CN213185267U - Accurate positioning device for tail end of deep pipeline - Google Patents

Accurate positioning device for tail end of deep pipeline Download PDF

Info

Publication number
CN213185267U
CN213185267U CN202022204512.3U CN202022204512U CN213185267U CN 213185267 U CN213185267 U CN 213185267U CN 202022204512 U CN202022204512 U CN 202022204512U CN 213185267 U CN213185267 U CN 213185267U
Authority
CN
China
Prior art keywords
positioning
sleeve
pipeline
pipe
upright posts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022204512.3U
Other languages
Chinese (zh)
Inventor
宁焕昌
杨猛
樊炜
张锦武
刘铁铮
沈思佳
杨峰
奚寅峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, China Construction Second Bureau Installation Engineering Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202022204512.3U priority Critical patent/CN213185267U/en
Application granted granted Critical
Publication of CN213185267U publication Critical patent/CN213185267U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a device for accurately positioning the end of a deep pipeline, which comprises a positioning piece and a sleeve detachably connected in the positioning piece, wherein the positioning piece is a positioning bracket with a frame structure and a positioning plate detachably connected in the positioning bracket; the positioning support comprises upright posts which are arranged in a rectangular shape, a cross rod which is connected to the long direction of the upright posts and a connecting rod which is connected to the short direction of the upright posts, and the upright posts, the cross rod and the connecting rod can be detachably connected; the utility model is beneficial to the unit installation of pipelines with different specialties and sizes through the arrangement of the positioning piece, and the sleeve is further divided into a vertical section, a horizontal section and an arc section according to the trend of the pipeline, so that the installation requirements of different pipelines can be met as much as possible; the installation position of the pipeline can be determined by deepening the position of the pipeline to be installed in advance and numbering the sleeves in advance; through the setting of locating support, be convenient for categorised and fixed pipeline, and do benefit to and adjust according to on-the-spot actual conditions.

Description

Accurate positioning device for tail end of deep pipeline
Technical Field
The utility model belongs to the building construction field, in particular to terminal accurate positioning device of deep pipeline.
Background
With the rapid development of the building industry, the requirements on the aspects of building aesthetics, safety, functionality, economic benefit, energy conservation, environmental protection and the like are higher and higher; underground buried pipelines are important links in the process of electrical installation.
The electric pipeline construction in the past is directly under construction according to design institute's drawing, and the pipeline is alternately in disorder, and the collision is serious between each specialty, leads to the scene to coordinate repeatedly to tear open and change, not only wastes time and energy, still influences the aesthetic property, more leaves huge hidden danger for later stage cable threading work. In places such as amusement parks, movie cities and the like, the building structure is complex, the space is narrow, the variety of electric systems is various, the pipelines are dense, and the requirements on the concealment and the attractiveness of the installation of the electric pipelines are extremely strict. In the construction process, the cable sleeve needs to be buried underground for construction, and the problems of crossed and disordered pipelines, repeated coordination and dismantling and modification and the like in a construction site need to be solved.
SUMMERY OF THE UTILITY MODEL
The utility model provides a terminal accurate positioning device of deep pipeline for solve convenient installation, the orderly construction of pipeline and to the pipeline stretch out terminal technical problem such as design to the ization.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a device for accurately positioning the tail end of a deep pipeline comprises a positioning piece and a sleeve detachably connected in the positioning piece, wherein the positioning piece comprises a positioning bracket in a frame structure and a positioning plate detachably connected in the positioning bracket; the positioning support comprises upright posts which are arranged in a rectangular shape, a cross rod which is connected to the long direction of the upright posts and a connecting rod which is connected to the short direction of the upright posts, and the upright posts, the cross rod and the connecting rod can be detachably connected;
the positioning plate is connected to the rectangular frame formed by the cross rods and the connecting rods and comprises a positioning plate body and positioning holes arranged in the positioning plate body; the inner diameter of the positioning hole is adapted to the outer diameter of the sleeve, and the inner diameter of the sleeve is adapted to the outer diameter of the pipeline;
the sleeve comprises a vertical section connected to the positioning piece, and an arc-shaped section and a horizontal section which are connected below the vertical section and buried underground, wherein the top of the vertical section extends out of the designed ground elevation; a single or a plurality of layers of the sleeves are arranged in parallel to form a tube bank, and a fixed tube clamp is installed when the tube bank is laid.
Furthermore, a rectangular frame formed by the transverse rods and the connecting rods in the positioning support is at least divided into an upper layer and a lower layer, at least the opposite transverse rods or the opposite connecting rods are L-shaped pieces, and the width of the transverse parts of the L-shaped pieces is adapted to the lap joint width of the positioning plate.
Furthermore, the positioning support is fixed in the soil layer for at least 1 m, and the periphery of the upright post is fixed by 200mm by C20 concrete.
Furthermore, the positioning plates are at least two layers, the upper layer and the lower layer are prefabricated according to different professional units, and each unit corresponds to one positioning plate independently.
Furthermore, the transverse rods and the connecting rods are assembled and prefabricated according to the length of the positioning plates, and four corners of each positioning plate in the vertical direction are correspondingly connected with the stand columns.
Furthermore, the tail end of the top of the vertical section of the sleeve is provided with a label or is connected with a tag, and the top of the vertical section extends out of the designed ground elevation by at least 200 mm; when the sleeves are connected, the inner surface and the outer surface of a bell socket of the connecting pipe section are coated with adhesive, and the joint is quickly inserted before the glue is dried to form a continuous pipeline.
Further, a medium-coarse sand layer with the thickness of 100mm is paved below the design elevation of the casing pipe at the bottommost layer, and the foundation below the medium-coarse sand layer is tamped.
Furthermore, the pipe clamp is a hard PVC interlocking clamp sleeve, and the size of the pipe clamp is matched with the size of the sleeve, the distance between the sleeves and the outdoor temperature; the number of the fixed pipe clamps is not less than 4 per 6 meters of the casing pipe; in addition, a pipe bank of the cable well is arranged, and when the sleeve is laid, a drainage slope is arranged towards the cable well, wherein the slope is not lower than 0.2%; the vertical pipe section is connected with the horizontal pipe section by an elbow.
Further, the positioning plate is used for drilling holes according to the size of the sleeve and the pipe spacing, and the aperture is larger than the outer diameter of the sleeve by 2 mm; the minimum spacing between the same service type bushings is 20mm, and the minimum spacing between the power and signal bushings is 300 mm.
The beneficial effects of the utility model are embodied in:
1) the utility model adopts BIM technology to carry out comprehensive pipe distribution through the setting of the positioning piece, adopts coordinate positioning on site, is beneficial to the unit installation of pipelines with different specialties and sizes, and the sleeve pipe is further divided into a vertical section, a horizontal section and an arc section according to the trend of the pipeline, thus meeting the installation requirements of different pipelines as much as possible;
2) the utility model can make the installation position of the pipeline clear by deepening the position of the pipeline to be installed in advance and numbering the sleeve in advance, and the vertical section of the sleeve is higher than the ground, which is beneficial to the subsequent construction; compared with the underground and open-top construction method, the underground and open-top construction method reduces the cross operation procedures with multiple specialties and provides larger aboveground building installation space for other specialties, so that the overall construction progress is greatly improved;
3) the utility model, through the arrangement of the positioning bracket, on one hand, facilitates the classification and the fixing of pipelines, and on the other hand, because of the convenient installation and adjustment of the positioning bracket, the adjustment according to the actual situation on site is facilitated; in addition, each positioning plate is horizontally arranged according to different professional or type units, so that the positioning plates are convenient to perform and adjust independently;
in addition, in the process of pipeline installation, the positioning, laying and burying of the sleeve are designed in a targeted manner, so that the pipeline is favorably and orderly installed on site; additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention; the primary objects and other advantages of the invention may be realized and attained by the structure particularly pointed out in the written description.
Drawings
FIG. 1 is a schematic view of the installation and connection of a positioning member and a sleeve;
FIG. 2 is a schematic view of the positioning bracket and the positioning plate;
FIG. 3 is a schematic view of a positioning bracket;
fig. 4 is a schematic structural view of the positioning plate.
Reference numerals: 1-positioning piece, 11-positioning support, 111-upright post, 112-cross bar, 113-connecting rod, 12-positioning plate, 121-positioning plate body, 122-positioning hole and 2-sleeve.
Detailed Description
Taking a shadow city underground cable as an example, the underground cable is installed through a positioning piece 1, as can be seen from fig. 1 to 4, the positioning device of the pipeline comprises a positioning piece 1 and a sleeve 2 connected in the positioning piece 1 in a penetrating way, the positioning piece 1 is a positioning bracket 11 in a frame structure and a positioning plate 12 lapped in the positioning bracket 11; the positioning bracket 11 comprises upright posts 111 arranged in a rectangular shape, a cross bar 112 connected to the long direction of the upright posts 111 and a connecting rod 113 connected to the short direction of the upright posts 111, and the upright posts 111, the cross bar 112 and the connecting rod 113 are all connected through bolts; if disposable, the upright 111, the cross bar 112 and the connecting rod 113 can be welded together.
In this embodiment, the positioning bracket 11 is made of angle steel, the rectangular frame formed by the cross bar 112 and the connecting rod 113 in the positioning bracket 11 is at least divided into an upper layer and a lower layer, and at least the opposite cross bar 112 or the opposite connecting rod 113 is an L-shaped member, wherein the width of the transverse portion of the L-shaped member is adapted to the lap joint width of the positioning plate 12.
In this embodiment, the positioning plate 12 is an aluminum plate, a wood plate, or a plastic plate, the positioning plate 12 is connected to the rectangular frame formed by the cross bar 112 and the connecting rod 113, and the positioning plate 12 includes a positioning plate body 121 and a positioning hole 122 disposed in the positioning plate body 121. The sleeve 2 is connected in the positioning hole 122 in a penetrating mode, the inner diameter of the positioning hole 122 is adaptive to the outer diameter of the sleeve 2, and the inner diameter of the sleeve 2 is adaptive to the outer diameter of a pipeline.
In this embodiment, the positioning bracket 11 is fixed in the soil layer for at least 1 m and the column 111 is fixed by C20 concrete for 200 mm. The tail end of the top of the vertical section of the sleeve 2 is provided with a label or is connected with a tag, and the top of the vertical section extends out of the designed ground elevation by at least 200 mm. The casing 2 comprises a vertical section connected to the spacer 1 and an arc-shaped section and a horizontal section connected below the vertical section and buried underground.
With reference to fig. 1 to 4, a construction method of the deep pipeline end precise positioning device is further described, which comprises the following specific steps:
step one, comprehensive arrangement is carried out on underground pipelines by using BIM, the trend, the elevation and the position of a pipeline outlet pipe are determined, and the deepened design of an underground buried sleeve 2 is completed; according to a construction drawing, a BIM technology is applied to model construction of a distribution box, a control box, end equipment and a sleeve route, arrangement and adjustment are carried out by integrating related specialties, and the accurate positions of the equipment and the sleeve 2 extending out of the ground and the route trend and the elevation of the sleeve 2 under the ground are determined; when the sleeve 2 is connected, the inner surface and the outer surface of a bell socket of a connecting pipe section are coated by adopting an adhesive, and a joint is quickly inserted before glue is dried to form a continuous pipeline.
Secondly, manufacturing a tube bank fixing plate and a support according to the tube outlet positions and the number of the tube bank sleeves 2 determined by a deepening design when the sleeves 2 are led out of a terrace or a floor slab, so that the tube bank positions are accurate, the spacing is accurate, and the sleeves 2 are vertically installed; ID numbering is carried out on each sleeve pipe 2 according to the deepening design, and numbered hanging tags or marks are arranged at the gateway positions of the starting end and the terminal end of each sleeve pipe 2, so that accurate cable threading in the later period is ensured.
Wherein, the model derives a two-dimensional deepening map, the deepening map is marked with coordinates of the starting end and the terminal of each casing 2, the casing route elevation and the unique ID number of each pipeline; the number table of the sleeve 2 corresponds to the information such as the pipe diameter, the specification and the size of the cable, the loop number and the like; and drawing a detailed view of the installation and fixation nodes of the pipe section.
Thirdly, counting the required casings 2 and elbows of various specifications according to the deepening design, wherein the inner and outer wall surfaces of the casings 2 are smooth, have no cracks, obvious scratches and depressions, have uniform colors, and the pipe ends are flush, smooth and have no burrs; the related adhesive glue, cutting equipment, fixing clamps for horizontally laying pipelines, vertically fixing supports and the like are completely prepared.
Step four, measuring and excavating the field according to the elevation of the sleeve 2 designed by the deepening drawing; the pipelines in the area are dense and the coverage area is wide, and the whole area is excavated to be 100mm below the designed elevation; if the pipeline is a local pipeline, locally excavating a groove; paving a medium-coarse sand layer with the thickness of 100mm below the designed elevation of the casing 2 at the bottommost layer, and tamping the foundation below the medium-coarse sand layer; then the underground part of the casing 2 is landfilled.
For the step four, when the sleeve 2 is buried, the buried depth of the sleeve 2 should meet the following conditions: unless otherwise stated, when the sleeve 2 passes through the equidirectional laying roadway, the length from the top of the sleeve to the road surface is not less than 0.7m, and when the sleeve is used on sidewalks and green belts, the length is not less than 0.5 m; the multi-system sleeves 2 are preferably laid in layers according to the system type, the minimum distance between the sleeves 2 in the same service type is 20mm, and the minimum distance between the power and signal sleeves 2 is 300 mm.
When in buried construction, except for the pile foundation, most reference objects such as a structural bottom plate, a building floor, a wall body, a beam column and the like are not constructed, and the field measurement of control lines such as an axis shaft network and the like is not obvious; and (3) carrying out construction while measuring and setting the elevation and the coordinate of the sleeve 2 by adopting a total station, marking by using a flag after the measuring point is finished, and pre-marking the routing connecting line of the sleeve 2 by using lime powder.
The sleeve 2 for construction needs to be preprocessed and preprocessed, a steel saw or a sleeve cutting machine is adopted to cut the pipe, and after the pipe is cut, a reamer or abrasive paper is used to remove all chips and burrs from the inner edge and the outer edge of a cut; cleaning the surface of the spigot and the inner surface area of the bell and spigot, and wiping the spigot and the inner surface area by using clean lint-free cloth dipped with primer to remove stains and grease and soften the surface; coating a thin layer of solvent-free hydrosol on the inner surface of the bell and spigot; to ensure that no solvent accumulation occurs at the root of the socket, and then to apply glue evenly to the outer surface of the spigot.
For the connection of the sleeve 2, before the glue is dried, the joint is quickly inserted to a specified depth, and then the joint is rotated for a quarter of a circle so as to evenly spread the glue, and the joint is fixed at the position for at least thirty seconds without moving; wiping off redundant glue extruded from the interior of the joint on the outer side of the joint, and maintaining the joint not to move for five minutes so as to finish the initial solidification of the interface of the sleeve 2; the cure time is the time required for the solvent bond to reach the pressure rating of casing 2 and should keep casing 2 undisturbed by external forces for thirty minutes.
Step five, arranging one or more layers of the applied casing pipes 2 in parallel to form a pipe row, and installing and fixing pipe clamps when the pipe row is laid; the pipe clamp is a hard PVC interlocking clamping sleeve assembled in a factory, and the size of the pipe clamp is matched with the size of the sleeve 2, the distance between the sleeves 2 and the outdoor temperature; the number of the fixed pipe clamps is not less than 4 per 6 meters of the casing pipe 2; in addition, the pipe bank of the cable well is arranged, and when the casing 2 is laid, the drainage slope is arranged towards the cable well, and the slope cannot be lower than 0.2%. The vertical pipe section is connected with the horizontal pipe section by an elbow.
And sixthly, manufacturing the positioning piece 1, drilling holes in the positioning plate 12 according to the size of the sleeve 2 and the pipe spacing, wherein the hole diameter is larger than the outer diameter of the sleeve 2 by 2mm, so that the expansion and contraction of the sleeve 2 along with the change of temperature in construction are facilitated. The positioning bracket 11 is manufactured according to the detailed node diagram, firstly a door-shaped bracket or a square bracket is manufactured, and the positioning plate 12 is horizontally connected to form a planar rectangular outer frame according to the size of the positioning plate 12, wherein the rectangular outer frame is used for supporting the positioning plate 12; four corners of the outer frame are vertically connected with four upright posts 111 to form a system fixed with the ground; in addition, the positioning support 11 is fixed in the soil layer for not less than 1 meter, 200mm around the upright post 111 is fixed by C20 concrete, and the fixing point position is increased or decreased according to the buried depth of the sleeve 2.
For the positioning piece 1 in the sixth step, the positioning plates 12 are at least two layers, and are prefabricated according to different professional sub-units, and each unit corresponds to one positioning plate 12 independently; the upright posts 111, the cross bars 112 and the connecting rods 113 are assembled and prefabricated according to the length of the positioning plates 12, wherein four corners of each positioning plate 12 in the vertical direction are correspondingly connected with the upright posts 111.
Step seven, according to the position of the pipeline, after the positioning piece 1 is manufactured, measuring the position of the vertical outlet pipe through coordinates, and calibrating the position of the positioning piece 1; then, the sleeve 2 is arranged to enable the vertical pipe section to pass through the positioning hole 122 on the positioning plate body 121; the length of the vertical pipe section is reserved according to the height of 200mm higher than the final finished surface.
Step eight, numbering and marking the sleeve 2 in time in the laying process, marking the middle part of the pipe section except for the start end and the end, and particularly numbering and marking the position of a port of the pipe section with construction pause or interruption; the fixed pipe clamp of the horizontal laying casing pipe 2 is fixed with the soil layer, and the displacement amount in the backfilling process is monitored. After the first layer of the casing 2 is laid and installed, artificial backfilling is carried out by adopting medium coarse sand, and tamping is carried out; repeating the above process every time one layer is laid. After the last layer of casing 2 has been laid, 100mm medium coarse sand is manually backfilled above and manually tamped. And in the range of 0.7m above the top of the pipe, manual backfilling is required, and mechanical bulldozing backfilling is strictly forbidden.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be considered by those skilled in the art within the technical scope of the present invention should be covered by the protection scope of the present invention.

Claims (9)

1. The device for accurately positioning the tail end of the deep pipeline is characterized by comprising a positioning piece (1) and a sleeve (2) detachably connected in the positioning piece (1), wherein the positioning piece (1) is a positioning bracket (11) in a frame structure and a positioning plate (12) detachably connected in the positioning bracket (11); the positioning support (11) comprises upright posts (111) which are arranged in a rectangular shape, a cross rod (112) connected to the long direction of the upright posts (111) and a connecting rod (113) connected to the short direction of the upright posts (111), and the upright posts (111), the cross rod (112) and the connecting rod (113) can be detachably connected;
the positioning plate (12) is connected to a rectangular frame consisting of the cross rod (112) and the connecting rod (113), and the positioning plate (12) comprises a positioning plate body (121) and a positioning hole (122) arranged in the positioning plate body (121); the sleeve (2) penetrates into the positioning hole (122), the inner diameter of the positioning hole (122) is adapted to the outer diameter of the sleeve (2), and the inner diameter of the sleeve (2) is adapted to the outer diameter of a pipeline;
the sleeve (2) comprises a vertical section connected to the positioning piece (1), and an arc-shaped section and a horizontal section which are connected below the vertical section and buried underground, wherein the top of the vertical section extends out of the designed ground elevation; the single or multiple layers of the sleeve (2) are arranged in parallel to form a tube bank, and a fixed tube clamp is installed when the tube bank is laid.
2. The device for precisely locating the end of a deep pipeline as claimed in claim 1, wherein the rectangular frame formed by the cross bar (112) and the connecting rod (113) in the locating bracket (11) is divided into at least upper and lower layers, and at least the opposite cross bar (112) or the opposite connecting rod (113) is an L-shaped member, wherein the width of the cross portion of the L-shaped member is adapted to the overlapping width of the locating plate (12).
3. The fine positioning device for the end of a deep pipeline according to claim 2, wherein the positioning bracket (11) is fixed in the soil layer for not less than 1 m and the column (111) is fixed with C20 concrete for 200mm around.
4. The device for precisely locating the end of a deep pipeline according to claim 2, wherein the locating plates (12) are at least two layers, one above the other, and are prefabricated according to different professional sub-units, and each unit corresponds to one locating plate (12) individually.
5. The device for precisely positioning the tail end of the deep pipeline as claimed in claim 3, wherein the columns (111), the cross bar (112) and the connecting rod (113) are prefabricated according to the length of the positioning plate (12), and the columns (111) are correspondingly connected to four corners of each positioning plate (12) in the vertical direction.
6. The apparatus for precisely locating the end of a deep pipeline according to claim 1, wherein the top end of the vertical section of the casing (2) is provided with a mark or is connected with a tag, and the top of the vertical section extends out of the designed ground level by at least 200 mm; and an adhesive is filled between the sleeve (2) and the pipe section socket.
7. The device for precisely locating the end of a deep pipeline according to claim 6, wherein a medium-coarse sand layer with the thickness of 100mm is laid below the designed elevation of the casing (2) at the bottommost layer, and the foundation below the medium-coarse sand layer is tamped.
8. The device for precisely positioning the end of a deep pipeline according to claim 7, wherein the pipe clamp is a rigid PVC interlocking clamp sleeve, and the size of the pipe clamp is matched with the size of the sleeve (2), the distance between the sleeves (2) and the outdoor temperature; each 6 m of the sleeve (2) is not less than 4 fixed pipe clamps; the vertical pipe section is connected with the horizontal pipe section by an elbow.
9. The device for precisely locating the end of a deep pipeline according to claim 7, wherein the locating plate (12) is drilled and holed according to the size and the spacing of the casing pipes (2), and the hole diameter is larger than the outer diameter of the casing pipe (2) by 2 mm; the minimum spacing between the same service type bushings (2) is 20mm, and the minimum spacing between the power and signal bushings (2) is 300 m.
CN202022204512.3U 2020-09-30 2020-09-30 Accurate positioning device for tail end of deep pipeline Expired - Fee Related CN213185267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022204512.3U CN213185267U (en) 2020-09-30 2020-09-30 Accurate positioning device for tail end of deep pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022204512.3U CN213185267U (en) 2020-09-30 2020-09-30 Accurate positioning device for tail end of deep pipeline

Publications (1)

Publication Number Publication Date
CN213185267U true CN213185267U (en) 2021-05-11

Family

ID=75777664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022204512.3U Expired - Fee Related CN213185267U (en) 2020-09-30 2020-09-30 Accurate positioning device for tail end of deep pipeline

Country Status (1)

Country Link
CN (1) CN213185267U (en)

Similar Documents

Publication Publication Date Title
CN111502682B (en) Trenchless pipe jacking construction device and construction method
CN112609703B (en) Soil nailing wall support construction process
WO2024001680A1 (en) Waterproof uplift-resistant pile and construction method
CN213185267U (en) Accurate positioning device for tail end of deep pipeline
CN111119931B (en) Deformation control construction method for shallow-buried and underground-excavated foundation of pebble stratum power tunnel
US20040028473A1 (en) Apparatus for screeding
CN114484073B (en) Artificial pipe jacking construction method
CN113346401B (en) Precise positioning device for tail end of deep pipeline and construction method thereof
CN102912945A (en) Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN110230794B (en) Street lamp installation method in electronic factory building
CN107938467A (en) A kind of municipal administration sidewalk for visually impaired people laying method
CN111064155A (en) Calandria array installation and encapsulation construction method
CN116220027A (en) BIM auxiliary reinforced pile and non-reinforced pile engaged pile construction method
CN111676746B (en) Municipal road construction method
CN105951885B (en) A kind of assembled work well standard knot and its installation method in new construction
CN115898469A (en) Tunnel secondary lining construction method
CN105672172A (en) Construction method for Dacromet steel highway handrail
CN219692444U (en) Pipeline protection structure crossing foundation pit
CN105239660B (en) Guiding gutter and water conservancy diversion groove construction method
CN116856460A (en) Urban pipe gallery and installation method thereof
CN220521404U (en) Pipe gallery is assembled to circular arc building block and circular arc building block thereof
CN116398701B (en) Improved large-diameter main water pipe traversing foundation pit protection structure and construction method thereof
CN210946357U (en) Horizontal double escape canal structure of motor vehicle way
CN113430973B (en) High-stability electric car stopping structure and construction method of structure
GENERAL et al. Addendum No. 4 Erie International Airport Realignment & Reconstruction of Taxiway A–Phase

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210511

CF01 Termination of patent right due to non-payment of annual fee