CN211475089U - A pipeline support device for municipal construction - Google Patents
A pipeline support device for municipal construction Download PDFInfo
- Publication number
- CN211475089U CN211475089U CN201922085719.0U CN201922085719U CN211475089U CN 211475089 U CN211475089 U CN 211475089U CN 201922085719 U CN201922085719 U CN 201922085719U CN 211475089 U CN211475089 U CN 211475089U
- Authority
- CN
- China
- Prior art keywords
- screw
- shaped frame
- pipeline
- screw rod
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
Description
技术领域technical field
本实用新型属于支撑装置技术领域,具体涉及一种市政施工用管道支撑装置。The utility model belongs to the technical field of support devices, in particular to a pipeline support device for municipal construction.
背景技术Background technique
在我国,市政设施是指在城市区、镇(乡)规划建设范围内设置、基于政府责任和义务为居民提供有偿或无偿公共产品和服务的各种建筑物、构筑物、设备等。城市生活配套的各种公共基础设施建设都属于市政工程范畴,比如常见的城市道路、桥梁、地铁,比如与生活紧密相关的各种管线:雨水、污水、上水、中水、电力(红线以外部分)、电信、热力、燃气等,还有广场,城市绿化等的建设,都需要使用到管道支撑装置。In my country, municipal facilities refer to various buildings, structures, equipment, etc., which are set up within the planning and construction scope of urban areas and towns (townships) and provide residents with paid or unpaid public products and services based on government responsibilities and obligations. All kinds of public infrastructure construction supporting urban life belong to the category of municipal engineering, such as common urban roads, bridges, subways, such as various pipelines closely related to life: rainwater, sewage, water, reclaimed water, electricity (outside the red line) Parts), telecommunications, heat, gas, etc., as well as the construction of squares, urban greening, etc., all need to use pipeline support devices.
目前现有的管道支撑装置对管道均有着较好的支撑作用,在两个管道口需要对接时,需要对管道进行上下左右调整,才能进行准确接整,常见的调整方式都是通过施工人员用手托举管道进行调整,这种方式不仅费时费力,而且精度较低,现有的管道支撑装置又不能对管道进行上下左右位置调整。At present, the existing pipeline support devices have a good supporting effect on the pipeline. When the two pipeline ports need to be connected, the pipeline needs to be adjusted up and down, left and right, so as to be accurately connected. The common adjustment methods are used by the construction personnel. Holding the pipe by hand for adjustment is not only time-consuming and labor-intensive, but also has low precision, and the existing pipe support device cannot adjust the position of the pipe up, down, left, and right.
实用新型内容Utility model content
本实用新型的目的是解决现有技术的不足而提供一种能实现管道的高度和水平位置调整的市政施工用管道支撑装置。The purpose of the utility model is to solve the deficiencies of the prior art and provide a pipeline support device for municipal construction which can realize the adjustment of the height and the horizontal position of the pipeline.
为实现上述技术目的,本实用新型采用的技术方案如下:In order to realize the above-mentioned technical purpose, the technical scheme that the utility model adopts is as follows:
一种市政施工用管道支撑装置,包括用于径向定位管道1的左钳2和右钳21、实现左钳2和右钳21沿管道1径向水平移动的水平移动装置、带动水平移动装置沿垂直方向移动的垂直移动装置以及支撑垂直移动装置的工形架4,所述水平移动装置包括水平丝杆24,所述左钳2和右钳21下侧相对面设有与管道1大小相匹配的半圆形凹槽,所述左钳2和右钳21的上侧设有第二通孔,左钳2和右钳21通过第二通孔套装在所述水平丝杆24上,并且通过安装在水平丝杆24上的、设置在左钳2和右钳21两侧的螺母定位左钳2和右钳21在水平丝杆24上轴向的位置,所述水平丝杆24固定在C形架25上,所述工形架4上设有导向孔,所述 C形架25的两侧上方设有与导向孔相匹配的、垂直布设的导向杆41,所述C形架25的导向杆41从工形架4的底部插装在导向孔内,所述C形架25的中部旋转连接有垂直布设的第一螺杆3,所述工形架4上设有与第一螺杆3相匹配的螺孔,所述第一螺杆3螺纹连接在所述工形架4的螺孔内,从而将C形架25与工形架4连接,所述第一螺杆3的顶部从工形架4的上方伸出,并且顶部上设有方便旋转第一螺杆3的第一把手32,所述工形架4的四个端部通过支撑腿支撑在地面上从而将管道1架起,所述支撑腿为可调节高度的支撑腿包括四个第二螺杆42,所述工形架4的四个端部设有与第二螺杆42相匹配的螺孔,四个所述第二螺杆42 分别螺纹连接在对应螺孔内,所述第二螺杆42的顶端设有方便旋转第二螺杆42的第二把手 43,所述第二螺杆42底端设有支撑板44。A pipeline support device for municipal construction, comprising a left clamp 2 and a
采用本实用新型技术方案,夹紧管道时,松开第二左侧螺母、第二右侧螺母和第一螺母,将管道放置在左钳和右钳之间,并转动第一螺母使左钳和右钳将管道夹紧;向上调整管道位置时,逆时针转动第一把手,第一把手便带动第一螺杆逆时针转动,由于第一螺杆与工形架转动连接,又因为第一螺杆下端固定连接有圆块,所以第一螺杆会带动C形架向上运动,这样管道便能向上运动;同理向下调整管道的位置时,顺时针转动第一把手,便能向下调整管道位置;导向杆用于C形架限位,防止C形架转动;转动第一把手,再通过第一螺杆、圆块、工形架和导向杆的相互配合,使C形架上下运动,便能实现管道的高度调整,这样的高度调整方式,相比人力抬升,不仅调整精确,而且更加省力;向左调整管道位置时,松开第二左侧螺母,顺时针转动第二右侧螺母,由于第二右侧螺母与水平丝杆螺纹连接,又因为水平丝杆套设在第二通孔内,所以第二右侧螺母会推动左钳和右钳向左侧移动,这样管道便向左侧移动,移动完成后,扭紧第二左侧螺母将左钳与右钳固定;同理向右调整管道位置时,松开第二右侧螺母,逆时针转动第二左侧螺母,便能向右调整管道的位置;通过水平丝杆、C形架、第二左侧螺母和第二右侧螺母的相互配合,使左钳和右钳左右运动,便能实现管道的左右位置调整,相比人工直接左右调整,不仅调整精确,而且更加省力;通过工形架、第二螺杆、第二把手和支撑板的相互配合,便能支撑整个装置,并且还能单独调整每个支撑板的高度,以适用高低不平的地面;本实用新型用于管道支撑,同时使管道能够上下左右调整位置。By adopting the technical scheme of the utility model, when clamping the pipe, loosen the second left nut, the second right nut and the first nut, place the pipe between the left clamp and the right clamp, and rotate the first nut to make the left clamp Clamp the pipe with the right pliers; when adjusting the pipe position upward, turn the first handle counterclockwise, and the first handle will drive the first screw to rotate counterclockwise, because the first screw is connected with the I-shaped frame in rotation, and because the lower end of the first screw is fixedly connected There is a round block, so the first screw will drive the C-shaped frame to move upward, so that the pipe can move upward; similarly, when adjusting the position of the pipe downward, turn the first handle clockwise to adjust the position of the pipe downward; Limit the C-shaped frame to prevent the C-shaped frame from rotating; turn the first handle, and then through the cooperation of the first screw, the round block, the I-shaped frame and the guide rod, the C-shaped frame can move up and down, and the height of the pipeline can be adjusted. , This height adjustment method, compared with manual lifting, is not only accurate but also more labor-saving; when adjusting the pipe position to the left, loosen the second left nut and turn the second right nut clockwise, because the second right nut It is threadedly connected with the horizontal screw, and because the horizontal screw is sleeved in the second through hole, the second right nut will push the left and right pliers to move to the left, so that the pipe will move to the left. After the movement is completed , tighten the second left nut to fix the left and right pliers; similarly, when adjusting the position of the pipe to the right, loosen the second right nut and turn the second left nut counterclockwise to adjust the position of the pipe to the right ;Through the cooperation of the horizontal screw rod, the C-shaped frame, the second left side nut and the second right side nut, the left and right clamps can move left and right, and the left and right position adjustment of the pipeline can be realized. Compared with manual left and right adjustment, Not only is the adjustment accurate, but also more labor-saving; through the mutual cooperation of the I-shaped frame, the second screw, the second handle and the support plate, the entire device can be supported, and the height of each support plate can be adjusted individually to suit uneven heights. The ground; the utility model is used for pipeline support, and at the same time, the pipeline can adjust the position up, down, left and right.
进一步的,所述第二螺杆42在工形架4上下侧均设有与第二螺杆42螺纹连接的、用于锁定第二螺杆42旋转位置的第二限位螺母51,从而防止第二螺杆意外转动。Further, the
进一步的,所述第二把手43形状为十字形,便于使用者转动第二螺杆。Further, the
进一步的,所述第一螺杆3在工形架4的上下侧均设有与第一螺杆3螺纹连接的、用于锁定第一螺杆3旋转位置的第一限位螺母5,从而防止第一螺杆意外转动。Further, the
进一步的,所述第一把手32形状为圆环形,便于使用者转动第一螺杆。Further, the shape of the
本实用新型相比现有技术具有以下优点:Compared with the prior art, the utility model has the following advantages:
1、转动第一把手,再通过第一螺杆、圆块、工形架和导向杆的相互配合,使C形架上下运动,便能实现管道的高度调整,这样的高度调整方式,相比人力抬升,不仅调整精确,而且更加省力;1. Turn the first handle, and then through the cooperation of the first screw, the round block, the I-shaped frame and the guide rod, the C-shaped frame can move up and down, and the height adjustment of the pipeline can be realized. This height adjustment method is compared with manual lifting. , not only accurate adjustment, but also more labor-saving;
2、通过水平丝杆、C形架、第二左侧螺母和第二右侧螺母的相互配合,使左钳和右钳左右运动,便能实现管道的左右位置调整,相比人工直接左右调整,不仅调整精确,而且更加省力;2. Through the cooperation of the horizontal screw rod, the C-shaped frame, the second left side nut and the second right side nut, the left and right clamps can move left and right, and the left and right position adjustment of the pipeline can be realized, which is compared with manual left and right adjustment directly. , not only accurate adjustment, but also more labor-saving;
3、通过工形架、第二螺杆、第二把手和支撑板的相互配合,便能支撑整个装置,并且还能单独调整每个支撑板的高度,以适用高低不平的地面。3. Through the cooperation of the I-shaped frame, the second screw rod, the second handle and the support plate, the whole device can be supported, and the height of each support plate can be adjusted independently to suit the uneven ground.
附图说明Description of drawings
本实用新型可以通过附图给出的非限定性实施例进一步说明;The present invention may be further illustrated by the non-limiting examples given in the accompanying drawings;
图1为本实用新型一种市政施工用管道支撑装置实施例的结构示意图;1 is a schematic structural diagram of an embodiment of a pipeline support device for municipal construction of the present utility model;
图2为图1中A处的结构放大示意图;Fig. 2 is the structure enlarged schematic diagram at A place in Fig. 1;
附图中:1、管道、2、左钳、21、右钳、22、第一螺栓、23、第一螺母、24、水平丝杆、25、C形架、26、第二左侧螺母、261、第二右侧螺母、3、第一螺杆、31、圆块、32、第一把手、4、工形架、41、导向杆、42、第二螺杆、43、第二把手、44、支撑板、5、第一限位螺母、51、第二限位螺母。In the drawings: 1. Pipe, 2, Left clamp, 21, Right clamp, 22, First bolt, 23, First nut, 24, Horizontal screw, 25, C-shaped frame, 26, Second left nut, 261, second right nut, 3, first screw, 31, round block, 32, first handle, 4, I-shaped frame, 41, guide rod, 42, second screw, 43, second handle, 44, support Plate, 5, first limit nut, 51, second limit nut.
具体实施方式Detailed ways
为了使本领域的技术人员可以更好地理解本实用新型,下面结合附图和实施例对本实用新型技术方案进一步说明。In order to enable those skilled in the art to better understand the present invention, the technical solutions of the present invention are further described below with reference to the accompanying drawings and embodiments.
如图1-2所示,本实用新型的一种市政施工用管道支撑装置,包括管道1,管道1左右两侧分别设有左钳2和右钳21,右钳21的管道1上下侧均设有两个第一通孔,左钳2的管道1上下侧均设有贯穿第一通孔的第一螺栓22,第一螺栓22末端螺纹连接有第一螺母23,左钳2和右钳21上侧均设有两个左右贯穿的第二通孔,两个第二通孔均套设有水平丝杆24,两个水平丝杆24两端固定连接有C形架25,左钳2左侧设有与水平丝杆24螺纹连接的第二左侧螺母26,右钳21右侧设有与水平丝杆24螺纹连接的第二右侧螺母261,C形架25上端转动连接有第一螺杆3,第一螺杆3下端设有圆块31,第一螺杆3上端设有第一把手32,第一螺杆3螺纹连接有工形架4,工形架4滑动连接有与C形架25固定连接的导向杆41,工形架4四个端部均螺纹连接有第二螺杆42,第二螺杆42上端设有第二把手43,第二螺杆42下端设有支撑板44,As shown in Figures 1-2, a pipeline support device for municipal construction of the present invention includes a pipeline 1, and a left clamp 2 and a
本实施例中,C形架25上下侧均设有与第一螺杆3螺纹连接的第一限位螺母5。这样的结构,能够个固定第一螺杆3,防止第一螺杆3意外转动。实际上,也可根据情况考虑使用其他能够个固定第一螺杆3,防止第一螺杆3意外转动的结构,工形架4上下侧均设有与第二螺杆42螺纹连接的第二限位螺母51。这样的结构,能够个固定第二螺杆42,防止第二螺杆42意外转动。实际上,也可根据情况考虑使用其他能够个固定第二螺杆42,防止第二螺杆42意外转动的结构,第一把手32形状为圆环形。这样的结构,便于使用者转动第一螺杆 3。实际上,也可根据情况考虑使用其他能便于使用者转动第一螺杆3的结构,第二把手43 形状为十字形。这样的结构,便于使用者转动第二螺杆42。实际上,也可根据情况考虑使用其他能便于使用者转动第二螺杆42的结构。In this embodiment, the upper and lower sides of the C-
采用本实用新型技术方案,夹紧管道1时,松开第二左侧螺母26、第二右侧螺母261和第一螺母23,将管道1放置在左钳2和右钳21之间,并转动第一螺母23使左钳2和右钳21将管道1夹紧;向上调整管道1位置时,逆时针转动第一把手32,第一把手32便带动第一螺杆3逆时针转动,由于第一螺杆3与工形架4转动连接,又因为第一螺杆3下端固定连接有圆块31,所以第一螺杆3会带动C形架25向上运动,这样管道1便能向上运动;同理向下调整管道1的位置时,顺时针转动第一把手32,便能向下调整管道1位置;导向杆41用于C形架25限位,防止C形架25转动;转动第一把手32,再通过第一螺杆3、圆块31、工形架4和导向杆41的相互配合,使C形架25上下运动,便能实现管道1的高度调整,这样的高度调整方式,相比人力抬升,不仅调整精确,而且更加省力;向左调整管道1位置时,松开第二左侧螺母26,顺时针转动第二右侧螺母261,由于第二右侧螺母261与水平丝杆24 螺纹连接,又因为水平丝杆24套设在第二通孔内,所以第二右侧螺母261会推动左钳2和右钳21向左侧移动,这样管道1便向左侧移动,移动完成后,扭紧第二左侧螺母26将左钳2 与右钳21固定;同理向右调整管道1位置时,松开第二右侧螺母261,逆时针转动第二左侧螺母26,便能向右调整管道1的位置;通过水平丝杆24、C形架25、第二左侧螺母2和第二右侧螺母261的相互配合,使左钳2和右钳21左右运动,便能实现管道1的左右位置调整,相比人工直接左右调整,不仅调整精确,而且更加省力;通过工形架4、第二螺杆42、第二把手43和支撑板44的相互配合,便能支撑整个装置,并且还能单独调整每个支撑板44的高度,以适用高低不平的地面;本实用新型用于管道支撑,同时使管道能够上下左右调整位置。By adopting the technical solution of the present invention, when the pipe 1 is clamped, the second
上述实施例仅示例性说明本实用新型的原理及其功效,而非用于限制本实用新型。任何熟悉此技术的人士皆可在不违背本实用新型的精神及范畴下,对上述实施例进行修饰或改变。因此,凡所属技术领域中具有通常知识者在未脱离本实用新型所揭示的精神与技术思想下所完成的一切等效修饰或改变,仍应由本实用新型的权利要求所涵盖。The above-mentioned embodiments merely illustrate the principles and effects of the present invention, but are not intended to limit the present invention. Anyone skilled in the art can modify or change the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or changes completed by those with ordinary knowledge in the technical field without departing from the spirit and technical idea disclosed by the present invention should still be covered by the claims of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922085719.0U CN211475089U (en) | 2019-11-28 | 2019-11-28 | A pipeline support device for municipal construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922085719.0U CN211475089U (en) | 2019-11-28 | 2019-11-28 | A pipeline support device for municipal construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211475089U true CN211475089U (en) | 2020-09-11 |
Family
ID=72377201
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922085719.0U Expired - Fee Related CN211475089U (en) | 2019-11-28 | 2019-11-28 | A pipeline support device for municipal construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211475089U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112178281A (en) * | 2020-09-30 | 2021-01-05 | 陈迪锋 | Device for fixing pipeline |
-
2019
- 2019-11-28 CN CN201922085719.0U patent/CN211475089U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112178281A (en) * | 2020-09-30 | 2021-01-05 | 陈迪锋 | Device for fixing pipeline |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108978718B (en) | Inspection shaft combination template | |
| CN211475089U (en) | A pipeline support device for municipal construction | |
| CN209538241U (en) | Road inspection well well lid construction equipment | |
| CN110842528B (en) | A special kit for disassembling threaded connection pipe of deep well pump | |
| CN209653434U (en) | A kind of prefabricated post mounting device convenient for lifting | |
| CN210623788U (en) | Height-adjustable natural gas pipeline bridge mechanism | |
| CN208455646U (en) | Pit and groove support structure of municipal drainage pipeline | |
| CN211418007U (en) | Pipe fitting placing device for civil engineering | |
| CN209855242U (en) | A convenient and turnable pre-embedded parts installation device | |
| CN209520579U (en) | A kind of light pole mounting device | |
| CN221098065U (en) | Mapping instrument positioning device for engineering mapping | |
| CN219472949U (en) | Pipeline support that municipal construction was used | |
| CN218203934U (en) | Bridge support frame for municipal administration bridge in danger maintenance and transformation | |
| CN211665509U (en) | Template supporting beam device for municipal engineering | |
| CN223447863U (en) | Hydraulic engineering pipeline bracket | |
| CN222416382U (en) | A support for municipal garden drainage pipe | |
| CN216643297U (en) | Pipeline fixing device for laying municipal road pipe network | |
| CN217653816U (en) | Street light base leveling structure | |
| CN212627024U (en) | A positioning structure for electromechanical installation engineering construction | |
| CN221683819U (en) | Municipal works pipeline components | |
| CN215518479U (en) | Municipal works road warning device | |
| CN220851010U (en) | Underground pipeline laying device | |
| CN221974507U (en) | An adjustable modular support device for building pipeline construction | |
| CN215258181U (en) | Chemical building pipeline installation construction platform | |
| CN110700607A (en) | Pre-buried steel sheet installation device of isolation bearing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200911 |