inclined reinforcing rods 6 and the transverse reinforcing rods 20 are connected with the supporting legs 1 to form a supporting mechanism, then the second supporting plate 16 is fixed on the supporting mechanism through the clamping pipe 4, then the protection mechanism is fixed on the second supporting plate 16, the first supporting plate 15 can be fixed on the transverse reinforcing rods 20 through the fixing hooks 5, so that the first supporting plate 15 and the second supporting plate 16 are distributed in a step shape, the assembled publicity column is pushed to a work site through the universal wheels 11, the universal wheels 11 are locked through the wheel holders 13, the height of the supporting base 10 is adjusted by rotating the rotary handle 7 to adjust the fixing bolts 14 according to the situation of the specific site, so that the state of the publicity column is adjusted to be flat, a worker pedals the second supporting plate 16 through the first supporting plate 15 and hangs the hooks on the protection suit on the sliding rings 12, so that the working safety of the worker can be improved, at this time, the publicity information on the surface of the publicity column 21 on the top of the second supporting plate 16 and the front lateral reinforcing bar 20 can be replaced periodically.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Property management service publicity column includes four supporting legs (1), its characterized in that: the top ends of the four supporting legs (1) are all welded with first sleeves (17), the inner walls of the two first sleeves (17) are all sleeved with clamping tubes (4), the top ends of the two clamping tubes (4) are jointly welded with second supporting plates (16), the four corners of the top of each second supporting plate (16) are all welded with second sleeves (18), the inner walls of the four second sleeves (18) are jointly sleeved with a protection mechanism, the outer walls of the two supporting legs (1) are jointly and fixedly connected with two inclined reinforcing rods (6) through bolts, the four supporting legs (1) and the two inclined reinforcing rods (6) form a supporting mechanism, two sides of the outer wall of the supporting mechanism are respectively and fixedly connected with two transverse reinforcing rods (20), the top portions of the second supporting plates (16) and the front transverse reinforcing rods (20) are respectively and fixedly connected with propaganda columns (21), and the outer walls of the two transverse reinforcing rods (20) are respectively and fixedly clamped with fixing hooks (5), two the common welding of one end of fixed hook (5) has first backup pad (15), four fixed plate (19) have all been welded to the bottom of supporting leg (1), the top welding of fixed plate (19) outer wall has fixation nut (9), the inner wall threaded connection of fixation nut (9) has fixing bolt (14), and the inner wall of fixation nut (9) seted up with the identical internal thread of fixing bolt (14) surface, the top and the bottom of fixing bolt (14) have welded rotatory handle (7) and support base (10) respectively.
2. The property management service bulletin board of claim 1, wherein: the bottom of fixed plate (19) is installed universal wheel (11), wheel fixer (13) are installed to the central pivot department of universal wheel (11).
3. The property management service bulletin board of claim 1, wherein: the protection mechanism comprises four guardrail vertical rods (3), three guardrail cross rods (2) are welded at the top ends of the four guardrail vertical rods (3) together, and the outer walls of the guardrail cross rods (2) are all sleeved with sliding rings (12).
4. The property management service bulletin board of claim 1, wherein: the centers of the two inclined reinforcing rods (6) are hinged with each other through a rotating shaft.
5. The property management service bulletin board of claim 1, wherein: the wall body of fixed plate (19) has seted up the lift hole, the threaded end of fixing bolt (14) is run through in fixation nut (9) and the inner wall in lift hole and is welded in the top of supporting base (10) outer wall.
6. The property management service bulletin board of claim 1, wherein: the bottom of the second support plate (16) is adhered with a rubber block (8).
CN202022338038.3U 2020-10-20 2020-10-20 Property management service publicity column Active CN213691338U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022338038.3U CN213691338U (en) 2020-10-20 2020-10-20 Property management service publicity column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022338038.3U CN213691338U (en) 2020-10-20 2020-10-20 Property management service publicity column

Publications (1)

Publication Number Publication Date
CN213691338U true CN213691338U (en) 2021-07-13

Family

ID=76758755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022338038.3U Active CN213691338U (en) 2020-10-20 2020-10-20 Property management service publicity column

Country Status (1)

Country Link
CN (1) CN213691338U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113634326A (en) * 2021-10-12 2021-11-12 江苏美田农业装备科技有限公司 Full-automatic grain crushing apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113634326A (en) * 2021-10-12 2021-11-12 江苏美田农业装备科技有限公司 Full-automatic grain crushing apparatus

Similar Documents

Publication Publication Date Title
CN213691338U (en) Property management service publicity column
CN210288107U (en) Hanging basket for bridge engineering
CN104773654A (en) Concrete electric pole arrangement device
CN210177396U (en) Adjustable sign board for road and bridge construction
CN211475089U (en) Pipeline strutting arrangement for municipal construction
CN211922315U (en) Support bracket is used in public road bridge roof beam construction
CN211899826U (en) Support frame for building
CN212061752U (en) Bill-board for municipal works
CN205777416U (en) Ladder scaffolding
CN210081020U (en) Plate girder expansion joint positioning device
CN211596310U (en) Temporary construction platform for surface finishing in garden road construction process
CN211597633U (en) Scaffold for building engineering that can install fast
CN204529148U (en) Cement electric pole press-rod apparatus
CN210369827U (en) Scaffold for building external wall construction
CN220867993U (en) Pier surface artificial painting platform
CN214575505U (en) Scaffold reinforcing apparatus for building engineering
CN204701948U (en) Large hydraulic vibration hammer storage tray
CN216464549U (en) Shield constructs quick-witted maintenance strutting arrangement suitable for many diameters
CN213326441U (en) Instrument formula quick detach tower crane attaches wall mounting platform
CN221823443U (en) Elevation protector for steel structure construction
CN210767765U (en) Scaffold frame for municipal works
CN217925295U (en) A protection grid device for civil engineering
CN210459939U (en) Positioning and fixing device for building scaffold
CN211087625U (en) Teaching device based on professorship education
CN215923214U (en) Pipeline strorage device for highway engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230920

Address after: No. 64, Suning Avenue, Xuanwu District, Nanjing City, Jiangsu Province, 210000

Patentee after: Nanjing Siwei Space Electronic Technology Co.,Ltd.

Address before: 1912 4D space station, 86 runqi Road, Dongshan street, Jiangning District, Nanjing City, Jiangsu Province, 211103

Patentee before: Nanjing Yishang Information Technology Co.,Ltd.