CN213508914U - Steel structure beam column for prefabricated building - Google Patents
Steel structure beam column for prefabricated building Download PDFInfo
- Publication number
- CN213508914U CN213508914U CN202022323061.5U CN202022323061U CN213508914U CN 213508914 U CN213508914 U CN 213508914U CN 202022323061 U CN202022323061 U CN 202022323061U CN 213508914 U CN213508914 U CN 213508914U
- Authority
- CN
- China
- Prior art keywords
- beam column
- steel structure
- structure beam
- assembling
- mounting base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 35
- 239000010959 steel Substances 0.000 title claims abstract description 35
- 238000009434 installation Methods 0.000 claims abstract description 38
- 230000003014 reinforcing effect Effects 0.000 claims description 9
- 230000000149 penetrating effect Effects 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 9
- 230000002787 reinforcement Effects 0.000 abstract description 8
- 238000003466 welding Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 4
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to an assembly type structure technical field discloses a steel construction beam column for assembly type structure, and the bottom block of supporting the grudging post has the installation base, and the installation base cup joints the block through the locator card post with linking the cassette, and the top that links up the cassette is fixed with the equipment cardboard, consolidates the sill bar and is connected with equipment cardboard block through equipment spiral shell board, and the inboard that supports the grudging post is located top position department and twists in proper order from a left side to the right side and is connected with second concatenation pole, first concatenation pole. The utility model discloses have nimble matched stack nature of assembling, replaced the form that traditional welding was assembled, the matched stack work of assembling of staff of not only can being convenient for can reduce staff's intensity of labour simultaneously, and in the use is assembled at steel structure beam column, supports the reinforcement at both ends about supporting the grudging post through two sets of splice bars and reinforcement sill bar, can improve the high strength support performance of steel structure beam column, and then improves the support stability of steel structure beam column.
Description
Technical Field
The utility model relates to an assembly type structure technical field specifically is a steel construction beam column for assembly type structure.
Background
The beam column is a beam made of steel, a crane beam and a working platform beam in a factory building, a floor beam in a multi-storey building, purlines in a roof structure and the like can adopt steel beams, transportation conditions are limited, the beams are generally manufactured in sections in a factory and are transported to a construction site to be spliced into a whole, a splicing method generally adopts groove butt welding seam connection, labor and materials can be saved, but the beams can be spliced in the construction site of heavy beams, and can also be connected by high-strength bolts of splicing plates to improve the splicing quality and improve the power performance of the beams. At present, steel structure beams and columns are mostly assembled by welding and assembling, the labor intensity is high, meanwhile, the operation is very complicated, in the assembling and using process, the strength is insufficient, and the condition of collapse and overturn is easy to occur. Accordingly, one skilled in the art provides a steel structural beam column for a fabricated building to solve the problems set forth in the background art described above.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction beam column for assembly type structure to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel construction beam column for assembly type structure, includes and supports the grudging post, the bottom block that supports the grudging post has the installation base, and the bottom that supports the grudging post is located front surface position department and runs through and set up installation screw B, the front surface of installation base runs through and sets up installation screw A, and the top embedding of installation base has seted up positioning channel groove, both ends position department symmetry is fixed with the locator card post around one side of installation base is located, and the installation base cup joints the block through locator card post and linking cassette, the top of linking cassette is fixed with the equipment cardboard, the inboard block of equipment cardboard has the reinforcement sill bar, the reinforcement sill bar is connected with equipment cardboard block through the equipment swivel nut, the top of supporting the grudging post is fixed with the installation footstock, and the inboard that supports the grudging post is located top position department and twists in proper order from a left side to right and connect with, A first splice bar.
As a further aspect of the present invention: the upper surface of the mounting base is provided with four positioning screw holes in a penetrating manner, and the positioning screw holes are arranged in a mutually crossed and symmetrical manner relative to four corners of the mounting base.
As a further aspect of the present invention: the number of the connecting clamping seats is two, and the connecting clamping seats and the positioning clamping columns are in one-to-one correspondence.
As a further aspect of the present invention: the external diameter of equipment spiral shell board and the internal diameter looks adaptation of equipment cardboard, it is fixed with the equipment cardboard block through equipment spiral shell board to consolidate the sill bar.
As a further aspect of the present invention: the inner diameter of the positioning clamping groove is matched with the outer diameter of the supporting vertical frame, and the height of the groove diameter of the positioning clamping groove is not lower than 20 cm.
As a further aspect of the present invention: the mounting screw A is the same as the mounting screw B in size, the number of the mounting screw A and the number of the mounting screw B are not less than three, the mounting screw A and the mounting screw B are located on the same horizontal plane, and the mounting screw A and the inner side of the mounting screw B are provided with fixing bolts in a matched mode.
As a further aspect of the present invention: the length of the first splicing rod is the same as that of the second splicing rod, and the first splicing rod and the second splicing rod are of I-shaped structures.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses have nimble matched stack nature of assembling, replaced the form that traditional welding was assembled, the matched stack work of assembling of staff not only can be convenient for can reduce staff's intensity of labour simultaneously, improves staff's the efficiency of assembling, and assembles the use at steel structure beam column, supports through the reinforcement at two sets of splice bars and reinforcement sill bar to supporting both ends about the grudging post, can improve the high strength support performance of steel structure beam column, and then improves the support stability of steel structure beam column.
Drawings
FIG. 1 is a schematic structural view of a steel structural beam column for prefabricated construction;
FIG. 2 is an enlarged view of a steel structural beam column for a fabricated building at A in FIG. 1;
fig. 3 is a schematic structural view of a mounting base in a steel structural beam column for a fabricated building.
In the figure: 1. a support stand; 2. installing a top seat; 3. a first splice bar; 4. a second splice bar; 5. installing a base; 6. reinforcing the bottom rod; 7. positioning the clamp column; 8. connecting the card holder; 9. assembling a clamping plate; 10. assembling a screw plate; 11. mounting a screw hole A; 12. positioning the clamping groove; 13. and mounting a screw hole B.
Detailed Description
Please refer to fig. 1-3, in the embodiment of the utility model, a steel structure beam column for assembly type structure, including supporting grudging post 1, the bottom block that supports grudging post 1 has installation base 5, and the upper surface of installation base 5 runs through and has seted up the location screw, and the quantity of location screw is four groups, and the location screw is for four corner intercrossing symmetrical arrangement of installation base 5, assembling matched stack in-process to steel structure beam column, the staff will install base 5 and fix on the foundation pile that has set up in advance, carry out preliminary assembly fixed work to steel structure beam column.
The bottom end of the supporting vertical frame 1 is positioned at the front surface position and is provided with an installation screw hole B13 in a penetrating way, the front surface of the installation base 5 is provided with an installation screw hole A11 in a penetrating way, the top end of the installation base 5 is embedded and provided with a positioning clamping groove 12, the inner diameter of the positioning clamping groove 12 is matched with the outer diameter of the supporting vertical frame 1, the height of the groove diameter of the positioning clamping groove 12 is not lower than 20cm, the size of the installation screw hole A11 is the same as that of the installation screw hole B13, the number of the installation screw holes A11 and the number of the installation screw holes B13 are not less than three, the installation screw hole A11 and the installation screw hole B13 are positioned on the same horizontal plane, the installation screw hole A11 and the inner side of the installation screw hole B13 are both provided with fixing bolts in a matching way, after the reinforcing bottom rod 6 is assembled, a worker embeds and clamps the supporting vertical frame 1 in the, the support stand 1 is firmly engaged and fixed in the mounting base 5.
Positioning clamp columns 7 are symmetrically fixed at the front end and the rear end of one side of the mounting base 5, the mounting base 5 is in sleeve joint with the connecting clamp seats 8 through the positioning clamp columns 7, the assembling clamp plates 9 are fixed at the top ends of the connecting clamp seats 8, reinforcing bottom rods 6 are clamped at the inner sides of the assembling clamp plates 9, the reinforcing bottom rods 6 are in clamping connection with the assembling clamp plates 9 through assembling screw plates 10, the number of the connecting clamp seats 8 is two, the connecting clamp seats 8 correspond to the positioning clamp columns 7 one by one, the outer diameters of the assembling screw plates 10 are matched with the inner diameters of the assembling clamp plates 9, the reinforcing bottom rods 6 are in clamping fixation with the assembling clamp plates 9 through the assembling screw plates 10, after the mounting base 5 is mounted, a worker sleeves the connecting clamp seats 8 on the positioning clamp columns 7 to synchronously assemble and fix the assembling clamp plates 9 with the mounting base 5, and further by matching clamping the assembling screw plates 10 with the assembling clamp plates 9, the staff will consolidate the sill bar 6 and fix between installation base 5, make installation base 5 keep the support stability of high strength.
The top of supporting the grudging post 1 is fixed with installation footstock 2, and the inboard of supporting the grudging post 1 is located top position department and twists in proper order from a left side to the right side and be connected with second splice rod 4, first splice rod 3 is the same with the length of second splice rod 4, and first splice rod 3 is the I-shaped structure with second splice rod 4, after finishing to supporting grudging post 1 equipment, the staff assembles first splice rod 3 and second splice rod 4 on the top of supporting grudging post 1, carry out the enhancement support fixed processing to the top of supporting grudging post 1, make two sets of splice rods and reinforcement sill bar 6 carry out the reinforcement support to both ends about supporting the grudging post 1, improve the high strength support performance of steel structure beam column, and then the support stability of machine gun steel structure beam column.
The utility model discloses a theory of operation is: in the process of assembling and assembling the steel structure beam column, a worker fixes the installation base 5 on a pre-set foundation pile, performs preliminary assembling and fixing work on the steel structure beam column, after the installation of the installation base 5 is finished, the worker sleeves the connecting clamping seat 8 on the positioning clamping column 7, synchronously assembles and fixes the assembling clamping plate 9 and the installation base 5, further, the worker fixes the reinforcing bottom rod 6 between the installation bases 5 through the matched clamping of the assembling screw plate 10 and the assembling clamping plate 9, so that the installation base 5 keeps high-strength supporting stability, further, after the assembling of the reinforcing bottom rod 6 is finished, the worker embeds and clamps the support stand 1 in the installation base 5, further, the worker sequentially screws the matched fixing bolts into the installation screw holes, performs fixing treatment on the support stand 1, so that the support stand 1 is firmly clamped and fixed in the installation base 5, after finishing assembling the support stand 1, the staff assembles first concatenation pole 3 and second concatenation pole 4 on the top of supporting stand 1, strengthens supporting fixed processing to the top of supporting stand 1, makes two sets of concatenation poles and consolidates the sill bar 6 and consolidate the support to both ends about supporting stand 1, improves the high strength support performance of steel construction beam column, and then the support stability of machine gun steel construction beam column.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. A steel structure beam column for an assembly type building comprises a supporting vertical frame (1) and is characterized in that a mounting base (5) is clamped at the bottom end of the supporting vertical frame (1), a mounting screw hole B (13) is formed in the position, located on the front surface, of the bottom end of the supporting vertical frame (1) in a penetrating mode, a mounting screw hole A (11) is formed in the front surface of the mounting base (5) in a penetrating mode, a positioning clamping groove (12) is formed in the top end of the mounting base (5) in an embedded mode, positioning clamping columns (7) are symmetrically fixed to the positions, located on the front end and the rear end, of one side of the mounting base (5), the mounting base (5) is connected with a connecting clamping seat (8) in a sleeved mode through the positioning clamping columns (7), an assembling clamping plate (9) is fixed to the top end of the connecting clamping seat (8), a reinforcing bottom rod (6) is clamped to the assembling clamping plate (9) through an assembling screw plate (10), the top end of the supporting vertical frame (1) is fixed with an installation top seat (2), and the inner side of the supporting vertical frame (1) is positioned at the top end position and is sequentially connected with a second splicing rod (4) and a first splicing rod (3) in a screwing mode from left to right.
2. The steel structure beam column for the fabricated building as claimed in claim 1, wherein the mounting base (5) has four positioning screw holes formed through the upper surface thereof, and the positioning screw holes are arranged in a mutually crossed and symmetrical manner with respect to four corners of the mounting base (5).
3. The steel structural beam column for the fabricated building as claimed in claim 1, wherein the number of the engagement clamping seats (8) is two, and the engagement clamping seats (8) and the positioning clamping columns (7) are in one-to-one correspondence with each other.
4. The steel structure beam column for the fabricated building as claimed in claim 1, wherein the outer diameter of the assembly screw plate (10) is matched with the inner diameter of the assembly clamping plate (9), and the reinforcing bottom rod (6) is clamped and fixed with the assembly clamping plate (9) through the assembly screw plate (10).
5. The steel structure beam column for the fabricated building as claimed in claim 1, wherein the inner diameter of the positioning clamping groove (12) is matched with the outer diameter of the supporting vertical frame (1), and the height of the groove diameter of the positioning clamping groove (12) is not lower than 20 cm.
6. The steel structure beam column for the fabricated building as claimed in claim 1, wherein the mounting screw holes A (11) and B (13) are the same in size, the number of the mounting screw holes A (11) and B (13) is not less than three, the mounting screw holes A (11) and B (13) are on the same horizontal plane, and the inner sides of the mounting screw holes A (11) and B (13) are provided with fixing bolts in a matching manner.
7. The steel structure beam column for the fabricated building according to claim 1, wherein the first splicing rod (3) and the second splicing rod (4) are the same in length, and the first splicing rod (3) and the second splicing rod (4) are both in an I-shaped structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022323061.5U CN213508914U (en) | 2020-10-19 | 2020-10-19 | Steel structure beam column for prefabricated building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022323061.5U CN213508914U (en) | 2020-10-19 | 2020-10-19 | Steel structure beam column for prefabricated building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213508914U true CN213508914U (en) | 2021-06-22 |
Family
ID=76398659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022323061.5U Expired - Fee Related CN213508914U (en) | 2020-10-19 | 2020-10-19 | Steel structure beam column for prefabricated building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213508914U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114164943A (en) * | 2021-12-08 | 2022-03-11 | 南京工业职业技术大学 | Assembly type steel structure integrated green building and installation method thereof |
CN114960940A (en) * | 2022-05-05 | 2022-08-30 | 周利军 | Integral frame type building steel structure and assembling method |
-
2020
- 2020-10-19 CN CN202022323061.5U patent/CN213508914U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114164943A (en) * | 2021-12-08 | 2022-03-11 | 南京工业职业技术大学 | Assembly type steel structure integrated green building and installation method thereof |
CN114960940A (en) * | 2022-05-05 | 2022-08-30 | 周利军 | Integral frame type building steel structure and assembling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213508914U (en) | Steel structure beam column for prefabricated building | |
CN214195730U (en) | Combined workshop steel structure | |
CN112695952B (en) | Building roof truss support structure and construction method | |
CN108915153A (en) | Assembly concrete superposed column installation method and system | |
CN212656374U (en) | Building steel construction that intensity is high | |
CN108661301B (en) | Modular assembly platform for vertical frames of well frames and use method | |
CN217776061U (en) | Welding device for reinforcing hoop of steel reinforcement cage | |
CN214170074U (en) | Factory building steel construction beam column | |
CN213448902U (en) | Pre-buried box steel bracket structure | |
CN213654364U (en) | Many function combination formula removes protection canopy | |
CN212359115U (en) | Device for simply and quickly installing column hoop | |
CN111502006B (en) | Bird nest structure and construction method thereof | |
CN216156797U (en) | Reinforced structure for steel structure connection | |
CN221896252U (en) | Super-large embedded part hanging type installation system | |
CN212897179U (en) | Improved steel structure supporting beam | |
CN111945884A (en) | Steel structure upright post assembly capable of improving connection strength | |
CN213014688U (en) | High-precision steel structure platform | |
CN220377539U (en) | Super large concrete column holds in palm construction structures | |
CN210032087U (en) | Beam column rigid connection node of cooling tower water spraying framework | |
CN219569192U (en) | Accurate mounting structure of buckling restrained brace gusset plate in limited height | |
CN218988626U (en) | Tower crane attachment structure | |
CN211597734U (en) | A template reinforced structure for building supports | |
CN217079763U (en) | Steel construction rag bolt group wholly assembles construction system | |
CN216893723U (en) | Detachable supporting device for buckling constraint embedded part in column | |
CN214498378U (en) | Supporting structure for reinforcing steel structure house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210622 |
|
CF01 | Termination of patent right due to non-payment of annual fee |