CN213061743U - Assembling tool special for bridge assembly type pier stud - Google Patents

Assembling tool special for bridge assembly type pier stud Download PDF

Info

Publication number
CN213061743U
CN213061743U CN202021486044.7U CN202021486044U CN213061743U CN 213061743 U CN213061743 U CN 213061743U CN 202021486044 U CN202021486044 U CN 202021486044U CN 213061743 U CN213061743 U CN 213061743U
Authority
CN
China
Prior art keywords
pier stud
pedestal
plate
assembling
push
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021486044.7U
Other languages
Chinese (zh)
Inventor
刘洋
苏明辉
赵晓波
潘莉
赵品月郎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Monorail Transit Engineering Group Co.,Ltd.
Original Assignee
Chongqing Monorail Traffic Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Monorail Traffic Engineering Co ltd filed Critical Chongqing Monorail Traffic Engineering Co ltd
Priority to CN202021486044.7U priority Critical patent/CN213061743U/en
Application granted granted Critical
Publication of CN213061743U publication Critical patent/CN213061743U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a frock is assembled in special use of bridge assembled pier stud, including pedestal basis, assemble the pedestal, assemble the board, the push pedal, the support column with push away the material hydro-cylinder, assemble pedestal detachable and install on pedestal basis, the top of assembling the pedestal has the assembly platform, the jacking cavity has between assembly platform and the pedestal basis, the assembly board that is used for placing the pier stud is all installed to the left and right sides of assembly platform, the assembly board can be assembled the platform relatively and slide, all install the push pedal on the assembly board, the push rod that pushes away the material hydro-cylinder is articulated with the push pedal, the cylinder body that pushes away the material hydro-cylinder articulates on the support column. The utility model has the advantages that: can adjust the levelness of pier stud, can realize the position control of two pier studs through push pedal, assembly board and material pushing cylinder moreover to realize the ascending regulation of two pier studs in the axial, satisfied the requirement of assembling of pier stud and bent cap, the pier stud is adjusted conveniently moreover, improves and assembles efficiency.

Description

Assembling tool special for bridge assembly type pier stud
Technical Field
The utility model relates to a technical field, especially frock is assembled in bridge assembled pier stud special use is assembled to bridge assembled pier.
Background
At present, the construction mode of the reinforced concrete bridge is mainly cast-in-place, pier columns and capping beams which are important components of the bridge have longer construction period and larger social influence in the cast-in-place mode, and the bridge adopts the assembly type construction mode, so that the construction period can be greatly shortened, the field construction can be reduced, and the industrialized development direction can be met.
The assembled pier stud for bridge is made up through dividing the high pier into several components in vertical direction according to a certain modulus, prefabricating them in prefabricating factory around bridge site, transporting them to site by vehicle and ship, and assembling by hoisting. The main characteristics of the bridge fabricated pier column are: the prefabricated member can be prefabricated in a prefabricated field, is less interfered by the surrounding outside, but has higher requirements on transportation and hoisting mechanical equipment relatively. The splicing joint is a key process, and is firm and safe, high in splicing precision, simple in structure and convenient to construct.
Before bridge assembled pier stud, bent cap installation, pier stud and bent cap need be assembled well earlier in the mill usually, when assembling, need guarantee the axis between two pier studs and the axis collineation between the bent cap, because the weight between pier stud and the bent cap is all heavier again to lead to assembling the degree of difficulty between pier stud and the bent cap to be higher.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a frock is assembled in bridge assembled pier stud special use of convenient operation.
The purpose of the utility model is realized through the following technical scheme: frock is assembled in special use of bridge assembled pier stud, including pedestal basis, assemble the pedestal, the built-up plate, the push pedal, the support column with push away the material hydro-cylinder, assemble pedestal detachable and install on pedestal basis, the top of assembling the pedestal has the assembly platform, the jacking cavity has between assembly platform and the pedestal basis, the assembly plate that is used for placing the pier stud is all installed to assembly platform's the left and right sides, the assembly plate can be assembled the platform relatively and slide, all install the push pedal on the assembly plate, the push rod that pushes away the material hydro-cylinder is articulated with the push pedal, the cylinder body that pushes away the material hydro-cylinder articulates on the.
Preferably, the assembly platform is provided with a central axis, and the two assembly plates and the two push plates are symmetrical relative to the central axis.
Preferably, a screw is pre-embedded in the pedestal foundation, and the assembly pedestal is connected with the pedestal foundation through a bolt assembly.
Preferably, the push plate is detachably connected with the assembling plate, a reference vertical surface parallel to the central axis is arranged on the push plate, and the reference vertical surface is vertical to the upper surface of the assembling plate.
Preferably, the push plate is an L-shaped plate, rib plates are arranged on the front side and the rear side of the push plate, a pin shaft is installed on the assembling plate, and the push plate is installed on the assembling plate through the pin shaft in a positioning mode.
Preferably, install articulated seat on the lateral wall of push pedal, install rotatable articulated shaft in the articulated seat, be provided with a connecting rod on the articulated shaft, the connecting rod is connected with the push rod of assembling the hydro-cylinder.
Preferably, also be provided with articulated seat on the post, install rotatable articulated shaft in the articulated seat, be provided with a connecting rod on the articulated shaft, the connecting rod is connected with the cylinder body of assembling the hydro-cylinder.
Preferably, the left and right sides of assembly platform still is provided with the curb plate, and the curb plate still installs the arm-tie to pedestal foundation extension on the support column, and the other end of arm-tie is installed on the curb plate.
Preferably, the number of the pull plates on the column is two, and a triangle is formed among the two pull plates, the support column and the side plate.
Preferably, the support columns are I-shaped steel, and the pedestal foundation is a concrete base.
The utility model has the advantages of it is following: the utility model discloses a frock is assembled in special use of bridge assembled pier stud can adjust the levelness of pier stud, moreover through push pedal, assembly plate and push away the position control that the material hydro-cylinder can realize two pier studs to realize two pier studs and at the ascending regulation of axial, satisfied the requirement of assembling of pier stud and bent cap, the pier stud is adjusted conveniently moreover, improves and assembles efficiency.
Drawings
FIG. 1 is a schematic structural diagram of the present invention
FIG. 2 is a schematic structural diagram of the present invention
FIG. 3 is a schematic structural diagram III of the present invention
In the figure, 1-pedestal foundation, 2-splicing pedestal, 3-splicing plate, 4-push plate, 5-pushing oil cylinder, 6-hinging seat, 7-supporting column, 8-pulling plate, 9-nut, 10-hinging shaft, 11-connecting rod, 21-splicing platform, 22-jacking cavity and 23-side plate.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. The components of embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the present invention, the embodiments and the features of the embodiments may be combined with each other without conflict.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate the position or positional relationship based on the position or positional relationship shown in the drawings, or the position or positional relationship which the products of the present invention are conventionally placed in use, or the position or positional relationship which the skilled person conventionally understand, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element to which the reference is made must have a specific position, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1, fig. 2 and fig. 3, frock is assembled in special use of bridge assembled pier stud, including pedestal foundation 1, assemble pedestal 2, assemble board 3, push pedal 4, support column 7 and push away material hydro-cylinder 5, in this embodiment, pedestal foundation 1 is the concrete base, through concrete placement subaerial, when pouring, pre-buried screw rod on pedestal foundation 1, the vertical setting of screw rod, and the screw rod is outstanding the upper surface of pedestal foundation 1, pedestal foundation 1's upper surface is smooth plane, it is the steel construction to assemble pedestal 2, and set up the through-hole that corresponds with the screw rod.
In this embodiment, assemble 2 detachable of pedestal and install on pedestal basis 1, further, assemble the through-hole that corresponds with the screw rod to set up 2 bottom of pedestal, during the installation, pass the through-hole with the screw rod to lock through nut 9, nut 9 then forms bolt assembly with the screw rod, when the installation, according to actual conditions, bolt assembly still includes the gasket.
In this embodiment, the top of the assembly platform 2 has an assembly platform 21, the assembly platform 21 is provided with a central axis, after the assembly platform 21 is installed, the top of the assembly platform 21 should be kept horizontal, and the central axis should be coplanar and parallel with the axial lead of the movement of the cover beam, further, a jacking cavity 22 is provided between the assembly platform 21 and the platform foundation 1, a jack can be placed in the jacking cavity 22 according to actual requirements, when the levelness of the leveling platform needs to be adjusted, the nut 9 is loosened, then the jack works to adjust the inclined assembly platform 21 to be horizontal, then a backing plate is placed in the gap between the assembly platform 2 and the platform, the backing plate is a steel section, has strong structural strength and is not easy to crush, after the assembly platform 21 is adjusted to be horizontal through the backing plate and the jack, the nut 9 is locked, in the actual adjusting process, because assembly platform 21 is the adjustment level earlier, consequently after the pier stud was placed on assembly board 3, mostly be the fine setting to assembly platform 21's adjustment, the range of its adjustment is little.
In this embodiment, the assembling plates 3 for placing the pier stud are installed on both the left and right sides of the assembling platform 21, the assembling plates 3 can slide relative to the assembling platform 21, the pushing plates 4 are installed on the assembling plates 3, the two assembling plates 3 and the two pushing plates 4 are symmetrical relative to the central axis, the assembling plates 3 and the pushing plates 4 are both steel profiles, preferably, the assembling plates 3 are flat plates, the pushing plates 4 are L-shaped plates, in order to enhance the structural strength of the pushing plates 4, the front and rear sides of the pushing plates 4 are both provided with ribbed plates, further, the assembling plates 3 and the pushing plates 4 are provided with corresponding through holes, then pin shafts are installed in the through holes, the pin shafts are tightly matched with the through holes, thereby realizing the detachable connection of the pushing plates 4 and the assembling plates 3, so that the pushing plates 4 or the assembling plates 3 can be independently replaced, in this embodiment, the pushing plates 4 are provided with reference vertical surfaces parallel to the central axis, and the reference vertical surfaces are perpendicular to the upper surfaces of, when the pier stud is assembled, the pier stud is placed on the assembled plate 3, and then the side wall of the pier stud is required to be attached to the reference vertical surface, so that the stability of the placement position of a single pier stud is ensured, and then the positions of two pier studs are adjusted.
In this embodiment, the push rod of the pushing cylinder 5 is hinged to the push plate 4, the cylinder body of the pushing cylinder 5 is hinged to the supporting column 7, further, a hinge seat 6 is installed on the outer side wall of the push plate 4, the hinge seat 6 is composed of two steel plates arranged at intervals, a rotatable hinge shaft 10 is installed in the hinge seat 6, namely, a shaft hole is formed in each steel plate, two ends of the hinge shaft 10 are installed in the shaft hole, a connecting rod 11 is installed on the hinge shaft 10, the connecting rod 11 is arranged in a radial direction, the connecting rod 11 is connected with the push rod of the assembling cylinder, the hinge seat 6 is also installed on the supporting column 7, the rotatable hinge shaft 10 is installed in the hinge seat 6, a connecting rod 11 is installed on the hinge shaft 10, the connecting rod 11 is connected with the cylinder body of the assembling cylinder, the hinge mode of the cylinder body of the assembling cylinder and the supporting column 7, the work of assembling the oil cylinder to make the push pedal 4 and the assembling plate 3 that correspond remove, thereby drive the pier stud on the assembling plate 3 and remove, thereby adjust the relative position of two pier studs, make the axis of two pier studs and assemble the axis coplane and parallel on the platform 21, thereby accomplish the position control of pier stud.
In this embodiment, the left side and the right side of the assembly platform 21 are further provided with side plates 23, the side plates 23 extend towards the pedestal base 1, the support column 7 is further provided with pull plates 8, the other ends of the pull plates 8 are mounted on the side plates 23, further, the two pull plates 8 on the support column 7 are two, a triangle is formed among the two pull plates 8, the support column 7 and the side plates 23, when the material pushing cylinder 5 works, the material pushing cylinder 5 needs to apply reasoning on the support column 7, and the pull plates 8 can pull the support column 7, so that the support column 7 is prevented from deforming, and in order to further increase the structure of the support column 7, the support column 7 is preferably made of i-steel.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (10)

1. Frock is assembled in special use of bridge assembled pier stud, its characterized in that: including pedestal basis, assemble pedestal, built-up plate, push pedal, support column and push away the material hydro-cylinder, assemble pedestal detachable and install on pedestal basis, the top of assembling the pedestal has the built-up platform, the built-up platform with the jacking cavity has between the pedestal basis, the built-up plate that is used for placing the pier stud is all installed to the left and right sides of built-up platform, the built-up plate can be assembled the platform relatively and slide, all install on the built-up plate the push pedal, push rod that pushes away the material hydro-cylinder with the push pedal is articulated, the cylinder body that pushes away the material hydro-cylinder articulates on the support column.
2. The special assembling tool for the bridge assembled pier stud according to claim 1, wherein: the assembling platform is provided with a central axis, and the two assembling plates and the two push plates are symmetrical relative to the central axis.
3. The special assembling tool for the bridge assembled pier stud according to claim 1, wherein: the base foundation is pre-buried with the screw rod, assemble the base with the base foundation passes through bolt assembly and connects.
4. The special assembling tool for the bridge assembled pier stud according to claim 2, wherein: the push pedal with the makeup board is detachable connection, have the benchmark vertical plane parallel with the axis on the push pedal, just the benchmark vertical plane with the upper surface of makeup board is perpendicular.
5. The special assembling tool for the bridge assembled pier stud according to claim 4, wherein: the push plate is an L-shaped plate, rib plates are arranged on the front side and the rear side of the push plate, a pin shaft is installed on the assembling plate, and the push plate is installed on the assembling plate through the pin shaft in a positioning mode.
6. The special assembling tool for the bridge assembled pier stud according to claim 5, wherein: install articulated seat on the lateral wall of push pedal, install rotatable articulated shaft in the articulated seat, be provided with a connecting rod on the articulated shaft, the connecting rod is connected with the push rod of assembling the hydro-cylinder.
7. The special assembling tool for the bridge assembled pier stud according to claim 6, wherein: also be provided with articulated seat on the support column, install rotatable articulated shaft in the articulated seat, be provided with a connecting rod on the articulated shaft, the connecting rod with the cylinder body of assembling the hydro-cylinder is connected.
8. The special assembling tool for the bridge assembled pier stud according to claim 1, wherein: the left and right sides of assembly platform still is provided with the curb plate, the curb plate to the pedestal base extends, still install the arm-tie on the support column, the other end of arm-tie is installed on the curb plate.
9. The special assembling tool for the bridge assembled pier stud according to claim 8, wherein: the number of the pull plates on the supporting columns is two, and a triangle is formed among the two pull plates, the supporting columns and the side plates.
10. The special assembling tool for the bridge assembled pier stud according to claim 1, wherein: the support column is the I-steel, the pedestal basis is the concrete foundation.
CN202021486044.7U 2020-07-24 2020-07-24 Assembling tool special for bridge assembly type pier stud Active CN213061743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021486044.7U CN213061743U (en) 2020-07-24 2020-07-24 Assembling tool special for bridge assembly type pier stud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021486044.7U CN213061743U (en) 2020-07-24 2020-07-24 Assembling tool special for bridge assembly type pier stud

Publications (1)

Publication Number Publication Date
CN213061743U true CN213061743U (en) 2021-04-27

Family

ID=75577387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021486044.7U Active CN213061743U (en) 2020-07-24 2020-07-24 Assembling tool special for bridge assembly type pier stud

Country Status (1)

Country Link
CN (1) CN213061743U (en)

Similar Documents

Publication Publication Date Title
CN112411355A (en) Steel-concrete composite bridge and construction method thereof
CN210458916U (en) Bridge assembled bent cap prefabricated steel pedestal
CN111663457A (en) Assembly module, modular construction platform and method and bridge abutment construction method
CN213061743U (en) Assembling tool special for bridge assembly type pier stud
CN213061728U (en) Assembly type pier column and capping beam assembly device
CN210127654U (en) Large-span steel structure sliding device
CN111188278A (en) Jig frame structure, jig frame assembly and construction method
CN114108811B (en) Unsupported installation method of super high-rise conversion truss
CN108755438B (en) Y-shaped pier continuous beam construction pi-shaped support and installation construction method thereof
CN210127028U (en) Gantry crane end well track beam and gantry crane end well track mounting assembly
CN212452315U (en) Assembly module and modular construction platform
CN211849438U (en) Device for pile connection and perpendicularity adjustment
CN218621841U (en) Assembled pier roof beam concreties support
CN111719438A (en) Assembly type pier column and capping beam assembly device
CN108385710B (en) Reusable tower foundation and installation method thereof
CN208294163U (en) A kind of movable type assembly shop
CN215518362U (en) Take precast concrete case roof beam of anticollision wall to prevent structure of toppling
CN218931504U (en) Steel tower column segment adjusting and positioning tool
CN220848726U (en) Butt joint pouring template between beams
CN219692646U (en) Hydraulic leveling mechanism with tilting function
CN218757044U (en) Adjustable installation device for steel bridge cantilever beam crossing river
CN221420501U (en) Tower crane climbing mechanism
CN218712140U (en) Double-layer distribution beam
CN113561291B (en) Track beam mold
CN220827169U (en) Tower crane attaching device for well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.36 Jianqiao Avenue, Dadukou District, Chongqing

Patentee after: Chongqing Monorail Transit Engineering Group Co.,Ltd.