CN213038154U - Device for pile point paying-off - Google Patents
Device for pile point paying-off Download PDFInfo
- Publication number
- CN213038154U CN213038154U CN202021045242.XU CN202021045242U CN213038154U CN 213038154 U CN213038154 U CN 213038154U CN 202021045242 U CN202021045242 U CN 202021045242U CN 213038154 U CN213038154 U CN 213038154U
- Authority
- CN
- China
- Prior art keywords
- paying
- vertical rod
- bolt
- pendant
- top plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model provides a device for paying off pile points, which structurally comprises a vertical rod with the lower end inserted into the ground and a paying-off pendant installed on the vertical rod, wherein a plurality of wire grooves for hooking and hanging a paying-off rope are arranged on the paying-off pendant, and the paying-off pendant can move and be positioned on the vertical rod along a straight line vertical to the vertical rod; the top of the vertical rod is provided with a top plate, a columnar movable hammer is sleeved on the vertical rod between the top plate and the paying-off hanging piece in a penetrating mode, and the movable hammer can move up and down on the vertical rod between the top plate and the paying-off hanging piece. The device is simple to operate, can be repeatedly used, can reduce personnel investment, is favorable for simplifying the pile point laying process, improves the construction efficiency and reduces the construction cost.
Description
Technical Field
The utility model relates to an auxiliary construction tool, specifically speaking are a device for stake point unwrapping wire.
Background
In the process of road construction and building foundation construction, the positioning and paying off of on-site pile points are the most critical and indispensable construction procedures in the whole construction. The on-site pile point positioning and paying-off guarantee that the whole construction is carried out smoothly according to the design drawing. The operation flow of positioning and paying off the pile point commonly used at present is that a technician uses a measuring instrument to find the pile point position, then two to three workers use an iron hammer to hammer a wood pile or a steel bar into the pile point position to form the pile position, and finally paying off the pile position. The required personnel of this kind of stake point location unwrapping wire construction process are more, and the stake position is easily removed, and stake point location used stake or reinforcing bar are difficult to demolish, hardly use repeatedly, cause construction cost's increase.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a device for stake point unwrapping wire to it is more to solve the required personnel of current stake point location unwrapping wire construction process, the higher problem of construction cost.
The utility model discloses a realize like this: a device for paying off a pile point comprises a vertical rod and a paying-off pendant, wherein the lower end of the vertical rod is inserted into the ground, the paying-off pendant is installed on the vertical rod, a plurality of wire grooves for hooking paying off wires are formed in the paying-off pendant, and the paying-off pendant can be movably positioned on the vertical rod along a straight line vertical to the vertical rod; the top of the vertical rod is provided with a top plate, a columnar movable hammer is sleeved on the vertical rod between the top plate and the paying-off hanging piece in a penetrating mode, and the movable hammer can move up and down on the vertical rod between the top plate and the paying-off hanging piece.
The paying-off hanging piece comprises a penetrating part penetrating and sleeved on the vertical rod and an extending part extending outside the penetrating part, the extending direction of the extending part faces to one moving direction of the paying-off hanging piece, a plane is arranged at the top of the extending part, and the wire grooves are formed in the plane and are uniformly distributed on the plane along the extending direction of the extending part.
A bolt through hole is formed in the penetrating part of the pay-off hanger, the bolt through hole is arranged opposite to the extending part of the pay-off hanger, a bolt penetrates through the bolt through hole, one end of the bolt is exposed outside the pay-off hanger, and the other end of the bolt penetrates into the vertical rod; and a nut coaxially arranged with the bolt through hole is fixedly arranged outside the sleeve penetrating part and is used for being in threaded connection with the bolt.
The wire groove is a tooth-shaped groove.
The lower end of the vertical rod is of a dispersed three-claw prong structure.
The utility model relates to a device for stake point location unwrapping wire, the device is when using, and its lower extreme disect insertion decides stake point location department, inserts the subaerial in-process with its lower extreme, and the accessible is held the activity hammer and is reciprocated in the pole setting, and activity hammer hammering unwrapping wire pendant, the hammering power that the unwrapping wire pendant received transmit the pole setting lower extreme through the pole setting for the smooth below ground that inserts of pole setting lower extreme of this device. When carrying out the unwrapping wire operation, can directly be with the unwrapping wire rope hook in the wire casing of the unwrapping wire pendant of this device to adjust the accuracy of unwrapping wire through adjusting the position of unwrapping wire pendant in the pole setting. After the pile point positioning and paying-off process is finished, the movable hammer can be held by a hand, the movable hammer moves up and down on the vertical rod and hammers the top plate at the top of the vertical rod, and the jacking force borne by the top plate is transmitted to the vertical rod, so that the lower end of the vertical rod of the device is separated from the ground, and the device can be used in the next pile point paying-off process. The device is simple to operate, can be repeatedly used, can reduce personnel investment, is favorable for simplifying the pile point laying process, improves the construction efficiency and reduces the construction cost.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure: 1. a top plate; 2. erecting a rod; 3. a movable hammer; 4. a bolt; 5. a nut; 6. paying off the pendant; 7. a wire slot; 8. a three-pronged tine.
Detailed Description
As shown in fig. 1, the utility model discloses a pole setting 2 and the unwrapping wire pendant 6 of installing on pole setting 2, the lower extreme of pole setting 2 is when using for inserting the below ground, and in order to facilitate the insertion of pole setting 2, the lower extreme of pole setting 2 is dispersed three-jaw prong 8, and the concrete structure is seen in fig. 1. The paying-off hanging piece 6 can move and be positioned along a straight line vertical to the upright stanchion 2, a plurality of wire grooves 7 are arranged on the paying-off hanging piece, and the wire grooves 7 are used for hanging a paying-off rope used in the paying-off process. The top of pole setting 2 is equipped with roof 1, and it has movable hammer 3 to wear to overlap on the pole setting 2 between roof 1 and unwrapping wire pendant 6, and movable hammer 3 is the columnar structure, and it can slide from top to bottom on the pole setting 2 between roof 1 and the unwrapping wire pendant 6. Roof 1 and unwrapping wire pendant 6 play the effect of hindering the card, and movable hammer 3 along 2 upward hammering roofs 1 of pole setting, can transmit power for pole setting 2, make pole setting 2 have the power of a promotion. The movable hammer 3 hammers the pay-off hanger 6 downwards along the vertical rod 2, and can also transmit force to the vertical rod 2, so that the vertical rod 2 has downward impact force.
The line releasing hanging piece 6 comprises a penetrating part and an extending part which is connected to the penetrating part and extends outwards, and the extending direction of the extending part faces to one moving direction of the direction hanging piece 6. The top of the extension part of the paying-off hanging part 6 is provided with a plane, a wire casing 7 for hooking the paying-off rope is arranged on the plane, the wire casing 7 is a tooth-shaped groove, and a plurality of wire casings 7 are uniformly distributed on the plane at the top of the extension part along the extension direction.
The utility model discloses a unwrapping wire pendant 6 realizes its removal and location in pole setting 2 through bolt 4, and concrete structure is, and it has the bolt through-hole to open in the wearing and sleeving portion of unwrapping wire pendant 6, and the position of bolt through-hole sets up with the extension of unwrapping wire pendant 6 relatively, and in the bolt through-hole was worn to establish by bolt 4, the axial lead of bolt 4 was unanimous with the moving direction of unwrapping wire pendant 6. The one end of bolt 4 is exposed in the outside of unwrapping wire pendant 6, and the other end penetrates in the pole setting 2 that the unwrapping wire pendant 6 worn the cover, the utility model discloses at nut 5 of the outside welding of the portion of wearing the cover of unwrapping wire pendant 6, nut 5 and the coaxial setting of bolt through-hole of the portion of wearing the cover of unwrapping wire pendant 6 to with the 4 spiro unions of bolt that wear to establish in the bolt through-hole. The bolts 4 enable the longitudinal positioning of the payoff hangers 6 on the uprights 2. The screwing bolt 4 can lead the paying-off hanging piece 6 to slide on a straight line vertical to the upright stanchion 2, thus indirectly adjusting the position of the paying-off rope and leading the paying-off to be more accurate.
The utility model discloses when using, confirm the stake point location after, place this device and stand in the stake point location department of confirming, then hold movable hammer 3, move movable hammer 3 downwards along pole setting 2 hard to make movable hammer 3 constantly strike unwrapping wire pendant 6, unwrapping wire pendant 6 will do all can the power and transmit for pole setting 2, the lower extreme of pole setting 2 inserts the below ground under the effect of power, alright stop moving movable hammer 3, then carry out the unwrapping wire process. This device is when dismantling, holds movable hammer 3, and along pole setting 2 upward movement movable hammer 3 hard makes movable hammer 3 constantly hammer roof 1, and roof 1 transmits power for pole setting 2, finally makes the extraction ground of pole setting 2. The utility model is simple in operation, the personnel that can effectual reduction stake point unwrapping wire process are equipped with, reduce construction cost.
Claims (5)
1. A device for paying off pile points is characterized by comprising an upright post and a paying-off pendant, wherein the lower end of the upright post is inserted into the ground, the paying-off pendant is installed on the upright post, a plurality of wire grooves for hooking paying off wires are formed in the paying-off pendant, and the paying-off pendant can be movably positioned on the upright post along a straight line vertical to the upright post; the top of the vertical rod is provided with a top plate, a columnar movable hammer is sleeved on the vertical rod between the top plate and the paying-off hanging piece in a penetrating mode, and the movable hammer can move up and down on the vertical rod between the top plate and the paying-off hanging piece.
2. The apparatus of claim 1, wherein the line discharge hanger comprises a through portion for passing through the vertical rod and an extending portion extending outward, the extending portion extends in a direction toward one of the moving directions of the line discharge hanger, a plane is formed on the top of the extending portion, and the line grooves are formed on the plane and are uniformly arranged on the plane along the extending direction of the extending portion.
3. The device for pile point paying off according to claim 1, wherein a bolt through hole is formed in the penetrating part of the paying off hanger, the bolt through hole is arranged opposite to the extending part of the paying off hanger, a bolt is penetrated in the bolt through hole, one end of the bolt is exposed outside the paying off hanger, and the other end of the bolt penetrates into the vertical rod; and a nut coaxially arranged with the bolt through hole is fixedly arranged outside the sleeve penetrating part and is used for being in threaded connection with the bolt.
4. The apparatus of claim 1, wherein the raceway is a toothed groove.
5. A device for pile point paying out as claimed in claim 1, wherein the lower end of the upright is of a divergent three-prong configuration.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021045242.XU CN213038154U (en) | 2020-06-09 | 2020-06-09 | Device for pile point paying-off |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021045242.XU CN213038154U (en) | 2020-06-09 | 2020-06-09 | Device for pile point paying-off |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213038154U true CN213038154U (en) | 2021-04-23 |
Family
ID=75521974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021045242.XU Active CN213038154U (en) | 2020-06-09 | 2020-06-09 | Device for pile point paying-off |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213038154U (en) |
-
2020
- 2020-06-09 CN CN202021045242.XU patent/CN213038154U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203438194U (en) | Assisting hammer | |
CN203270599U (en) | Foundation bolt pre-buried die | |
CN213038154U (en) | Device for pile point paying-off | |
CN106284351A (en) | There is the photovoltaic piling machine of hi-Fix | |
CN203390893U (en) | Sliding weight for pulling pin | |
CN108088693B (en) | Vertical test bed for performance detection of rock drill | |
CN206110122U (en) | Bridge drilled pile convenient to get rid of pile head | |
CN210178366U (en) | Scattered cable saddle portal system of narrow space tunnel anchor of super large inclination | |
CN204690747U (en) | One easily hammers into earth anchor drilling | |
CN215447920U (en) | Civil engineering measurement rope bundle fixing device | |
CN208618399U (en) | A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit | |
CN211646388U (en) | Device for fixing a nail | |
CN211647234U (en) | Overhanging type scaffold | |
CN203170374U (en) | Fall block of simple rock smasher | |
CN209025119U (en) | A kind of simple rotary digging drilling hole bored concrete pile static load test device | |
CN109632167B (en) | Device and method for monitoring rock mass stress in open pit goaf | |
CN207197835U (en) | A kind of vertical test stand for rock drill performance test | |
CN202039373U (en) | Anchor rope hauling-down device | |
CN202662958U (en) | Auxiliary device for burying ground wire stud | |
CN203270575U (en) | Bored concrete pile pile-head breaking combined loosening device | |
CN112252318A (en) | Temporary stay wire anchoring device and construction method | |
CN207454005U (en) | A kind of pipe-seam type anchor rod installs pneumatic pounder | |
JP2000045572A (en) | Temporary electric pole for dwelling construction | |
CN206128066U (en) | Photovoltaic pile driver with hi -Fix | |
CN104912074A (en) | Ground anchor drill structure adopting rotating beating mode to achieve ground entering of anchor body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |