CN213449418U - Side slope monitoring instrument drilling construction platform - Google Patents

Side slope monitoring instrument drilling construction platform Download PDF

Info

Publication number
CN213449418U
CN213449418U CN202021174289.6U CN202021174289U CN213449418U CN 213449418 U CN213449418 U CN 213449418U CN 202021174289 U CN202021174289 U CN 202021174289U CN 213449418 U CN213449418 U CN 213449418U
Authority
CN
China
Prior art keywords
slope
prisms
hanging basket
fixing
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021174289.6U
Other languages
Chinese (zh)
Inventor
杜爱明
李兴涛
董阳
朱文申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Huakun Hydropower And Water Conservancy Scientific Research Co ltd
PowerChina Kunming Engineering Corp Ltd
Original Assignee
Yunnan Huakun Hydropower And Water Conservancy Scientific Research Co ltd
PowerChina Kunming Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Huakun Hydropower And Water Conservancy Scientific Research Co ltd, PowerChina Kunming Engineering Corp Ltd filed Critical Yunnan Huakun Hydropower And Water Conservancy Scientific Research Co ltd
Priority to CN202021174289.6U priority Critical patent/CN213449418U/en
Application granted granted Critical
Publication of CN213449418U publication Critical patent/CN213449418U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

Side slope monitoring instrument drilling construction platform relates to construction auxiliary assembly. The utility model comprises a hanging basket and a safety fixing component, wherein the safety fixing component is fixed on the slope surface of the high slope, the hanging basket is fixedly connected with the safety fixing component, the hanging basket is a cuboid frame and comprises four vertical prisms, two of the prisms are close to the slope surface and are front prisms, the other two prisms are far away from the slope surface and are rear prisms, and the length of the front prisms is greater than that of the rear prisms; four inclined struts are further arranged on the hanging basket, and two inclined struts are arranged on each side of the hanging basket; the safety fixing component comprises three safety fixing pieces. The utility model discloses a three insurance mountings hang the hanging flower basket on high slope is domatic, and fixed with domatic bed rock respectively, have guaranteed the stability of hanging flower basket, have reduced required engineering time, have improved the efficiency of construction greatly. And after the monitoring instrument at one position is constructed, hoisting the hanging basket, fixing the fixing pile at the required position again, and connecting and putting down the hanging basket and the fixing pile again to carry out construction again.

Description

Side slope monitoring instrument drilling construction platform
Technical Field
The utility model relates to a construction auxiliary assembly, especially one kind is with low costs, and the cycle is short, firm side slope monitoring instrument drilling construction platform that can remove in a flexible way.
Background
For high slopes of some hydroelectric power plants, monitoring instruments are required to be arranged on the slopes, and usually holes are drilled at corresponding positions, and then the monitoring instruments are installed in the drilled holes. The height of a high slope of a water inlet of a certain hydropower station is 30m, the slope is close to 90 degrees, 3 monitoring instruments need to be installed, the drilling depth is 30m, the aperture is 90mm, the drilling direction is vertical to the slope surface, and the distance between two adjacent drilling holes is 10m-15 m. Because the construction work amount of the monitor is less, the positions of the hole sites are dispersed and are all vertical to the slope surface of the high slope. Because the monitoring instrument requires a short construction period, if the conventional process is adopted, the bent frame construction is carried out, the construction cost is high, the construction period is long, and other construction procedures of excavation, pouring and the like of the side slope can be influenced in a cross mode.
Disclosure of Invention
The utility model aims to solve is that current high slope monitor drilling construction volume is little, builds drilling construction platform tradition technology with high costs, and the working period is long, still can influence the problem of other construction processes, provides one kind with low costs, and the cycle is short, the firm side slope monitor drilling construction platform that can remove in a flexible way.
The utility model discloses a side slope monitoring instrument drilling construction platform, set up in high slope department, its characterized in that this construction platform includes hanging flower basket and insurance fixed subassembly, and insurance fixed subassembly is fixed on the slope surface of high slope, and hanging flower basket and insurance fixed subassembly fixed connection, hanging flower basket are a cuboid frame, including four vertical prisms, wherein two prisms are close to the slope surface and are preceding prisms, and two other prisms are kept away from the slope surface and are the back prisms, and preceding prism length is greater than back prism length; four inclined struts are further arranged on the hanging basket, two inclined struts are arranged on each side, one end of one inclined strut on the same side is welded with the bottom of the rear prism on the side, the other end of the inclined strut is welded with the top of the front prism, one end of the other inclined strut is welded with the bottom of the rear prism on the side, and the other end of the inclined strut is welded with the bottom of the front prism; the subassembly is fixed in insurance includes three insurance mountings, wherein:
the first safety fixing piece comprises a first fixing pile and steel wire ropes, the first fixing pile is inserted into bedrock of the slope and fixed, and the first fixing pile is connected with the top of the front prism through the two steel wire ropes;
the second safety fixing piece comprises a second fixing pile and steel wire ropes, the second fixing pile is inserted into bedrock of the slope and fixed, and the second fixing pile is connected with the bottom of the rear prism through the two steel wire ropes;
the third safety fixing piece is triangular and is close to the slope surface, the top angle is fixed on the slope surface through a third fixing pile and is welded and fixed with the middle of the horizontal prism below the front end of the hanging basket, and the two bottom angles are respectively welded with the bottoms of the two front prisms;
the second spud pile sets up in first spud pile top, and 150cm is no less than to both intervals, and not on same rock.
The prism and the bracing of hanging flower basket all adopt 20cmX15 cm's channel-section steel, the order welding forms the hanging flower basket, set up protection skirting board around the hanging flower basket bottom surface, be provided with the guardrail bar on the lateral wall.
The first fixing pile is vertical to the surface of the bedrock at the insertion point, the diameter of the first fixing pile is 5cm, and the insertion depth is not less than 100 cm.
The second fixing pile is vertical to the surface of the bedrock at the insertion point, the diameter of the second fixing pile is 5cm, and the insertion depth is not less than 100 cm.
The construction platform is further provided with a rope ladder, the top of the rope ladder is fixed on the ground of the top of the high slope, the lower portion of the rope ladder is arranged in the hanging basket, and an operator enters the construction platform through the rope ladder to operate.
The height of the protective skirting board is not less than 20cm, and the safety of the interior of the hanging basket is improved.
The utility model discloses a side slope monitoring instrument drilling construction platform, rational in infrastructure, the design science, convenient to use hangs the hanging flower basket on high slope is domatic through three insurance mountings, and three insurance mountings are fixed with domatic bed rock respectively, have not only guaranteed the stability of hanging flower basket, have still reduced required engineering time, have improved the efficiency of construction greatly, because the required area of hanging flower basket is less, can also effectively avoid influencing other process constructions, have improved holistic efficiency of construction greatly. After the monitoring instrument construction of a position is accomplished, hoist the hanging flower basket, fix the spud pile again in the position that needs, be connected hanging flower basket and spud pile once more and put down, can carry out the construction once more for the hanging flower basket can be nimble remove the use, arranges at the construction point of a plurality of monitoring instruments fast, has saved a large amount of time cost and construction cost.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Wherein, high slope 1, hanging flower basket 2, bracing 3, first spud pile 4, wire rope 5, second spud pile 6, third insurance mounting 7, protection baseboard 8.
Detailed Description
Example 1: a drilling construction platform of a side slope monitoring instrument is arranged at a high side slope 1 and comprises a hanging basket 2 and a safety fixing component, wherein the safety fixing component is fixed on a slope surface of the high side slope 1, the hanging basket 2 is fixedly connected with the safety fixing component, the hanging basket 2 is a cuboid frame and comprises four vertical prisms, two prisms are front prisms close to the slope surface, the other two prisms are rear prisms far away from the slope surface, and the length of the front prisms is greater than that of the rear prisms; four inclined struts 3 are further arranged on the hanging basket 2, two inclined struts 3 are arranged on each side, one end of one inclined strut 3 on the same side is welded with the bottom of the rear prism on the side, the other end of the inclined strut 3 is welded with the top of the front prism, one end of the other inclined strut 3 is welded with the bottom of the rear prism on the side, and the other end of the other inclined strut 3 is welded with the bottom of the front prism; the subassembly is fixed in insurance includes three insurance mountings, wherein:
the first safety fixing piece comprises a first fixing pile 4 and steel wire ropes 5, the first fixing pile 4 is inserted into bed rock of the slope for fixing, and the first fixing pile 4 is respectively connected with the top of the front prism through the two steel wire ropes 5;
the second safety fixing piece comprises a second fixing pile 6 and steel wire ropes 5, the second fixing pile 6 is inserted into the bed rock of the slope for fixing, and the second fixing pile 6 is respectively connected with the bottoms of the rear prisms through the two steel wire ropes 5;
the third safety fixing piece 7 is triangular and is close to the slope surface, the top angle is fixed on the slope surface through a third fixing pile, the third safety fixing piece is welded and fixed with the middle of the horizontal prism below the front end of the hanging basket 2, and the two bottom angles are respectively welded with the bottoms of the two front prisms;
second spud pile 6 sets up in first spud pile 4 top, and 150cm are no less than to both intervals, and not on same rock. The prism and the bracing 3 of hanging flower basket 2 all adopt 20cmX15 cm's channel-section steel, and the order welding forms hanging flower basket 2, and hanging flower basket 2 bottom surface sets up protection skirting board 8 all around, is provided with the guardrail bar on the lateral wall. The first fixing pile 4 is vertical to the surface of bedrock at an insertion point, the diameter of the first fixing pile 4 is 5cm, and the insertion depth is not less than 100 cm. The second fixing pile 6 is vertical to the surface of the bedrock at the insertion point, the diameter of the second fixing pile 6 is 5cm, and the insertion depth is not less than 100 cm. The construction platform is further provided with a rope ladder, the top of the rope ladder is fixed on the ground at the top of the high slope 1, the lower part of the rope ladder is arranged in the hanging basket 2, and an operator enters the construction platform through the rope ladder to operate. The height of the protective skirting board 8 is not less than 20cm, and the safety of the interior of the hanging basket 2 is improved.

Claims (6)

1. A side slope monitoring instrument drilling construction platform is arranged at a high side slope (1), and is characterized by comprising a hanging basket (2) and a safety fixing component, wherein the safety fixing component is fixed on a slope surface of the high side slope (1), the hanging basket (2) is fixedly connected with the safety fixing component, the hanging basket (2) is a cuboid frame and comprises four vertical prisms, two prisms are close to the slope surface and are front prisms, the other two prisms are far away from the slope surface and are rear prisms, and the length of the front prisms is greater than that of the rear prisms; four inclined struts (3) are further arranged on the hanging basket (2), two inclined struts (3) are arranged on each side, one end of one inclined strut (3) on the same side is welded with the bottom of the rear prism on the side, the other end of the inclined strut is welded with the top of the front prism, one end of the other inclined strut (3) is welded with the bottom of the rear prism on the side, and the other end of the inclined strut is welded with the bottom of the front prism; the subassembly is fixed in insurance includes three insurance mountings, wherein:
the first safety fixing piece comprises a first fixing pile (4) and steel wire ropes (5), the first fixing pile (4) is inserted into bedrock of the slope for fixing, and the first fixing pile (4) is connected with the top of the front prism through the two steel wire ropes (5) respectively;
the second safety fixing piece comprises a second fixing pile (6) and steel wire ropes (5), the second fixing pile (6) is inserted into bedrock of the slope for fixing, and the second fixing pile (6) is respectively connected with the bottom of the rear prism through the two steel wire ropes (5);
the third safety fixing piece (7) is triangular and is close to the slope surface, the top angle is fixed on the slope surface through a third fixing pile and is welded and fixed with the middle of the horizontal prism below the front end of the hanging basket (2), and the two base angles are respectively welded with the bottoms of the two front prisms;
second spud pile (6) set up in first spud pile (4) top, and 150cm is no less than to both intervals, and not on same rock.
2. The slope monitoring instrument drilling construction platform according to claim 1, wherein the hanging basket (2) is formed by sequentially welding 20cmX15cm channel steel for the prism and the diagonal brace (3), the protecting skirting boards (8) are arranged on the periphery of the bottom surface of the hanging basket (2), and the side walls of the hanging basket are provided with guard rails.
3. The slope monitoring instrument drilling construction platform according to claim 1, wherein the first fixing pile (4) is perpendicular to the surface of the bedrock at the insertion point, the diameter of the first fixing pile (4) is 5cm, and the insertion depth is not less than 100 cm.
4. The slope monitoring instrument drilling construction platform according to claim 1, wherein the second fixing pile (6) is perpendicular to the surface of the bedrock at the insertion point, the diameter of the second fixing pile (6) is 5cm, and the insertion depth is not less than 100 cm.
5. The slope monitoring instrument drilling construction platform according to claim 1, wherein a rope ladder is further arranged on the construction platform, the top of the rope ladder is fixed on the ground at the top of the high slope (1), and the lower part of the rope ladder is arranged in the hanging basket (2).
6. The slope monitoring instrument drilling construction platform according to claim 2, characterized in that the height of the protective skirting board (8) is not less than 20cm, so as to improve the safety inside the hanging basket (2).
CN202021174289.6U 2020-06-23 2020-06-23 Side slope monitoring instrument drilling construction platform Active CN213449418U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021174289.6U CN213449418U (en) 2020-06-23 2020-06-23 Side slope monitoring instrument drilling construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021174289.6U CN213449418U (en) 2020-06-23 2020-06-23 Side slope monitoring instrument drilling construction platform

Publications (1)

Publication Number Publication Date
CN213449418U true CN213449418U (en) 2021-06-15

Family

ID=76371218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021174289.6U Active CN213449418U (en) 2020-06-23 2020-06-23 Side slope monitoring instrument drilling construction platform

Country Status (1)

Country Link
CN (1) CN213449418U (en)

Similar Documents

Publication Publication Date Title
CN213449418U (en) Side slope monitoring instrument drilling construction platform
CN207079900U (en) A kind of construction resists suspension device stubbornly with scaffold soft drawn
CN207847548U (en) A kind of movable drilling platform of side slope construction
CN206034875U (en) Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device
CN207073326U (en) Safety protection device of municipal road foundation pit
CN217601452U (en) Bracing-free enclosure structure
CN213417826U (en) Foundation ditch support anti-drop reinforced structure
CN214273676U (en) Colliery tunnel supporting construction of prevention roof rockfall
CN209854730U (en) Foundation ditch construction support for railway engineering
CN112709585B (en) Blocking device and method for preventing mud outburst and water inrush of tunnel
CN213978609U (en) Pocket bottom protection platform for cross-line bridge hanging basket construction
CN211200105U (en) Hanging flower basket is used in bridge construction
CN210029726U (en) Anti-swing control device of crane
CN212175712U (en) Water conservancy and hydropower garbage intercepting device capable of classifying garbage
CN217480187U (en) Steel encloses purlin fixing device
CN212462657U (en) High antidetonation ladder type cable testing bridge
CN212849794U (en) Multi-hook assembled cable support
CN110258528A (en) One kind can assemble insertion self-clamping type precast hollow diaphram wall and its construction method
CN216108576U (en) Be applied to platform set up structure on precipitation well
CN210886933U (en) Anti-falling device for bridge construction
CN217500969U (en) Zinc pouring construction platform for main cable of cable crane
CN212406734U (en) Multifunctional tunnel construction trolley
CN204899264U (en) Take building construction protection fence of protection network
CN204676555U (en) Excavation of foundation pit protection handling canopy
CN211006683U (en) Foundation pit supporting structure and foundation pit supporting assembly