CN212295569U - Movable type operation platform that encorbelments - Google Patents
Movable type operation platform that encorbelments Download PDFInfo
- Publication number
- CN212295569U CN212295569U CN202020291884.1U CN202020291884U CN212295569U CN 212295569 U CN212295569 U CN 212295569U CN 202020291884 U CN202020291884 U CN 202020291884U CN 212295569 U CN212295569 U CN 212295569U
- Authority
- CN
- China
- Prior art keywords
- platform
- inner platform
- pull rod
- operation platform
- oblique pull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a portable operation platform that encorbelments, including inner platform and outer platform, inner platform and outer platform include the frame construction who comprises horizontal pole, pole setting, oblique pull rod, fastener, running-board, still be provided with portal and portal oblique pull rod on inner platform and the outer platform, be a whole through horizontal pole, pole setting, oblique pull rod, fastener fixed connection between inner platform and the outer platform, still be provided with gyro wheel and adjustable collet on the inner platform.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a portable operation platform of encorbelmenting.
Background
The method is characterized in that the local repair of an outer wall is frequently met in the building construction process, sporadic embedded parts and bolts need to be installed on the periphery of the building, and in order to ensure the construction safety, a safe and reliable operation platform needs to be provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and adopting the hanging flower basket among the prior art, set up console mode scaffold frame, set up with the steel pipe and encorbelment operation platform as operation platform, nevertheless the construction is complicated, intensity of labour is high, take a lot of work to take the material, can not remove, and set up the scaffold frame and belong to high altitude construction, often can take place the high altitude and fall and the object strikes the accident, dangerous higher problem, and the portable operation platform of encorbelmenting who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an operation platform is encorbelmented to movable type, includes inner platform and outer platform, inner platform and outer platform include the frame construction who comprises horizontal pole, pole setting, oblique pull rod, fastener, running-board, still be provided with portal and portal oblique pull rod on inner platform and the outer platform, be a whole through horizontal pole, pole setting, oblique pull rod, fastener fixed connection between inner platform and the outer platform, still be provided with gyro wheel and adjustable collet on the inner platform.
Preferably, a steel pipe diagonal draw bar is further arranged between the inner platform and the outer platform.
Preferably, the top and the bottom of interior platform all are provided with adjustable collet, the collet can push up the top and the bottom floor of tight construction building through adjusting with adjustable.
Preferably, the cross rods, the vertical rods and the diagonal draw rods are all made of steel pipes with the diameter of 48 multiplied by 3.5 mm.
Preferably, a skirting board 200mm high is arranged on the pedal.
Preferably, the two gantries arranged on the inner platform and the outer platform are two, and the two gantries in the same platform are fixedly connected through a gantry diagonal draw bar.
Compared with the prior art, the utility model provides a portable operation platform of encorbelmenting possesses following beneficial effect:
1. operation platform's a difficult problem during having overcome sporadic outer wall construction, portable operation platform portal bottom of encorbelmenting sets up the gyro wheel, removal that can be convenient, and it is nimble convenient to use, and convenient for material collection, simple manufacture, economical and practical.
2. Constructor accessible gate-type scaffold ladder gets into and is under construction on the operation platform steel footboard, operates safelyr.
3. After the skirting board is arranged, sporadic construction materials can be placed on the skirting board, so that the materials can be horizontally transported conveniently during construction.
Drawings
Fig. 1 is the utility model discloses a portable operation platform that encorbelments's structural schematic.
Fig. 2 is a view from direction a in fig. 1.
In the figure: 1. erecting a rod; 2. a horizontal cross bar; 3. a steel pipe diagonal draw bar; 4. a foot pedal; 5. a roller; 6, an adjustable bottom support; 7. a door frame, 8. a fastener; 9. a gantry diagonal draw bar; 10. skirting boards; 11. and (7) a floor slab.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example one
Referring to fig. 1-2, a portable operation platform that encorbelments, includes inner platform and outer platform, inner platform and outer platform include the frame construction who comprises horizontal pole 2, pole setting 1, oblique pull rod, fastener 8, running-board 4, still be provided with portal 7 and portal oblique pull rod 9 on inner platform and the outer platform, through horizontal pole 2, pole setting 1, oblique pull rod, fastener 8 fixed connection as a whole between inner platform and the outer platform, still be provided with gyro wheel 5 and adjustable collet 6 on the inner platform.
Example two
On the basis of the first embodiment: still be provided with steel pipe diagonal draw bar 3 between inner platform and the outer platform, the top and the bottom of inner platform all are provided with adjustable collet 6, collet 6 can push up the top and the bottom floor 11 of tight construction building through adjusting with adjustable, horizontal pole, pole setting 1, diagonal draw bar are 48 x 3.5 mm's of phi steel pipe preparation and form, be equipped with the high baseboard 10 of 200mm on the running-board 4, the portal 7 that sets up on inner platform and the outer platform are two, and it is fixed to connect through portal diagonal draw bar 9 between two portals 7 in the same platform.
The utility model discloses a realize like this:
firstly, assemble portable operation platform skeleton of encorbelmenting, pole setting 1, horizontal pole 2, steel pipe oblique pull rod 3 connect into the platform skeleton of encorbelmenting through the fastener, set up four adjustable collet 6 about pole setting 1 respectively.
Secondly, install the portal, four portals 7 of installation on portable operation platform framework of encorbelmenting, respectively establish two on inner platform and the outer platform, be connected through fastener 8 between portal 7 and the framework, portal 7 bottom sets up four gyro wheels 5, the operation platform of encorbelmenting of being convenient for remove.
Then, the portal diagonal draw bars 9 are installed, and the two portals 7 are connected through the portal diagonal draw bars 9.
Finally, a steel footboard 4 and an upper skirting board 10 are installed.
During concrete construction, the movable overhanging operation platform is pushed to an operation position, the adjustable collet 6 is adjusted, the concrete floor is tightly pushed up from top to bottom, the fixed movable overhanging operation platform is fixed, the door-type scaffold ladder stand of an operator can enter the overhanging operation platform to operate, after the construction is finished, the adjustable collet 6 is loosened, the adjustable collet is fixed on the vertical rod 1 by an iron wire, the adjustable collet 6 is separated from a concrete floor, and the movable overhanging operation platform is pushed to a next operation point.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides an operation platform is encorbelmented to movable type, a serial communication port, including inner platform and outer platform, inner platform and outer platform include the frame construction who comprises horizontal pole, pole setting, oblique pull rod, fastener, running-board, still be provided with portal and portal oblique pull rod on inner platform and the outer platform, be a whole through horizontal pole, pole setting, oblique pull rod, fastener fixed connection between inner platform and the outer platform, still be provided with gyro wheel and adjustable collet on the inner platform.
2. The mobile cantilever operation platform of claim 1, wherein a steel tube diagonal draw bar is further arranged between the inner platform and the outer platform.
3. The mobile cantilever operation platform of claim 1, wherein the top and the bottom of the inner platform are provided with adjustable bottom supports, and the adjustable bottom supports can tightly support the top and the bottom floor of the construction building through adjustment.
4. The mobile cantilever operation platform of claim 1, wherein the cross bar, the vertical bar and the diagonal bars are all made of steel pipes with a diameter of 48 x 3.5 mm.
5. A mobile cantilever work platform according to claim 1, wherein the foot plate is provided with a skirting board 200mm high.
6. The mobile cantilever operation platform according to claim 1, wherein the two gantries arranged on the inner platform and the outer platform are connected and fixed with each other through a gantry diagonal draw bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020291884.1U CN212295569U (en) | 2020-03-10 | 2020-03-10 | Movable type operation platform that encorbelments |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020291884.1U CN212295569U (en) | 2020-03-10 | 2020-03-10 | Movable type operation platform that encorbelments |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212295569U true CN212295569U (en) | 2021-01-05 |
Family
ID=73959087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020291884.1U Active CN212295569U (en) | 2020-03-10 | 2020-03-10 | Movable type operation platform that encorbelments |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212295569U (en) |
-
2020
- 2020-03-10 CN CN202020291884.1U patent/CN212295569U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204940915U (en) | Dish button construction safety cat ladder | |
CN210195192U (en) | Scaffold frame that construction was used | |
CN212295569U (en) | Movable type operation platform that encorbelments | |
CN205777412U (en) | Roof flower is set a roof beam in place and exterior wall finishing construction mobile operating platform | |
CN210738053U (en) | Turnover operation platform suitable for elevator counterweight installation | |
CN203783170U (en) | Detachable protective shed | |
CN102926554A (en) | Steel hanging seat template supports and construction method thereof | |
CN205713026U (en) | One can be walked cornice high-altitude operation vehicle | |
CN209907972U (en) | Conversion frame for longitudinal and transverse conversion of precast concrete exterior wall cladding | |
CN104453243B (en) | Cast-in-situ concrete beam steadily enters the erection device and method of mould | |
CN207727978U (en) | Girderless floor bolumn cap template reinforcing device | |
CN107381376B (en) | Device and method for hoisting by utilizing curtain wall embedded part | |
CN215595002U (en) | Auxiliary scaffold for mounting tall and big laths in place | |
CN113123800B (en) | Construction method of starting base of large-diameter shield tunnel steel structure | |
CN214658693U (en) | A fixed chassis for outer wall construction goes up and down | |
CN113309256A (en) | Construction device and construction method for prefabricated shear wall with post-pouring section | |
CN211775944U (en) | Support arrangement for quicken installation of taking one's place of PC wall body | |
CN212388363U (en) | A auxiliary device for construction of hollow mound cross slab of bridge | |
CN209874434U (en) | Simple and easy scaffold frame of encorbelmenting of building high latitude | |
CN212249204U (en) | A can have enough to meet need formula triangular supports frame that is used for shallow round storehouse cornice board support system | |
CN211369454U (en) | Scaffold for building engineering | |
CN106836807A (en) | It is a kind of can quick-assembling and mobile modular rack application method | |
CN213174728U (en) | Overhung operation platform for super high-rise building | |
CN217840808U (en) | High-altitude construction platform | |
CN208483996U (en) | A kind of box girder formwork device with detachable operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |