CN221896252U - A hanging installation system for super large embedded parts - Google Patents

A hanging installation system for super large embedded parts Download PDF

Info

Publication number
CN221896252U
CN221896252U CN202323519214.3U CN202323519214U CN221896252U CN 221896252 U CN221896252 U CN 221896252U CN 202323519214 U CN202323519214 U CN 202323519214U CN 221896252 U CN221896252 U CN 221896252U
Authority
CN
China
Prior art keywords
embedded part
frame
installation system
embedded
oversized
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323519214.3U
Other languages
Chinese (zh)
Inventor
刘寅昌
周国梁
王东锋
陈红亮
齐贺
刘驷
崔哲铭
李佳宝
寇大力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Construction and Development Co Ltd
Original Assignee
China Construction First Group Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Construction and Development Co Ltd filed Critical China Construction First Group Construction and Development Co Ltd
Priority to CN202323519214.3U priority Critical patent/CN221896252U/en
Application granted granted Critical
Publication of CN221896252U publication Critical patent/CN221896252U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种超大埋件吊挂式安装体系,包括支撑门架、埋件胎架、电葫芦倒链和丝杠顶撑,支撑门架跨设在大型埋件待埋设位置的设备基础上方,埋件胎架通过电葫芦倒链吊挂在支撑门架上,且埋件胎架悬吊在大型埋件待埋设位置的设备基础上方,位于待埋设位置的大型埋件固定在埋件胎架上,且埋件胎架与支撑门架之间通过若干组可拆卸的丝杠顶撑相对固定。本实用新型结构新颖,设计巧妙,通过设置支撑门架+埋件胎架将大型埋件悬挂安装,避免大型埋件和基础钢筋接触,极大程度减少了混凝土浇筑振捣时的扰动,使得大型埋件的安装精度和效率得以大幅提高,而且,支撑门架+埋件胎架形式的安装体系可循环利用,残值亦可回收,经济性更佳。

The utility model discloses a hanging installation system for super-large embedded parts, including a support gantry, an embedded part frame, an electric hoist fall chain and a screw top support. The support gantry is straddled above the equipment foundation at the position where the large embedded parts are to be buried. The embedded part frame is hung on the support gantry through the electric hoist fall chain, and the embedded part frame is suspended above the equipment foundation at the position where the large embedded parts are to be buried. The large embedded parts at the position to be buried are fixed on the embedded part frame, and the embedded part frame and the support gantry are relatively fixed by a plurality of groups of detachable screw top supports. The utility model has a novel structure and an ingenious design. The large embedded parts are suspended and installed by setting a support gantry + embedded part frame, so that the large embedded parts are prevented from contacting with the foundation steel bars, and the disturbance during concrete pouring and vibration is greatly reduced, so that the installation accuracy and efficiency of the large embedded parts are greatly improved. Moreover, the installation system in the form of the support gantry + embedded part frame can be recycled, and the residual value can also be recovered, which is more economical.

Description

一种超大埋件吊挂式安装体系A hanging installation system for super large embedded parts

技术领域Technical Field

本实用新型涉及建筑施工技术领域,具体涉及一种超大埋件吊挂式安装体系。The utility model relates to the technical field of building construction, in particular to a hanging installation system for super-large embedded parts.

背景技术Background Art

随着科学技术的不断进步,自动化程度越来越高,工业厂房的大型设备安装的数量越来越多,而且,这些大型设备基础上的埋件尺寸很大,安装平整度要求也高。With the continuous advancement of science and technology, the degree of automation is getting higher and higher, and the number of large-scale equipment installed in industrial plants is increasing. Moreover, the embedded parts on the foundations of these large equipment are large in size and the installation flatness requirements are also high.

传统的埋件安装采用角钢或槽钢作为支撑,埋件直接焊接在支撑上。该种埋件安装方式针对小型埋件可满足其施工要求,但对于大型埋件来说,施工过程中容易出现埋件移位,平整度控制精度不足的问题;而且,采用角钢或槽钢作为大型埋件的支撑,焊接安装功效低,且大量焊接作业会造成环境污染;同时,型钢支撑浇筑至基础混凝土内无法取出,成本高,经济性差,因而,通过角钢或槽钢作为支撑来安装埋件的传统施工方式并不理想。Traditional embedded parts installation uses angle steel or channel steel as support, and the embedded parts are directly welded to the support. This embedded parts installation method can meet the construction requirements for small embedded parts, but for large embedded parts, embedded parts are prone to displacement during construction, and the flatness control accuracy is insufficient; moreover, using angle steel or channel steel as support for large embedded parts has low welding installation efficiency, and a large number of welding operations will cause environmental pollution; at the same time, the steel support is poured into the foundation concrete and cannot be removed, which is costly and economical. Therefore, the traditional construction method of installing embedded parts using angle steel or channel steel as support is not ideal.

实用新型内容Utility Model Content

本实用新型目的在于提出一种超大埋件吊挂式安装体系,以解决背景技术中所述的技术问题。The utility model aims to provide a hanging installation system for super-large embedded parts to solve the technical problems described in the background technology.

为实现上述技术目的,本实用新型采用如下技术方案:In order to achieve the above technical purpose, the utility model adopts the following technical solutions:

一种超大埋件吊挂式安装体系,包括支撑门架、埋件胎架、电葫芦倒链和丝杠顶撑,所述支撑门架跨设在大型埋件待埋设位置的设备基础上方,所述埋件胎架通过电葫芦倒链吊挂在支撑门架上,且埋件胎架悬吊在大型埋件待埋设位置的设备基础上方,位于待埋设位置的大型埋件固定在埋件胎架上,且埋件胎架与支撑门架之间通过若干组可拆卸的丝杠顶撑相对固定。A hanging installation system for extra-large embedded parts comprises a supporting gantry, an embedded part frame, an electric hoist fall chain and a screw top support, wherein the supporting gantry is straddled above the equipment foundation at the position where the large embedded parts are to be buried, the embedded part frame is suspended on the supporting gantry by the electric hoist fall chain, and the embedded part frame is suspended above the equipment foundation at the position where the large embedded parts are to be buried, the large embedded parts at the position to be buried are fixed on the embedded part frame, and the embedded part frame and the supporting gantry are relatively fixed by a plurality of groups of detachable screw top supports.

优选的,所述支撑门架包括若干对立柱,成对设置的立柱分别对应布置在设备基础两侧,所述立柱顶端通过横梁固定相连,且位于设备基础同一侧的立柱之间通过横撑加固。Preferably, the supporting gantry includes a plurality of pairs of columns, which are arranged in pairs on both sides of the equipment foundation respectively, the top ends of the columns are fixedly connected by cross beams, and the columns on the same side of the equipment foundation are reinforced by cross braces.

优选的,所述立柱底端固定设置有万向轮和千斤顶。Preferably, a universal wheel and a jack are fixedly provided at the bottom end of the column.

优选的,所述横梁至少设置有两道,且横梁与横梁之间、立柱与横梁之间均通过斜腹杆加固。Preferably, at least two cross beams are provided, and the cross beams and the columns and cross beams are reinforced by diagonal web members.

优选的,所述支撑门架与外侧结构面之间还设置有加固组件。Preferably, a reinforcement component is also provided between the supporting portal frame and the outer structural surface.

优选的,所述加固组件包括钢丝绳、花篮螺栓和膨胀螺栓,所述钢丝绳倾斜拉设,钢丝绳一端固定在支撑门架上,另一端通过膨胀螺栓固定在其外侧结构面上,且钢丝绳绳体上设置有花篮螺栓。Preferably, the reinforcement assembly includes a steel wire rope, a basket bolt and an expansion bolt. The steel wire rope is tilted and arranged, one end of the steel wire rope is fixed to the supporting door frame, and the other end is fixed to its outer structural surface by means of the expansion bolt, and a basket bolt is arranged on the steel wire rope body.

优选的,所述埋件胎架包括网架结构的主框架,所述主框架的纵框与横框之间通过加腋框加固,且主框架上固定设置有吊环。Preferably, the embedded tire frame includes a main frame of a grid structure, the longitudinal frame and the transverse frame of the main frame are reinforced by adding axillary frames, and a lifting ring is fixedly provided on the main frame.

优选的,所述埋件胎架与大型埋件之间通过固定在埋件主体上的埋件螺栓连接固定。Preferably, the embedded component frame and the large embedded component are connected and fixed by embedded component bolts fixed on the embedded component body.

与现有技术相比,本实用新型的有益效果为:本实用新型结构新颖,设计巧妙,可广泛应用于任意大型设备基础埋件的安装,通过设置支撑门架+埋件胎架将大型埋件悬挂安装,避免大型埋件和基础钢筋接触,极大程度减少了混凝土浇筑振捣时的扰动,使得大型埋件的安装精度和效率得以大幅提高,而且,支撑门架+埋件胎架形式的安装体系可循环利用,残值亦可回收,经济性更佳。Compared with the prior art, the beneficial effects of the utility model are as follows: the utility model has a novel structure and ingenious design, and can be widely used in the installation of embedded parts in the foundation of any large equipment. By setting a supporting gantry + embedded part frame, large embedded parts are suspended and installed to avoid contact between large embedded parts and foundation steel bars, which greatly reduces the disturbance during concrete pouring and vibration, thereby greatly improving the installation accuracy and efficiency of large embedded parts. Moreover, the installation system in the form of a supporting gantry + embedded part frame can be recycled, and the residual value can also be recovered, which is more economical.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

通过结合以下附图所作的详细描述,本实用新型的上述和/或其他方面和优点将变得更清楚和更容易理解,这些附图只是示意性的,并不限制本实用新型,其中:The above and/or other aspects and advantages of the present invention will become clearer and easier to understand through the detailed description made in conjunction with the following drawings, which are only schematic and do not limit the present invention, wherein:

图1为本实用新型的剖面结构示意图;Fig. 1 is a schematic diagram of the cross-sectional structure of the utility model;

图2为本实用新型的俯视结构示意图;FIG2 is a schematic diagram of the top view of the structure of the utility model;

图3为本实用新型支撑门架的俯视结构示意图;FIG3 is a schematic diagram of the top view of the support door frame of the utility model;

图4为本实用新型支撑门架的侧视结构示意图。FIG. 4 is a side structural schematic diagram of the support door frame of the utility model.

附图标记:1、支撑门架;101、立柱;102、横梁;103、横撑;104、斜腹杆;105、万向轮;106、千斤顶;2、埋件胎架;201、主框架;202、加腋框;203、吊环;3、电葫芦倒链;4、丝杠顶撑;5、大型埋件;501、埋件主体;502、埋件螺栓;6、加固组件;601、钢丝绳;602、花篮螺栓;603、膨胀螺栓;7、设备基础。Figure numerals: 1. Supporting door frame; 101. Upright column; 102. Crossbeam; 103. Cross brace; 104. Diagonal web; 105. Universal wheel; 106. Jack; 2. Embedded frame; 201. Main frame; 202. Axillary frame; 203. Lifting ring; 3. Electric hoist fall chain; 4. Screw top support; 5. Large embedded part; 501. Embedded part body; 502. Embedded part bolt; 6. Reinforcement assembly; 601. Wire rope; 602. Basket bolt; 603. Expansion bolt; 7. Equipment foundation.

具体实施方式DETAILED DESCRIPTION

在下文中,将参照附图描述本实用新型的一种超大埋件吊挂式安装体系的实施例。在此记载的实施例为本实用新型的特定的具体实施方式,用于说明本实用新型的构思,均是解释性和示例性的,不应解释为对本实用新型实施方式及本实用新型范围的限制。除在此记载的实施例外,本领域技术人员还能够基于本申请权利要求书和说明书所公开的内容采用显而易见的其它技术方案,这些技术方案包括采用对在此记载的实施例的做出任何显而易见的替换和修改的技术方案。In the following, an embodiment of an oversized embedded component hanging installation system of the utility model will be described with reference to the accompanying drawings. The embodiments described herein are specific embodiments of the utility model, which are used to illustrate the concept of the utility model. They are all explanatory and exemplary and should not be interpreted as limiting the implementation methods and scope of the utility model. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the contents disclosed in the claims and the specification of this application, including technical solutions that adopt any obvious replacements and modifications to the embodiments described herein.

在本实用新型的描述中,需要说明的是,术语“前”、“后”、“左”、“右”、“顶”、“底”、“上”、“下”、“内”、“外”、“横”、“纵”、“立”、“斜”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the terms "front", "rear", "left", "right", "top", "bottom", "up", "down", "inside", "outside", "horizontal", "longitudinal", "vertical", "oblique" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

本说明书的附图为示意图,辅助说明本实用新型的构思,示意性地表示各部分的形状及其相互关系。请注意,为了便于清楚地表现出本实用新型实施例的各部件的结构,各附图之间并未按照相同的比例绘制。相同的参考标记用于表示相同的部分。The drawings of this specification are schematic diagrams, which assist in explaining the concept of the utility model and schematically show the shapes of various parts and their mutual relationships. Please note that in order to clearly show the structure of various components of the embodiments of the utility model, the drawings are not drawn according to the same scale. The same reference numerals are used to represent the same parts.

以下结合附图对本实用新型的原理和特征进行描述,所举实施例只用于解释本实用新型,并非用于限定本实用新型的范围。下面结合图1-4,其中图2为了避免支撑门架1遮挡埋件胎架2,将支撑门架1部分顶部结构略去,对本实用新型的优选实施例作进一步详细说明:The principle and features of the present invention are described below in conjunction with the accompanying drawings. The examples are only used to explain the present invention and are not used to limit the scope of the present invention. The preferred embodiments of the present invention are further described in detail in conjunction with Figures 1-4, where Figure 2 omits part of the top structure of the support gantry 1 to avoid the support gantry 1 blocking the embedded tire frame 2:

如图1-4所示,本实用新型优选的一种超大埋件吊挂式安装体系,包括支撑门架1、埋件胎架2、电葫芦倒链3和丝杠顶撑4,所述支撑门架1跨设在大型埋件5待埋设位置的设备基础7上方,所述埋件胎架2通过电葫芦倒链3吊挂在支撑门架1上,且埋件胎架2悬吊在大型埋件5待埋设位置的设备基础7上方,位于待埋设位置的大型埋件5固定在埋件胎架2上,且埋件胎架2与支撑门架1之间通过若干组可拆卸的丝杠顶撑4相对固定,丝杠顶撑4能够将埋件胎架2固定,防止埋件胎架2在固定之后出现水平及竖向位移;As shown in Fig. 1-4, the utility model preferably adopts a hanging installation system for large embedded parts, including a support gantry 1, an embedded part frame 2, an electric hoist fall chain 3 and a screw top support 4, wherein the support gantry 1 is arranged across the equipment foundation 7 at the position where the large embedded part 5 is to be buried, the embedded part frame 2 is hung on the support gantry 1 through the electric hoist fall chain 3, and the embedded part frame 2 is suspended above the equipment foundation 7 at the position where the large embedded part 5 is to be buried, the large embedded part 5 located at the position to be buried is fixed on the embedded part frame 2, and the embedded part frame 2 and the support gantry 1 are relatively fixed by a plurality of groups of detachable screw top supports 4, and the screw top support 4 can fix the embedded part frame 2 to prevent the embedded part frame 2 from horizontal and vertical displacement after being fixed;

所述支撑门架1包括若干对立柱101,成对设置的立柱101分别对应布置在设备基础7两侧,所述立柱101顶端通过横梁102固定相连,且位于设备基础7同一侧的立柱101之间通过横撑103加固,所述横梁102至少设置有两道,且横梁102与横梁102之间、立柱101与横梁102之间均通过斜腹杆104加固,为了方便支撑门架1的移动周转,立柱101底端固定设置有万向轮105和千斤顶106,千斤顶106可在移动就位后实现锁止,并能够实现各支撑点的高度微调,方便支撑门架1的调平;The support gantry 1 includes a plurality of pairs of columns 101, and the columns 101 arranged in pairs are respectively arranged on both sides of the equipment foundation 7. The tops of the columns 101 are fixedly connected by cross beams 102, and the columns 101 on the same side of the equipment foundation 7 are reinforced by cross braces 103. At least two cross beams 102 are provided, and the cross beams 102 and the columns 101 are reinforced by diagonal web bars 104. In order to facilitate the movement and turnover of the support gantry 1, universal wheels 105 and jacks 106 are fixedly provided at the bottom ends of the columns 101. The jacks 106 can be locked after being moved into place, and can achieve fine adjustment of the height of each support point, so as to facilitate the leveling of the support gantry 1.

所述埋件胎架2与大型埋件5之间通过固定在埋件主体501上的埋件螺栓502连接固定,埋件胎架2与大型埋件5之间通过埋件螺栓502固定的方式一方面可以简化固定措施,通过充分利用大型埋件5自身结构实现固定,不需要额外设置连接结构,另一方面也可以配合实现大型埋件5的调平;The embedded part frame 2 and the large embedded part 5 are connected and fixed by embedded part bolts 502 fixed on the embedded part body 501. The embedded part frame 2 and the large embedded part 5 are fixed by embedded part bolts 502. On the one hand, the fixing measures can be simplified by making full use of the structure of the large embedded part 5 to achieve fixation without the need for additional connection structure. On the other hand, the large embedded part 5 can also be leveled.

所述埋件胎架2包括网架结构的主框架201,埋件胎架2设置为网架结构形式可以减轻其自重,并且能够增加其通透性,进而避免遮挡工人视野,方便工人更精准地实现大型埋件5的精准安设,所述主框架201(16#槽钢)的纵框与横框之间通过加腋框202(14#槽钢)加固,且主框架201上固定设置有吊环203(φ18光圆钢筋)以方便电葫芦倒链3的挂接,其中,主框架201的纵框与横框的布置位置需考虑埋件螺栓502的设置位置,以便于用于连接的埋件螺栓502能够稳定生根;The embedded component frame 2 includes a main frame 201 of a grid structure. The embedded component frame 2 is set to a grid structure to reduce its own weight and increase its permeability, thereby avoiding blocking the workers' field of vision and facilitating the workers to more accurately install large embedded components 5. The longitudinal frame and the transverse frame of the main frame 201 (16# channel steel) are reinforced by adding an axil frame 202 (14# channel steel), and a lifting ring 203 (φ18 round steel bar) is fixedly provided on the main frame 201 to facilitate the hanging of the electric hoist fall chain 3. The arrangement position of the longitudinal frame and the transverse frame of the main frame 201 needs to consider the setting position of the embedded component bolts 502, so that the embedded component bolts 502 used for connection can be stably rooted;

同时,为了进一步对支设固定之后的支撑门架1进行加固,每根立柱101外侧均通过加固组件6进行加固,所述加固组件6包括钢丝绳601、花篮螺栓602和膨胀螺栓603,所述钢丝绳601倾斜拉设,钢丝绳601一端固定在立柱101上,另一端通过膨胀螺栓603固定在立柱101外侧的结构面上,且钢丝绳601绳体上设置有花篮螺栓602,花篮螺栓602能够在钢丝绳601拉设完成之后为钢丝绳601施加预应力,将钢丝绳601张紧,使钢丝绳601处于紧绷状态,防止施工时的意外扰动对大型埋件5造成位置扰动。At the same time, in order to further reinforce the supporting portal frame 1 after support and fixation, the outer side of each column 101 is reinforced by a reinforcement assembly 6, and the reinforcement assembly 6 includes a wire rope 601, a basket bolt 602 and an expansion bolt 603. The wire rope 601 is tilted, and one end of the wire rope 601 is fixed on the column 101, and the other end is fixed to the structural surface on the outer side of the column 101 by the expansion bolt 603. The wire rope 601 is provided with a basket bolt 602. The basket bolt 602 can apply prestress to the wire rope 601 after the wire rope 601 is pulled, and the wire rope 601 is tensioned to prevent accidental disturbance during construction from causing position disturbance to the large embedded parts 5.

本实用新型的具体施工方法如下:The specific construction method of the utility model is as follows:

步骤一、将支撑门架1的万向轮105松开,并通过万向轮105将支撑门架1整体移动至埋件胎架2上侧并将支撑门架1的万向轮105通过自带的限位机构锁止,采用电葫芦倒链3拉结在埋件胎架2的吊环203上,将埋件胎架2吊离地面;Step 1: Loosen the universal wheel 105 of the support gantry 1, and move the support gantry 1 as a whole to the upper side of the embedded tire frame 2 through the universal wheel 105, and lock the universal wheel 105 of the support gantry 1 through the self-contained limiting mechanism, and use the electric hoist fall chain 3 to pull the embedded tire frame 203 to lift the embedded tire frame 2 off the ground;

步骤二、将大型埋件5采用叉车放置在设备基础7旁边;Step 2: Place the large embedded part 5 next to the equipment foundation 7 using a forklift;

步骤三、将支撑门架1的万向轮1松开,将支撑门架1整体移动至大型埋件5上方并将万向轮1锁止,启动电葫芦倒链3将埋件胎架2降落至大型埋件5上侧,并通过埋件螺栓502将埋件胎架2和大型埋件5连接成一个整体;Step 3, loosen the universal wheel 1 of the support gantry 1, move the support gantry 1 as a whole to above the large embedded part 5 and lock the universal wheel 1, start the electric hoist fall chain 3 to drop the embedded part frame 2 to the upper side of the large embedded part 5, and connect the embedded part frame 2 and the large embedded part 5 into a whole through the embedded part bolts 502;

步骤四、采用电葫芦倒链3将大型埋件5及埋件胎架2整体吊离地面,将支撑门架1的万向轮1松开,并将支撑门架1移动至设备基础7上方;Step 4: Use the electric hoist chain 3 to lift the large embedded part 5 and the embedded part frame 2 off the ground as a whole, loosen the universal wheel 1 of the supporting gantry 1, and move the supporting gantry 1 to above the equipment foundation 7;

步骤五、调整支撑门架1的位置使得大型埋件5位置基本准确,锁死万向轮105,5t千斤顶106施加压力将支撑门架1的四个立柱101顶起悬空,粗定位完成后采用电葫芦倒链3调整大型埋件5的标高及平整度,调整到位后,采用丝杠顶撑4完成大型埋件5的水平及竖向定位固定;Step 5: Adjust the position of the support gantry 1 so that the position of the large embedded part 5 is basically accurate, lock the universal wheel 105, and use the 5t jack 106 to apply pressure to lift the four columns 101 of the support gantry 1 into the air. After the rough positioning is completed, use the electric hoist chain 3 to adjust the elevation and flatness of the large embedded part 5. After the adjustment is in place, use the screw support 4 to complete the horizontal and vertical positioning and fixing of the large embedded part 5;

步骤六:大型埋件5定位符合设计要求后,采用φ16钢丝绳601通过花篮螺栓602将立柱101与M16*150膨胀螺栓603连接拉紧作为加强固定,防止施工时的扰动影响。Step 6: After the large embedded part 5 is positioned in accordance with the design requirements, a φ16 steel wire rope 601 is used to connect and tighten the column 101 and the M16*150 expansion bolt 603 through the basket bolt 602 as a reinforcement to prevent disturbance during construction.

以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides an oversized buries a suspension type installation system which characterized in that: including support portal (1), embedded part bed-jig (2), electric hoist chain (3) and lead screw top stay (4), support portal (1) stride to establish in the equipment basis (7) top of the position of waiting to bury in large-scale embedded part (5), embedded part bed-jig (2) hang on support portal (1) through electric hoist chain (3), and embedded part bed-jig (2) hang in large-scale embedded part (5) wait to bury equipment basis (7) top in position, are located the large-scale embedded part (5) of waiting to bury the position and fix on embedded part bed-jig (2), and embedded part bed-jig (2) and support portal (1) between through a plurality of detachable lead screw top stay (4) relative fixation.
2. The oversized burial hanging installation system of claim 1, wherein: the support portal frame (1) comprises a plurality of pairs of upright posts (101), the upright posts (101) arranged in pairs are respectively and correspondingly arranged on two sides of the equipment foundation (7), the top ends of the upright posts (101) are fixedly connected through cross beams (102), and the upright posts (101) positioned on the same side of the equipment foundation (7) are reinforced through cross braces (103).
3. The oversized burial hanging installation system of claim 2, wherein: the bottom end of the upright post (101) is fixedly provided with a universal wheel (105) and a jack (106).
4. The oversized burial hanging installation system of claim 2, wherein: the cross beam (102) is at least provided with two beams, and the space between the cross beams (102) and the space between the upright post (101) and the cross beams (102) is reinforced by the inclined web members (104).
5. The oversized burial hanging installation system of claim 1, wherein: and a reinforcing component (6) is further arranged between the supporting portal (1) and the outer side structural surface.
6. The oversized burial hanging installation system of claim 5, wherein: the reinforcing component (6) comprises a steel wire rope (601), a basket bolt (602) and an expansion bolt (603), wherein the steel wire rope (601) is obliquely pulled, one end of the steel wire rope (601) is fixed on the supporting portal (1), the other end of the steel wire rope is fixed on the outer side structural surface of the supporting portal through the expansion bolt (603), and the basket bolt (602) is arranged on the rope body of the steel wire rope (601).
7. The oversized burial hanging installation system of claim 1, wherein: the embedded part jig frame (2) comprises a main frame (201) with a grid structure, wherein a longitudinal frame and a transverse frame of the main frame (201) are reinforced through an armpit frame (202), and a hanging ring (203) is fixedly arranged on the main frame (201).
8. The oversized burial hanging installation system of claim 1, wherein: the embedded part jig frame (2) is fixedly connected with the large embedded part (5) through an embedded part bolt (502) fixed on the embedded part main body (501).
CN202323519214.3U 2023-12-22 2023-12-22 A hanging installation system for super large embedded parts Active CN221896252U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323519214.3U CN221896252U (en) 2023-12-22 2023-12-22 A hanging installation system for super large embedded parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323519214.3U CN221896252U (en) 2023-12-22 2023-12-22 A hanging installation system for super large embedded parts

Publications (1)

Publication Number Publication Date
CN221896252U true CN221896252U (en) 2024-10-25

Family

ID=93136086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323519214.3U Active CN221896252U (en) 2023-12-22 2023-12-22 A hanging installation system for super large embedded parts

Country Status (1)

Country Link
CN (1) CN221896252U (en)

Similar Documents

Publication Publication Date Title
CN103243654B (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN209780193U (en) Suspension type scaffold
CN111809528B (en) A pier column vertical cage platform channel construction method and cage platform channel device
CN114876209A (en) Steel reinforced beam sectional construction method for limited hoisting
CN221896252U (en) A hanging installation system for super large embedded parts
CN222990595U (en) Multifunctional portal for suspension bridge construction
CN214459664U (en) Floor-free pier column bent cap template dismounting device
CN212532065U (en) A gantry crane that can be used in different height difference sites
CN113309256A (en) Construction device and construction method for prefabricated shear wall with post-pouring section
CN220081308U (en) A kind of pneumatic anchor drilling rig operation auxiliary vehicle
CN219604164U (en) Variable cross-section special-shaped steel tower crown mounting device
CN215669490U (en) A cantilever type pipe pile lifting positioning bracket
CN215053064U (en) Lattice column verticality correction device
CN212612028U (en) Temporary support system for basket type steel box tied arch
CN202144681U (en) Oar-type steel well frame
CN108331341A (en) A kind of formwork support method and device of large size conversion beam
CN210659321U (en) Trolley structure for binding concrete reinforcing steel bars
CN209780229U (en) Jacking platform system of integrated tower crane
CN209907435U (en) Pipe rack platform truck for comprehensive pipe rack building construction
CN223048204U (en) Sectional cantilever mounting device for high-altitude large-span steel girder
CN112681148A (en) Floor-free pier column capping beam template dismounting device and construction method
CN206800204U (en) A kind of highway bridge bent cap reinforcement cage mold
CN216947913U (en) Arch rib supporting structure of large-tonnage bridge
CN221877786U (en) Rectangular capping beam bracket for high pier
CN220789459U (en) Support system for segmented construction of steel structure arch installation

Legal Events