CN213584939U - Electrical engineering threading construction equipment - Google Patents

Electrical engineering threading construction equipment Download PDF

Info

Publication number
CN213584939U
CN213584939U CN202022075166.3U CN202022075166U CN213584939U CN 213584939 U CN213584939 U CN 213584939U CN 202022075166 U CN202022075166 U CN 202022075166U CN 213584939 U CN213584939 U CN 213584939U
Authority
CN
China
Prior art keywords
base
sides
electrical engineering
fixed
threading construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022075166.3U
Other languages
Chinese (zh)
Inventor
唐雪梅
刘亮
赵玉水
袁晨博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022075166.3U priority Critical patent/CN213584939U/en
Application granted granted Critical
Publication of CN213584939U publication Critical patent/CN213584939U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model relates to a construction equipment technical field specifically is an electrical engineering threading construction equipment, the device comprises a device main part, the device main part includes first base, the both sides on first base top all slidable mounting have first fixed column, two one side that first fixed column is close to each other all has the fixed block through bearing movable mounting, the second spout has all been seted up to one side of fixed block, the inside all slidable mounting of second spout has the second slider, two one side fixed mounting that the second slider is close to each other has the wire winding bucket, one side of second spout all is provided with fixed establishment. The utility model discloses a be provided with fixture, it is stable to utilize the grip ring of both sides to carry out the centre gripping to inboard line, utilizes the second ball can not obstruct the removal of line simultaneously to can smooth out the straight with the line of bending, make things convenient for the staff to carry out the threading operation, promoted staff's work efficiency, also increased the practicality of structure.

Description

Electrical engineering threading construction equipment
Technical Field
The utility model relates to a construction equipment technical field specifically is an electrical engineering threading construction equipment.
Background
Building electric circuit all is behind pre-buried spool, put into the steel wire belt line that is used for the later stage to lead in the spool with the cable in advance in the spool, then penetrate the pipeline with the steel wire belt line from pipeline one end inside again, promote the steel wire belt line, make the steel wire belt line remove in the pipeline, wear out from the pipeline other end until the steel wire belt line, then carry out fixed connection with the electric wire with the steel wire belt line one end of wearing out, then follow former penetrating end and pull back the steel wire belt line, pull in the pipeline with the electric wire, realize the threading construction.
When threading, need take off the line from the winding barrel, but current threading construction equipment mostly does not possess and smooths out straight mechanism, and when the line was taken off, often the line was comparatively tortuous and is not convenient for the staff and carries out the threading operation to staff's work efficiency has been reduced, consequently, needs design an electrical engineering threading construction equipment and solves above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electrical engineering threading construction equipment to the majority that provides in solving above-mentioned background does not possess and smooths out straight mechanism, when the line was taken off, often the comparatively tortuous staff of being not convenient for of line carries out the threading operation, thereby has reduced staff's work efficiency's problem.
In order to achieve the above object, the utility model provides a following technical scheme: the threading construction device for the electrical engineering comprises a device main body, wherein the device main body comprises a first base, first fixing columns are slidably mounted on two sides of the top end of the first base, fixing blocks are movably mounted on the mutually close sides of the two first fixing columns through bearings, second sliding grooves are formed in one sides of the fixing blocks, second sliding blocks are slidably mounted inside the second sliding grooves, winding barrels are fixedly mounted on the mutually close sides of the two second sliding blocks, a fixing mechanism is arranged on one side of each second sliding groove, a clamping mechanism is arranged on the top end of the first base and comprises a second base, a second base is fixedly mounted on the top end of the first base, second fixing columns are fixedly mounted on two sides of the top end of the second base, threaded rods are threadedly mounted inside the second fixing columns, two one side that the threaded rod is close to each other all has the grip ring through bearing movable mounting, the second ball is installed, two in the equal even embedding in one side of grip ring one side that the threaded rod kept away from each other all fixed mounting have the rolling disc.
Preferably, the bottom ends of the first fixing columns are fixedly provided with first sliding blocks, the two sides of the top end of the first base are provided with first sliding grooves, and the first sliding blocks are slidably arranged inside the first sliding grooves.
Preferably, the fixing mechanism comprises a cavity, the cavity is formed in one side of the second sliding groove, the spring is fixedly mounted in the cavity, the limiting column is fixedly mounted in one side of the spring, and the limiting hole is formed in one side of the second sliding block.
Preferably, the limiting column is inserted into the limiting hole, and one side of the limiting column and the limiting hole are both arc-shaped.
Preferably, first mounting groove has all been seted up to one side of spacing post, first ball is all installed in the inside all embedding of first mounting groove.
Preferably, the two ends of the rotating disc are fixedly provided with auxiliary blocks.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through being provided with fixture, the grip ring that utilizes both sides carries out the centre gripping to inboard line stably, utilizes the second ball can not obstruct the removal of line simultaneously to can straighten out crooked line, make things convenient for the staff to carry out the threading operation, promoted staff's work efficiency, also increased the practicality of structure.
2. Through being provided with fixed establishment, utilize spacing post to insert the inside of installing to spacing hole to can increase the fastness of structure with the firm inside of fixing at the second spout of second slider, also prevented simultaneously that the phenomenon of damage that drops from appearing in the wire winding bucket, also be convenient for the staff and dismantle and install the wire winding bucket, further increased the practicality of structure.
Drawings
FIG. 1 is a schematic sectional view of the front view of the structure of the present invention;
FIG. 2 is a schematic sectional view of the clamping mechanism of the present invention;
FIG. 3 is a schematic top view of the structure of the clamping mechanism of the present invention;
fig. 4 is an enlarged schematic view of a portion of the structure in fig. 1.
In the figure: 1. a device main body; 110. a first base; 111. a first fixed column; 112. a first slider; 113. a first chute; 114. a fixed block; 115. a second chute; 116. a second slider; 117. a winding barrel; 2. a fixing mechanism; 210. a cavity; 211. a spring; 212. a limiting column; 213. a limiting hole; 214. a first mounting groove; 215. a first ball bearing; 3. a clamping mechanism; 310. a second base; 311. a second fixed column; 312. a threaded rod; 313. a clamp ring; 314. a second ball bearing; 315. rotating the disc; 316. and an auxiliary block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment:
the threading construction device for the electrical engineering comprises a device main body, wherein the device main body comprises a first base, first fixing columns are slidably mounted on two sides of the top end of the first base, fixing blocks are movably mounted on the mutually close sides of the two first fixing columns through bearings, second sliding grooves are formed in one sides of the fixing blocks, second sliding blocks are slidably mounted inside the second sliding grooves, winding barrels are fixedly mounted on the mutually close sides of the two second sliding blocks, a fixing mechanism is arranged on one side of each second sliding groove, a clamping mechanism is arranged on the top end of the first base and comprises a second base, a second base is fixedly mounted on the top end of the first base, second fixing columns are fixedly mounted on two sides of the top end of the second base, threaded rods are threadedly mounted inside the second fixing columns, two one side that the threaded rod is close to each other all has a grip ring through bearing movable mounting, the second ball, two are installed in all even embedding in one side of grip ring one side that the threaded rod was kept away from each other all fixed mounting has a rolling disc, rotates the rolling disc through the staff, can make the threaded rod rotate, makes the grip ring of both sides be close to each other, and the grip ring that utilizes both sides carries out the centre gripping to inboard line stably, utilizes the second ball can not obstruct the removal of line simultaneously to can straighten out the crooked line, make things convenient for the staff to carry out threading operation, promoted staff's work efficiency, also increased the practicality of structure.
Further, the bottom of first fixed column all fixed mounting have first slider, first spout has all been seted up to the both sides on first base top, first slider slidable mounting utilizes first slider to slide in the inside of first spout to the position of adjusting first fixed column about can, fix the wire winding bucket of different length and use, made things convenient for staff's use to the inside of first spout.
Further, fixed establishment includes the cavity, the cavity has all been seted up to one side of second spout, the inside fixed mounting that all has the spring of cavity, the equal fixed mounting in one side of spring has spacing post, spacing hole has all been seted up to one side of second slider, spacing post inserts the inside of installing to spacing hole, just one side and the spacing hole of spacing post all are the arc, utilize spacing post to insert the inside of installing to spacing hole to can firmly fix the inside at the second spout with the second slider, increased the fastness of structure, also prevented simultaneously that the phenomenon of damage appears dropping in the wire winding bucket, the staff of also being convenient for dismantles and installs the wire winding bucket, has further increased the practicality of structure.
Further, first mounting groove has all been seted up to one side of spacing post, first ball is installed in all imbeds in the inside of first mounting groove, when spacing post received the extrusion, can make first ball roll in the inside of first mounting groove to can reduce the frictional force that spacing post received, prolonged the life of spacing post.
Furthermore, both ends of the rotating disc are fixedly provided with auxiliary blocks, and the auxiliary blocks can be used for better borrowing force when workers rotate the rotating disc, so that the physical strength of the workers is saved.
The working principle is as follows: when the staff need use the device main part, remove the device main part to appointed position, with the inside of second slider slidable mounting to the second spout afterwards, utilize spacing post bullet to spacing inside in hole, thereby can be with the firm inside of fixing at the second spout of second slider, can accomplish the installation to the wire winding bucket, take off one end with the line on the wire winding bucket simultaneously, pass one side of grip ring, rotate the rolling disc through the staff afterwards, can make the threaded rod rotate, the grip ring that makes both sides is close to each other, it is fixed to carry out the centre gripping to inboard line.
The staff pulls the one end of line afterwards, makes the line pass through the inboard of grip ring, drives the second ball and rotates to can smooth out the straight line of bending, made things convenient for staff's use, the staff can utilize first slider to slide in the inside of first spout simultaneously, thereby can control the position of adjusting first fixed column, fix the wire winding bucket of different length and use.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides an electrical engineering threading construction device, includes device main part (1), its characterized in that: the device main body (1) comprises a first base (110), wherein first fixing columns (111) are slidably mounted on two sides of the top end of the first base (110), fixed blocks (114) are movably mounted on one sides, close to each other, of the two first fixing columns (111) through bearings, second sliding grooves (115) are formed in one sides of the fixed blocks (114), second sliding blocks (116) are slidably mounted inside the second sliding grooves (115), winding barrels (117) are fixedly mounted on one sides, close to each other, of the two second sliding blocks (116), fixing mechanisms (2) are arranged on one sides of the second sliding grooves (115), clamping mechanisms (3) are arranged on the top end of the first base (110), each clamping mechanism (3) comprises a second base (310), the second base (310) is fixedly mounted on the top end of the first base (110), and second fixing columns (311) are fixedly mounted on two sides of the top end of the second base (310), threaded rods (312) are installed to the inside all threads of second fixed column (311), two one side that threaded rods (312) are close to each other all has clamping ring (313) through bearing movable mounting, second ball (314) are all installed to the equal embedding in one side of clamping ring (313), two one side that threaded rods (312) keep away from each other all fixed mounting has rolling disc (315).
2. An electrical engineering threading construction device according to claim 1, characterized in that: the bottom end of the first fixing column (111) is fixedly provided with a first sliding block (112), two sides of the top end of the first base (110) are provided with first sliding grooves (113), and the first sliding block (112) is slidably arranged inside the first sliding grooves (113).
3. An electrical engineering threading construction device according to claim 1, characterized in that: fixed establishment (2) include cavity (210), cavity (210) have all been seted up to one side of second spout (115), the inside of cavity (210) all fixed mounting have spring (211), the one side all fixed mounting of spring (211) has spacing post (212), spacing hole (213) have all been seted up to one side of second slider (116).
4. An electrical engineering threading construction device according to claim 3, characterized in that: the limiting column (212) is inserted into the limiting hole (213), and one side of the limiting column (212) and the limiting hole (213) are both arc-shaped.
5. An electrical engineering threading construction device according to claim 4, characterized in that: first mounting groove (214) have all been seted up to one side of spacing post (212), first ball (215) are all installed in the inside embedding of first mounting groove (214).
6. An electrical engineering threading construction device according to claim 1, characterized in that: and auxiliary blocks (316) are fixedly arranged at two ends of the rotating disc (315).
CN202022075166.3U 2020-09-21 2020-09-21 Electrical engineering threading construction equipment Active CN213584939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022075166.3U CN213584939U (en) 2020-09-21 2020-09-21 Electrical engineering threading construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022075166.3U CN213584939U (en) 2020-09-21 2020-09-21 Electrical engineering threading construction equipment

Publications (1)

Publication Number Publication Date
CN213584939U true CN213584939U (en) 2021-06-29

Family

ID=76577917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022075166.3U Active CN213584939U (en) 2020-09-21 2020-09-21 Electrical engineering threading construction equipment

Country Status (1)

Country Link
CN (1) CN213584939U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113740590A (en) * 2021-09-08 2021-12-03 南京乾瑞电力科技有限公司 Multi-channel current measuring device with leakage current measuring function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113740590A (en) * 2021-09-08 2021-12-03 南京乾瑞电力科技有限公司 Multi-channel current measuring device with leakage current measuring function
CN113740590B (en) * 2021-09-08 2024-03-12 南京乾瑞电力科技有限公司 Multichannel current measurement device with leakage current measurement function

Similar Documents

Publication Publication Date Title
CN113812051B (en) Fixing frame for mounting light current engineering line pipe of Internet of things
CN213584939U (en) Electrical engineering threading construction equipment
CN114455392A (en) High accuracy is unwrapping wire positioner for electrical engineering
CN210640651U (en) Cable support for electric power convenient to adjust
CN214079625U (en) Lens cone thread processing fixing device for digital lens production
CN216540641U (en) Clamp for spring winding
CN217506968U (en) Drag-resistant cable
CN213014934U (en) Suspended ceiling with building steel structure
CN211733401U (en) Water conservancy construction pipe laying pay-off
CN215036663U (en) Focusing lens cone adds clamping apparatus
CN213134570U (en) Sheet metal channel-section steel flattening device with location limit structure
JP5276208B1 (en) Aluminum wire retention clamp
CN215498076U (en) Electrical engineering and automatic pipeline connection protection device thereof
CN211569734U (en) Pipe laying and paying-off device for water conservancy construction
CN110943423A (en) Aluminum profile supporting and guiding device for cable of shield machine for drilling tunnel
CN213106492U (en) Bearing processing is with lasso positioner
CN216335964U (en) Hand puller with good protection effect
CN211404757U (en) Improved live-line loading and unloading wire clamp
CN212946644U (en) Anchor clamps fixed knot of digit control machine tool constructs
CN214573767U (en) Anti-icing hydraulic engineering gate
CN218403074U (en) Cable recovery unit for power engineering
CN218449396U (en) Novel nanometer strain clamp
CN210744681U (en) Aluminum alloy cable winding displacement fixing device
CN215949114U (en) Protector is used in indoor outer decoration construction
CN217656398U (en) Power transmission line drainage wire windproof device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant