CN111719438A - Assembly type pier column and capping beam assembly device - Google Patents

Assembly type pier column and capping beam assembly device Download PDF

Info

Publication number
CN111719438A
CN111719438A CN202010724589.5A CN202010724589A CN111719438A CN 111719438 A CN111719438 A CN 111719438A CN 202010724589 A CN202010724589 A CN 202010724589A CN 111719438 A CN111719438 A CN 111719438A
Authority
CN
China
Prior art keywords
assembling
capping beam
plates
pier stud
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010724589.5A
Other languages
Chinese (zh)
Other versions
CN111719438B (en
Inventor
沈中原
刘洋
李秀江
邓明亮
黄税亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Monorail Transit Engineering Group Co.,Ltd.
Original Assignee
Chongqing Monorail Traffic Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Monorail Traffic Engineering Co ltd filed Critical Chongqing Monorail Traffic Engineering Co ltd
Priority to CN202010724589.5A priority Critical patent/CN111719438B/en
Publication of CN111719438A publication Critical patent/CN111719438A/en
Application granted granted Critical
Publication of CN111719438B publication Critical patent/CN111719438B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an assembly type pier stud and capping beam assembly device which comprises a capping beam assembly tool, a guide rail and a pier stud assembly tool, wherein the pier stud assembly tool is positioned in front of the capping beam assembly tool, and the capping beam assembly tool is arranged on the guide rail in a rolling manner; the assembling platform is detachably arranged on the platform foundation, the assembling platform is arranged at the top of the assembling platform, the jacking cavity is arranged between the assembling platform and the platform foundation, the assembling plates for placing the pier stud are arranged on the left side and the right side of the assembling platform respectively, the assembling plates can slide relative to the assembling platform, the assembling plates are respectively provided with a push plate, a push rod of a material pushing oil cylinder is hinged with the push plate, and a cylinder body of the material pushing oil cylinder is hinged on the support column; the top of the assembling trolley is a reference plane, a reference baffle and a limiting block are installed on the reference plane, the limiting block and the reference baffle are arranged at intervals, the reference baffle is perpendicular to the reference plane, and a reference inclined plane attached to the bent cap inclined plane is arranged on the limiting block. Pier stud and bent cap convenient assembling, and the assembly precision is high.

Description

Assembly type pier column and capping beam assembly device
Technical Field
The invention relates to the technical field of bridge assembly type assembly, in particular to an assembly type pier stud and capping beam assembly device.
Background
At present, the construction mode of the reinforced concrete bridge is mainly cast-in-place, pier columns and capping beams which are important components of the bridge have longer construction period and larger social influence in the cast-in-place mode, and the bridge adopts the assembly type construction mode, so that the construction period can be greatly shortened, the field construction can be reduced, and the industrialized development direction can be met.
The assembled pier stud for bridge is made up through dividing the high pier into several components in vertical direction according to a certain modulus, prefabricating them in prefabricating factory around bridge site, transporting them to site by vehicle and ship, and assembling by hoisting. The main characteristics of the bridge fabricated pier column are: the prefabricated member can be prefabricated in a prefabricated field, is less interfered by the surrounding outside, but has higher requirements on transportation and hoisting mechanical equipment relatively. The splicing joint is a key process, and is firm and safe, high in splicing precision, simple in structure and convenient to construct.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides an assembly type pier column and capping beam assembly device.
The purpose of the invention is realized by the following technical scheme: the assembling device for the assembled pier stud and the bent cap comprises a bent cap assembling tool, a guide rail and a pier stud assembling tool, wherein the pier stud assembling tool is positioned in front of the bent cap assembling tool, and the bent cap assembling tool is arranged on the guide rail in a rolling manner;
the pier stud assembling tool comprises a pedestal base, an assembling pedestal, assembling plates, a push plate, a support column and a material pushing oil cylinder, wherein the assembling pedestal is detachably arranged on the pedestal base, an assembling platform is arranged at the top of the assembling pedestal, a jacking cavity is arranged between the assembling platform and the pedestal base, the assembling plates for placing pier studs are arranged on the left side and the right side of the assembling platform, the assembling plates can slide relative to the assembling platform, the push plates are arranged on the assembling plates, a push rod of the material pushing oil cylinder is hinged with the push plate, and a cylinder body of the material pushing oil cylinder is hinged on the support column;
the tooling for assembling the cover beam comprises an assembling trolley, the top of the assembling trolley is a reference plane, a reference baffle and a limiting block are installed on the reference plane, the limiting block and the reference baffle are arranged at intervals, the reference baffle is perpendicular to the reference plane, and a reference inclined plane attached to the inclined plane of the cover beam is arranged on the limiting block.
Preferably, the assembly platform is provided with a central axis, and the two assembly plates and the two push plates are symmetrical relative to the central axis.
Preferably, a screw is pre-embedded in the pedestal base, and the assembly pedestal is connected with the pedestal base through a bolt assembly.
Preferably, the push plate is an L-shaped plate, rib plates are arranged on the front side and the rear side of the push plate, a pin shaft is installed on the assembling plate, and the push plate is installed on the assembling plate through the pin shaft in a positioning mode.
Preferably, install articulated seat on the lateral wall of push pedal, install rotatable articulated shaft in the articulated seat, be provided with a connecting rod on the articulated shaft, the connecting rod is connected with the push rod of assembling the hydro-cylinder.
Preferably, also be provided with articulated seat on the support column, install rotatable articulated shaft in the articulated seat, be provided with a connecting rod on the articulated shaft, the connecting rod is connected with the cylinder body of assembling the hydro-cylinder.
Preferably, the left and right sides of assembly platform still is provided with the curb plate, and the curb plate still installs the arm-tie to pedestal foundation extension on the support column, and the other end of arm-tie is installed on the curb plate.
Preferably, the assembling trolley comprises wheels, support frames and connecting frames, the support frames are arranged in pairs, the two support frames are arranged at intervals in parallel, the wheels are mounted at the bottoms of the support frames, the wheels are located on the guide rails and can roll relative to the support frames, the two support frames are connected through the connecting frames, and the upper surfaces of the support frames are reference planes.
Preferably, the limiting block comprises two supporting plates and a connecting plate, the two supporting plates are arranged on the reference plane in a crossing mode, the tops of the two supporting plates are connected through the connecting plate, and the upper surface of the connecting plate is a reference inclined plane.
Preferably, the number of the reference baffles is two, the reference baffles are respectively installed on the reference planes of the corresponding support frames and connected through a connecting plate, the connecting plate is arranged on the side wall, away from the limiting block, of the reference baffle, and rib plates are further arranged on the side wall, away from the limiting block, of the reference baffle.
The invention has the following advantages: according to the assembly type pier stud and capping beam assembly device, the levelness of the pier stud and the plumb lines of the two pier studs can be conveniently adjusted through the pier stud assembly tool, the levelness of the capping beam and the plumb lines of the two pier studs can be conveniently adjusted through the capping beam assembly tool, the plumb lines of the capping beam and the plumb lines of the two pier studs are collinear, and then the capping beam is moved close to the pier stud through the assembly trolley, so that the pier stud and the capping beam are convenient to assemble, and the assembly precision is high.
Drawings
FIG. 1 is a schematic structural diagram of the present invention
FIG. 2 is a schematic structural view I of a pier stud assembling tool
FIG. 3 is a schematic structural view II of the pier stud assembling tool
FIG. 4 is a schematic structural view III of a pier stud assembling tool
FIG. 5 is a schematic view of a structure of a bent cap assembling tool
FIG. 6 is a schematic view of a structure of a bent cap assembling tool
FIG. 7 is a schematic cross-sectional view of FIG. 5
In the figure, 1-pedestal foundation, 2-splicing pedestal, 3-splicing plate, 4-push plate, 5-pushing oil cylinder, 6-hinging seat, 7-supporting column, 8-pulling plate, 9-nut, 10-hinging shaft, 11-connecting rod, 12-guide rail, 21-splicing platform, 22-jacking cavity, 23-side plate, 100-pier column splicing tool, 200-cover beam splicing tool, 31-wheel, 32-supporting frame, 33-connecting frame, 34-reference baffle, 35-limiting block, 36-reference inclined plane, 37-rib plate, 38-connecting plate and 39-reference plane.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings of the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
In addition, the embodiments of the present invention and the features of the embodiments may be combined with each other without conflict.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, or orientations or positional relationships that the products of the present invention conventionally lay out when in use, or orientations or positional relationships that are conventionally understood by those skilled in the art, which are merely for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1, assembled pier stud and bent cap assembly quality, including bent cap assembly frock 200, guide rail 12 and pier stud assembly frock 100, pier stud assembly frock 100 is located bent cap assembly frock 200 the place ahead, and bent cap assembly frock 200 roll mounting is on guide rail 12, and further, pier stud assembly frock 100 is two, and one of them pier stud assembly frock 100 is located the preceding tip of pier stud, and another pier stud assembly frock 100 is located the rear end portion of pier stud.
In this embodiment, as shown in fig. 2, fig. 3 and fig. 4, the special assembling tool for the pier stud comprises a pedestal base 1, an assembling pedestal 2, an assembling plate 3, a push plate 4, a support column 7 and a material pushing cylinder 5, in this embodiment, the pedestal base 1 is a concrete base, and is poured on the ground through concrete, when pouring, a screw is pre-embedded on the pedestal base 1, the screw is vertically arranged, and protrudes out of the upper surface of the pedestal base 1, the upper surface of the pedestal base 1 is a flat plane, the assembling pedestal 2 is a steel structure, and a through hole corresponding to the screw is formed.
In this embodiment, assemble 2 detachable of pedestal and install on pedestal basis 1, further, assemble the through-hole that corresponds with the screw rod to set up 2 bottom of pedestal, during the installation, pass the through-hole with the screw rod to lock through nut 9, nut 9 then forms bolt assembly with the screw rod, when the installation, according to actual conditions, bolt assembly still includes the gasket.
In this embodiment, the top of the assembly platform 2 has an assembly platform 21, the assembly platform 21 is provided with a central axis, after the assembly platform 21 is installed, the top of the assembly platform 21 should be kept horizontal, and the central axis should be coplanar and parallel with the axial lead of the movement of the cover beam, further, a jacking cavity 22 is provided between the assembly platform 21 and the platform foundation 1, a jack can be placed in the jacking cavity 22 according to actual requirements, when the levelness of the leveling platform needs to be adjusted, the nut 9 is loosened, then the jack works to adjust the inclined assembly platform 21 to be horizontal, then a backing plate is placed in the gap between the assembly platform 2 and the platform, the backing plate is a steel section, has strong structural strength and is not easy to crush, after the assembly platform 21 is adjusted to be horizontal through the backing plate and the jack, the nut 9 is locked, in the actual adjusting process, because assembly platform 21 is the adjustment level earlier, consequently after the pier stud was placed on assembly board 3, mostly be the fine setting to assembly platform 21's adjustment, the range of its adjustment is little.
In this embodiment, the assembling plates 3 for placing the pier stud are installed on both the left and right sides of the assembling platform 21, the assembling plates 3 can slide relative to the assembling platform 21, the pushing plates 4 are installed on the assembling plates 3, the two assembling plates 3 and the two pushing plates 4 are symmetrical relative to the central axis, the assembling plates 3 and the pushing plates 4 are both steel profiles, preferably, the assembling plates 3 are flat plates, the pushing plates 4 are L-shaped plates, in order to enhance the structural strength of the pushing plates 4, the front and rear sides of the pushing plates 4 are both provided with ribbed plates, further, the assembling plates 3 and the pushing plates 4 are provided with corresponding through holes, then pin shafts are installed in the through holes, the pin shafts are tightly matched with the through holes, thereby realizing the detachable connection of the pushing plates 4 and the assembling plates 3, so that the pushing plates 4 or the assembling plates 3 can be independently replaced, in this embodiment, the pushing plates 4 are provided with reference vertical surfaces parallel to the central axis, and the reference vertical surfaces are perpendicular to the upper surfaces of, when the pier stud is assembled, the pier stud is placed on the assembled plate 3, and then the side wall of the pier stud is required to be attached to the reference vertical surface, so that the stability of the placement position of a single pier stud is ensured, and then the positions of two pier studs are adjusted.
In this embodiment, the push rod of the pushing cylinder 5 is hinged to the push plate 4, the cylinder body of the pushing cylinder 5 is hinged to the supporting column 7, further, a hinge seat 6 is installed on the outer side wall of the push plate 4, the hinge seat 6 is composed of two steel plates arranged at intervals, a rotatable hinge shaft 10 is installed in the hinge seat 6, namely, a shaft hole is formed in each steel plate, two ends of the hinge shaft 10 are installed in the shaft hole, a connecting rod 11 is installed on the hinge shaft 10, the connecting rod 11 is arranged in a radial direction, the connecting rod 11 is connected with the push rod of the assembling cylinder, the hinge seat 6 is also installed on the supporting column 7, the rotatable hinge shaft 10 is installed in the hinge seat 6, a connecting rod 11 is installed on the hinge shaft 10, the connecting rod 11 is connected with the cylinder body of the assembling cylinder, the hinge mode of the cylinder body of the assembling cylinder and the supporting column 7, the work of assembling the oil cylinder to make the push pedal 4 and the assembling plate 3 that correspond remove, thereby drive the pier stud on the assembling plate 3 and remove, thereby adjust the relative position of two pier studs, make the axis of two pier studs and assemble the axis coplane and parallel on the platform 21, thereby accomplish the position control of pier stud.
In this embodiment, the left side and the right side of the assembly platform 21 are further provided with side plates 23, the side plates 23 extend towards the pedestal base 1, the support column 7 is further provided with pull plates 8, the other ends of the pull plates 8 are mounted on the side plates 23, further, the two pull plates 8 on the support column 7 are two, a triangle is formed among the two pull plates 8, the support column 7 and the side plates 23, when the material pushing cylinder 5 works, the material pushing cylinder 5 needs to apply reasoning on the support column 7, and the pull plates 8 can pull the support column 7, so that the support column 7 is prevented from deforming, and in order to further increase the structure of the support column 7, the support column 7 is preferably made of i-steel.
In this embodiment, as shown in fig. 5, 6 and 7, the capping assembly tool includes an assembly trolley, the top of the assembly trolley is a reference plane 39, the reference plane 39 is mainly used for placing the sidewall of the capping, after the capping is placed on the reference plane 39, then the levelness of the bent cap is tested again, if the levelness does not reach the standard, a backing plate is placed on the reference plane 39 until the levelness of the bent cap reaches the standard, further, a reference baffle 34 and a limiting block 35 are installed on the reference plane 39, the limiting block 35 and the reference baffle 34 are arranged at intervals, the reference baffle 34 is vertical to the reference plane 39, when the bent cap is placed, the left side wall of the bent cap is attached to the reference plane 39, so that the initial positioning function is realized for the placement of the cover plate, the positioning of other surfaces of the bent cap is facilitated, and there is a location when the bent cap is initially placed, so that the versatility of the tool can be increased.
In this embodiment, be provided with the benchmark inclined plane 36 with the bent cap inclined plane laminating on the stopper 35, after the bent cap was placed, the left side wall and the laminating of benchmark baffle 34 of bent cap, the right side of bent cap is spacing through benchmark inclined plane 36 again to make whole bent cap put the back, and the steadiness can obtain guaranteeing, thereby be convenient for the regulation of bent cap levelness.
In this embodiment, the assembling trolley comprises wheels 1, support frames 32 and a connecting frame 33, the support frames 32 are arranged in pairs, and the two support frames 32 are arranged in parallel at intervals, the bottom of the support frame 32 is provided with a plurality of wheels 1, the wheels 1 are positioned on the guide rails 12 and can roll relative to the support frames 32, the mounting mode of the wheels 1 and the wheel 1 frames is the prior art, for example, the wheel 1 frames are mounted at the bottom of the support frame 32, the wheel 1 frames are provided with rotating shafts, and the wheels 1 are mounted at the two ends of the rotating shafts, because the cover beam has heavy dead weight, after the cover beam is placed on the support frame 32, the assembling trolley can not move under the action of left and right thrust, and when a base plate is placed, after the levelness of the cover beam is measured, the cover beam is lifted by a gantry crane, then a proper base plate is placed on the reference plane 39, and finally the cover beam is, the levelness of the bent cap is measured again, in the actual working process, the bent cap is manufactured according to the installation standard size, and the assembling tool is designed according to the design size of the bent cap, so that after the bent cap is placed on the reference plane 39, the cover is adjusted by the positioning of the reference baffle 34 and the reference inclined plane 36, the cover is not adjusted by a large range, and most of the cover is subjected to fine adjustment, so that the assembling efficiency of the bent cap is improved.
In the embodiment, the two support frames 32 are connected through the plurality of connecting frames 33, the upper surface of each support frame 32 is a reference plane 39, preferably, the support frames 32 are i-shaped steel, the upper surface of the i-shaped steel is the reference plane 39, the two ends of each connecting frame 33 are connected with the waist wall of the i-shaped steel, and the two support frames 32 are connected through the connecting frames 33, so that the structural strength of the assembly trolley is ensured.
In this embodiment, the limiting block 35 includes two supporting plates and a connecting plate 38, the two supporting plates are installed on the reference plane 39 in a crossing manner, the tops of the two supporting plates are connected through the connecting plate 38, and the upper surface of the connecting plate 38 is the reference inclined surface 36, so that the limiting block 35 is a hollow structure, thereby saving steel sections and reducing manufacturing cost.
In this embodiment, the reference baffles 34 are two, and install respectively on the datum plane 39 of corresponding support frame 32, and two reference baffles 34 are connected through connecting plate 38, connecting plate 38 sets up on the lateral wall that the stopper 35 was kept away from to reference baffle 34, furthermore, still be provided with floor 37 on the lateral wall of keeping away from the stopper 35 on the reference baffle 34, floor 37 is installed at the top of support frame 32 through the welded mode, thereby guaranteed the structural strength of reference baffle 34, make it non-deformable, thereby improved the life of reference baffle 34.
The working process of the invention is as follows: placing the pier stud on the assembly plate through a lifting device, attaching the side wall of the pier stud to a reference vertical surface, detecting the levelness of the pier stud by using a level meter, lifting the pier stud if the levelness does not reach the standard, then placing a proper base plate on the assembly platform, adjusting the relative position relationship of the two pier studs after the levelness of the pier stud reaches the standard to align the central axis between the two pier studs with the central axis on the assembly pedestal, thereby completely adjusting the pier stud, then placing the capping beam on the capping beam assembly tool, firstly adjusting the levelness of the capping beam, moving the capping beam after adjusting the levelness of the capping beam to make the central axis of the capping beam and the central axis between the two pier studs collinear, finally applying a thrust on the assembly trolley to move the assembly trolley, thereby moving the capping beam towards the pier stud, and then connecting reinforcing steel bars on the pier stud and the capping beam are connected and locked through nuts after the assembly trolley is moved to the right place, thereby completing the assembly between the pier stud and the bent cap.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.

Claims (10)

1. Assembled pier stud and bent cap assembly quality, its characterized in that: the device comprises a bent cap assembling tool, a guide rail and a pier stud assembling tool, wherein the pier stud assembling tool is positioned in front of the bent cap assembling tool, and the bent cap assembling tool is arranged on the guide rail in a rolling manner;
the pier stud assembling tool comprises a pedestal foundation, an assembling pedestal, assembling plates, a push plate, a support column and a material pushing oil cylinder, wherein the assembling pedestal is detachably installed on the pedestal foundation, an assembling platform is arranged at the top of the assembling pedestal, a jacking cavity is arranged between the assembling platform and the pedestal foundation, the assembling plates for placing pier studs are installed on the left side and the right side of the assembling platform, the assembling plates can slide relative to the assembling platform, the push plate is installed on the assembling plates, a push rod of the material pushing oil cylinder is hinged to the push plate, and a cylinder body of the material pushing oil cylinder is hinged to the support column;
the capping beam assembling tool comprises an assembling trolley, the top of the assembling trolley is a reference plane, a reference baffle and a limiting block are installed on the reference plane, the limiting block and the reference baffle are arranged at intervals, the reference baffle is perpendicular to the reference plane, and a reference inclined plane attached to the capping beam inclined plane is arranged on the limiting block.
2. The assembly type pier column and capping beam assembly device according to claim 1, wherein: the assembling platform is provided with a central axis, and the two assembling plates and the two push plates are symmetrical relative to the central axis.
3. The assembly type pier column and capping beam assembly device according to claim 2, wherein: the base is pre-buried with the screw rod, assemble the pedestal with the pedestal basis passes through bolt assembly and connects.
4. The assembly type pier column and capping beam assembly device according to claim 3, wherein: the push plate is an L-shaped plate, rib plates are arranged on the front side and the rear side of the push plate, a pin shaft is installed on the assembling plate, and the push plate is installed on the assembling plate through the pin shaft in a positioning mode.
5. The assembly type pier stud and capping beam assembly device according to claim 4, wherein: install articulated seat on the lateral wall of push pedal, install rotatable articulated shaft in the articulated seat, be provided with a connecting rod on the articulated shaft, the connecting rod with the push rod of assembling the hydro-cylinder is connected.
6. The assembly type pier stud and capping beam assembly device according to claim 5, wherein: also be provided with articulated seat on the support column, install rotatable articulated shaft in the articulated seat, be provided with a connecting rod on the articulated shaft, the connecting rod with the cylinder body of assembling the hydro-cylinder is connected.
7. The assembly type pier column and capping beam assembly device according to claim 6, wherein: the left and right sides of assembly platform still is provided with the curb plate, the curb plate to the pedestal base extends, still install the arm-tie on the support column, the other end of arm-tie is installed on the curb plate.
8. The assembly type pier column and capping beam assembly device according to claim 1, wherein: the assembling trolley comprises wheels, supporting frames and connecting frames, the supporting frames are arranged in pairs, the two supporting frames are arranged at intervals in parallel, a plurality of wheels are installed at the bottoms of the supporting frames, the wheels are located on the guide rails and can roll relative to the supporting frames, the two supporting frames are connected through the connecting frames, and the upper surfaces of the supporting frames are reference planes.
9. The assembly type pier column and capping beam assembly device according to claim 8, wherein: the stopper includes two backup pads and a connecting plate, two the backup pad span install on the reference plane, two the top of backup pad is passed through the connecting plate is connected, the upper surface of connecting plate is the benchmark inclined plane.
10. The assembly type pier stud and capping beam assembly device according to claim 9, wherein: the two reference baffles are respectively installed on the corresponding reference planes of the support frame and connected through a connecting plate, the connecting plate is arranged on the side wall of the limit block far away from the reference baffles, and rib plates are further arranged on the side wall of the limit block far away from the reference baffles.
CN202010724589.5A 2020-07-24 2020-07-24 Assembling device for assembled pier column and bent cap Active CN111719438B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010724589.5A CN111719438B (en) 2020-07-24 2020-07-24 Assembling device for assembled pier column and bent cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010724589.5A CN111719438B (en) 2020-07-24 2020-07-24 Assembling device for assembled pier column and bent cap

Publications (2)

Publication Number Publication Date
CN111719438A true CN111719438A (en) 2020-09-29
CN111719438B CN111719438B (en) 2024-07-02

Family

ID=72573513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010724589.5A Active CN111719438B (en) 2020-07-24 2020-07-24 Assembling device for assembled pier column and bent cap

Country Status (1)

Country Link
CN (1) CN111719438B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208478A (en) * 2017-06-30 2019-01-15 中交第二航务工程局有限公司 A kind of prefabricated assembled bridge integration rapid constructing method
CN109811642A (en) * 2019-03-12 2019-05-28 上海市城市建设设计研究总院(集团)有限公司 Assembled prefabricated assembly bent cap structure and its construction method
CN111172864A (en) * 2020-02-20 2020-05-19 浙江省交通规划设计研究院有限公司 Assembly type integrated pier column and capping beam combined structure and construction method thereof
CN213061728U (en) * 2020-07-24 2021-04-27 重庆单轨交通工程有限责任公司 Assembly type pier column and capping beam assembly device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208478A (en) * 2017-06-30 2019-01-15 中交第二航务工程局有限公司 A kind of prefabricated assembled bridge integration rapid constructing method
CN109811642A (en) * 2019-03-12 2019-05-28 上海市城市建设设计研究总院(集团)有限公司 Assembled prefabricated assembly bent cap structure and its construction method
CN111172864A (en) * 2020-02-20 2020-05-19 浙江省交通规划设计研究院有限公司 Assembly type integrated pier column and capping beam combined structure and construction method thereof
CN213061728U (en) * 2020-07-24 2021-04-27 重庆单轨交通工程有限责任公司 Assembly type pier column and capping beam assembly device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李泽鹏;赵洪学;唐宏亮;包龙生;: "装配式桥墩施工工艺及其应用", 北方交通, no. 04, 20 April 2019 (2019-04-20) *

Also Published As

Publication number Publication date
CN111719438B (en) 2024-07-02

Similar Documents

Publication Publication Date Title
CN109680568B (en) Track beam line shape adjusting equipment and method
CN211772901U (en) Space abnormal shape steel case arch rib installation device
CN213061728U (en) Assembly type pier column and capping beam assembly device
CN215052151U (en) Temporary supporting device for bridge construction
CN113718627A (en) Construction method for adjusting gravity center of open bridge body
CN115743460B (en) Construction method of offshore floating wind power platform
CN111719438A (en) Assembly type pier column and capping beam assembly device
CN209958161U (en) Linear adjusting equipment of track beam
CN208380117U (en) The full-automatic aligning apparatus of cantilever steel girder
CN113738125B (en) Construction method for lifting limited-space large-span steel structure of station house under line
CN108374350B (en) Assembly jig frame of steel anchor beam and steel corbel unit and installation method
CN111335188B (en) Hanging beam for prefabricating No. 1 box beam with small curvature radius and hanging and splicing cast-in-situ No. 0 box beam
CN216105793U (en) End beam jacking jig frame
CN213061743U (en) Assembling tool special for bridge assembly type pier stud
CN211922331U (en) Hanging beam formed by splicing prefabricated No. 1 box beam with small curvature radius and cast-in-place No. 0 box beam in hanging mode
CN107938854A (en) A kind of steel girder erection method using built-in fitting
CN108643595B (en) Full-automatic correcting device for cantilever steel beam and construction method thereof
CN103072004B (en) Installation method of electric hoist hanger
CN218931504U (en) Steel tower column segment adjusting and positioning tool
CN219665617U (en) Control device for on-site accurate assembly of steel anchor beam and steel corbel
CN114873470B (en) Method for hoisting in four-beam bridge crane factory building
CN219692646U (en) Hydraulic leveling mechanism with tilting function
CN213061744U (en) Assembling tool special for bridge assembled bent cap
CN219080340U (en) Integral lining rack for deep foundation pit wall construction and large template connecting structure thereof
CN220150100U (en) Truss type double-column two-side cantilever type bent cap support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.36 Jianqiao Avenue, Dadukou District, Chongqing

Patentee after: Chongqing Monorail Transit Engineering Group Co.,Ltd.

Country or region after: China

Address before: No. 36 Jianqiao Avenue, Dadukou District, Chongqing

Patentee before: CHONGQING MONORAIL TRAFFIC ENGINEERING CO.,LTD.

Country or region before: China