CN213356752U - Building materials hoisting accessory for building - Google Patents
Building materials hoisting accessory for building Download PDFInfo
- Publication number
- CN213356752U CN213356752U CN202021509935.XU CN202021509935U CN213356752U CN 213356752 U CN213356752 U CN 213356752U CN 202021509935 U CN202021509935 U CN 202021509935U CN 213356752 U CN213356752 U CN 213356752U
- Authority
- CN
- China
- Prior art keywords
- guide
- guide rail
- building
- screw rod
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004566 building material Substances 0.000 title claims abstract description 24
- 230000005540 biological transmission Effects 0.000 claims abstract description 6
- 238000010276 construction Methods 0.000 claims 3
- 230000000087 stabilizing effect Effects 0.000 abstract description 7
- 239000000463 material Substances 0.000 description 7
- 230000009471 action Effects 0.000 description 2
- 239000000919 ceramic Substances 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000003638 chemical reducing agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229920006351 engineering plastic Polymers 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000007747 plating Methods 0.000 description 1
- 230000000979 retarding effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- -1 tile Substances 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a building materials hoisting accessory for building, including the guide rail board, the guide rail board is installed on screw rod and guide bar, the roof is all installed on the top of screw rod and guide bar, the support post is installed to the bottom of screw rod, the axle bed is installed on stabilizing the seat, the bottom mid-mounting of stabilizing the seat has the motor, the slider is installed to the bottom of guide rail board, auto-lock spring balancer is installed to the below of slider, balanced frame plate is installed to the below of auto-lock spring balancer, the second couple is installed to the bottom both sides of balanced frame plate. The utility model discloses a mid-mounting of guide rail plate has the deflector, is provided with screw hole and guiding hole respectively in the middle part and both sides of deflector, and the screw hole is connected with screw rod transmission, and the guiding hole is connected with the litter, carries out automatic lift control to the guide rail plate through its convenience, and lift control is comparatively stable, and simple structure conveniently dismantles low in cost.
Description
Technical Field
The utility model relates to a hoisting accessory technical field especially relates to a building materials hoisting accessory for building.
Background
A building material hoisting device for building is used for hoisting and controlling building materials, which are a general name of materials used in civil engineering and building engineering. It can be divided into structural material, decorative material and some special materials. The structural material includes wood, bamboo, stone, cement, concrete, metal, tile, ceramic, glass, engineering plastic, composite material, etc., the decorative material includes various coatings, paint, plating layer, facing layer, various kinds of ceramic tile, glass with special effect, etc., the special material is used for water proofing, moisture proofing, corrosion proofing, fire retarding, sound insulating, heat insulating, sealing, etc., and the power unit of the crane consists of motor, speed reducer, clutch, brake, rope drum, steel wire rope, etc.
The hoisting accessory of present stage has many shortcomings, for example, can't carry out two sets of building materials and lift by crane simultaneously, leads to lifting by crane efficiency lower, and the use of hanging to the building materials of the process of lifting by crane is inconvenient, and is comparatively hard, and lifting control is stable inadequately, and the structure is great, and is comparatively heavy, inconvenient dismantlement and carrying are transported.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building materials hoisting accessory for building solves current unable two sets of building materials of carrying on and lifts by crane simultaneously, leads to lifting by crane efficiency lower, and lifts by crane the process and use inconvenient to hanging of building materials, comparatively hard, and lift control is stable inadequately, and the structure is great, and is comparatively heavy, inconvenient dismantlement and the problem of carrying the transportation.
In order to achieve the above purpose, the technical scheme of the utility model is as follows:
the utility model provides a building materials hoisting accessory for building, includes the guide rail board, the guide rail board is installed on screw rod and guide bar, the roof is all installed on the top of screw rod and guide bar, the support post is installed to the bottom of screw rod, the axle bed is installed to the bottom of support post, the axle bed is installed on stabilizing the seat, the bottom mid-mounting of stabilizing the seat has the motor, the slider is installed to the bottom of guide rail board, auto-lock spring balancer is installed to the below of slider, balanced frame plate is installed to auto-lock spring balancer's below, the second couple is installed to the bottom both sides of balanced frame plate.
In the scheme, the bottom of the guide rail plate is provided with the sliding groove, and the sliding groove is connected with the sliding block in a sliding mode.
In the scheme, the top of the self-locking spring balancer is provided with the first hook, the bottom of the sliding block is provided with the first lifting ring, and the first lifting ring is connected with the first hook in a hanging manner.
In the scheme, a lifting rope is wound inside the self-locking spring balancer, a second lifting ring is installed at one end of the lifting rope, a lifting chain is hung below the second lifting ring, a connecting clamp is installed at the bottom of the lifting chain, and the connecting clamp is fixedly connected with the top of the balance frame plate.
In the scheme, the guide plate is arranged in the middle of the guide rail plate, the middle of the guide plate is provided with a threaded hole, and the two sides of the guide plate are provided with guide holes.
In the scheme, the threaded hole is in transmission connection with the screw rod, and the guide hole is in sliding connection with the guide rod.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a mid-mounting of guide rail plate has the deflector, be provided with screw hole and guiding hole respectively in the middle part and both sides of deflector, and the screw hole is connected with screw rod transmission, the guiding hole is connected with the litter, conveniently carry out automatic lifting control to the guide rail plate through it, and lifting control is comparatively stable, and simple structure conveniently dismantles, low in cost, and all install the slider in the bottom both sides of guide rail plate, install auto-lock spring balancer in the below of slider, conveniently carry out stability control to balanced frame plate through it, and can auto-lock balance, save physical power, and conveniently hang the building materials, high durability and convenient use.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a bottom view of the guide rail plate of the present invention;
fig. 3 is a front view of the balance frame plate of the present invention.
In the figure: 1. a top plate; 2. a guide bar; 3. a screw; 4. a guide rail plate; 5. a slider; 6. a first hanging ring; 7. a first hook; 8. a lifting rope; 9. a second hoisting ring; 10. a chain is hung; 11. a self-locking spring balancer; 12. a balance frame plate; 13. a connecting clip; 14. a second hook; 15. supporting the upright post; 16. a shaft seat; 17. a stabilizing base; 18. a motor; 19. a chute; 20. a guide plate.
Detailed Description
The technical solution of the present invention will be further described in detail with reference to the accompanying drawings and embodiments.
As shown in fig. 1-3, the building material lifting device of the present invention comprises a guide rail plate 4, the guide rail plate 4 is installed on a screw rod 3 and a guide rod 2, a top plate 1 is installed on the top ends of the screw rod 3 and the guide rod 2, a supporting upright post 15 is installed on the bottom end of the screw rod 3, the supporting upright post 15 facilitates the installation of the screw rod 3, a shaft seat 16 is installed on the bottom end of the supporting upright post 15, the shaft seat 16 can control the rotation of a balance frame plate 12, the shaft seat 16 is installed on a stabilizing seat 17, a motor 18 is installed in the middle of the bottom end of the stabilizing seat 17, the motor 18 is used for driving the screw rod 3 to rotate, a slider 5 is installed on the bottom end of the guide rail plate 4, the slider 5 is used for sliding connection with a chute 19 at the bottom end of the guide rail plate 4, a self-locking spring balancer 11 is installed below the slider 5, the self-locking spring, a balance frame plate 12 is installed below the self-locking spring balancer 11, second hooks 14 are installed on two sides of the bottom of the balance frame plate 12, and the second hooks 14 are used for hanging building materials.
In one embodiment, the bottom of the rail plate 4 is provided with a sliding groove 19, and the sliding groove 19 is slidably connected with the sliding block 5, so that the sliding block 5 slides on the sliding groove 19 to drive the self-locking spring balancer 11 to move transversely.
In one embodiment, a first hook 7 is installed at the top of the self-locking spring balancer 11, a first hanging ring 6 is installed at the bottom of the sliding block 5, and the first hanging ring 6 is connected with the first hook 7 in a hanging manner and is conveniently connected with the first hanging ring 6 in a hanging manner through the first hook 7.
In one embodiment, a lifting rope 8 is wound inside the self-locking spring balancer 11, a second lifting ring 9 is installed at one end of the lifting rope 8, a lifting chain 10 is hung below the second lifting ring 9, a connecting clamp 13 is installed at the bottom of the lifting chain 10, the connecting clamp 13 is fixedly connected with the top of the balancing frame plate 12, and the lifting chain 10 is conveniently connected with the lifting chain 10 through the second lifting ring 9, so that the lifting chain 10 can suspend the balancing frame plate 12.
In an embodiment, the guide plate 20 is installed in the middle of the guide rail plate 4, a threaded hole is formed in the middle of the guide plate 20, guide holes are formed in two sides of the guide plate 20, and the guide plate is conveniently in transmission with a screw rod through the threaded hole and the guide hole in the guide plate 20 and is controlled by the guide rod 2 in a sliding mode.
In one embodiment, the threaded hole is in screw driving connection with the screw rod 3, and the guide hole is in sliding connection with the guide rod 2.
When the equipment is used, the balance frame plate 12 is pulled manually, automatic balance control is carried out on the position of the balance frame plate 12 under the action of the self-locking spring balancer 11, building materials are hung on the second hook 14, automatic balance is carried out on the building materials through the self-locking spring balancer 11, the screw rod 3 is controlled to rotate through the motor 18, the screw rod 3 and the threaded hole screw rod in the middle of the guide plate 20 are in transmission, the automatic control guide rail plate 4 is lifted on the guide rod 2, the sliding block 5 slides with the sliding groove 19, the balance frame plate 12 is driven to move transversely, the rotation of the guide rail plate 4 can be controlled under the action of the shaft seat 16, and turning control is conveniently carried out on the position of the building materials.
The above-mentioned embodiments further explain in detail the objects, technical solutions and advantages of the present invention, and it should be understood that the above-mentioned embodiments are only the embodiments of the present invention, and are not intended to limit the scope of the present invention, any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the scope of the present invention.
Claims (6)
1. The utility model provides a building materials hoisting accessory for building, includes guide rail board (4), its characterized in that: guide rail plate (4) are installed on screw rod (3) and guide bar (2), roof (1) are all installed on the top of screw rod (3) and guide bar (2), support stand (15) are installed to the bottom of screw rod (3), axle bed (16) are installed to the bottom of support stand (15), install on stable seat (17) axle bed (16), the bottom mid-mounting of stable seat (17) has motor (18), slider (5) are installed to the bottom of guide rail plate (4), auto-lock spring balancer (11) are installed to the below of slider (5), balance frame plate (12) are installed to the below of auto-lock spring balancer (11), second couple (14) are installed to the bottom both sides of balance frame plate (12).
2. A building material lifting device for construction according to claim 1, wherein: the bottom of the guide rail plate (4) is provided with a sliding groove (19), and the sliding groove (19) is connected with the sliding block (5) in a sliding mode.
3. A building material lifting device for construction according to claim 1, wherein: first couple (7) are installed at the top of auto-lock spring equalizer (11), first rings (6) are installed to the bottom of slider (5), and first rings (6) hang with first couple (7) and are connected.
4. A building material lifting device for construction according to claim 1, wherein: the inside roll-up of auto-lock spring equalizer (11) has lifting rope (8), second rings (9) are installed to the one end of lifting rope (8), the below of second rings (9) has hung lifting chain (10), and the bottom of lifting chain (10) installs connecting clamp (13), and the top fixed connection of connecting clamp (13) and balanced frame board (12).
5. A building material lifting device for building of claim 4, wherein: the middle part of the guide rail plate (4) is provided with a guide plate (20), the middle part of the guide plate (20) is provided with a threaded hole, and two sides of the guide plate (20) are provided with guide holes.
6. A building material lifting device for building according to claim 5, wherein: the threaded hole is in transmission connection with the screw rod (3), and the guide hole is in sliding connection with the guide rod (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021509935.XU CN213356752U (en) | 2020-07-27 | 2020-07-27 | Building materials hoisting accessory for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021509935.XU CN213356752U (en) | 2020-07-27 | 2020-07-27 | Building materials hoisting accessory for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213356752U true CN213356752U (en) | 2021-06-04 |
Family
ID=76141429
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021509935.XU Expired - Fee Related CN213356752U (en) | 2020-07-27 | 2020-07-27 | Building materials hoisting accessory for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213356752U (en) |
-
2020
- 2020-07-27 CN CN202021509935.XU patent/CN213356752U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201376850Y (en) | Unitary curtain wall field lifting device | |
CN112027933A (en) | Multi-functional hoisting accessory that construction was used | |
CN202401774U (en) | Simple bogie for hoisting unit-type curtain wall plate block | |
CN213356752U (en) | Building materials hoisting accessory for building | |
CN201762035U (en) | Simple crane movable arm | |
CN208545023U (en) | Mention pipe device | |
CN201040694Y (en) | Convenient movable material lifter | |
CN105668449A (en) | Indoor crane for architecture decoration | |
CN212450358U (en) | Mechanical equipment that lifts by crane that construction was used | |
CN205575444U (en) | Indoor loop wheel machine is used in building decoration | |
CN108483212A (en) | Cladding glass installation self-control electric hoist hanger system and its hanging method | |
CN201010430Y (en) | Suspending tool for cement precast slab | |
CN201406297Y (en) | Lifting equipment for lath | |
CN204310700U (en) | A kind of indoor hoisting crane | |
CN208648517U (en) | Cladding glass installation self-control electric hoist hanger system | |
CN209940317U (en) | Marble mounting hanger | |
CN201485200U (en) | Hoisting frame for tall building | |
CN217173051U (en) | Convenient and easy-to-use building material hoisting machine | |
CN214828524U (en) | Portable assembled building board hoist device | |
CN211548842U (en) | Material hoisting device for urban construction | |
CN220845218U (en) | Curtain wall mounting cross-wall suspension device | |
CN214456384U (en) | Hoisting device for large tile wall mounting | |
CN212769565U (en) | Heavy pipe riser device of underground garage | |
CN215402719U (en) | Auxiliary lifting appliance for building construction | |
CN221396962U (en) | Safe type overhead hoist is used in house construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210604 |