CN211569734U - Pipe laying and paying-off device for water conservancy construction - Google Patents

Pipe laying and paying-off device for water conservancy construction Download PDF

Info

Publication number
CN211569734U
CN211569734U CN202020185293.6U CN202020185293U CN211569734U CN 211569734 U CN211569734 U CN 211569734U CN 202020185293 U CN202020185293 U CN 202020185293U CN 211569734 U CN211569734 U CN 211569734U
Authority
CN
China
Prior art keywords
pipe laying
spring
wall
water conservancy
conservancy construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020185293.6U
Other languages
Chinese (zh)
Inventor
李冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020185293.6U priority Critical patent/CN211569734U/en
Application granted granted Critical
Publication of CN211569734U publication Critical patent/CN211569734U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses a pipe laying and paying-off device for water conservancy construction, which comprises a frame body and spring pieces, wherein the spring pieces are respectively arranged on the upper part and the lower part of the inner cavity of the frame body, and the outer walls of the spring pieces are connected with an adjusting mechanism; the adjusting mechanism comprises a movable block, a push rod, a movable plate, a bolt and a bearing, wherein the movable block is fixedly connected to the two ends of the spring piece, the outer wall of the movable block is fixedly connected with one end of the push rod, the other end of the push rod penetrates through the frame body and is fixedly connected with the two sides of the bottom of the movable plate, the bolt is inserted into the top of the movable plate, and the bolt penetrates through the movable plate and is connected with the outer wall of the frame body through the bearing. The utility model discloses a bolt is adjusted the distance between two sets of spring leafs to can adapt to the different buried pipe that advances outward, directly pass the buried pipe and carry on after two sets of spring leafs spacing can use threading convenient and fast, improve the efficiency of operation.

Description

Pipe laying and paying-off device for water conservancy construction
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a pipe laying pay-off is used in water conservancy construction.
Background
The buried pipe pay-off device is a device which is convenient for laying pipelines when the buried pipe needs to be paid off and pulled, and when the buried pipe is paid off, the buried pipe has certain elasticity and is easy to vibrate, so that the pay-off efficiency is influenced, the power of a pay-off motor is small, the continuous and stable operation is ensured, the working efficiency of the device can be improved only in this way, and the universality of the device is further improved. But current water conservancy construction is with pipe laying pay-off trembles easily at wire winding and unwrapping wire in-process, leads to the efficiency reduction of wire winding and unwrapping wire, and the device operation is inconvenient moreover, and on the other hand, device life is short, leads to the change cycle of device to shorten to the use cost of device has been increased.
According to patent CN201721380745.0, a pipe laying and paying-off device for water conservancy construction comprises a fixing plate, wherein a fixed clamping rod and a movable clamping rod are respectively arranged inside the fixing plate, the fixed clamping rod is fixedly connected with the movable clamping rod through screws, a second spring is arranged on one side of the fixed clamping rod and is fixedly connected with the fixed clamping rod through screws, a second clamping block is arranged at one end of the fixed clamping rod and is welded with the fixed clamping rod, a first groove is arranged inside the second clamping block, a first clamping block is arranged at one end of the movable clamping rod and is welded with the movable clamping rod, a plurality of symmetrically-arranged outer telescopic rods are arranged on the side surfaces of the fixed clamping rod and the movable clamping rod and are welded with the fixed clamping rod and the movable clamping rod, and the adjustable detection instrument is high in efficiency, and the method is simple to operate, low in price and wide in market prospect and application prospect.
At present, the existing pipe laying and paying-off device for water conservancy construction has some defects, such as the defects; the device is at the in-process that uses, and the threading is troublesome, influences the efficiency of construction, appears the friction easily between rubber tube and the pipe laying moreover, influences unwrapping wire efficiency. For this reason, new technical solutions need to be designed to solve the problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy construction is with pipe laying pay-off has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a pipe laying and paying off device for water conservancy construction comprises a frame body and spring pieces, wherein the spring pieces are respectively arranged on the upper part and the lower part of an inner cavity of the frame body, and the outer walls of the spring pieces are connected with an adjusting mechanism;
the adjusting mechanism comprises a movable block, a push rod, a movable plate, a bolt and a bearing, wherein the movable block is fixedly connected to the two ends of the spring piece, the outer wall of the movable block is fixedly connected with one end of the push rod, the other end of the push rod penetrates through the frame body and is fixedly connected with the two sides of the bottom of the movable plate, the bolt is inserted into the top of the movable plate, and the bolt penetrates through the movable plate and is connected with the outer wall of the frame body through the bearing.
As a preferred embodiment of the present invention, the inner wall of the spring plate is provided with balls and the balls are uniformly distributed on the inner wall of the spring plate.
As an optimal implementation manner of the utility model, the outer wall and the rubber pad fixedly connected with of spring leaf, the both ends of rubber pad respectively with two sets of movable block fixed connection.
As a preferred embodiment of the utility model, spacing spout has all been seted up to the inner chamber left and right sides wall of framework, spacing slider, bilateral symmetry are two sets of all installed from top to bottom in the inner chamber of spacing spout spacing slider respectively with two sets of movable block fixed connection.
As an optimized embodiment of the present invention, the through holes adapted to the push rods are respectively disposed on both sides of the top and bottom of the frame body.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a bolt is adjusted the distance between two sets of spring leafs to can adapt to the different buried pipe that advances outward, directly pass the buried pipe and carry on after two sets of spring leafs spacing can use threading convenient and fast, improve the efficiency of operation.
2. The utility model discloses a ball of spring leaf inner wall can reduce and the buried pipe between the frictional force to further promoted efficiency, rubber pad and spring leaf can the shock attenuation simultaneously, slow down tremble, thereby avoid tremble to influence the unwrapping wire.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
FIG. 1 is a schematic view of the overall structure of a pipe laying and paying-off device for water conservancy construction of the present invention;
FIG. 2 is a schematic view of a spring leaf structure of the pipe laying and paying off device for water conservancy construction;
fig. 3 is the utility model relates to a water conservancy construction is with pipe laying pay-off's framework inner wall structure sketch map.
In the figure: 1. a frame body; 2. a spring plate; 3. a movable block; 4. a push rod; 5. a movable plate; 6. a bolt; 7. a bearing; 8. a ball bearing; 9. a rubber pad; 10. a limiting chute; 11. and a limiting sliding block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected" and "disposed" are to be construed broadly, and may for example be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. To the ordinary technical personnel in this field, can understand the specific meaning in the utility model of above-mentioned term with the concrete condition, the utility model provides an electrical apparatus's model is the reference only, can be through changing different models electrical apparatus that the function is the same according to the actual use condition.
Referring to fig. 1-3, the present invention provides a technical solution: a pipe laying and paying off device for water conservancy construction comprises a frame body 1 and spring pieces 2, wherein the spring pieces 2 are respectively arranged on the upper part and the lower part of an inner cavity of the frame body 1, and the outer walls of the spring pieces 2 are connected with an adjusting mechanism;
adjustment mechanism includes movable block 3, push rod 4, fly leaf 5, bolt 6 and bearing 7, the equal fixedly connected with movable block 3 in both ends of spring leaf 2, the outer wall of movable block 3 and the one end fixed connection of push rod 4, it is two sets of the other end of push rod 4 all runs through framework 1 and with the bottom both sides fixed connection of fly leaf 5, bolt 6 has been pegged graft at the top of fly leaf 5, bolt 6 runs through fly leaf 5 and the outer wall connection through bearing 7 and framework 1, and is shown as figure 1 in this embodiment, adjusts through bolt 6 and drives two sets of spring leaves 2 and remove to carry on spacingly to the pipe laying, make and avoid producing the displacement, the elasticity of the self of spring leaf 2 can alleviate the vibration simultaneously, avoids appearing tremble the phenomenon, can adapt to the pipe laying of different external diameters moreover.
In this embodiment, referring to fig. 1, the balls 8 are mounted on the inner wall of the spring plate 2, and the balls 8 are uniformly distributed on the inner wall of the spring plate 2, so that the balls 8 can reduce friction.
Referring to fig. 2 in this embodiment, the outer wall of the spring piece 2 is fixedly connected to the rubber pad 9, and two ends of the rubber pad 9 are respectively fixedly connected to the two sets of movable blocks 3, so that the rubber pad 9 can further reduce tremor.
Referring to fig. 3 in this embodiment, the left and right side walls of the inner cavity of the frame body 1 are both provided with limiting sliding grooves 10, the upper and lower parts of the inner cavity of the limiting sliding grooves 10 are both provided with limiting sliding blocks 11, and the two groups of the limiting sliding blocks 11 which are bilaterally symmetrical are respectively and fixedly connected with the two groups of the movable blocks 3, so that the spring piece 2 can move stably by limiting through the limiting sliding grooves 10.
In this embodiment, referring to fig. 1, through holes adapted to the push rod 4 are respectively formed at both sides of the top and the bottom of the frame body 1, and are used for limiting the push rod 4.
It should be noted that, the components included in the pipe laying and paying-off device for water conservancy construction of the present invention are all the components known by the general standard components or the technicians in the field, the structure and principle thereof are all known by the technical manual or by the conventional experimental method, at the idle position of the device, all the electric devices in the above are connected by the conducting wires, which refer to the power elements, the electric devices and the adaptive monitoring computer and the power supply, the specific connection means should refer to the following working principle, the electric connection between the electric devices is completed in sequence, the detailed connection means is the known technology in the field, the following main introduces the working principle and process, no description is made on the electric control, when the pipe laying and paying-off device for water conservancy construction is used, the pipe laying is firstly passed through the two sets of spring pieces 2, then the bolt 6 is rotated to drive the movable plate 5 to descend, thereby push rod 4 drives two sets of spring leaf 2 and is close to and makes the laminating at the pipe laying outer wall, spring leaf 2 contacts and finishes behind the pipe laying, thereby carry out spacing messenger to the pipe laying and avoid lateral shifting, then pull the free end of pipe laying, thereby spring leaf 2 is to carrying out spacing buffering, utilize the elasticity of spring leaf 2 self and the vibration that the pipe laying can be alleviated to rubber pad 9, thereby avoid tremble to influence the pipe laying unwrapping wire, simultaneously the ball 8 of 2 inner walls of spring leaf can roll on the pipe laying outer wall, thereby the effectual friction that has reduced, make the light unwrapping wire of pipe laying, further promotion efficiency, the device simple structure, and convenient operation, therefore, the clothes hanger is strong in practicability.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a water conservancy construction is with pipe laying pay-off, includes framework (1) and spring leaf (2), its characterized in that: spring pieces (2) are respectively installed on the upper part and the lower part of the inner cavity of the frame body (1), and the outer walls of the spring pieces (2) are connected with the adjusting mechanism;
adjustment mechanism includes movable block (3), push rod (4), fly leaf (5), bolt (6) and bearing (7), the equal fixedly connected with movable block (3) in both ends of spring leaf (2), the outer wall of movable block (3) and the one end fixed connection of push rod (4), it is two sets of the other end of push rod (4) all runs through framework (1) and with the bottom both sides fixed connection of fly leaf (5), the top of fly leaf (5) is pegged graft and is had bolt (6), bolt (6) run through fly leaf (5) and through the outer wall connection of bearing (7) and framework (1).
2. The pipe laying and paying-off device for water conservancy construction according to claim 1, characterized in that: balls (8) are installed on the inner wall of the spring piece (2), and the balls (8) are uniformly distributed on the inner wall of the spring piece (2).
3. The pipe laying and paying-off device for water conservancy construction according to claim 1, characterized in that: the outer wall of the spring piece (2) is fixedly connected with the rubber pad (9), and two ends of the rubber pad (9) are fixedly connected with the two groups of movable blocks (3) respectively.
4. The pipe laying and paying-off device for water conservancy construction according to claim 1, characterized in that: spacing spout (10) have all been seted up to the inner chamber left and right sides wall of framework (1), spacing slider (11) are all installed from top to bottom to the inner chamber of spacing spout (10), and bilateral symmetry is two sets of spacing slider (11) respectively with two sets of movable block (3) fixed connection.
5. The pipe laying and paying-off device for water conservancy construction according to claim 1, characterized in that: through holes matched with the push rods (4) are formed in the two sides of the top and the bottom of the frame body (1) respectively.
CN202020185293.6U 2020-02-19 2020-02-19 Pipe laying and paying-off device for water conservancy construction Expired - Fee Related CN211569734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020185293.6U CN211569734U (en) 2020-02-19 2020-02-19 Pipe laying and paying-off device for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020185293.6U CN211569734U (en) 2020-02-19 2020-02-19 Pipe laying and paying-off device for water conservancy construction

Publications (1)

Publication Number Publication Date
CN211569734U true CN211569734U (en) 2020-09-25

Family

ID=72524798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020185293.6U Expired - Fee Related CN211569734U (en) 2020-02-19 2020-02-19 Pipe laying and paying-off device for water conservancy construction

Country Status (1)

Country Link
CN (1) CN211569734U (en)

Similar Documents

Publication Publication Date Title
CN114034546B (en) Wear resistance detection device for wires and cables
CN212503323U (en) Efficient and uniform winding device for cables for electric power engineering
CN110752090A (en) Automatic coil winding machine is used in transformer production
CN211569734U (en) Pipe laying and paying-off device for water conservancy construction
CN110550506B (en) Umbilical cable installation, discharge and recovery device for underwater robot
CN208964300U (en) A kind of new type auto coil winder
CN109038377B (en) Pre-buried pipe threading device
CN116470438A (en) Wire embedding device for engineering and method thereof
CN113172290B (en) Clamping and fixing method for wire cutting machining part
CN207986386U (en) A kind of wire production high-speed cable stranding-up machine actinobacillus device
CN212402980U (en) Take-up device for electric power
CN213508685U (en) Prefabricated pump station of integration is with overlength barrel sectional type equipment
CN209871961U (en) Vortex line optical fiber coiling device
CN112938650A (en) Communication technology cable storage device capable of adjusting elasticity according to drawing speed
CN214663169U (en) Multifunctional electric control sliding rail based on wireless communication technology
CN115512949B (en) High-energy magnetic energy-saving voltage regulator
CN220431837U (en) Construction pay-off
CN221126745U (en) Wiring frame for power engineering
CN220381897U (en) Inductor with adjustable inductance intensity
CN220886477U (en) Stabilizing device for winding up cable
CN207171297U (en) Double welding machine tab welding mechanisms
CN216252500U (en) Multi-coil eddy current driving device
CN216597128U (en) Multifunctional improved cantilever single twister
CN213341597U (en) New energy automobile is with filling harness device of electric pile
CN221239505U (en) Winding device for processing transformer coil

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200925

Termination date: 20220219