CN213114502U - Hydraulic engineering construction concrete slope wall - Google Patents

Hydraulic engineering construction concrete slope wall Download PDF

Info

Publication number
CN213114502U
CN213114502U CN202021848508.4U CN202021848508U CN213114502U CN 213114502 U CN213114502 U CN 213114502U CN 202021848508 U CN202021848508 U CN 202021848508U CN 213114502 U CN213114502 U CN 213114502U
Authority
CN
China
Prior art keywords
rubble
concrete slope
slope
fixing
dirt bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021848508.4U
Other languages
Chinese (zh)
Inventor
李玉勇
曾新立
吴圣勇
黄金海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gezhouba Xinjiang Engineering Co ltd
Original Assignee
China Gezhouba Group No 3 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 3 Engineering Co Ltd filed Critical China Gezhouba Group No 3 Engineering Co Ltd
Priority to CN202021848508.4U priority Critical patent/CN213114502U/en
Application granted granted Critical
Publication of CN213114502U publication Critical patent/CN213114502U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a hydraulic engineering construction concrete slope wall, including base member, holding surface and support column, the top joint support post of holding surface, the base member is connected to the side of holding surface, the concrete slope has been pour to the contained angle region that base member and holding surface constitute, rubble dirt bed has been pour on the inclined plane of concrete slope, rubble dirt bed's surface upper berth is equipped with fixed establishment, the last one end that is connected with the dead lever that can dismantle of fixed establishment, the other end of dead lever inserts in the rubble dirt bed and the other end terminal surface of dead lever is connected with the connecting rod, and the connecting rod link up in the rubble dirt bed inserts the concrete slope. The utility model provides a protection to the revetment wall can be accomplished to the revetment wall initial stage, can effectively prevent the surface of rubble dirt bed from taking place soil erosion and water loss, and the bank protection effect is better.

Description

Hydraulic engineering construction concrete slope wall
Technical Field
The utility model belongs to the technical field of the revetment wall, specifically belong to a hydraulic engineering construction concrete revetment wall.
Background
Slope protection refers to the general name of various paving and planting on a slope surface for preventing a side slope from being washed, a river section where a bridge site is located, a concave bank of the river bank is washed by water flow year by year, the river bank can be continuously collapsed, and a protective building needs to be built on the concave bank for protecting the safety of a bridge and the road bank. In addition, when the river flow direction changes due to the arrangement of bridges and the river bank is washed to endanger farmlands and villages, protective buildings need to be built on the river bank, slope protection walls are produced at the same time, and various slope protection walls appear on the market.
Be CN205421158U according to the patent number a hydraulic engineering construction concrete slope wall, planted green vegetation in the round hole on the stone of building of setting, effectual protection pier prevents that pier loss from appearing the phenomenon of collapsing. But when the earth layer on the surface is fixed, the initial protection effect is poor, only after the green plants are grown up, the protection can be carried out, and the soil erosion is easily caused in the early stage.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem that exists among the prior art, the utility model provides a hydraulic engineering construction concrete slope wall solves at present when fixing the dirt bed to the surface, and initial stage protecting effect is relatively poor, only waits green plant to grow up and finishes the back, just can protect, leads to the problem of soil erosion and water loss easily in earlier stage.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hydraulic engineering construction concrete slope wall, includes base member, holding surface and support column, the top joint support post of holding surface, the base member is connected to the side of holding surface, the concrete slope has been pour in the contained angle region that base member and holding surface constitute, rubble dirt bed has been pour on the inclined plane on concrete slope, rubble dirt bed's surface upper berth is equipped with fixed establishment, the last one end that is connected with the dead lever of dismantling of fixed establishment, the other end of dead lever inserts in the rubble dirt bed and is connected with the connecting rod at this end terminal surface, and the connecting rod link up in rubble dirt bed inserts concrete slope.
Furthermore, the fixing mechanism comprises a plurality of detachably connected cross fixing frames, and screwing bolts used for being connected with one end of the fixing rod are screwed into the cross fixing frames.
Further, the cross mount includes integrated into one piece and crossing first connector and second connector, the both ends of first connector are provided with horizontal fixed slot and horizontal mounting respectively, and the horizontal mounting of current first connector is used for dismantling with the horizontal fixed slot of next first connector and is connected, the both ends of second connector are provided with vertical fixed slot and vertical mounting respectively, and the vertical mounting of current second connector is used for dismantling with the vertical fixed slot of next second connector and is connected.
Furthermore, the transverse fixing piece is inserted in the transverse fixing groove, the transverse fixing piece is detachably connected with the transverse fixing groove through the first pin, the longitudinal fixing piece is inserted in the longitudinal fixing groove, and the longitudinal fixing piece is detachably connected with the longitudinal fixing groove through the second pin.
Furthermore, a slope protection net is arranged between the fixing mechanism and the gravel soil layer.
Further, the slope protection net rack is provided with a plurality of.
Furthermore, greening vegetation is planted in the meshes of the slope protection net at intervals.
Furthermore, the edge of the slope protection net is connected with a fixing plate.
Further, the fixed plate is connected with the gravel soil layer through a limiting pin.
Furthermore, the connecting rod embedded in the concrete slope is of a T-shaped structure.
Compared with the prior art, the utility model discloses following beneficial effect has at least:
the utility model provides a hydraulic engineering construction concrete revetment, through the regional concrete slope of pouring of contained angle that constitutes at base member and holding surface, increase the steadiness between base member and the holding surface, and increase the stability of concrete slope through laying rubble dirt bed on concrete slope, lay fixed establishment on the surface on rubble dirt bed, then pass through dead lever and connecting rod and be connected with rubble dirt bed and concrete layer with fixed establishment, make whole revetment more stable, do not confine to wait for green plant to grow and just can carry out good protection after finishing, the utility model provides a protection to the revetment can be accomplished in the revetment initial stage to the revetment initial stage, can effectively prevent rubble dirt bed's surface emergence soil erosion and water loss, the bank protection effect is better.
Furthermore, the fixing mechanism is formed by connecting a plurality of detachably connected cross fixing frames, the cross fixing frames are increased or reduced according to the areas of the gravel soil layer and the concrete slope, and the application range is wider.
Furthermore, the cross fixing frame is directly connected with the longitudinal fixing piece through the transverse fixing groove, the transverse fixing piece, the longitudinal fixing groove and the longitudinal fixing piece, the structure is simple, the cross fixing frame can be rapidly assembled on site, and the working efficiency is improved.
Further, horizontal fixed slot and horizontal mounting and vertical fixed slot and vertical mounting are connected through the mode of pegging graft, have increased whole fixed establishment's stability, and fixed establishment can not scatter easily, ensures fixed establishment's fixed effect, and soil erosion and water loss can not take place easily in rubble mud layer and concrete slope, and stability is better.
Further, still be provided with the bank protection net between fixed establishment and the rubble dirt bed, promoted the stability on rubble dirt bed and concrete slope.
Further, the edge of slope protection net sets up the fixed plate, makes the slope protection net can not take place to slide easily when increasing the security when slope protection net lays, ensures the utility model discloses holistic performance.
Further, the fixed plate passes through spacing pin and rubble dirt bed, with firm the fixing on rubble dirt bed of slope protection net, can carry out fixed mounting to the slope protection net fast, the equipment is fast.
Furthermore, the connecting rod that buries the concrete slope is the T type, has increased the connection steadiness between connecting rod and the concrete slope, ensures that the concrete slope can not take place soil erosion and water loss easily, and the bank protection effect is better.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of the structure of FIG. 1;
FIG. 3 is a schematic structural view of a cross-shaped fixing frame;
FIG. 4 is a schematic view of a slope protection net;
in the drawings: 1-substrate, 2-supporting surface, 3-concrete slope, 4-supporting column, 5-gravel soil layer, 6-connecting rod, 7-fixing rod, 8-cross fixing frame, 9-screwing bolt, 10-transverse fixing piece, 11-transverse fixing groove, 12-first pin, 13-longitudinal fixing piece, 14-longitudinal fixing groove, 15-slope protection net, 16-fixing plate, 17-limiting pin and 18-second pin.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the detailed description.
As shown in fig. 1 and 2, the utility model provides a hydraulic engineering construction concrete slope wall, including base member 1 and holding surface 2 and pour the concrete slope 3 in the contained angle region of base member 1 and holding surface 2, the support column 4 has been pour at the top of holding surface 2, the surface packing of concrete slope 3 has rubble dirt bed 5, the inside of concrete slope 3 and the inside of rubble dirt bed 5 are all fixedly connected with connecting rod 6, the terminal surface threaded connection dead lever 7 of connecting rod 6 that is located rubble dirt bed 5, dead lever 7 link up rubble dirt bed 5 and reach the surface of rubble dirt bed 5, and dead lever 7 and the fixed establishment on rubble dirt bed 5 surface can dismantle the connection;
as shown in fig. 3, specifically, the fixing mechanism includes a plurality of detachably connected cross fixing frames 8, each cross fixing frame 8 includes a first connecting body and a second connecting body which are integrally formed and cross each other, a screwing bolt 9 is screwed into a cross point of the first connecting body and the second connecting body, the screwing bolt 9 is in threaded connection with the fixing rod 7, and the cross fixing frames 8 and the fixing rod 7 are fastened;
specifically, two ends of a first connecting body of the cross fixing frame 8 are respectively provided with a transverse fixing groove 11 and a transverse fixing member 10, the transverse fixing member 10 of the current first connecting body is used for being connected with the transverse fixing groove 11 of the next first connecting body, wherein a first pin 12 is inserted into the transverse fixing member 10 to be connected with the transverse fixing groove 11, two ends of the second connecting body are respectively provided with a longitudinal fixing groove 14 and a longitudinal fixing member 13, the longitudinal fixing member 13 of the current second connecting body is used for being detachably connected with the longitudinal fixing groove 14 of the next second connecting body, and a second pin 18 is inserted into the longitudinal fixing member 13 to be connected with the longitudinal fixing groove 14;
in the preferred embodiment of this embodiment, the transverse fixing member 10 and the transverse fixing groove 11 and the longitudinal fixing member 13 and the longitudinal fixing groove 14 are all connected by inserting, the transverse fixing member 10 is inserted into the transverse fixing groove 11 and connected by the first pin 12, and the longitudinal fixing member 13 is inserted into the longitudinal fixing groove 14 and connected by the second pin 18; can assemble cross mount 8 fast, and then fix rubble dirt bed 5, can effectively prevent surface rubble dirt bed 5's soil erosion and water loss, the bank protection effect is better.
As shown in fig. 4, preferably, a slope protection net 15 is further arranged between the fixing mechanism composed of the cross fixing frame 8 and the gravel soil layer 5, a fixing plate 16 is fixedly connected to the periphery of the slope protection net 15, a limit pin 17 is fixedly connected to the surface of the fixing plate 16, the back of the cross fixing frame 8 is in surface contact with the fixing plate 16, the slope protection net 15 is provided with a plurality of slope protection nets, the slope protection nets are uniformly distributed on the surface of the gravel soil layer 5, the fixing plate 16 and the slope protection net 15 are placed on the surface of the gravel soil layer 5, the fixing plate 16 is fixed in the gravel soil layer 5 through the limit pin 17, then the cross fixing frame 8 is placed above the fixing plate 16, the slope protection net 15 is quickly and fixedly installed.
During the construction, when pouring concrete slope 3, including pouring connecting rod 6, then when pouring rubble dirt bed 5, including pouring dead lever 7, place fixed plate 16 and slope protection net 15 on rubble dirt bed 5's surface, fix fixed plate 16 through stop pin 17, then place cross mount 8 in fixed plate 16 top, install cross mount 8 and dead lever 7 through the bolt 9 of screwing, horizontal mounting 10 pegs graft into horizontal fixed slot 11 this moment in, install through first pin 12, fix longitudinal fixing spare 13 in vertical fixed slot 14, fix through second pin 18. After accomplishing, even do not plant green in slope protection network 15 and plant or just planting green and plant and not grow up and finish, can't reach the effect that prevents soil erosion and water loss in the initial stage, utilize the utility model discloses a slope protection wall also can prevent soil erosion and water loss. Of course, the green plants are planted in the meshes of the slope protection net 15 at intervals and grow up, and the water and soil loss can be further prevented by combining the slope protection wall.
Finally, it should be noted that: the above-mentioned embodiments are only specific embodiments of the present invention, and are not intended to limit the technical solution of the present invention, and the protection scope of the present invention is not limited thereto, although the present invention is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: those skilled in the art can still modify or easily conceive of changes in the technical solutions described in the foregoing embodiments or make equivalent substitutions for some technical features within the technical scope of the present disclosure; such modifications, changes or substitutions do not substantially depart from the spirit and scope of the embodiments of the present invention, and are intended to be included within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. The utility model provides a hydraulic engineering construction concrete slope wall, a serial communication port, including base member (1), holding surface (2) and support column (4), top joint support post (4) of holding surface (2), base member (1) is connected to the side of holding surface (2), concrete slope (3) have been pour in the contained angle region that base member (1) and holding surface (2) constitute, rubble dirt bed (5) have been pour on the inclined plane of concrete slope (3), the surface upper berth of rubble dirt bed (5) is equipped with fixed establishment, the last one end that can dismantle and be connected with dead lever (7) of fixed establishment, the other end of dead lever (7) inserts in rubble dirt bed (5) and is connected with connecting rod (6) at this end terminal surface, and connecting rod (6) link up in rubble dirt bed (5) insert concrete slope (3).
2. The concrete slope wall for the water conservancy project construction according to claim 1, wherein the fixing mechanism comprises a plurality of detachably connected cross fixing frames (8), and screwing bolts (9) used for being connected with one end of the fixing rod (7) are screwed into the cross fixing frames (8).
3. The concrete slope wall for the water conservancy project construction according to claim 2, wherein the cross fixing frame (8) comprises a first connecting body and a second connecting body which are integrally formed and crossed, a transverse fixing groove (11) and a transverse fixing member (10) are respectively arranged at two ends of the first connecting body, the transverse fixing member (10) of the current first connecting body is detachably connected with the transverse fixing groove (11) of the next first connecting body, a longitudinal fixing groove (14) and a longitudinal fixing member (13) are respectively arranged at two ends of the second connecting body, and the longitudinal fixing member (13) of the current second connecting body is detachably connected with the longitudinal fixing groove (14) of the next second connecting body.
4. A concrete retaining wall for water conservancy project construction according to claim 3, wherein the transverse fixing member (10) is inserted in the transverse fixing groove (11), the transverse fixing member (10) is detachably connected with the transverse fixing groove (11) through a first pin (12), the longitudinal fixing member (13) is inserted in the longitudinal fixing groove (14), and the longitudinal fixing member (13) is detachably connected with the longitudinal fixing groove (14) through a second pin (18).
5. A hydraulic engineering construction concrete retaining wall according to claim 1, characterized in that a protective slope net (15) is further arranged between the fixing mechanism and the gravel soil layer (5).
6. A hydraulic engineering construction concrete slope wall according to claim 5, characterized in that, the slope protection net (15) is provided in plurality.
7. A water conservancy project construction concrete slope wall according to claim 5, characterized in that greening vegetation is planted in the meshes of the slope protection net (15) at intervals.
8. A water conservancy project construction concrete revetment wall according to claim 5, characterized in that the edge of said revetment net (15) is connected with a fixing plate (16).
9. A hydraulic engineering construction concrete retaining wall according to claim 8, characterized in that the fixing plate (16) is connected with the gravel soil layer (5) through a limiting pin (17).
10. A water conservancy project construction concrete slope wall according to claim 1, characterized in that the connecting rod (6) of burying concrete slope (3) is T type structure.
CN202021848508.4U 2020-08-28 2020-08-28 Hydraulic engineering construction concrete slope wall Active CN213114502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021848508.4U CN213114502U (en) 2020-08-28 2020-08-28 Hydraulic engineering construction concrete slope wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021848508.4U CN213114502U (en) 2020-08-28 2020-08-28 Hydraulic engineering construction concrete slope wall

Publications (1)

Publication Number Publication Date
CN213114502U true CN213114502U (en) 2021-05-04

Family

ID=75657907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021848508.4U Active CN213114502U (en) 2020-08-28 2020-08-28 Hydraulic engineering construction concrete slope wall

Country Status (1)

Country Link
CN (1) CN213114502U (en)

Similar Documents

Publication Publication Date Title
CN206736931U (en) Highway Lithological Slope liana ecological safeguard structure
CN212000895U (en) River bank slope surface protection device
CN206157742U (en) Ecological bank protection module of concrete frame, bank protection
CN213114502U (en) Hydraulic engineering construction concrete slope wall
CN211446799U (en) Be applied to ecological slope protection structure among channel treatment project
CN218813500U (en) Ecological bank protection of environment-friendly restores structure
CN216973293U (en) Ecological retaining brick with novel structure
CN215759085U (en) Slope reinforced structure for civil engineering
CN214573720U (en) Assembled large-aperture ecological sash structure and side slope protection structure
CN112832196A (en) Assembled large-aperture ecological sash structure and side slope protection structure
CN209277100U (en) A kind of soil and water conservation ecological slope protection
CN211948481U (en) Civil engineering is with bank protection soil erosion and water loss prevention structure
CN209798781U (en) Exposed rock surface greening structure
KR100461664B1 (en) Structures and system of construction based on the use of plants growing block that protect a shore
CN220977885U (en) River course revetment structure for preventing soil erosion and water loss
CN210031682U (en) Slope protection support frame for hydraulic engineering
CN210562222U (en) Combined ecological slope protection
CN217267233U (en) Combined river channel ecological revetment
CN220685958U (en) Slope, shore zone and water body integrated ecological management system
CN112982451B (en) Sectional road slope protection structure convenient to install
KR100763874B1 (en) Retaining wall block
CN219410741U (en) Ecological water conservancy slope protection structure based on hydraulic engineering
CN220318447U (en) High steady state ecological landscape slope protection
CN111691432B (en) Ecological slope plant combined system for green road construction
CN214993552U (en) Slope surface reinforcing flood discharge device for channel design edge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230625

Address after: 830026 Room 503, 34 Kouan Road, UErvmqi Economic and Technological Development Zone, Xinjiang

Patentee after: Gezhouba Xinjiang Engineering Co.,Ltd.

Address before: 712000 No. 12102, 21 / F, unit 1, building 1, Qiyuan Jinshang phase II, No. 36, Jinye Road, high tech Zone, Xi'an City, Shaanxi Province

Patentee before: CHINA GEZHOUBA GROUP NO.3 ENGINEERING Co.,Ltd.

TR01 Transfer of patent right