CN204676555U - Excavation of foundation pit protection handling canopy - Google Patents

Excavation of foundation pit protection handling canopy Download PDF

Info

Publication number
CN204676555U
CN204676555U CN201520184447.9U CN201520184447U CN204676555U CN 204676555 U CN204676555 U CN 204676555U CN 201520184447 U CN201520184447 U CN 201520184447U CN 204676555 U CN204676555 U CN 204676555U
Authority
CN
China
Prior art keywords
handling
excavation
ceiling
foundation pit
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520184447.9U
Other languages
Chinese (zh)
Inventor
刘海亮
黎金亮
赵亚军
郭效法
李果徽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201520184447.9U priority Critical patent/CN204676555U/en
Application granted granted Critical
Publication of CN204676555U publication Critical patent/CN204676555U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a kind of excavation of foundation pit protection handling canopy, comprising: for enclosing the under(-)chassis in excavation of foundation pit region; Be located at the support frame on described under(-)chassis, a side of described support frame is provided with protective door; The top of described support frame is provided with ceiling; Be located at the handling bar bottom described ceiling, comprise relative two the handling ends stretching out in described ceiling, supply handling.The utility model is by enclosing under(-)chassis in excavation of foundation pit region, and on under(-)chassis basis according to lower and on support frame and ceiling are set, handling bar is provided with bottom ceiling, before excavation pit, only handling appliance need be connected to two handling ends of handling bar, just by the handling of whole protection handling canopy on the foundation ditch for excavation, thus the lower and revolving low inferior problem of existing excavation of foundation pit safeguard procedures safety can be solved.

Description

Excavation of foundation pit protection handling canopy
Technical field
The utility model relates to building field, is specifically related to a kind of excavation of foundation pit protection handling canopy.
Background technology
In building operations place, the crawl spaces such as small size hand excavated pile or single footing comparatively deep foundation pit soil rock excavation time, temporarily the general safeguard procedures adopted adopt the scaffold on construction plant to build a protective guard, safeguard procedures are simpler and cruder, safety is lower, and often dig a foundation ditch and will build a protective guard, lowly revolving.
Utility model content
For overcoming the defect existing for prior art, a kind of excavation of foundation pit is now provided to protect handling canopy, to solve the lower and revolving low inferior problem of existing kind of excavation of foundation pit safeguard procedures safety.
For achieving the above object, a kind of excavation of foundation pit protection handling canopy, comprising: for enclosing the under(-)chassis in excavation of foundation pit region; Be located at the support frame on described under(-)chassis, a side of described support frame is provided with protective door; The top of described support frame is provided with ceiling; Be located at the handling bar bottom described ceiling, comprise two the handling ends stretching out in described ceiling, supply handling.
The further improvement of the utility model excavation of foundation pit protection handling canopy is, described under(-)chassis comprises four corners; Described support frame comprises: be vertically arranged at four support bars on four described corners respectively; The bottom that two adjacent described support bars are corresponding and middle part are all connected with firm bar.
The further improvement of the utility model excavation of foundation pit protection handling canopy is, described support frame comprise be provided with described protective door front, with the back side of described vis-a-vis and relative two sides, described side intersects and is provided with two shores, and described shore comprises and stays on first of described ceiling frame and shore end and shore end relative to described first, be connected to second of described support bar lower end and shore end.
The further improvement of the utility model excavation of foundation pit protection handling canopy is, the described back side of described support frame and two described sides all hang with safety net.
The further improvement of the utility model excavation of foundation pit protection handling canopy is, described ceiling comprises ceiling frame and is layed in the scaffold floor of described ceiling frame.
The beneficial effects of the utility model are, by enclosing under(-)chassis in excavation of foundation pit region, and on under(-)chassis basis according to lower and on support frame and ceiling are set, handling bar is provided with bottom ceiling, before excavation pit, only handling appliance need be connected to two handling ends of handling bar, just can by the handling of whole protection handling canopy on the foundation ditch for excavating, thus solve the lower and revolving low inferior problem of existing excavation of foundation pit safeguard procedures safety.
Accompanying drawing explanation
Fig. 1 is the front schematic view of the utility model excavation of foundation pit protection handling canopy;
Fig. 2 is the side schematic view of the utility model excavation of foundation pit protection handling canopy;
Fig. 3 is the top view of the utility model excavation of foundation pit protection handling canopy.
Detailed description of the invention
For the benefit of to the understanding of structure of the present utility model, be described below in conjunction with drawings and Examples.
Please refer to Fig. 1, Fig. 2 and Fig. 3, Fig. 1 is the front schematic view of the utility model excavation of foundation pit protection handling canopy, and Fig. 2 is the side schematic view of the utility model excavation of foundation pit protection handling canopy, and Fig. 3 is the top view of the utility model excavation of foundation pit protection handling canopy.
As shown in Figure 1, Figure 2 and Figure 3, the utility model provides a kind of excavation of foundation pit protection handling canopy, comprising: the under(-)chassis 2 excavating region for enclosing foundation ditch 1; Be located at the support frame 3 on under(-)chassis 2, a side of support frame 3 is provided with protective door 4; The top of support frame 3 is provided with ceiling 5; The bottom of ceiling 5 is provided with handling bar 6, comprises relative two the handling ends 60 stretching out in ceiling 5, supply handling.
Below said modules is described in detail.
As shown in Figure 3, under(-)chassis 2 is located in foundation ditch 1, adapts to the size of foundation ditch 1, and under(-)chassis 2 is metal framework, can be to adopt the conventional channel-section steel in construction plant to be spliced.Under(-)chassis 2 comprises four corners, and support frame 3 comprises: be vertically arranged at four support bars 30 on four described corners of under(-)chassis 2 respectively; Bottom and the middle part of two adjacent support bar 30 correspondences are all connected with firm bar 31.Support bar 30 can be welded in the steel pipe on under(-)chassis 2, the bottom of adjacent support bar 30 and the middle part of adjacent support bar 30 all enclose the firm bar 31 for firm support framework 3, firm bar 31 can be welded on support bar 30, also can be that colligation is on support bar 30.
Support frame 3 comprise be provided with protective door 4 front, with the back side of described vis-a-vis and relative two sides, as shown in Figure 2, described side intersects and is provided with two shores 7, and shore 7 comprises and stays on first of ceiling frame 5 and shore end and shore end relative to described first, be connected to second of support bar 30 lower end and shore end.Safer in order to construct, the described back side of support frame 3 and two described sides all hang with safety net.
Ceiling 5 comprises the scaffold floor 51 that ceiling frame 50 is layed in ceiling frame.The bottom of ceiling frame 50 is located at by handling bar 6, comprises relative two the handling ends 60 stretching out in ceiling frame 50, supply handling.In order to firm ceiling 5 and make handling bar 6 more firmly be fixed on the bottom of ceiling frame 50, as shown in Figure 1, the bottom of ceiling frame 50 is provided with two support bars 8, support bar 8 comprises first end 81 and second end 82 relative with first end 81, the first end 81 of two support bars 8 all stays on the bottom of ceiling frame 50 and is positioned at the both sides of handling bar 6, second end 82 of two support bars 8 is connected to and is positioned on the firm bar 31 of two sides, and this firm bar 31 is positioned at the middle part of two adjacent support bars 30.
The beneficial effects of the utility model are:
By enclosing under(-)chassis in excavation of foundation pit region, and on under(-)chassis basis according to lower and on support frame and ceiling are set, handling bar is provided with bottom ceiling, before excavation pit, only handling appliance need be connected to two handling ends of handling bar, just by the handling of whole protection handling canopy on the foundation ditch for excavation, thus the lower and revolving low inferior problem of existing excavation of foundation pit safeguard procedures safety can be solved.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thus, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain.

Claims (5)

1. an excavation of foundation pit protection handling canopy, is characterized in that, comprising:
For enclosing the under(-)chassis in excavation of foundation pit region;
Be located at the support frame on described under(-)chassis, a side of described support frame is provided with protective door;
The top of described support frame is provided with ceiling;
Be located at the handling bar bottom described ceiling, comprise two the handling ends stretching out in described ceiling, supply handling.
2. excavation of foundation pit protection handling canopy according to claim 1, is characterized in that,
Described under(-)chassis comprises four corners;
Described support frame comprises: be vertically arranged at four support bars on four described corners respectively; The bottom that two adjacent described support bars are corresponding and middle part are all connected with firm bar.
3. excavation of foundation pit protection handling canopy according to claim 2, it is characterized in that, described support frame comprise be provided with described protective door front, with the back side of described vis-a-vis and relative two sides, described side intersects and is provided with two shores, and described shore comprises and stays on first of described ceiling frame and shore end and shore end relative to described first, be connected to second of described support bar lower end and shore end.
4. excavation of foundation pit protection handling canopy according to claim 3, it is characterized in that, the described back side of described support frame and two described sides all hang with safety net.
5. excavation of foundation pit protection handling canopy according to claim 1, it is characterized in that, described ceiling comprises ceiling frame and is layed in the scaffold floor of described ceiling frame.
CN201520184447.9U 2015-03-30 2015-03-30 Excavation of foundation pit protection handling canopy Expired - Fee Related CN204676555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520184447.9U CN204676555U (en) 2015-03-30 2015-03-30 Excavation of foundation pit protection handling canopy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520184447.9U CN204676555U (en) 2015-03-30 2015-03-30 Excavation of foundation pit protection handling canopy

Publications (1)

Publication Number Publication Date
CN204676555U true CN204676555U (en) 2015-09-30

Family

ID=54176260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520184447.9U Expired - Fee Related CN204676555U (en) 2015-03-30 2015-03-30 Excavation of foundation pit protection handling canopy

Country Status (1)

Country Link
CN (1) CN204676555U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195437A (en) * 2019-05-28 2019-09-03 贵州桥梁建设集团有限责任公司 A kind of manually digging hole gallows frame construction technology of safety and stability
CN113636453A (en) * 2021-09-07 2021-11-12 中铁上海工程局集团第五工程有限公司 Auxiliary crane for artificial digging pile construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195437A (en) * 2019-05-28 2019-09-03 贵州桥梁建设集团有限责任公司 A kind of manually digging hole gallows frame construction technology of safety and stability
CN113636453A (en) * 2021-09-07 2021-11-12 中铁上海工程局集团第五工程有限公司 Auxiliary crane for artificial digging pile construction

Similar Documents

Publication Publication Date Title
CN102191777B (en) Steel sheet pile coefferdam structure and topdown construction method thereof
CN204343301U (en) A kind of Metro station excavation excavation supporting structure
CN207567742U (en) The protective device of the anti-settling anti-fishing net of shallow water underwater equipment stake formula
CN103790393A (en) Construction method for integrated replacement of existing building structure
CN204676555U (en) Excavation of foundation pit protection handling canopy
CN203007958U (en) Protection system for eliminating sliding mass
CN213926286U (en) Supporting construction for building foundation engineering
CN204571384U (en) A kind of sizing chemoprevention pounds switchbox protection canopy
CN207829505U (en) A kind of pin-connected panel floor edge protective fence
KR101182820B1 (en) Self-sustaining earth retaining panel for pipe conduit construction
CN110984168B (en) Combined foundation pit supporting pile structure
CN204040042U (en) A kind of super large ultra-deep support with manually dug piles structure
CN211523222U (en) Thermal power plant confined space deep basal pit pond construction safety enclosure device
CN206220461U (en) A kind of packaged type I-steel hoistway operation platform
CN212477770U (en) Slope protection device based on geotechnical engineering
CN204139697U (en) Pole guy fastening devices
CN204023600U (en) Pillar crane composite base structure
CN203603527U (en) Adjustable sliding block oblique beam steel frame canopy guard structure for brickwork house
CN203393721U (en) Inner support main purlin component
CN210887250U (en) Foundation pit supporting structure for controlling deformation of existing building
CN204112739U (en) A kind of tower crane high-altitude mounting or dismounting operation caisson type operating platform
CN207048457U (en) A kind of building construction protector suitable for debris flow region
CN207420183U (en) Electric power flood-protection electric pole device
CN217896517U (en) Retaining and stagnant water combination formula underground structure
CN106760566B (en) Construction method of height-variable feeding and discharging platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930

Termination date: 20200330

CF01 Termination of patent right due to non-payment of annual fee