CN213174728U - Overhung operation platform for super high-rise building - Google Patents

Overhung operation platform for super high-rise building Download PDF

Info

Publication number
CN213174728U
CN213174728U CN202021697222.0U CN202021697222U CN213174728U CN 213174728 U CN213174728 U CN 213174728U CN 202021697222 U CN202021697222 U CN 202021697222U CN 213174728 U CN213174728 U CN 213174728U
Authority
CN
China
Prior art keywords
frame
base frame
platform
super high
rise building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021697222.0U
Other languages
Chinese (zh)
Inventor
马毅
易霄
唐安
郑彦来
魏慧�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Changsha Fujisash Curtain Wall and Decoration Co Ltd
Original Assignee
CSCEC Changsha Fujisash Curtain Wall and Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Changsha Fujisash Curtain Wall and Decoration Co Ltd filed Critical CSCEC Changsha Fujisash Curtain Wall and Decoration Co Ltd
Priority to CN202021697222.0U priority Critical patent/CN213174728U/en
Application granted granted Critical
Publication of CN213174728U publication Critical patent/CN213174728U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an overhanging work platform of a super high-rise building, which comprises a base frame and a work platform; the base frame comprises a pulley and a top support, the pulley is arranged at the bottom of the base frame, and the top support is arranged at the top of the base frame; the operation platform is fixedly connected to the outer side of the frame; the base frame moves to the edge of the bottom plate through the pulleys, so that the operation platform extends out of the building main body and is tightly supported by the top support for limiting and locking. During the use, pass through the rim position department that the pulley moved this floor bottom plate with the bed frame, make the operation platform extend outside the building main part, then adjust the shore and stretch out, make the shore push up tight roof, accomplish the spacing of whole platform, the operation personnel can step on the frame operation. After the operation is finished, the top support is adjusted to be retracted, the locking is released, and the whole platform can be moved to the next station through the pulley. The locking and unlocking of the platform are simple and convenient, the platform can be flexibly moved on a floor slab, the construction period is shortened, and the work efficiency is improved.

Description

Overhung operation platform for super high-rise building
Technical Field
The utility model belongs to the technical field of the curtain construction equipment, especially, relate to a super high-rise building work platform of encorbelmenting.
Background
In the curtain construction process, the curtain need be done to super high-rise building in eminence position (50 meters and above) according to architectural design with protrusion floor structure furred ceiling, and two difficult questions in the construction are: structural columns are arranged outside the building at intervals; the floor is too high. At present, the conventional construction modes have two types. One is that the operation construction is carried out by erecting a hanging basket from an upper floor and placing the hanging basket below a corresponding suspended ceiling, but the hanging basket has two defects, on one hand, the cost for erecting the hanging basket is relatively high, on the other hand, the horizontal construction operation range of the hanging basket is limited, and the hanging basket is troublesome to move. The second scheme is that the fixed operation platform is installed indoors, but when the operation platform needs to be moved after a section of operation is finished, the operation platform needs to be detached and installed again, the moving process is very troublesome, and time and labor are wasted.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's weak point, provide an easy operation, remove convenient super high-rise building operation platform of encorbelmenting.
The utility model provides an overhanging work platform of a super high-rise building, which comprises a base frame and a work platform; the base frame comprises a pulley and a top support, the pulley is arranged at the bottom of the base frame, and the top support is arranged at the top of the base frame; the operation platform is fixedly connected to the outer side of the frame; the base frame moves to the edge of the bottom plate through the pulleys, so that the operation platform extends out of the building main body and is tightly supported by the top support for limiting and locking.
The base frame is a rectangular frame and comprises a vertical column, a cross rod and a longitudinal rod; the pulley is connected to the bottom end of the upright post; the top brace is connected to the top end of the upright post.
The top support comprises a screwed pipe, a screw rod and a supporting plate, the supporting plate is fixedly connected to the screw rod, and the screw rod is connected in the screwed pipe; the solenoid is coaxially connected to the top end of the upright post.
And an inclined pull rod is arranged between the two upright columns at the inner end and the outer end of the same plane in the base frame.
The base frame further comprises a counterweight frame, the counterweight frame is a rectangular frame, and the counterweight frame is horizontally arranged in the base frame and located on the opposite side of the operation platform.
The operation platform is a concave frame and comprises a frame main body and a standing person operation table arranged in the frame main body, the frame main body comprises a vertical rod, a horizontal cross rod and a horizontal longitudinal rod, the standing person operation table is arranged in the frame main body, and the horizontal cross rod and the horizontal longitudinal rod at the top are positioned on the standing person operation table and used as handrails; the frame main body is fixedly connected with the outside of the base frame by the inner end.
The base frame further comprises a pedal which is horizontally arranged in the base frame and is flush with the standing person operating platform.
And a bottom support is arranged outside the base frame and below the operation platform.
The bottom support comprises a threaded pipe, a lifting screw and a supporting plate, the lifting screw is externally provided with a handle convenient to operate, the supporting plate is fixedly connected to the bottom end of the lifting screw, the lifting screw is connected to the interior of the threaded pipe, and the threaded pipe is fixedly connected to the exterior of the longitudinal rod.
The utility model discloses when putting into operation, pass through the pulley with the bed frame and move to this floor bottom plate's border position department, make operation platform extend outside the building main part, then adjust the shore and stretch out, make the shore push up tight roof, accomplish the spacing of whole platform, the operation personnel can step on the frame operation. After the operation is finished, the top support is adjusted to be retracted, the locking is released, and the whole platform can be moved to the next station through the pulley. The locking and unlocking of the platform are simple and convenient, the platform can be flexibly moved on a floor slab, the construction period is shortened, and the work efficiency is improved.
Drawings
Fig. 1 is a schematic front view of a preferred embodiment of the present invention.
Fig. 2 is a schematic enlarged top view of the preferred embodiment.
Fig. 3 is an enlarged schematic view of the bottom bracket in the preferred embodiment.
Sequence numbers of the drawings:
1-base frame, 11-upright post, 12-transverse rod, 13-longitudinal rod, 14-diagonal rod,
15-top support, 151-solenoid, 152-screw, 153-top support plate,
16-bottom support, 161-threaded pipe, 162-lifting screw, 163-bottom support plate, 164-handle;
2-operation platform, 21-frame main body, 22-standing operator operation platform;
3-a counterweight frame; 4-a foot pedal;
5-a top plate; 6-a bottom plate; 7-structural column.
Detailed Description
As shown in fig. 1 and fig. 2, the overhanging working platform for a super high-rise building disclosed in this embodiment is composed of a base frame 1 and a working platform 2. The operation platform 2 is fixedly connected outside the base frame 1 so as to extend out of the building main body to form an overhang for high-altitude operation outside a wall.
The base frame 1 is a rectangular frame and is formed by combining upright posts 11, a cross rod 12 and a longitudinal rod 13, and a diagonal draw bar 14 is arranged between the two upright posts at the inner end and the outer end of the same plane in the base frame so as to improve the strength and the integrity; the upright posts, the cross rods and the longitudinal rods are made of square steel tubes. The top of the upright post 11 is provided with a top support 15, and the vertical rod at the bottom end is externally provided with a bottom support 16 so as to lock and position the whole base frame. The top support 15 comprises a screw tube 151, a screw 152 and a top support plate 153, the support plate is fixedly connected to the screw, the screw is connected to the screw in the screw tube, and the screw tube 151 is coaxially connected to the top end of the upright column. As shown in fig. 3, the bottom brace 16 includes a threaded tube 161, a lifting screw 162 and a bottom brace plate 163, the lifting screw is externally provided with a handle 164 for convenient operation, the bottom brace plate is fixedly connected to the bottom end of the lifting screw, the lifting screw is connected in the threaded tube, and the threaded tube is fixedly connected outside the longitudinal rod. The locking or separation between the base frame and the main structure of the building is realized by adjusting the top supporting plate and the bottom supporting plate in the using process.
And a counterweight frame 3 is arranged in the region of the bottom of the base frame 1 corresponding to the opposite side of the operation platform. The counterweight frame is a rectangular frame and is horizontally arranged in the base frame and positioned on the opposite side of the operation platform. Placing the counter weight in order to prevent that operation platform from appearing empting or tilting when the operation in the use on the counter weight frame, improving operation stability.
The middle part of the base frame 1 is internally provided with a pedal 4 so that an operator can conveniently enter the operation platform for operation, and the cross rod 12 and the longitudinal rod 13 on the upper part of the base frame 1 can be used as handrails in the platform climbing process to provide an acting point for the operator when the operator climbs the platform, so that the operator can conveniently enter the operation platform 2.
The operation platform 2 is a concave frame and comprises a frame main body 21 and a standing person operation table 22 arranged in the frame main body, the frame main body comprises a vertical rod, a horizontal cross rod and a horizontal longitudinal rod, the standing person operation table is arranged in the frame main body, and the horizontal cross rod and the horizontal longitudinal rod at the top are positioned on the standing person operation table and used as handrails; the frame main body is fixedly connected outside the upright post at the outer end of the base frame by the upright post at the inner end of the frame main body. And the bottom of each upright stanchion is provided with a pulley to further improve the moving convenience of the whole device.
After the platform is put into use, the base frame is moved to the edge position of the floor through the pulleys, the operation platform extends out of the building main body, then the top support is adjusted to extend out, the top support plate is tightly propped against the top plate 5, the bottom support is adjusted, the bottom support plate is tightly propped against the bottom plate 6, and the locking and limiting of the whole platform are completed; after the counter weight is placed on the counter weight frame, an operator can enter the operation platform from the pedal in the base frame to carry out operation. The operation platform is concave, and the middle part reserves a space capable of giving way the structural column 7, so that operation of operators is facilitated. After the operation is completed, the top supporting plate and the bottom supporting plate are adjusted to retract, the locking is removed, and the whole platform can be moved to the next station through the pulley. The locking and unlocking of the platform are simple and convenient, the platform can be flexibly moved on a floor slab, the construction period is shortened, and the work efficiency is improved.

Claims (9)

1. The utility model provides a super high-rise building operation platform of encorbelmenting which characterized in that: it comprises a base frame and an operation platform; the base frame comprises a pulley and a top support, the pulley is arranged at the bottom of the base frame, and the top support is arranged at the top of the base frame; the operation platform is fixedly connected to the outer side of the frame; the base frame moves to the edge of the bottom plate through the pulleys, so that the operation platform extends out of the building main body and is tightly supported by the top support for limiting and locking.
2. The super high-rise building overhanging work platform of claim 1, characterized in that: the base frame is a rectangular frame and comprises a vertical column, a cross rod and a longitudinal rod; the pulley is connected to the bottom end of the upright post; the top brace is connected to the top end of the upright post.
3. The super high-rise building overhanging work platform of claim 2, wherein: the top support comprises a screwed pipe, a screw rod and a supporting plate, the supporting plate is fixedly connected to the screw rod, and the screw rod is connected in the screwed pipe; the solenoid is coaxially connected to the top end of the upright post.
4. The super high-rise building overhanging work platform of claim 3, wherein: and an inclined pull rod is arranged between the two upright columns at the inner end and the outer end of the same plane in the base frame.
5. The super high-rise building overhanging work platform of claim 1, characterized in that: the base frame further comprises a counterweight frame, the counterweight frame is a rectangular frame, and the counterweight frame is horizontally arranged in the base frame and located on the opposite side of the operation platform.
6. The super high-rise building overhanging work platform of claim 2, wherein: the operation platform is a concave frame and comprises a frame main body and a standing person operation table arranged in the frame main body, the frame main body comprises a vertical rod, a horizontal cross rod and a horizontal longitudinal rod, the standing person operation table is arranged in the frame main body, and the horizontal cross rod and the horizontal longitudinal rod at the top are positioned on the standing person operation table and used as handrails; the frame main body is fixedly connected with the outside of the base frame by the inner end.
7. The super high-rise building overhanging work platform of claim 6, wherein: the base frame further comprises a pedal which is horizontally arranged in the base frame and is flush with the standing person operating platform.
8. The super high-rise building overhanging work platform of claim 2, wherein: and a bottom support is arranged outside the base frame and below the operation platform.
9. The super high-rise building cantilever work platform of claim 8, wherein: the bottom support comprises a threaded pipe, a lifting screw and a supporting plate, the lifting screw is externally provided with a handle convenient to operate, the supporting plate is fixedly connected to the bottom end of the lifting screw, the lifting screw is connected to the interior of the threaded pipe, and the threaded pipe is fixedly connected to the exterior of the longitudinal rod.
CN202021697222.0U 2020-08-14 2020-08-14 Overhung operation platform for super high-rise building Active CN213174728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021697222.0U CN213174728U (en) 2020-08-14 2020-08-14 Overhung operation platform for super high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021697222.0U CN213174728U (en) 2020-08-14 2020-08-14 Overhung operation platform for super high-rise building

Publications (1)

Publication Number Publication Date
CN213174728U true CN213174728U (en) 2021-05-11

Family

ID=75801113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021697222.0U Active CN213174728U (en) 2020-08-14 2020-08-14 Overhung operation platform for super high-rise building

Country Status (1)

Country Link
CN (1) CN213174728U (en)

Similar Documents

Publication Publication Date Title
CN209703989U (en) A kind of non-perpendicular elevation construction of building hangs blue device
CN106284956B (en) A kind of scaffold and its construction method of automatic lifting
CN210195192U (en) Scaffold frame that construction was used
CN213174728U (en) Overhung operation platform for super high-rise building
CN110185247A (en) Mobile outrigger platform
CN215595002U (en) Auxiliary scaffold for mounting tall and big laths in place
CN215167805U (en) Safe scaffold that civil engineering construction used
CN212926984U (en) Movable suspension operating platform
CN213979843U (en) Prefabricated staircase safety operation platform of assembled structure
CN212802428U (en) Portable lifting scaffold
CN211164702U (en) Beam slab bar planting drilling tool
CN210342611U (en) Scaffold frame of building engineering construction usefulness
CN209907435U (en) Pipe rack platform truck for comprehensive pipe rack building construction
CN212295569U (en) Movable type operation platform that encorbelments
CN215760330U (en) Worker operation platform for indoor atrium cavity decoration operation in building construction
CN204282839U (en) The frame that cast-in-situ concrete beam steadily enters mould founds device
CN111305433A (en) Construction structure and construction method of inclined glass curtain wall of roof steel structure platform
CN110259100A (en) A kind of overhanging scaffold inversely removes auxiliary frame
CN214329836U (en) Construction hanging bracket for slip form system
CN220725748U (en) Ultra-high-rise atrium roof refuge layer formwork system
CN210685325U (en) Scaffold for building
CN210798239U (en) Truss removes operation platform
CN213774398U (en) Elevator shaft operating platform
CN212271700U (en) Cage ladder for foundation pit construction
CN211447682U (en) Scaffold convenient to adjust

Legal Events

Date Code Title Description
GR01 Patent grant