CN210127028U - Gantry crane end well track beam and gantry crane end well track mounting assembly - Google Patents

Gantry crane end well track beam and gantry crane end well track mounting assembly Download PDF

Info

Publication number
CN210127028U
CN210127028U CN201921039236.0U CN201921039236U CN210127028U CN 210127028 U CN210127028 U CN 210127028U CN 201921039236 U CN201921039236 U CN 201921039236U CN 210127028 U CN210127028 U CN 210127028U
Authority
CN
China
Prior art keywords
gantry crane
layer
end well
beams
crane end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921039236.0U
Other languages
Chinese (zh)
Inventor
彭智佳
胡恒
徐厚庆
刘文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201921039236.0U priority Critical patent/CN210127028U/en
Application granted granted Critical
Publication of CN210127028U publication Critical patent/CN210127028U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application relates to the field of gantry crane track installation, in particular to a gantry crane end well track beam and a gantry crane end well track installation assembly, wherein the gantry crane end well track installation assembly comprises the gantry crane end well track beam, the gantry crane end well track beam comprises a first layer and a second layer, the first layer comprises a plurality of I-shaped steels spliced along the width direction, the second layer comprises a plurality of H-shaped steels arranged along the length direction of the I-shaped steels, and each H-shaped steel spans the plurality of I-shaped steels and is fixedly connected with the H-shaped steels; the first layer is fixedly connected with the foundation of the portal crane end well, the second layer is fixedly connected with the portal crane end well track, and the portal crane end well track is arranged along the length direction of the I-steel. The track beam can be firstly assembled outside the field, and after the track beam is assembled and molded outside the field, the reproducing field is assembled at the position of the end well, so that compared with a form of closing a mold and pouring on the spot, the track beam does not need to wait for molding on the spot, and the time of on-site construction can be greatly saved.

Description

龙门吊端头井轨道梁及龙门吊端头井轨道的安装组件Gantry crane end well track beam and gantry crane end well track installation components

技术领域technical field

本申请涉及龙门吊轨道安装领域,具体而言,涉及龙门吊端头井轨道梁及龙门吊端头井轨道的安装组件。The present application relates to the field of gantry crane track installation, and in particular, to a gantry crane end well track beam and an installation assembly for the gantry crane end well track.

背景技术Background technique

龙门吊在各种大型结构的吊装中是必不可少的工具,但在地铁工程施工中,龙门吊多作为辅助设备临时性使用,因此在地铁施工现场龙门吊轨道基础一般没有专门的设计,而是大多由施工单位技术人员自行设计。目前地铁车站端头井处广泛采用钢筋混凝土条形或者T形基础,一般采用现场关模浇筑成型,施工时间长。Gantry cranes are an indispensable tool in the hoisting of various large-scale structures, but in the construction of subway projects, gantry cranes are mostly used temporarily as auxiliary equipment. The technical personnel of the construction unit design by themselves. At present, reinforced concrete strip or T-shaped foundations are widely used at the end wells of subway stations, which are generally formed by on-site closed formwork casting, and the construction time is long.

实用新型内容Utility model content

本申请旨在提供一种龙门吊端头井轨道梁及龙门吊端头井轨道的安装组件,以解决现有技术中的龙门吊端头井轨道梁现场施工不便、周期长的问题。The present application aims to provide a gantry crane end well track beam and an installation assembly for the gantry crane end well track, so as to solve the problems of inconvenient on-site construction and long period of the gantry crane end well track beam in the prior art.

本申请的实施例是这样实现的:The embodiments of the present application are implemented as follows:

第一方面,本申请实施例提供一种龙门吊端头井轨道梁,其包括第一层和第二层,所述第一层包括沿宽度方向拼接的多根工字钢,所述第二层包括多根H型钢,所述多根H型钢沿所述工字钢的长度方向排列,每根所述H型钢横跨所述多根工字钢并与所述多根工字钢固定连接;In a first aspect, an embodiment of the present application provides a gantry crane head well track beam, which includes a first layer and a second layer, the first layer includes a plurality of I-beams spliced along the width direction, and the second layer Including a plurality of H-beams, the plurality of H-beams are arranged along the length direction of the I-beams, and each of the H-beams spans the plurality of I-beams and is fixedly connected with the plurality of I-beams;

所述第一层与龙门吊端头井的基础固定连接,所述第二层用于与龙门吊端头井轨道固定连接以支撑所述龙门吊端头井轨道。The first layer is fixedly connected with the foundation of the gantry crane end well, and the second layer is used for fixed connection with the gantry crane end well track to support the gantry crane end well track.

本申请提供的龙门吊端头井轨道梁(以下简称“轨道梁”)由第一层的工字钢和第二层的H型钢组装成型,其可以首先在场外组装,场外组装成型后,再现场组装于端头井位置处,相较于现场关模浇筑的形式,无需现场等待成型,可以大大节省现场施工时间。The gantry crane end well track beam (hereinafter referred to as "track beam") provided by this application is assembled and formed by the I-beam of the first layer and the H-beam of the second layer. It is assembled on site at the position of the end well. Compared with the form of on-site closed form casting, there is no need to wait for molding on site, which can greatly save on-site construction time.

在本申请的一种实施例中,可选地,相邻的所述H型钢间隔设置。In an embodiment of the present application, optionally, the adjacent H-beams are arranged at intervals.

H型钢的主要作用是承接钢轨、拉结工字钢、垫高钢轨,通过将H型钢间隔设置可以在满足要求的情况下减轻自重、节省材料。The main function of H-beams is to undertake rails, tie I-beams, and elevate rails. By setting H-beams at intervals, the self-weight and materials can be reduced while meeting the requirements.

在本申请的一种实施例中,可选地,所述第二层设有轨道压板,所述轨道压板与所述H型钢连接夹紧所述龙门吊端头井轨道;所述H型钢、所述轨道压板分别预留有螺纹孔,所述轨道压板与所述H型钢采用与所述螺纹孔适配的对穿螺杆固定连接。In an embodiment of the present application, optionally, the second layer is provided with a rail pressing plate, and the rail pressing plate is connected with the H-shaped steel to clamp the rail of the gantry crane end well; The rail pressing plates are respectively provided with threaded holes, and the rail pressing plates and the H-shaped steel are fixedly connected by the opposite threaded screws adapted to the threaded holes.

H型钢间隔设置,H型钢上预留螺纹孔,对穿螺杆穿过轨道压板与H型钢,可以方便在H型钢的下表面固定和拆卸螺母,方便安装轨道压板,也方便使用完成后拆卸回收。通过设置轨道压板与H型钢配合进一步压紧龙门吊端头井轨道,抵抗龙门吊端头井轨道脱离的力为H型钢施加的拉力与轨道压板施加的压力的合力,H型钢与龙门吊端头井轨道之间的拉力减小,龙门吊端头井轨道不容易脱离连接H型钢。The H-beams are set at intervals, and the threaded holes are reserved on the H-beams. The opposite-threading screws pass through the rail pressing plate and the H-beams, which can facilitate fixing and removing the nuts on the lower surface of the H-beams, which is convenient for installing the rail pressing plates, and also convenient for disassembly and recycling after use. By setting the track pressure plate to cooperate with the H-beam to further compress the gantry crane end well track, the force against the gantry crane end well track being detached is the resultant force of the tensile force exerted by the H-beam and the pressure exerted by the track pressure plate, and the relationship between the H-beam and the gantry crane end well track The tension between the gantry cranes is reduced, and the gantry crane end well track is not easy to be disconnected from the H-beam.

在本申请的一种实施例中,可选地,相邻的所述工字钢沿长度方向对接焊缝满焊。通过将相邻工字钢沿长度方向对接满焊,工字钢之间的连接点增多,连接稳定。In an embodiment of the present application, optionally, the butt welds of the adjacent I-beams are fully welded along the length direction. By butt welding the adjacent I-beams along the length direction, the connection points between the I-beams are increased and the connection is stable.

在本申请的一种实施例中,可选地,所述H型钢与所述工字钢角焊连接,且沿所述H型钢的长度方向满焊。通过将H型钢沿长度方向满焊于工字钢上,H型钢能够稳定固定,能够很好地承接上部的龙门吊且H型钢对每个工字钢都起到拉结的效果,相邻的工字钢的连接节点受力降低,不容易发生破坏。In an embodiment of the present application, optionally, the H-shaped steel is connected to the I-beam by fillet welding, and is fully welded along the length direction of the H-shaped steel. By fully welding the H-beam to the I-beam along the length direction, the H-beam can be stably fixed, can well carry the upper gantry crane, and the H-beam has the effect of tying each I-beam. The connecting node of the steel beam is less stressed and less prone to damage.

在本申请的一种实施例中,可选地,所述第一层的工字钢为五根,每根所述工字钢的翼缘宽度为180mm、高度为630mm。In an embodiment of the present application, optionally, there are five I-beams in the first layer, and each I-beam has a flange width of 180 mm and a height of 630 mm.

在本申请的一种实施例中,可选地,所述第二层的H型钢的翼缘宽度为255mm、高度为250mm。In an embodiment of the present application, optionally, the width of the flange of the H-shaped steel of the second layer is 255 mm and the height is 250 mm.

在本申请的一种实施例中,可选地,相邻的所述H型钢的间隔为0.5m。龙门吊在轨道上运行的速度一般较慢,一般停留在同一地方的时间较长,发明人经过多次实验,发现每隔0.5m设置一根H型钢既能够减小轨道梁的自重、节省成本,又能够满足承载力要求。In an embodiment of the present application, optionally, the interval between adjacent H-beams is 0.5m. The speed of the gantry crane running on the track is generally slow, and it generally stays in the same place for a long time. After many experiments, the inventor found that setting an H-beam every 0.5m can reduce the self-weight of the track beam and save the cost. It can also meet the bearing capacity requirements.

第二方面,本申请提供一种龙门吊端头井轨道的安装组件,其包括铺设于所述龙门吊端头井的基础上的混凝土调平层,及上述的龙门吊端头井轨道梁;所述龙门吊端头井轨道梁跨设于龙门吊端头井,且所述龙门吊端头井轨道梁的两端与所述混凝土调平层固定连接。In a second aspect, the present application provides an installation assembly for a gantry crane end well track, which includes a concrete leveling layer laid on the foundation of the gantry crane end well, and the above-mentioned gantry crane end well track beam; the gantry crane The end well track beam is arranged across the gantry crane end well, and both ends of the gantry crane end well track beam are fixedly connected to the concrete leveling layer.

通过包括混凝土调平层和轨道梁的组件,混凝土调平层可以在基础浇筑后浇筑,对工期影响较小,轨道梁组件主要用于支撑端头井轨道,混凝土调平层用于调节轨道梁的水平度和高度。一般来说,基础规格需要按照设计要求来修筑,不能随意更改。当轨道梁两端的基础不等高时,混凝土调平层调节至两边等高,以使轨道梁大致水平;当端头井轨道低于其前后的路面轨道时,可以按照需要调节混凝土调平层的厚度,以垫高轨道梁从而将端头井轨道固定在适合的高度。本申请提供的龙门吊端头井轨道的安装组件具有方便快速铺装的特点,端头井轨道可以与龙门吊端头井轨道梁组装好之后吊装拼接在路面轨道之间,无需等待端头井轨道梁现场浇筑后再行铺装整体轨道,铺装速度快,工期短;并且方便调节端头井轨道的水平度和高度。By including the components of the concrete leveling layer and the track beam, the concrete leveling layer can be poured after the foundation is poured, which has little impact on the construction period. The track beam component is mainly used to support the end well track, and the concrete leveling layer is used to adjust the track beam. level and height. Generally speaking, the basic specifications need to be built according to the design requirements and cannot be changed arbitrarily. When the foundations at both ends of the track beam are not of equal height, the concrete leveling layer should be adjusted to the same height on both sides, so that the track beam is roughly horizontal; when the end well track is lower than the road track before and after it, the concrete leveling layer can be adjusted as required thickness to raise the track beams to hold the end well track at a suitable height. The installation assembly of the gantry crane end well track provided by the present application has the characteristics of convenient and rapid installation. The end well track can be assembled with the gantry crane end well track beam and then hoisted and spliced between the road rails, without waiting for the end well track beam. The overall track is paved after the on-site pouring, the paving speed is fast, the construction period is short; and the levelness and height of the end well track are easily adjusted.

在本申请的一种实施例中,可选地,所述混凝土调平层预埋有承压钢板,所述承压钢板与所述龙门吊端头井轨道梁的第一层固定连接。In an embodiment of the present application, optionally, a pressure-bearing steel plate is pre-embedded in the concrete leveling layer, and the pressure-bearing steel plate is fixedly connected to the first layer of the rail beam of the gantry crane end well.

通过在混凝土调平层的上表面预埋承压钢板,以便于通过焊接、锚接等方式固定轨道梁。By pre-embedding the bearing steel plate on the upper surface of the concrete leveling layer, it is convenient to fix the track beam by welding, anchoring, etc.

附图说明Description of drawings

为了更清楚地说明本申请实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本申请的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the embodiments of the present application more clearly, the following drawings will briefly introduce the drawings that need to be used in the embodiments. It should be understood that the following drawings only show some embodiments of the present application, and therefore do not It should be regarded as a limitation of the scope, and for those of ordinary skill in the art, other related drawings can also be obtained according to these drawings without any creative effort.

图1为本申请实施例提供的龙门吊端头井轨道梁及端头井轨道的立体示意图;1 is a schematic perspective view of a gantry crane end well rail beam and an end well track provided by an embodiment of the present application;

图2为本申请实施例提供的龙门吊端头井轨道梁及端头井轨道的第一视角平面示意图;2 is a schematic plan view from a first perspective of the gantry crane end well track beam and the end well track provided by the embodiment of the present application;

图3为本申请实施例提供的龙门吊端头井轨道梁及端头井轨道的第二视角平面示意图;3 is a schematic plan view from a second perspective of the gantry crane end well track beam and the end well track provided by the embodiment of the present application;

图4为本申请实施例提供的龙门吊端头井轨道梁及端头井轨道的第三视角平面示意图。FIG. 4 is a schematic plan view from a third perspective of a gantry crane end well track beam and end well track provided by an embodiment of the present application.

图标:20-端头井轨道;30-基础;40-路面;100-轨道梁;110-第一层;120-第二层;200-混凝土调平层;210-承压钢板;300-轨道压板。Icons: 20 - end well track; 30 - foundation; 40 - road surface; 100 - track beam; 110 - first floor; 120 - second floor; 200 - concrete leveling layer; 210 - bearing steel plate; 300 - track platen.

具体实施方式Detailed ways

为使本申请实施例的目的、技术方案和优点更加清楚,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本申请一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本申请实施例的组件可以以各种不同的配置来布置和设计。In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of the present application, but not all of the embodiments. The components of the embodiments of the present application generally described and illustrated in the drawings herein may be arranged and designed in a variety of different configurations.

因此,以下对在附图中提供的本申请的实施例的详细描述并非旨在限制要求保护的本申请的范围,而是仅仅表示本申请的选定实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。Thus, the following detailed description of the embodiments of the application provided in the accompanying drawings is not intended to limit the scope of the application as claimed, but is merely representative of selected embodiments of the application. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present application.

应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters refer to like items in the following figures, so once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.

在本申请的描述中,需要说明的是,若出现术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该申请产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。此外,本申请的描述中若出现术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of this application, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" appear ” and other indications are based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship that the product of the application is usually placed in use, and are only for the convenience of describing the application and simplifying the description, rather than indicating Or imply that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as a limitation of the present application. In addition, if the terms "first", "second" and the like appear in the description of the present application, they are only used to distinguish the description, and should not be understood as indicating or implying relative importance.

此外,本申请的描述中若出现术语“水平”、“竖直”等术语并不表示要求部件绝对水平或悬垂,而是可以稍微倾斜。如“水平”仅仅是指其方向相对“竖直”而言更加水平,并不是表示该结构一定要完全水平,而是可以稍微倾斜。Furthermore, the appearance of the terms "horizontal", "vertical" and the like in the description of the present application does not mean that the component is required to be absolutely horizontal or overhang, but may be slightly inclined. For example, "horizontal" only means that its direction is more horizontal than "vertical", it does not mean that the structure must be completely horizontal, but can be slightly inclined.

在本申请的描述中,还需要说明的是,除非另有明确的规定和限定,若出现术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本申请中的具体含义。In the description of this application, it should also be noted that, unless otherwise expressly specified and limited, the terms "arranged", "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed The connection can also be a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be internal communication between two components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood in specific situations.

实施例Example

本申请实施例提供一种龙门吊端头井轨道梁100(以下简称“轨道梁100”),参照附图1、附图2和附图3所示,该轨道梁100设置于端头井轨道20和基础30之间。The embodiment of the present application provides a gantry crane end well track beam 100 (hereinafter referred to as "track beam 100"), as shown in FIG. 1 , FIG. 2 and FIG. 3 , the track beam 100 is arranged on the end well track 20 and base 30.

参照附图2、附图3、附图4所示,上述的轨道梁100包括第一层110和第二层120,第一层110与第二层120固定连接为一体。Referring to FIG. 2 , FIG. 3 , and FIG. 4 , the above-mentioned track beam 100 includes a first layer 110 and a second layer 120 , and the first layer 110 and the second layer 120 are fixedly connected as a whole.

第一层110为多根工字钢沿其宽度方向拼接而成的格式结构,参照附图3所示,相邻的工字钢的翼缘边缘相接并固定,固定方式可以是焊接、粘结或锚接等,本实施例中,采用对接焊缝满焊的方式焊接固定,即沿工字钢的长度方向对接焊接满焊。可选地,在满足受力需求的情况下,也可以点焊连接。The first layer 110 is a format structure formed by splicing a plurality of I-beams along its width direction. Referring to Figure 3, the flange edges of adjacent I-beams are connected and fixed, and the fixing method can be welding, sticking. Knots or anchors, etc., in this embodiment, the butt weld is fully welded, that is, the butt welding is fully welded along the length direction of the I-beam. Optionally, in the case of meeting the force requirements, it can also be connected by spot welding.

第二层120为铺设固定在第一层110上部的多根H型钢,参照附图2所示,多根H型钢的沿工字钢的长度方向排列,每根H型钢横跨在第一层110的多根工字钢上,并与工字钢固定连接,固定方式可以是焊接、粘结、锚接等,本实施例中,采用角焊的方式固定,沿H型钢的长度方向(即第一层110的宽度方向)满焊。可选地,在满足受力需求的情况下,也可以点焊连接。The second layer 120 is a plurality of H-beams laid and fixed on the upper part of the first layer 110. Referring to FIG. 2, the plurality of H-beams are arranged along the length of the I-beam, and each H-beam spans the first layer. 110 on multiple I-beams, and are fixedly connected with the I-beams. The fixing method can be welding, bonding, anchoring, etc. The width direction of the first layer 110) is fully welded. Optionally, in the case of meeting the force requirements, it can also be connected by spot welding.

轨道梁100的第一层110主要承受来自上部的压力,使用多个工字钢沿宽度方向拼接形成格式结构,第一层110在满足承受上部传来的压力的情况下,自重较轻,可以减少下部基础30的负荷;另外,第一层110的宽度可以根据端头井基础30的宽度进行调整,端头井基础30较宽则多拼接几个工字钢、基础30较窄则减少工字钢,具有安装方便、适用性强的特点,在基础30较宽时还能够尽可能增大受力面积,防止基础30局部应力过大。第二层120直接承受钢轨的压力,使用多个H型钢拉结横跨铺设在工字钢表面,H型钢将钢轨传来的力传递给轨道梁100的第一层110,增大了第一层110的受力面积,防止第一层110的局部应力过大,并且H型钢起到拉结多根工字钢的作用,在H型钢的拉结作用下,相邻的工字钢的拼接节点不容易发生破坏。The first layer 110 of the track beam 100 mainly bears the pressure from the upper part, and uses a plurality of I-beams to form a grid structure by splicing along the width direction. Reduce the load of the lower foundation 30; in addition, the width of the first layer 110 can be adjusted according to the width of the end well foundation 30. If the end well foundation 30 is wider, a few more I-beams are spliced, and the foundation 30 is narrower to reduce labor. The steel beam has the characteristics of convenient installation and strong applicability. When the foundation 30 is wide, the stress area can be increased as much as possible to prevent the local stress of the foundation 30 from being too large. The second layer 120 directly bears the pressure of the rail, and is laid across the surface of the I-beam by using a plurality of H-beams. The H-beam transmits the force from the rail to the first layer 110 of the rail beam 100, increasing the first The stress area of the layer 110 prevents the local stress of the first layer 110 from being too large, and the H-beam plays the role of tying multiple I-beams. Nodes are not prone to damage.

上述的H型钢间隔设置,相邻的H型钢并不连接。H型钢的主要作用是承接钢轨、拉结工字钢,间隔设置的H型钢可以在满足要求的情况下减轻自重、节省材料。The above H-beams are arranged at intervals, and adjacent H-beams are not connected. The main function of H-beam is to undertake rails and tie I-beams. H-beams arranged at intervals can reduce their own weight and save materials while meeting the requirements.

可选地,H型钢的长度大于等于第一层110的宽度,以使第一层110在整个宽度上都能够承受来自上部的压力,减少第一层110局部压力过大出现破坏的情况。Optionally, the length of the H-shaped steel is greater than or equal to the width of the first layer 110 , so that the first layer 110 can bear the pressure from the upper part over the entire width, and the damage of the first layer 110 due to excessive local pressure is reduced.

轨道梁100与端头井轨道20的连接方式可以是焊接固定、锚固等方式固定连接,可选地,在轨道梁100的第二层120设置轨道压板300,轨道压板300将端头井轨道20压紧在第二层120上,当端头井轨道20具有远离第二层120的趋势时,轨道压板300提供下压的力,减小端头井轨道20与第二层120的连接部位的相对作用力,防止端头井轨道20的安装部位损坏导致脱离。The connection between the rail beam 100 and the end well rail 20 may be fixed connection by welding, anchoring, etc. Optionally, a rail pressure plate 300 is provided on the second layer 120 of the rail beam 100, and the rail pressure plate 300 connects the end well rail 20. Pressed on the second layer 120 , when the end well track 20 has a tendency to move away from the second layer 120 , the track pressing plate 300 provides a downward pressure force to reduce the connection between the end well track 20 and the second layer 120 . The relative force prevents the installation site of the end well track 20 from being damaged and disengaged.

上述的轨道压板300可以采用焊接、锚固等方式固定于第二层120上,本实施例中,轨道压板300与第二层120的H型钢采用对穿螺杆连接。在制作轨道梁100时,在H型钢上预留螺纹孔,该螺纹孔设置在H型钢的翼缘;在制作轨道压板300时,在轨道压板300上预留螺纹孔。在安装端头井轨道20时,将轨道压板300的螺纹孔与H型钢的螺纹孔对应,使用对穿螺杆穿过两个对应的螺纹孔,并利用螺母固定,从而使轨道压板300与第二层120的H型钢配合夹紧端头井轨道20。The above-mentioned rail pressing plate 300 can be fixed on the second layer 120 by welding, anchoring or the like. In this embodiment, the rail pressing plate 300 is connected with the H-shaped steel of the second layer 120 by means of an opposite screw. When manufacturing the rail beam 100 , a threaded hole is reserved on the H-shaped steel, and the threaded hole is arranged on the flange of the H-shaped steel; when the rail pressing plate 300 is produced, a threaded hole is reserved on the rail pressing plate 300 . When installing the end well track 20, the threaded holes of the track pressing plate 300 correspond to the threaded holes of the H-shaped steel, and the opposite threaded screws are used to pass through the two corresponding threaded holes, and are fixed with nuts, so that the track pressing plate 300 is connected to the second threaded hole. The H-beams of layer 120 cooperate to clamp the end well track 20 .

配合前述H型钢间隔设置的特点,可以方便在H型钢的下表面固定和拆卸螺母,因此在减轻自重、节省材料的基础30上,还具有进一步加快施工速度、节省工期的效果。Combined with the aforementioned H-beam interval setting feature, the nuts can be easily fixed and removed on the lower surface of the H-beam. Therefore, on the basis of lightening self-weight and saving materials, it also has the effect of further accelerating construction speed and saving construction period.

本申请实施例还提供一种龙门吊端头井轨道的安装组件,参照附图1、附图2和附图3所示,该安装组件包括的混凝土调平层200和前述的轨道梁100。Embodiments of the present application further provide an installation assembly for a gantry crane end well track. Referring to FIG. 1 , FIG. 2 and FIG. 3 , the installation assembly includes a concrete leveling layer 200 and the aforementioned track beam 100 .

发明人发现,不同的位置的端头井可能存在基础30的顶面到地面的高度不同的情况,为了使龙门吊端头井轨道20与前后的路面轨道能够在同一水平面上接通,就需要使组合梁的高度满足不同的高度要求,如果采用不同规格的工字钢或H型钢制作以满足高度要求,将降低工人批量化生产的速度。由于基础30的高度一般是按照设计要求设置,其高度是固定的,不能够随意调节,否则可能会对后期结构施工产生影响。The inventor found that the heights of the top surface of the foundation 30 to the ground may be different in the end wells at different positions. In order to make the gantry crane end well track 20 and the front and rear road tracks connect on the same level, it is necessary to make the top surface of the foundation 30 different from the ground. The height of the composite beam meets different height requirements. If different specifications of I-beam or H-beam are used to meet the height requirements, it will reduce the speed of mass production by workers. Since the height of the foundation 30 is generally set according to the design requirements, its height is fixed and cannot be adjusted at will, otherwise it may have an impact on the later structural construction.

因此可选地,发明人设置上述的混凝土调平层200用于调整轨道梁100的高度和水平度。Therefore, optionally, the inventor provides the above-mentioned concrete leveling layer 200 for adjusting the height and levelness of the track beam 100 .

轨道梁100跨设于龙门吊端头井上,轨道梁100的两端分别搭设在基础30上。该混凝土调平层200铺设于基础30顶部,即混凝土调平层200位于基础30与轨道梁100之间,轨道梁100固定在该混凝土调平层200上。The rail beam 100 spans over the end well of the gantry crane, and the two ends of the rail beam 100 are respectively erected on the foundation 30 . The concrete leveling layer 200 is laid on top of the foundation 30 , that is, the concrete leveling layer 200 is located between the foundation 30 and the track beam 100 , and the track beam 100 is fixed on the concrete leveling layer 200 .

混凝土调平层200是临时设置的结构,端头井轨道20拆除后就可以随之拆除,对基础30的结构及后期上部主体的结构影响较小,不影响后期修建。The concrete leveling layer 200 is a temporary structure, and can be removed after the end well track 20 is removed, which has little impact on the structure of the foundation 30 and the structure of the upper body in the later stage, and does not affect the later construction.

可选地,在混凝土调平层200上预埋承压钢板210,该承压钢板210与轨道梁100的第一层110连接。Optionally, a bearing steel plate 210 is pre-embedded on the concrete leveling layer 200 , and the bearing steel plate 210 is connected to the first layer 110 of the track beam 100 .

该混凝土调平层200可以在基础30浇筑后进行浇筑,浇筑混凝土调平层200时,在其上表面预埋承压钢板210,以便于固定连接轨道梁100。待混凝土调平层200成型且达到需要的混凝土强度值后,吊装轨道梁100,将轨道梁100的两端与预埋的承压钢板210连接,可选地,轨道梁100的第一层110通过锚接、焊接等方式固定在承压钢板210上。The concrete leveling layer 200 can be poured after the foundation 30 is poured. When the concrete leveling layer 200 is poured, a bearing steel plate 210 is pre-embedded on the upper surface of the concrete leveling layer 200 to facilitate the connection of the rail beam 100 . After the concrete leveling layer 200 is formed and reaches the required concrete strength value, the rail beam 100 is hoisted, and both ends of the rail beam 100 are connected to the pre-embedded bearing steel plates 210. Optionally, the first layer 110 of the rail beam 100 It is fixed on the pressure-bearing steel plate 210 by means of anchoring, welding or the like.

由于混凝土调平层200只作为垫高和调平的作用,其强度要求相比现有的现浇轨道梁的强度要求低,且体量相对较小,因此等待其成型的时间较少,对工期的影响较小。承压钢板210还具有增大混凝土调平层200承载能力,上部压力通过承压钢板210传递给混凝土调平层200,混凝土调平层200受力均匀不容易产生局部应力过大导致的破坏。Since the concrete leveling layer 200 is only used for height and leveling, its strength requirements are lower than those of the existing cast-in-place rail beams, and the volume is relatively small, so it takes less time to wait for it to form. The impact of the construction period is small. The bearing steel plate 210 also increases the bearing capacity of the concrete leveling layer 200, and the upper pressure is transmitted to the concrete leveling layer 200 through the bearing steel plate 210, and the concrete leveling layer 200 is uniformly stressed and is not easily damaged due to excessive local stress.

发明人在多次实践中得出经验,提供一个轨道梁100的常用实施例:The inventor has gained experience in many practices, and provides a common embodiment of the track beam 100:

上述的第一层110采用翼缘宽度为180mm、高度为630mm的工字钢,五根工字钢沿宽度方向拼接成格式结构。相邻的工字钢的翼缘相接,采用对接焊缝满焊的方式将相邻的工字钢焊接固定。The above-mentioned first layer 110 adopts an I-beam with a flange width of 180 mm and a height of 630 mm, and five I-beams are spliced along the width direction to form a format structure. The flanges of adjacent I-beams are connected, and the adjacent I-beams are welded and fixed by full welding of butt welds.

上述的第二层120采用翼缘宽度为255mm、高度为250mm的H型钢,H型钢每隔0.5m设置一根。H型钢以该0.5m的间隔沿第一层110的工字钢的长度方向排布,单根H型钢的长度略大于第一层110的宽度,即每根H型钢的两端略超出第一层110的两条边,如附图3所示。H型钢采用角焊连接的方式固定在第一层110的工字钢上,焊接时沿H型钢的长度方向满焊,使H型钢与每根工字钢都固定连接。The above-mentioned second layer 120 adopts H-shaped steel with a flange width of 255 mm and a height of 250 mm, and one H-shaped steel is provided every 0.5 m. The H-beams are arranged along the length direction of the I-beams of the first layer 110 at the interval of 0.5m. The length of a single H-beam is slightly larger than the width of the first layer 110, that is, the two ends of each H-beam The two sides of layer 110 are shown in FIG. 3 . The H-beam is fixed on the I-beam of the first layer 110 by means of fillet welding. During welding, the H-beam is fully welded along the length of the H-beam, so that the H-beam and each I-beam are fixedly connected.

轨道梁100的第一层110和第二层120制作完成后,可以进行现场吊装,将轨道梁100通过塔吊、吊车等机械吊至端头井的位置后缓慢下放,然后固定轨道梁100。After the first layer 110 and the second layer 120 of the track beam 100 are fabricated, they can be hoisted on site. The track beam 100 is mechanically hoisted to the position of the end well by a tower crane, crane, etc., and then lowered slowly, and then the track beam 100 is fixed.

上述的端头井轨道20可以在制作轨道梁100时安装,以减少现场制作时间和制作工序,加快施工速度。The above-mentioned end well track 20 can be installed when the track beam 100 is manufactured, so as to reduce the on-site manufacturing time and manufacturing process, and speed up the construction speed.

使用本申请提供的龙门吊端头井轨道梁100及具有其的安装组件进行端头井轨道20安装时,该轨道梁100及端头井轨道20均可以在车间中批量生产,轨道梁100的规格尺寸固定,通过现场把控混凝土调平层200的高度即可将端头井轨道20与其前后的路面40上的轨道对齐,安装方便、适应性强。When using the gantry crane end well rail beam 100 and its installation assembly provided by the present application to install the end well rail 20, both the rail beam 100 and the end well rail 20 can be mass-produced in the workshop. The specifications of the rail beam 100 The size is fixed, the end well track 20 can be aligned with the track on the front and rear road surfaces 40 by controlling the height of the concrete leveling layer 200 on site, and the installation is convenient and adaptable.

以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above descriptions are only preferred embodiments of the present application, and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of this application shall be included within the protection scope of this application.

Claims (10)

1.一种龙门吊端头井轨道梁,其特征在于,包括第一层和第二层,所述第一层包括沿宽度方向拼接的多根工字钢,所述第二层包括多根H型钢,所述多根H型钢沿所述工字钢的长度方向排列,每根所述H型钢横跨所述多根工字钢并与所述多根工字钢固定连接;1. A gantry crane head well rail beam, characterized in that it comprises a first layer and a second layer, the first layer includes a plurality of I-beams spliced along the width direction, and the second layer includes a plurality of H Section steel, the plurality of H-beams are arranged along the length direction of the I-beams, and each of the H-beams spans the plurality of I-beams and is fixedly connected to the plurality of I-beams; 所述第一层与龙门吊端头井的基础固定连接,所述第二层用于与龙门吊端头井轨道固定连接以支撑所述龙门吊端头井轨道。The first layer is fixedly connected with the foundation of the gantry crane end well, and the second layer is used for fixed connection with the gantry crane end well track to support the gantry crane end well track. 2.根据权利要求1所述的龙门吊端头井轨道梁,其特征在于,相邻的所述H型钢间隔设置。2 . The gantry crane end well rail beam according to claim 1 , wherein the adjacent H-beams are arranged at intervals. 3 . 3.根据权利要求2所述的龙门吊端头井轨道梁,其特征在于,所述第二层设有轨道压板,所述轨道压板与所述H型钢连接以夹紧所述龙门吊端头井轨道;所述H型钢、所述轨道压板分别预留有螺纹孔,所述轨道压板与所述H型钢采用与所述螺纹孔适配的对穿螺杆固定连接。3 . The gantry crane head well rail beam according to claim 2 , wherein the second layer is provided with a rail pressure plate, and the rail pressure plate is connected with the H-beam to clamp the gantry crane head well rail. 4 . ; The H-shaped steel and the rail pressing plate are respectively provided with threaded holes, and the rail pressing plate and the H-shaped steel are fixedly connected by the opposite threaded screws adapted to the threaded holes. 4.根据权利要求1所述的龙门吊端头井轨道梁,其特征在于,相邻的所述工字钢沿长度方向对接焊缝满焊。4 . The gantry crane end well rail beam according to claim 1 , wherein the adjacent I-beams are fully welded along the length direction of the butt welds. 5 . 5.根据权利要求1所述的龙门吊端头井轨道梁,其特征在于,所述H型钢与所述工字钢角焊连接,且沿所述H型钢的长度方向满焊。5 . The gantry crane head well rail beam according to claim 1 , wherein the H-shaped steel is connected with the I-beam by fillet welding, and is fully welded along the length direction of the H-shaped steel. 6 . 6.根据权利要求1所述的龙门吊端头井轨道梁,其特征在于,所述第一层的工字钢为五根,每根所述工字钢的翼缘宽度为180mm、高度为630mm。6. The gantry crane head well track beam according to claim 1, wherein the number of I-beams of the first layer is five, and the flange width of each described I-beam is 180mm, and the height is 630mm . 7.根据权利要求6所述的龙门吊端头井轨道梁,其特征在于,所述第二层的H型钢的翼缘宽度为255mm、高度为250mm。7 . The gantry crane end well rail beam according to claim 6 , wherein the flange width of the H-section steel of the second layer is 255 mm and the height is 250 mm. 8 . 8.根据权利要求2所述的龙门吊端头井轨道梁,其特征在于,相邻的所述H型钢的间隔为0.5m。8 . The gantry crane end well track beam according to claim 2 , wherein the interval between the adjacent H-beams is 0.5m. 9 . 9.一种龙门吊端头井轨道的安装组件,其特征在于,包括铺设于所述龙门吊端头井的基础上的混凝土调平层,及权利要求1-8任一项所述的龙门吊端头井轨道梁;所述龙门吊端头井轨道梁跨设于龙门吊端头井,且所述龙门吊端头井轨道梁的两端与所述混凝土调平层固定连接。9 . An installation assembly for a gantry crane end well track, characterized in that it comprises a concrete leveling layer laid on the foundation of the gantry crane end well, and the gantry crane end according to any one of claims 1 to 8 well track beam; the gantry crane end well track beam spans over the gantry crane end well, and both ends of the gantry crane end well track beam are fixedly connected to the concrete leveling layer. 10.根据权利要求9所述的龙门吊端头井轨道的安装组件,其特征在于,所述混凝土调平层预埋有承压钢板,所述承压钢板与所述龙门吊端头井轨道梁的第一层固定连接。10 . The installation assembly of the gantry crane head well track according to claim 9 , wherein the concrete leveling layer is pre-embedded with a pressure-bearing steel plate, and the pressure-bearing steel plate is connected to the gantry crane head well rail beam. 10 . The first layer is fixed connection.
CN201921039236.0U 2019-07-04 2019-07-04 Gantry crane end well track beam and gantry crane end well track mounting assembly Active CN210127028U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921039236.0U CN210127028U (en) 2019-07-04 2019-07-04 Gantry crane end well track beam and gantry crane end well track mounting assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921039236.0U CN210127028U (en) 2019-07-04 2019-07-04 Gantry crane end well track beam and gantry crane end well track mounting assembly

Publications (1)

Publication Number Publication Date
CN210127028U true CN210127028U (en) 2020-03-06

Family

ID=69664765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921039236.0U Active CN210127028U (en) 2019-07-04 2019-07-04 Gantry crane end well track beam and gantry crane end well track mounting assembly

Country Status (1)

Country Link
CN (1) CN210127028U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113957921A (en) * 2021-11-26 2022-01-21 黑龙江建龙钢铁有限公司 Process method for manufacturing heavy-load track bearing foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113957921A (en) * 2021-11-26 2022-01-21 黑龙江建龙钢铁有限公司 Process method for manufacturing heavy-load track bearing foundation

Similar Documents

Publication Publication Date Title
CN102888815B (en) The pouring construction method of a kind of wide-angle V-type pier and 0# block case beam
CN107245934A (en) A kind of assembled steel profiled sheet concrete combined board small box girder
CN101781879A (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN108677962B (en) Subway entrance and exit segment foundation pit formwork installing and dismantling method
CN110409624B (en) Reverse calculation and construction method for large equipment installation and main body structure
CN111411724A (en) Steel beam-concrete composite floor slab combined assembly system
CN109440724B (en) Installation method of cast-in-place beam template suspension support system of high-pile wharf
CN102704406A (en) Roadbed slab non-tensile stress construction method based on combined channel girder
CN110847039A (en) Full cantilever installation method of segmental precast concrete box girder
CN103015453A (en) Dual-connection type tower crane foundation
CN218951932U (en) T-beam bridge without diaphragm plate, wing plate hanging die and hogging moment beam tooth block
CN210127028U (en) Gantry crane end well track beam and gantry crane end well track mounting assembly
CN106760486A (en) Exterior wall mould and its erection method in foundation ditch
CN203639841U (en) Steel plate-concrete combined reinforcement structure of hollow plate beam
CN113684766A (en) A construction platform for bridge main tower corbel and construction method thereof
CN220468517U (en) Overlap joint type continuous overhead beam
CN119041304A (en) Large cantilever bent cap lower chord reverse support bracket system and construction method thereof
CN219010936U (en) Steel pipe concrete pier connection structure of PBL shear key
CN211498483U (en) Hollow wall pier tie beam formwork system
CN217839735U (en) Quick hoisting construction structure for steel box girder closure section
CN112323647B (en) Rigid frame bridge hanging basket suspension casting system and construction method thereof
CN111851318B (en) Side span formwork system of cantilever bridge and its construction method
CN103898835B (en) The anti-back of the body of bridge draws load-bearing construction bracket and construction method
CN211947881U (en) Top-up longitudinal block prefabricated box girder
CN114657882A (en) A super-large 0# block cast-in-place box girder bracket structure and its installation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200228

Address after: 100000 Beijing, Guanzhuang, Chaoyang District, Zhou

Co-patentee after: THE THIRD ENGINEERING Co.,Ltd. OF THE HIGHWAY ENGINEERING BUREAU OF CCCC

Patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd.

Address before: 101149, Beijing, Zhongguancun Tongzhou District science and Technology Park, Tongzhou Park Jinqiao technology industry base, 10 North San Sheng Road

Patentee before: THE THIRD ENGINEERING Co.,Ltd. OF THE HIGHWAY ENGINEERING BUREAU OF CCCC

TR01 Transfer of patent right