CN213063162U - Temporary construction shed for construction site - Google Patents

Temporary construction shed for construction site Download PDF

Info

Publication number
CN213063162U
CN213063162U CN202021702412.7U CN202021702412U CN213063162U CN 213063162 U CN213063162 U CN 213063162U CN 202021702412 U CN202021702412 U CN 202021702412U CN 213063162 U CN213063162 U CN 213063162U
Authority
CN
China
Prior art keywords
rods
shed
mounting groove
rod
ejector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021702412.7U
Other languages
Chinese (zh)
Inventor
雷钧
陈崇
赵红亮
叶金朋
汪盼盼
李艳勋
崔梅静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Yatai Jindian Construction Engineering Co ltd
Original Assignee
Beijing Urban Yatai Jindian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Yatai Jindian Construction Engineering Co ltd filed Critical Beijing Urban Yatai Jindian Construction Engineering Co ltd
Priority to CN202021702412.7U priority Critical patent/CN213063162U/en
Application granted granted Critical
Publication of CN213063162U publication Critical patent/CN213063162U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The temporary construction shed comprises a shed frame, the shed frame comprises two horizontally arranged basic rods, the two basic rods are parallel to each other, a first mounting groove is formed in each basic rod, a plurality of supporting rods are arranged in each first mounting groove, a fixing bolt penetrates through each supporting rod and the corresponding basic rod, two ejector rods are arranged right above each basic rod, a second mounting groove is formed in the lower surface of each ejector rod, a fixing bolt penetrates through each ejector rod and the corresponding supporting rod, third mounting grooves are formed in the side walls, facing each other, of the two ejector rods, a plurality of connecting rods are arranged between the two third mounting grooves, two ends of each connecting rod are embedded in the two third mounting grooves respectively, and fixing bolts penetrate through the two ends of each connecting rod and the two ejector rods respectively, covering cloth is covered on the work shed frame. It has convenient dismantlement and installation, and circulated use's advantage.

Description

Temporary construction shed for construction site
Technical Field
The application relates to the field of construction sheds for construction sites, in particular to a temporary construction shed for a construction site.
Background
At present at the construction site, for the convenience of staff's work, often can set up some temporary construction sheds, the staff carries out the operation in the construction canopy, for example work such as the welding of some steel constructions, and current construction canopy is most all to draw materials on the spot, adopt welding such as reinforcing bar or steel pipe to form, then cover on steel structural framework and prevent rain cloth can, such construction canopy no matter be installation or all can be very inconvenient when dismantling, and when the construction finishes, the construction canopy also can be demolishd, and the material of preparation construction canopy also can't be recycled, certain wasting of resources has been caused.
SUMMERY OF THE UTILITY MODEL
In order to provide an easy to assemble and dismantle, interim worker canopy that simultaneously can recycle, this application provides an interim construction canopy for job site.
The application provides a temporary construction canopy for job site adopts following technical scheme:
a temporary construction shed for a construction site comprises a shed frame, wherein the shed frame comprises two horizontally arranged basic rods, the two basic rods are parallel to each other, a first mounting groove arranged along the length direction of the basic rods is formed in the upper surface of the basic rods, a plurality of vertically arranged supporting rods are arranged in the first mounting groove, the bottom ends of the supporting rods are embedded in the first mounting groove, fixing bolts penetrate through the supporting rods and the basic rods, two ejector rods are arranged right above the basic rods and correspond to the two basic rods one by one respectively, the mutually corresponding ejector rods are parallel to the basic rods, a second mounting groove arranged along the length direction of the supporting rods is formed in the lower surface of the ejector rods, the top ends of the plurality of supporting rods between the mutually corresponding ejector rods and the basic rods are embedded in the second mounting groove, fixing bolts penetrate through the ejector rods and the supporting rods, and third mounting grooves arranged along the length direction of the two ejector rods are formed in the side walls facing each other, be provided with many connecting rods between two third mounting grooves, the both ends of connecting rod are inlayed respectively and are established in two third mounting grooves, and the both ends of connecting rod respectively with wear to establish fixing bolt between two ejector pins, the canopy frame upper cover is equipped with the drop cloth.
Through adopting above-mentioned technical scheme, the worker's canopy frame adopts detachable connected mode to install, and each part all adopts modular work piece to constitute for interim worker's canopy can conveniently assemble more in the installation, and when using the completion, conveniently dismantles, and can recycle.
Preferably, one end of the third mounting groove extends to the end face of one end of the ejector rod.
Through adopting above-mentioned technical scheme, make things convenient for the installation of connecting rod on the worker's canopy frame.
Preferably, the covering cloth comprises a horizontal part and two vertical parts, the horizontal part and the two vertical parts jointly form a U-shaped covering cloth with a downward opening, the two vertical parts are respectively in one-to-one correspondence with the two base rods, and a plurality of fixing pieces are arranged between the vertical parts and the base rods which are in the mutual correspondence.
Through adopting above-mentioned technical scheme, make to have had the relation of connection between drop cloth and the worker's canopy frame to make drop cloth more stable.
Preferably, the mounting includes the collar, and threaded connection has the tie bolt that sets up in the collar, and the circular shape connection chamber has been seted up to tie bolt inside, and the connecting hole that communicates with the connection chamber is seted up to tie bolt's upper surface simultaneously, connects the intracavity and rotates and be connected with the turning block, and the connecting hole internal rotation is connected with the dwang, and the dwang is in the same place with the turning block rigid coupling, and the top rigid coupling of dwang has the couple, is provided with the link on the drop cloth that the couple corresponds, and the couple hook is hung on the link.
Through adopting above-mentioned technical scheme, the staff at fixed drop cloth, at first with the drape lid establish on the worker's canopy frame, then with the couple hook on the link on the drape, later use the rotatory tie bolt of spanner to make the both ends of drape by taut, and then make the drape by fixed.
Preferably, adjacent two be provided with the wallboard between the bracing piece, the top of wallboard inlays to be established in the second mounting groove, and the bottom of wallboard inlays to be established in first mounting groove, all is provided with the roof between two adjacent connecting rods, and the both ends of roof are inlayed respectively and are established in two third mounting grooves.
Through adopting above-mentioned technical scheme, roof and wallboard can support the drop cloth on the one hand, and roof and wallboard also play certain stabilizing action to the stability of worker's canopy, and on the other hand can make the syllable-dividing effect of worker's canopy better.
Preferably, first connecting grooves are all formed in the side walls, facing each other, of the two supporting rods, the first connecting grooves are arranged along the length direction of the supporting rods, two sides of a wall plate between every two adjacent supporting rods are embedded in the first connecting grooves formed in the two supporting rods respectively, second connecting grooves are formed in the side walls, facing each other, of the two connecting rods, the second connecting grooves are arranged along the length direction of the connecting rods, and two sides of a top plate between every two adjacent supporting rods are embedded in the two second connecting grooves respectively.
Through adopting above-mentioned technical scheme, increased the relation of connection between wallboard and the bracing piece, also increased the relation of connection between roof and the connecting rod simultaneously for the stability more of worker's canopy.
Preferably, the equal rigid coupling in border at horizontal part both ends has sealed cloth, and sealed cloth adopts the tarpaulin, and the border of sealed cloth both sides is connected with two vertical portions respectively, has seted up the gate on the sealed cloth, and the last border rigid coupling in gate has the door curtain.
Through adopting above-mentioned technical scheme, sealed cloth just seals up the worker's canopy, and the staff is when carrying out the welding, can avoid the interior air inlet of worker's canopy as far as to influence staff's welding.
Preferably, the edges of the two sides of the sealing cloth are connected with the vertical part through a zipper.
Through adopting above-mentioned technical scheme, when need not be sealed in the worker's canopy, the staff can be opened by the sealed cloth at worker's canopy both ends.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the temporary shed frame is formed by combining the basic rods, the supporting rods, the ejector rods and the connecting rods, all components on the shed frame can be disassembled, and the covering cloth covers the shed frame, so that the temporary shed frame is more convenient to install and disassemble and can be recycled;
2. the fixing piece is arranged between the covering cloth and the base rod, so that the covering cloth and the work shed frame are more stable, meanwhile, the sealing cloth is arranged on the covering cloth, and a door opening and a door curtain are arranged on the sealing cloth, so that the work shed can be used under more conditions;
3. through set up the wallboard between two adjacent bracing pieces, set up the roof between two adjacent connecting rods for whole job shed frame stability more, and leakproofness and sound insulation are better.
Drawings
FIG. 1 is a schematic view showing the outer structure of a frame of a booth in the present embodiment;
FIG. 2 is a schematic view of the installation structure of the raised wall panel on the framework of the canopy in the present embodiment;
FIG. 3 is a sectional view of the ejector pin of the structure of the ejector pin of the present embodiment;
FIG. 4 is a schematic view of the installation mechanism of the convex top plate on the frame of the booth in the present embodiment;
FIG. 5 is a schematic view of the construction shed according to the present embodiment;
FIG. 6 is an enlarged partial schematic view of portion A of FIG. 5;
figure 7 is a side cross-sectional view of the fastener highlighting the internal structure of the fastener of this embodiment.
Description of reference numerals: 1. a base rod; 11. a first mounting groove; 111. a countersunk bolt; 2. a support bar; 21. a first connecting groove; 3. a top rod; 31. a second mounting groove; 32. a third mounting groove; 33. a top plate; 4. a connecting rod; 41. a second connecting groove; 5. covering cloth; 51. a horizontal portion; 52. a vertical portion; 521. hanging a ring; 6. a fixing member; 61. a mounting ring; 62. tightening the bolts; 621. a connecting cavity; 622. connecting holes; 623. rotating the block; 624. rotating the rod; 6241. hooking; 7. wall plates; 8. sealing cloth; 81. a doorway; 811. a door curtain; 9. a zipper.
Detailed Description
The present application is described in further detail below with reference to figures 1-7.
Referring to fig. 1, fig. 2, the embodiment of the application discloses a temporary construction canopy for job site, the construction canopy includes the worker's canopy frame, the worker's canopy frame includes that two levels set up in subaerial basic pole 1 particularly, two basic poles 1 are parallel to each other, the first mounting groove 11 of laying along self length direction is seted up to the upper surface of basic pole 1, evenly laid a plurality of countersunk head bolts 111 along self length direction on the diapire in the first mounting groove 11, countersunk head bolt 111 passes and wears to establish behind basic pole 1 subaerial and then be fixed in ground with basic pole 1. Be provided with the bracing piece 2 of many vertical settings in the first mounting groove 11, the bottom of bracing piece 2 inlays to be established in first mounting groove 11, and many bracing pieces 2 evenly lay along the length direction of basic pole 1. The side wall of the base rod 1 is provided with a plurality of fixing bolts for fixing the support rod 2 on the base rod 1.
Referring to fig. 2 and 3, two ejector rods 3 are arranged right above the base rod 1, the two ejector rods 3 respectively correspond to the two base rods 1 one to one, the ejector rods 3 corresponding to each other are parallel to the base rod 1, a second mounting groove 31 arranged along the length direction of the second ejector rod 3 is formed in the lower surface of the ejector rod 3, the top ends of the support rods 2 between the ejector rods 3 corresponding to each other and the base rod 1 are embedded in the second mounting groove 31, and fixing bolts are arranged between the ejector rods 3 and the support rods 2 in a penetrating mode. The third mounting groove 32 that lays along self length direction is all seted up on the lateral wall that two ejector pins 3 faced each other, and third mounting groove 32 on same ejector pin 3 is located second mounting groove 31 directly over.
Referring to fig. 3 and 4, a plurality of connecting rods 4 are arranged between the two third mounting grooves 32, the connecting rods 4 are parallel to each other, two ends of the connecting rods 4 are perpendicular to the two ejector rods 3, and two ends of the connecting rods 4 are embedded in the two third mounting grooves 32 respectively. The ejector rod 3 and the connecting rod 4 are fixed together by penetrating a fixing bolt.
Referring to fig. 5, a cover cloth 5 is sleeved on a C-shaped shed frame formed by a plurality of support rods 2 and a plurality of connecting rods 4, and the cover cloth 5 is made of waterproof cloth.
When carrying out the worker canopy and setting up, the staff at first places two basic poles 1 on subaerial, then fixes bracing piece 2 in first mounting groove 11, later is fixed in two ejector pins 3 respectively directly over two basic poles 1 again, sets up many connecting rods 4 between two third mounting grooves 32, later is fixed with two ejector pins 3 respectively with the both ends of connecting rod 4, later is fixed in subaerial with basic pole 1 again, it can on the worker canopy frame to set up drop cloth 5 at last.
Referring to fig. 4, further to facilitate the installation of the connecting rod 4, one end of the third installation groove 32 extends to the end surface of one end of the top rod 3, so that when the connecting rod 4 is installed, a worker only needs to put the positions of the two top rods 3, and then slide the connecting rod 4 into the third installation groove 32 from the open end of the third installation groove 32.
Referring to fig. 6 and 7, a fixing member 6 is arranged between two ends of the cover cloth 5 and the base rod 1, specifically, the fixing member 6 includes a mounting ring 61, a tension bolt 62 is connected to an inner thread of the mounting ring 61, the tension bolt 62 is arranged upward, a circular connecting cavity 621 is formed inside the tension bolt 62, a connecting hole 622 communicated with the connecting cavity 621 is formed in the upper surface of the tension bolt 62, a rotating block 623 is rotatably connected to the connecting cavity 621, a rotating rod 624 is rotatably connected to the connecting hole 622, the rotating rod 624 is fixedly connected with the rotating block 623, and a hook 6241 is fixedly connected to the top end of the rotating rod 624. Equal rigid coupling has a plurality of mountings 6 in the one side that two root length poles 1 deviate from each other, solid fixed ring and the 1 rigid coupling of root length pole on the mounting 6, and a plurality of mountings 6 along the length direction evenly distributed of root length pole 1, the both ends of drop cloth 5 all are provided with a plurality of links 521, a plurality of links 521 of same end on the drop cloth 5 and a plurality of mountings 6 one-to-one that this end corresponds, couple 6241 on the mounting 6 of mutual correspondence is hung on link 521.
Thus, when the cover cloth 5 is erected on the shed frame, the worker hooks the hook 6241 of the fixing member 6 on the hanging ring 521, then rotates the tension bolt 62 to move the tension bolt 62 downward, and under the action of the tension bolts 62 on the two base rods 1, the cover cloth 5 is fixed and the cover cloth 5 is tensioned.
Referring to fig. 2 and 4, a wall plate 7 is arranged between two adjacent supporting rods 2, a plurality of wall plates 7 and a plurality of supporting rods 2 on the same basic rod 1 are located in the same plane, the top end of the wall plate 7 is embedded in the second mounting groove 31, a fixing bolt is arranged between the wall plate 7 and the ejector rod 3 in a penetrating mode, the bottom end of the wall plate 7 is embedded in the first mounting groove 11, and a fixing bolt is arranged between the wall plate 7 and the basic rod 1 in a penetrating mode. All be provided with roof 33 between two adjacent connecting rods 4, polylith roof 33 and many connecting rods 4 are located the coplanar, and the both ends of roof 33 are inlayed respectively and are established in two third mounting grooves 32, all wear to be equipped with fixing bolt between the both ends of roof 33 and two ejector pins 3. Roof 33 and wallboard 7 can support drop cloth 5 on the one hand, and roof 33 and wallboard 7 also play certain stabilizing action to the stability of worker's canopy, and on the other hand can make the syllable-dividing effect of worker's canopy better.
First connecting grooves 21 are formed in the side walls, facing each other, of the two adjacent supporting rods 2, the first connecting grooves 21 are arranged along the length direction of the supporting rods 2, and two sides of the wall plate 7 between the two adjacent supporting rods 2 are embedded in the first connecting grooves 21 formed in the two supporting rods 2 respectively. Second connecting groove 41 has all been seted up on the lateral wall of two connecting rods 4 mutual orientation, and second connecting groove 41 is laid along the length direction of connecting rod 4, and inlays respectively in two second connecting grooves 41 in roof 33 both sides between two adjacent bracing pieces 2. Thus, the connection relationship between the wall plate 7 and the support rod 2 is increased, and the connection relationship between the top plate 33 and the connecting rod 4 is also increased, so that the work shed is more stable.
Referring to fig. 5, further, the cover cloth 5 includes a horizontal portion 51 and two vertical portions 52, the edges at both ends of the horizontal portion 51 are fixedly connected with a sealing cloth 8, the sealing cloth 8 is made of waterproof cloth, the edges at both sides of the sealing cloth 8 are respectively connected with the two vertical portions 52, a door opening 81 is formed in the sealing cloth 8, and a door curtain 811 is fixedly connected to the upper edge of the door opening 81. The work shed is sealed by the sealing cloth 8, and the worker can avoid air inlet in the work shed as far as possible when welding, so that the welding of the worker is influenced.
Furthermore, the edges of the two sides of the sealing cloth 8 are connected with the vertical part 52 through the zipper 9, so that when the sealing is not needed in the work shed, the working personnel can open the sealing cloth 8 at the two ends of the work shed.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. A temporary construction shed for a construction site is characterized by comprising a shed frame, wherein the shed frame comprises two horizontally arranged foundation rods (1), the two foundation rods (1) are parallel to each other, a first mounting groove (11) arranged along the length direction of the upper surface of each foundation rod (1) is formed in the upper surface of the corresponding foundation rod (1), a plurality of vertically arranged support rods (2) are arranged in the first mounting groove (11), the bottom ends of the support rods (2) are embedded in the first mounting groove (11), fixing bolts are penetrated between the support rods (2) and the foundation rods (1), two ejector rods (3) are arranged right above the foundation rods (1), the two ejector rods (3) are respectively in one-to-one correspondence with the two foundation rods (1), the corresponding ejector rods (3) are parallel to the foundation rods (1), a second mounting groove (31) arranged along the length direction of the lower surface of each ejector rod (3) is formed in a matched manner, the top of many spinal branchs vaulting pole (2) between ejector pin (3) that correspond each other and basic pole (1) all inlays and establishes in second mounting groove (31), wear to be equipped with fixing bolt between ejector pin (3) and bracing piece (2), all set up on the lateral wall of two ejector pin (3) orientation each other along third mounting groove (32) that self length direction laid, be provided with many connecting rods (4) between two third mounting grooves (32), the both ends of connecting rod (4) are inlayed respectively and are established in two third mounting grooves (32), and the both ends of connecting rod (4) wear to establish fixing bolt respectively with between two ejector pin (3), the worker canopy frame upper cover is equipped with drop cloth (5).
2. A temporary construction shed for a construction site as claimed in claim 1, wherein: one end of the third mounting groove (32) extends to the end face of one end of the ejector rod (3).
3. A temporary construction shed for a construction site as claimed in claim 1, wherein: the covering cloth (5) comprises a horizontal part (51) and two vertical parts (52), the horizontal part (51) and the two vertical parts (52) jointly form a U-shaped covering cloth (5) with a downward opening, the two vertical parts (52) are respectively in one-to-one correspondence with the two base rods (1), and a plurality of fixing pieces (6) are arranged between the vertical parts (52) and the base rods (1) which are mutually corresponding.
4. A temporary construction shed for a construction site as claimed in claim 3, wherein: mounting (6) are including collar (61), collar (61) female connection has straining bolt (62) that sets up, round shape connection chamber (621) have been seted up to straining bolt (62) inside, connecting hole (622) with being connected chamber (621) intercommunication are seted up to the upper surface of straining bolt (62) simultaneously, connecting chamber (621) internal rotation is connected with turning block (623), connecting hole (622) internal rotation is connected with dwang (624), dwang (624) and turning block (623) rigid coupling are in the same place, and the top rigid coupling of dwang (624) has couple (6241), be provided with link (521) on drop cloth (5) that couple (6241) correspond, couple (6241) hook is hung on link (521).
5. A temporary construction shed for a construction site as claimed in claim 1, wherein: two adjacent be provided with between bracing piece (2) wallboard (7), inlay on the top of wallboard (7) and establish in second mounting groove (31), inlay in first mounting groove (11) the bottom of wallboard (7), all be provided with roof (33) between two adjacent connecting rods (4), the both ends of roof (33) are inlayed respectively and are established in two third mounting grooves (32).
6. A temporary construction shed for a construction site as claimed in claim 5, wherein: all seted up first spread groove (21) on the lateral wall of two spinal branch vaulting pole (2) orientation each other, first spread groove (21) are laid along the length direction of bracing piece (2), and wallboard (7) both sides between two adjacent spinal branch vaulting poles (2) inlay respectively and establish in first spread groove (21) on two spinal branch vaulting poles (2), second spread groove (41) have all been seted up on the lateral wall of two spinal branch vaulting poles (4) orientation each other, second spread groove (41) are laid along the length direction of connecting rod (4), and roof (33) both sides between two adjacent spinal branch vaulting poles (2) inlay respectively and establish in two second spread grooves (41).
7. A temporary construction shed for a construction site as claimed in claim 3, wherein: the equal rigid coupling in border at horizontal part (51) both ends has sealed cloth (8), and sealed cloth (8) adopt the tarpaulin, and the border of sealed cloth (8) both sides is connected with two vertical portions (52) respectively, has seted up gate (81) on sealed cloth (8), and the last border rigid coupling of gate (81) has door curtain (811).
8. A temporary construction shed for a construction site as claimed in claim 7, wherein: the edges of the two sides of the sealing cloth (8) are connected with the vertical part (52) through a zipper (9).
CN202021702412.7U 2020-08-14 2020-08-14 Temporary construction shed for construction site Active CN213063162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021702412.7U CN213063162U (en) 2020-08-14 2020-08-14 Temporary construction shed for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021702412.7U CN213063162U (en) 2020-08-14 2020-08-14 Temporary construction shed for construction site

Publications (1)

Publication Number Publication Date
CN213063162U true CN213063162U (en) 2021-04-27

Family

ID=75583494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021702412.7U Active CN213063162U (en) 2020-08-14 2020-08-14 Temporary construction shed for construction site

Country Status (1)

Country Link
CN (1) CN213063162U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114934683A (en) * 2022-07-01 2022-08-23 河南远鸿建筑有限公司 Building construction safety device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114934683A (en) * 2022-07-01 2022-08-23 河南远鸿建筑有限公司 Building construction safety device
CN114934683B (en) * 2022-07-01 2024-04-09 河南远鸿建筑有限公司 Building construction safety device

Similar Documents

Publication Publication Date Title
CN213063162U (en) Temporary construction shed for construction site
US10858856B1 (en) Modular tent construction and components thereof
AU2003292712A1 (en) Crosswind-resistant outdoor tent
CN208748959U (en) Prefabricated modular assembling frame structural column-column connected node
CN211974274U (en) No counter weight hanging flower basket structure for construction
CN214786169U (en) Rain-proof cover of building site
CN210918443U (en) Outdoor tent for leisure and sports
JP2021021258A (en) Bosh device for wedge binding type scaffold and bosh device system for wedge binding type scaffold
CN205637142U (en) Take a prefabricated beam column node pin frame of curb plate
CN216713537U (en) Building site ceiling structure
CN209942292U (en) Building shed convenient to dismantle and install
CN210598087U (en) Decoration hanging flower basket for building
CN212201451U (en) Assembled heat-insulation type steel bar processing factory
CN212983930U (en) Middle part exempts from trompil retaining wall template
KR200348011Y1 (en) Structure support for a vinyl house use a wire
CN215331339U (en) Net frame external suspension construction platform
CN219671885U (en) Roofing system of plastics thatch tile assembly
CN207513060U (en) A kind of cylinder stone material dry suspending wall construction
CN103015696B (en) Hanging basket outer protective layer for super high-rise building
CN212755050U (en) Building new material show board
CN219691230U (en) Outdoor tent with lighting device
CN215564905U (en) Cooling pergola
CN205637140U (en) Support multicavity steel pipe -concrete composite post braced frame system of flat push assembly
CN209443809U (en) A kind of masonry wall bracing means
CN211229662U (en) Weather enclosure is used in cement concrete road surface construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant