CN215760330U - Worker operation platform for indoor atrium cavity decoration operation in building construction - Google Patents

Worker operation platform for indoor atrium cavity decoration operation in building construction Download PDF

Info

Publication number
CN215760330U
CN215760330U CN202121632012.8U CN202121632012U CN215760330U CN 215760330 U CN215760330 U CN 215760330U CN 202121632012 U CN202121632012 U CN 202121632012U CN 215760330 U CN215760330 U CN 215760330U
Authority
CN
China
Prior art keywords
operating platform
decoration
building construction
movable base
counterweight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121632012.8U
Other languages
Chinese (zh)
Inventor
车海宝
杜永升
王少龙
王鹏
苗卫强
张清收
曾子彤
姚雄伟
张孝亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Original Assignee
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd filed Critical China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority to CN202121632012.8U priority Critical patent/CN215760330U/en
Application granted granted Critical
Publication of CN215760330U publication Critical patent/CN215760330U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a worker operating platform for decorative operation of an indoor atrium cavity in building construction, which comprises a rectangular movable base, wherein the lower part of the rectangular movable base is provided with 4 universal wheels with brakes, four corners of the movable base are respectively provided with tubular columns uniformly distributed with adjusting holes, the middle parts of the four tubular columns are provided with a counterweight zone formed by closed cross braces, a counterweight is arranged in the counterweight zone, four upright and downward upright posts are respectively arranged on two corners at the inner end of the rectangular operating platform and under 2/3 positions on symmetrical long sides of the rectangular operating platform, the upright posts are in sliding fit with the inner walls of the tubular columns of the movable base and are adjusted and positioned by positioning pins, and the rest 1/3 positions on the long sides of the operating platform form an overhanging part of the operating platform. The utility model has reasonable structure, does not need to set up a higher scaffold during the hollow decoration and finishing construction, is suitable for being used in the atrium hollow decoration and finishing projects with the same size and shape, and can improve the safety guarantee, improve the working efficiency and reduce the cost.

Description

Worker operation platform for indoor atrium cavity decoration operation in building construction
Technical Field
The utility model belongs to a worker operation platform in a building construction room, in particular to a worker operation platform for atrium hole decoration operation in the building construction room.
Background
Along with the rapid development of the society, construction units have more and more tight requirements on construction period, and generally, when decoration is carried out and a atrium cavity is encountered, a large number of scaffolds are erected to complete the construction of decoration projects, so that the cost of the construction unit is greatly increased, and the safety cannot be guaranteed correspondingly.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a worker operation platform for the atrium hole decoration work in a building construction room, which has a reasonable structure, does not need to set a higher scaffold during the cavity decoration construction, is suitable for being used in atrium hole decoration projects with the same size and shape and can improve the safety guarantee, improve the working efficiency and reduce the cost.
The purpose of the utility model is realized as follows: the utility model provides a workman's operation platform of indoor atrium hole decoration operation of building construction, rectangular removal base, its lower part is setting up 4 universal wheels of area brake, it has the tubular column of regulation hole to set up the equipartition respectively on four angles of removal base, the counter weight district that constitutes through the confined stull is being set up at the middle part of four tubular columns, set up the counter weight in the counter weight district, set up four decurrent stands of standing vertically respectively on two angles of its inner end of rectangular operation platform and below the 2/3 departments on the long limit of its symmetry, the tubular column of stand and removal base inner wall sliding fit, and adjust the location through the locating pin, the remaining 1/3 department on the long limit of operation platform constitutes operation platform and encorbelments the position, the scissors support is being connected between the adjacent stand of operation platform, guardrail detachable is setting up on operation platform's periphery.
The utility model finishes the indoor atrium decoration work through the balance weight and the steel structure frame, the balance weight provides stability, the steel structure steel frame provides a worker construction operation platform, and the balance weight stabilizes the stability of the whole steel structure, thereby achieving an ectopic platform, and allowing workers to avoid climbing the upper bottom in the atrium construction and finish the decoration work of the outer edge of the cavity. The method has the advantages that a higher scaffold is not required to be erected during the hollow decoration construction, the cost is reduced, the decoration work can be completed, the cost increase can be avoided, and the method is very suitable for the atrium hollow decoration projects with the same size and shape.
The utility model comprises 4 universal wheels with brakes: the platform is used for moving the whole platform, thereby achieving the functions of accurate positioning and repeated utilization.
A platform frame: the lifting section comprises lifting section upright columns, tubular columns, inclined struts and cross struts, and the main purpose is to ensure the stability of a frame. The lifting section upright post adopts a square steel tube with the specification of 40 x40x2.0; the pipe column adopts a square steel pipe with the specification of 50 x50x2.0. The inclined strut adopts an ordinary decorative scaffold inclined strut or 25x25x1.0 square steel, the pipe columns are connected by pins with locks, the specification of the pipe columns is not less than phi 10, and at least 2 parts are connected.
Operating platform counterweight: in the decoration stage, sand or a balancing weight can be used for balancing weight, and the weight balancing requirement of the sand or the balancing weight is required to be more than 3 times of the weight of a person at the overhanging part.
An operation platform: the frame is divided into a common operation part and an overhanging operation part, and is erected by using a flower-shaped steel plate, and the thickness of the frame is not less than 5 mm. The detachable guardrail is necessary to be installed during high-altitude operation, the guardrail is in a mode of adopting a cargo car door and can be hollowed to reduce dead weight, and the height of the guardrail is not less than 1.2m
Universal wheel: and the locking universal wheel is adopted, so that the platform can be moved, and the construction is convenient.
The utility model has reasonable structure, does not need to set up a higher scaffold during the hollow decoration and finishing construction, is suitable for being used in the atrium hollow decoration and finishing projects with the same size and shape, improves the safety guarantee, improves the working efficiency and reduces the cost.
Drawings
The utility model will be further described with reference to the accompanying drawings, and fig. 1 is a schematic perspective view of the utility model.
Detailed Description
A worker operating platform for decoration of atrium hole in building construction room is shown in figure 1, a rectangular movable base 1, the lower part of the moving base is provided with 4 universal wheels 2 with brakes, four corners of the moving base 1 are respectively provided with a pipe column 3 evenly distributed with adjusting holes 6, the middle parts of the four pipe columns 3 are provided with a counterweight area 5 formed by a closed cross brace 4, a counterweight is arranged in the counterweight area 5, four upright and downward upright posts 7 are respectively arranged on two corners at the inner end of a rectangular operating platform 9 and under 2/3 positions on symmetrical long edges of the rectangular operating platform, the upright posts 7 are in sliding fit with the inner wall of the pipe column 3 of the moving base, the rest 1/3 positions on the long edge of the operating platform form the overhanging part of the operating platform, the cross braces 8 are connected between the adjacent upright posts 7 of the operating platform, and the detachable guardrails 10 are arranged on the periphery of the operating platform 9. The weight of the counterweight arranged in the counterweight zone 5 is 3 times of the weight of a person positioned at the overhanging part of the operating platform. The height of the guard rail 10 is not less than 1.2 m. The column 3 provided on the movable base 1 is formed of a square steel pipe of 50 × 2 mm. The upright 7 of the operating platform consists of square steel tubes of 40 × 2 mm. The positioning pin is provided with a lock catch, and the diameter of the positioning pin is not less than 10 mm. The portion of the tubular string 3 constituting the weight section 5 has a height of 500 and 1000 mm. A patterned steel plate with the thickness not less than 5mm is arranged on the bottom surface of the operating platform 9. The length of the movable base 1 is 3m and the width thereof is 2 m.

Claims (9)

1. The utility model provides a workman's operation platform of indoor zhongting hole decoration operation of construction, characterized by: a rectangular movable base (1), the lower part of which is provided with 4 universal wheels (2) with brakes, four corners of the movable base (1) are respectively provided with a pipe column (3) which is evenly distributed with adjusting holes (6), the middle parts of the four pipe columns (3) are provided with a counterweight area (5) formed by closed cross braces (4), a counterweight is arranged in the counterweight zone (5), four upright and downward upright posts (7) are respectively arranged on two corners at the inner end of the rectangular operating platform (9) and under 2/3 positions on the symmetrical long edges of the rectangular operating platform, the upright posts (7) are in sliding fit with the inner wall of the tubular column (3) of the movable base, the rest 1/3 positions on the long edge of the operating platform form the overhanging part of the operating platform, a cross brace (8) is connected between the adjacent upright posts (7) of the operating platform, and a detachable guardrail (10) is arranged on the periphery of the operating platform (9).
2. The worker operating platform for the decoration of the atrium space in the building construction room according to claim 1, wherein: the weight of the counterweight arranged in the counterweight area (5) is 3 times of the weight of a person positioned at the overhanging part of the operating platform.
3. The worker operating platform for the decoration of the atrium space in the building construction room according to claim 1, wherein: the height of the guardrail (10) is not less than 1.2 m.
4. The worker operating platform for the decoration of the atrium space in the building construction room according to claim 1, wherein: the tubular column (3) arranged on the movable base (1) is composed of square steel tubes with the length of 50x2 mm.
5. The worker operating platform for the decoration of the atrium space in the building construction room according to claim 1, wherein: the upright column (7) arranged on the operating platform is composed of square steel pipes of 40 × 2 mm.
6. The worker operating platform for the decoration of the atrium space in the building construction room according to claim 1, wherein: the positioning pin is provided with a lock catch, and the diameter of the positioning pin is not less than 10 mm.
7. The worker operating platform for the decoration of the atrium space in the building construction room according to claim 1, wherein: the height of the part of the pipe column (3) constituting the counterweight zone (5) is 500-1000 mm.
8. The worker operating platform for the decoration of the atrium space in the building construction room according to claim 1, wherein: a pattern steel plate with the thickness not less than 5mm is arranged on the bottom surface of the operating platform (9).
9. The worker operating platform for the decoration of the atrium space in the building construction room according to claim 1, wherein: the length of the movable base (1) is 3m, and the width of the movable base is 2 m.
CN202121632012.8U 2021-07-19 2021-07-19 Worker operation platform for indoor atrium cavity decoration operation in building construction Active CN215760330U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121632012.8U CN215760330U (en) 2021-07-19 2021-07-19 Worker operation platform for indoor atrium cavity decoration operation in building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121632012.8U CN215760330U (en) 2021-07-19 2021-07-19 Worker operation platform for indoor atrium cavity decoration operation in building construction

Publications (1)

Publication Number Publication Date
CN215760330U true CN215760330U (en) 2022-02-08

Family

ID=80106141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121632012.8U Active CN215760330U (en) 2021-07-19 2021-07-19 Worker operation platform for indoor atrium cavity decoration operation in building construction

Country Status (1)

Country Link
CN (1) CN215760330U (en)

Similar Documents

Publication Publication Date Title
CN110616885A (en) Movable overhanging working frame
CN210947650U (en) Assembly movable type lifting cantilever operation platform
CN201165752Y (en) Moveable building construction platform
CN215760330U (en) Worker operation platform for indoor atrium cavity decoration operation in building construction
CN110185247A (en) Mobile outrigger platform
CN212957538U (en) Roof flower frame beam and outer wall decoration construction movable operation platform
CN206205407U (en) It is a kind of can flexible combination multi-functional scaffold
CN213979843U (en) Prefabricated staircase safety operation platform of assembled structure
CN205777412U (en) Roof flower is set a roof beam in place and exterior wall finishing construction mobile operating platform
CN215948858U (en) Attached lifting scaffold protection platform
CN213509519U (en) Regularization formula elevartor shaft handling frame structure
CN210598244U (en) Movable operation and protection platform for assembled building stairwell
CN105003074A (en) Commercial building construction system and construction method thereof
CN217518109U (en) Multipurpose operation platform that encorbelments
CN211736301U (en) Operation platform for prefabricated staircase
CN214605199U (en) Auxiliary device for punching high beam plate
CN220100564U (en) Lifting scaffold for building outer wall construction
CN213297069U (en) Scaffold for architectural decoration
CN219653539U (en) Support frame is used in construction of multi-functional bridge of convenient regulation
CN215254428U (en) Scaffold for housing construction
CN213174728U (en) Overhung operation platform for super high-rise building
CN217299738U (en) Steel structure scaffold
CN217106057U (en) Can have enough to meet need removal operation platform of encorbelmenting
CN215858949U (en) Construction frame
CN216840490U (en) Multi-functional platform of assembly type structure stairwell

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant