CN211733401U - Water conservancy construction pipe laying pay-off - Google Patents
Water conservancy construction pipe laying pay-off Download PDFInfo
- Publication number
- CN211733401U CN211733401U CN201922173145.2U CN201922173145U CN211733401U CN 211733401 U CN211733401 U CN 211733401U CN 201922173145 U CN201922173145 U CN 201922173145U CN 211733401 U CN211733401 U CN 211733401U
- Authority
- CN
- China
- Prior art keywords
- fixing ring
- solid fixed
- wall
- fixed ring
- water conservancy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a water conservancy construction pipe laying pay-off, including the solid fixed ring of first solid fixed ring and second, the solid fixed ring of second has been put on first solid fixed ring's right side, the solid fixed ring's of second outer wall both sides have all been pegged graft and have the gag lever post, the gag lever post runs through the solid fixed ring of second and with first solid fixed ring outer wall fixed connection, adjustment mechanism is installed to first solid fixed ring's inner chamber. The utility model discloses a bolt drives the arc and carries out the adjusting position to can form the space of equidimension not, thereby can adapt to the cable conductor of different external diameters, application range is wide.
Description
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a water conservancy construction pipe laying pay-off.
Background
In the process of water conservancy construction pipe laying unwrapping wire, need take out the cable conductor of winding on the line wheel to lay in corresponding position, in order to improve unwrapping wire efficiency, generally through a pipe laying pay-off guide cable conductor, in order to improve unwrapping wire speed, however, when unwrapping wire speed was too fast, there was the bending part like the cable conductor, easily leaded to the cable conductor chucking in pipe laying pay-off, can't continue the unwrapping wire, influence unwrapping wire efficiency.
According to patent CN201822221027.X, the water conservancy construction pipe laying pay-off device comprises a first guide ring, a guide bearing, at least three fixing screws, a plurality of return assemblies and a second guide ring, wherein a threaded hole is formed in the position, corresponding to each fixing screw, of the first guide ring, and each return assembly comprises a telescopic rod and a return spring sleeved on the outer side of the telescopic rod. Above-mentioned water conservancy construction pipe laying pay-off, wherein, guide bearing and the wrench movement who follows the cable conductor rotate, prevent that the cable conductor from turning round into the twist form because of interfering, simultaneously, when the cable conductor that contains bending part passes guide bearing fast, the cable conductor drives guide bearing and removes to the second guide ring, it is not hard up because of the atress at this in-process cable conductor bending part, until straight, the realization prevents the bending part chucking of cable conductor, the problem of the easy card line of current water conservancy construction pipe laying pay-off has been solved.
At present, the existing water conservancy construction pipe laying and paying-off device has some defects, for example; the device is at the in-process that uses, and the bearing size is fixed, can't adapt to the cable of equidimension not, and the bearing fluting makes things convenient for the cable to remove moreover, can influence the roll of bearing ball, and it is inconvenient to use. For this reason, new technical solutions need to be designed to solve the problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy construction pipe laying pay-off has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a water conservancy construction pipe laying pay-off device comprises a first fixing ring and a second fixing ring, wherein the second fixing ring is arranged on the right side of the first fixing ring, limiting rods are inserted into two sides of the outer wall of the second fixing ring, the limiting rods penetrate through the second fixing ring and are fixedly connected with the outer wall of the first fixing ring, and an adjusting mechanism is installed in the inner cavity of the first fixing ring;
the adjusting mechanism comprises bolts, bearings, an arc-shaped plate, balls and guide rods, the bolts are inserted into the outer wall of the first fixing ring in the equal distance mode, the bolts are four groups, the bolts penetrate through the first fixing ring and are inserted into the inner cavity of the bearings, the bearings are fixedly installed on the inner wall of the arc-shaped plate, the balls are installed on the outer wall of the arc-shaped plate, the guide rods are installed on two sides of the inner wall of the arc-shaped plate, and the outer ends of the guide rods penetrate through the first fixing ring and extend to the outer side of the first fixing ring.
As a preferred embodiment of the present invention, the second ball is mounted on the inner wall of the second fixing ring.
As a preferred embodiment of the present invention, the outer walls of the first fixing ring and the second fixing ring are both provided with notches.
As an embodiment of the present invention, the outer wall of the limiting rod is sleeved with a spring and the spring is disposed between the first fixing ring and the second fixing ring.
As an embodiment of the utility model, the screw hole with bolt looks adaptation is seted up to first solid fixed ring's outer wall, the through-hole with the gag lever post adaptation is seted up to the first solid fixed ring outer wall in screw hole both sides.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a bolt drives the arc and carries out the adjusting position to can form the space of equidimension not, thereby can adapt to the cable conductor of different external diameters, application range is wide.
2. The utility model discloses a first ball is installed to the arc outer wall and the solid fixed ring inner wall of second is installed the second ball to make the friction with the cable conductor reduce, make things convenient for the slip of cable, avoid causing wearing and tearing.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic view of the overall structure of a water conservancy construction pipe laying and paying-off device of the utility model;
fig. 2 is a schematic structural view of an inner cavity of a first fixing ring of the water conservancy construction pipe laying and paying-off device of the utility model;
fig. 3 is the utility model relates to a water conservancy construction pipe laying pay-off's second fixed loop constructs the schematic diagram.
In the figure: 1 first solid fixed ring, 2 bolts, 3 solid fixed rings of second, 4 gag lever posts, 5 springs, 6 bearings, 7 arcs, 8 balls, 9 guide bars, 10 second balls, 11 breachs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected" and "disposed" are to be construed broadly, and may for example be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. To the ordinary technical personnel in this field, can understand the specific meaning in the utility model of above-mentioned term with the concrete condition, the utility model provides an electrical apparatus's model is the reference only, can be through changing different models electrical apparatus that the function is the same according to the actual use condition.
Referring to fig. 1-3, the present invention provides a technical solution: a water conservancy construction pipe laying pay-off device comprises a first fixing ring 1 and a second fixing ring 3, wherein the second fixing ring 3 is arranged on the right side of the first fixing ring 1, limiting rods 4 are inserted into two sides of the outer wall of the second fixing ring 3, the limiting rods 4 penetrate through the second fixing ring 3 and are fixedly connected with the outer wall of the first fixing ring 1, and an adjusting mechanism is installed in the inner cavity of the first fixing ring 1;
adjustment mechanism includes bolt 2, bearing 6, arc 7, ball 8 and guide bar 9, the figure that bolt 2 and bolt 2 were pegged graft to first solid fixed ring 1's outer wall equidistance is four groups, bolt 2 runs through first solid fixed ring 1 and pegs graft in the inner chamber of bearing 6, bearing 6 fixed mounting is in the inner wall of arc 7, ball 8 is installed to the outer wall of arc 7, guide bar 9 is all installed to the inner wall both sides of arc 7, the outer end of guide bar 9 runs through first solid fixed ring 1 and extends to the 1 outside of first solid fixed ring, as shown in fig. 1 in this embodiment, drives arc 7 through bolt 2 and adjusts.
In the embodiment, referring to fig. 3, the inner wall of the second fixing ring 3 is provided with a second ball 10, which is used for preventing the second fixing ring 3 from wearing the cable.
In this embodiment, referring to fig. 3, the outer walls of the first fixing ring 1 and the second fixing ring 3 are both provided with a notch 11, which is used for facilitating the entry and exit of a cable.
In this embodiment, referring to fig. 1, the outer wall of the limiting rod 4 is sleeved with a spring 5, and the spring 5 is disposed between the first fixing ring 1 and the second fixing ring 3, and is used for straightening the bent portion of the cable by the reaction force of the spring 5.
In this embodiment, referring to fig. 1, the outer wall of the first fixing ring 1 is provided with a threaded hole adapted to the bolt 2, and the outer walls of the first fixing rings 1 on two sides of the threaded hole are provided with through holes adapted to the guide rod 9.
It should be noted that, the components included in the water conservancy construction pipe laying and paying-off device of the present invention are all the components known by the general standard components or the technicians in the field, the structure and principle thereof are all known by the technical manual or by the routine experiment method, at the idle position of the device, all the electric devices in the above are connected by the conducting wires, which refers to the power elements, the electric devices and the adaptive monitoring computer and the power supply, the specific connection means should refer to the following working principle that the electric connection between the electric devices is completed in sequence, the detailed connection means is the known technology in the field, the following main introduces the working principle and process, without describing the electric control, when the water conservancy construction pipe laying and paying-off device is used, firstly the cable is clamped into the first fixing ring 1 and the second fixing ring 3 through the gap 11 of the outer wall of the first fixing ring 1 and the second fixing ring 3, then rotate through bolt 2 and drive the space adaptation cable conductor size between the arc 7 of four groups of arcs of arc to adjust, then the cable conductor is at the in-process of unwrapping wire, first ball 8 and second ball 10 can avoid the cable conductor to be cut and rubbed, simultaneously the solid fixed ring 3 of second then compression spring 5 is caught in the cable conductor flexion, then the reaction force of spring 5 can be straightened the cable conductor, after the direction is ended, drive arc 7 through bolt 2 and separate the back, with the cable conductor from the solid fixed ring 3 of first solid fixed ring 1 and second solid fixed ring 3 surface breach 11 pull out can, solid fixed ring 1 of first solid fixed ring and the solid fixed ring 2 of second possess certain elasticity, thereby breach 11 can change the size under the external force condition, adapt to the cable conductor of different external diameters, the device simple structure, and convenient for operation, therefore, the clothes hanger is.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (5)
1. The utility model provides a water conservancy construction pipe laying pay-off, includes first solid fixed ring (1) and the solid fixed ring of second (3), its characterized in that: a second fixing ring (3) is arranged on the right side of the first fixing ring (1), limiting rods (4) are inserted into two sides of the outer wall of the second fixing ring (3), the limiting rods (4) penetrate through the second fixing ring (3) and are fixedly connected with the outer wall of the first fixing ring (1), and an adjusting mechanism is installed in the inner cavity of the first fixing ring (1);
adjustment mechanism includes bolt (2), bearing (6), arc (7), ball (8) and guide bar (9), the figure that the outer wall equidistance of first solid fixed ring (1) was pegged graft and is had bolt (2) and bolt (2) is four groups, bolt (2) run through first solid fixed ring (1) and peg graft in the inner chamber of bearing (6), bearing (6) fixed mounting is in the inner wall of arc (7), ball (8) are installed to the outer wall of arc (7), guide bar (9) are all installed to the inner wall both sides of arc (7), the outer end of guide bar (9) runs through first solid fixed ring (1) and extends to first solid fixed ring (1) outside.
2. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: and a second ball (10) is mounted on the inner wall of the second fixing ring (3).
3. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: the outer walls of the first fixing ring (1) and the second fixing ring (3) are provided with notches (11).
4. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: the outer wall of the limiting rod (4) is sleeved with a spring (5), and the spring (5) is arranged between the first fixing ring (1) and the second fixing ring (3).
5. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: the outer wall of the first fixing ring (1) is provided with a threaded hole matched with the bolt (2), and the outer wall of the first fixing ring (1) on two sides of the threaded hole is provided with a through hole matched with the guide rod (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922173145.2U CN211733401U (en) | 2019-12-06 | 2019-12-06 | Water conservancy construction pipe laying pay-off |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922173145.2U CN211733401U (en) | 2019-12-06 | 2019-12-06 | Water conservancy construction pipe laying pay-off |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211733401U true CN211733401U (en) | 2020-10-23 |
Family
ID=72875258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922173145.2U Expired - Fee Related CN211733401U (en) | 2019-12-06 | 2019-12-06 | Water conservancy construction pipe laying pay-off |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211733401U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112499390A (en) * | 2020-11-19 | 2021-03-16 | 许磊 | Communication cable protector |
-
2019
- 2019-12-06 CN CN201922173145.2U patent/CN211733401U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112499390A (en) * | 2020-11-19 | 2021-03-16 | 许磊 | Communication cable protector |
CN112499390B (en) * | 2020-11-19 | 2022-06-14 | 安徽宇达建设工程有限公司 | Communication cable protector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209200622U (en) | A kind of cable fixer of power engineering | |
CN211733401U (en) | Water conservancy construction pipe laying pay-off | |
CN210795375U (en) | Winding roller for tin wire winding machine | |
CN210146864U (en) | Straightening equipment for cable processing | |
CN211769424U (en) | Device for adjusting tension of electric wire and cable | |
CN216594846U (en) | Cable wire product detection mechanism | |
CN208964300U (en) | A kind of new type auto coil winder | |
CN208894871U (en) | A kind of six linkage cold drawing mechanisms of multipurpose steel processing | |
CN207361508U (en) | A kind of cable processing winding device easy to use | |
CN211670603U (en) | Adjustable two-split spacer for high-voltage bus erection | |
CN211714650U (en) | Join in marriage net live working and correct distortion straight line pole cross arm instrument | |
CN209981995U (en) | Cable overhead structure for electric power steel pipe pole | |
CN114506746A (en) | Portable wire and cable winding and unwinding frame | |
CN108057817A (en) | Cable machine wire grip | |
CN203552808U (en) | High-safety stranding machine | |
CN210142538U (en) | Cable core traction stranding device | |
CN210498102U (en) | Straightening device for cable production | |
CN112723017A (en) | Rope winding robot and winding method | |
CN110635433A (en) | Strain clamp equipment for electric power engineering | |
CN217726959U (en) | Transformer substation's secondary control cable instrument of flare-outing | |
CN216872723U (en) | Electric wire carding unit for electric power system | |
CN218472634U (en) | Electric wire cable erects support | |
CN220537202U (en) | Be applied to electric power construction's multi-functional cable pay-off | |
CN220873320U (en) | Cable stranded wire equipment | |
CN219420172U (en) | Cable support for power engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201023 Termination date: 20211206 |
|
CF01 | Termination of patent right due to non-payment of annual fee |