CN206128066U - Photovoltaic pile driver with hi -Fix - Google Patents

Photovoltaic pile driver with hi -Fix Download PDF

Info

Publication number
CN206128066U
CN206128066U CN201621123883.6U CN201621123883U CN206128066U CN 206128066 U CN206128066 U CN 206128066U CN 201621123883 U CN201621123883 U CN 201621123883U CN 206128066 U CN206128066 U CN 206128066U
Authority
CN
China
Prior art keywords
vibration hammer
piling machine
fix
mast
photovoltaic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621123883.6U
Other languages
Chinese (zh)
Inventor
杨帆
李华
李亦军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Poly Intelligent Technology Co Ltd
Original Assignee
Jiangsu Poly Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Poly Intelligent Technology Co Ltd filed Critical Jiangsu Poly Intelligent Technology Co Ltd
Priority to CN201621123883.6U priority Critical patent/CN206128066U/en
Application granted granted Critical
Publication of CN206128066U publication Critical patent/CN206128066U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a photovoltaic pile driver with hi -Fix, include: moving platform is provided with rotary mechanism on it, bore the mast, it sets up rotary mechanism is last, be provided with first antenna on the brill mast, the vibration hammer, its perpendicular slip sets up bore on the mast, the vibration hammer is high frequency hydraulic -vibration hammer, vibration hammer lower extreme is provided with the anchor clamps that are used for fixed tubular pile, vibration peen portion is provided with the second antenna, the second antenna with anchor clamps are not on same perpendicular line. Change a social system on the basis of rig is dug soon to present crawler -type, combine ripe intelligent guiding control system to use GNSS location finding technique, sensor technology and software technique, be applied to the photovoltaic pile driver with GPSBDS's high accuracy intelligent guiding control system, realize GPS high accuracy photovoltaic basis piling operations. The utility model discloses a pile driver has been solved at the poor technical problem with high costs that just drives piles of current pile driver pile precision.

Description

Photovoltaic piling machine with hi-Fix
Technical field
The utility model is related to a kind of piling machine, and more specifically, the utility model is related to a kind of with hi-Fix Photovoltaic piling machine.
Background technology
At present, existing photovoltaic piling machine product is mostly to increase hydraulic vibration driver on the basis of excavator, using vibration The dither of hammer passes to pile body, causes the soil structures around stake because vibration changes, intensity decreases, reduces stake side with soil The frictional resistance of body, is then sunk to stake in soil with pressure, vibration hammer and pile body deadweight under digging machine.
But this photovoltaic piling machine product is primarily present following two problems:
First, precision is not high, and existing piling machine is all to pile foundation point position travel direction, piling by field surveys engineering Machine is constructed according to the point position for putting line well, and error is larger in plane, and existing product is difficult control to the perpendicularity of pile body, At present major part is to visually observe control by field worker, and perpendicularity precision is also poor.
Second, the workman of needs auxiliary is more, and early stage defence line workload is also larger.The auxiliary that existing piling machine needs at present Workman includes:1 machine hand, 2 workmans help stake and observation perpendicularity, 1 workman to be responsible for observing absolute altitude, at least need to configure 4 people.
Therefore, existing photovoltaic piling machine product piling low precision, personnel depaly be more and early stage defence line workload is big etc. lacks Fall into, not only increased difficulty to work progress, and construction cost is high.
Utility model content
A purpose of the present utility model is to solve at least the above, and provides the advantage that at least will be described later.
The utility model it is also an object that provide a kind of photovoltaic piling machine with hi-Fix, in existing shoe Changed a social system on the basis of belt rotary drilling rig, with reference to ripe intelligently guiding control system GNSS location technologies, sensing are used Device technology and software engineering, guide control system in photovoltaic piling machine the high-precision intelligent of GPS/BDS, realize that GPS is high Precision photovoltaic foundation piling work.Piling machine of the present utility model is solved in existing piling machine piling low precision and piling cost High technical problem.
In order to realize according to these purposes of the present utility model and further advantage, there is provided a kind of with hi-Fix Photovoltaic piling machine, including:
Mobile platform, is provided with rotating mechanism;
Mast is bored, it is arranged on the rotating mechanism, on the brill mast first antenna is provided with;
Vibration hammer, its vertical sliding motion be arranged on it is described brill mast on, the vibration hammer be high-frequency hydraulic hammer, the vibration Hammer lower end is provided with the fixture for fixing pile tube, and the vibration hammer top is provided with the second antenna, second antenna and institute Fixture is stated not on same vertical line.
Preferably, the mobile platform is crawler-type mobile platform, and 360 ° of the rotating mechanism is freely rotatably arranged on institute State on mobile platform.
Preferably, the brill mast is vertically set on the rotating mechanism, and the first antenna is arranged on the brill mast On the wall of side.
Preferably, slide rail is vertically offered on the brill mast lateral wall, slide block, the slide block limit is provided with the slide rail System is moved on the slide rail, and the lateral wall of the slide block is fixed with the vibration hammer.
Preferably, the upper end for boring mast is provided with master winch system and secondary hoisting system, and the master winch system passes through Steel wire rope is connected with vibration hammer upper end, and the secondary hoisting system is connected by steel wire rope with the pile tube.
Preferably, the fixture is connected by bolt with the vibration hammer, and the jaws of the fixture is opened up down, the pipe Stake upper end is vertically folded in the jaws, and the upper end of the pile tube supports the lower surface of the vibration hammer by the fixture.
Preferably, it is additionally provided with control system on the mobile platform, the control system and the first antenna, second Antenna and ground base station communication connection.
Preferably, spring is arranged with the brill mast on the slide rail top, the upper end of the spring is fixed on the brill The top of mast, and the spring is on the mobile route of the slide block.
Preferably, the brill mast bottom is provided with several extension springs, and the lower end of the extension spring is connected with the brill mast bottom, The upper end of the extension spring is connected with slider bottom, and during the extension spring nature, the upper end of extension spring is less than the slide rail most Lower end.
Preferably, offer on the slide block and vertically offer chute, the chute is fastened on the slide rail and moves, institute State and beam is provided with chute inwall, be fixed with the outer wall of the beam and lead boots, the boots of leading are limited in the slide rail Upper movement.
The utility model at least includes following beneficial effect:
1st, piling machine of the present utility model combines ripe intelligently guiding control system, and piling machine adopts GPS positioning system, Automatic location function is realized, the work of pile foundation point position early stage unwrapping wire is eliminated, GPS location high-accuracy high-efficiency rate light is realized Voltaic stake works, and piling precision reaches 10mm in plane, and absolute altitude precision reaches 20mm, and old-fashioned piling machine needs early stage specialty Mapping worker is carried out in setting-out work, and plane and absolute altitude precision is 30-50mm;
2nd, piling machine can meet concrete pipe pile foundation and steel pile foundation construction, be suitable for stake long up to 11.5m;And it is old-fashioned Piling machine construction length is 6 meters or so;
3rd, piling machine can realize 24h all weather operations with night work, greatly improve operating efficiency;And old-fashioned piling Machine can only operation on daytime;
4th, piling machine have elevator pressurization, enhanced feature, plus-pressure, promotions power be 8t, pressurization, lifting speed it is adjustable, most Big reachable 0.85m/s;And old-fashioned piling machine pile pulling operational difficulties are loaded down with trivial details;
5th, piling machine is fixed using the mode of clamping to pile foundation end, greatly improves hammer force, and hammer force can Up to 48t, the project construction of different soil property situations is met;And old-fashioned piling machine carries out piling and applies using the principle that high frequency impacts stake top Work, is easily damaged pile body.
Further advantage of the present utility model, target and feature embody part by description below, and part will also pass through Research of the present utility model and practice are understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the structural representation of the photovoltaic piling machine;
Wherein, 1. mobile platforms in figure;2. secondary hoisting system;3. master winch system;4. mast is bored;5. the second antenna;6. shake Dynamic hammer;7. steel wire rope;8. fixture;9. first antenna;10. pile tube.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to explanation Book word can be implemented according to this.
It should be appreciated that it is used herein such as " have ", "comprising" and " including " term do not allot one or many The presence or addition of individual other elements or its combination.
As shown in figure 1, the utility model provides a kind of photovoltaic piling machine with hi-Fix, including:
Mobile platform 1, is provided with rotating mechanism, and the mobile platform is crawler-type mobile platform, the whirler 360 ° of structure is freely rotatably arranged on the mobile platform;
Mast 4 is bored, it passes through bearing and is arranged on the rotating mechanism, it is described to bore mast 4 and the rotating mechanism synchronous axial system, The brill mast is perpendicular to the ground, is provided with first antenna on the brill mast, it is preferred that the first antenna is arranged on the brill mast Side wall on;
Vibration hammer 6, its vertical sliding motion is arranged on the brill mast, and the vibration hammer is high-frequency hydraulic hammer, described to shake Dynamic hammer lower end is provided with the fixture 8 for fixing pile tube, and pile tube 10 is clipped in the bottom of fixture, and pile tube is photovoltaic foundation prefabricated pipe Stake, in 300mm, specifically, the fixture is connected caliber by bolt with the vibration hammer bottom, fixture and the same center of vibration hammer Axle is arranged, meanwhile, the jaws of the fixture is opened up down, and the pile tube upper end is vertically folded in the jaws, that is to say, that After pile tube is fixed, pile tube on the same axis, is beaten with the direction of motion for boring the keeping parallelism of mast 4, pile tube and vibration hammer so as to improve Stake efficiency, pile tube squeezes into vertically downward ground, and pile tube is difficult stress deformation, and the upper end of the pile tube is supported by the fixture The lower surface of the vibration hammer, that is, pile tube upper end is stressed directly, and on the one hand avoids vibration hammer strike pile tube upper end from also making it Deformation, on the other hand, the lower pressure of vibration hammer is directly delivered to pile tube, and centre does not have strike loss, further increases and beat Stake efficiency.
Vibration hammer of the present utility model is connected with high-frequency hydraulic hammer by fixture, and piling machine uses the side for clamping Formula is fixed to pile foundation end, pile tube and vibration hammer be connected and disconnected from it is convenient efficiently, while greatly improving hammer Power is hit, hammer force meets the project construction of different soil property situations up to 48t, and old-fashioned piling machine impacts stake top using high frequency Principle carries out piling construction, is easily damaged pile body.
Vibration hammer top is provided with the second antenna 5, second antenna with the fixture not on same vertical line, Thus, be additionally provided with control system on the mobile platform, be provided with base station on ground, the control system with described first day The communication connection of line 9, the second antenna 5 and ground base station, so as to form GPS positioning system, high-precision GPS alignment system passes through two Individual GPS system antenna co-ordination is completed, and wherein GPS system first antenna is positioned at brill mast 4 side, GPS system second day Line is positioned at high-frequency hydraulic hammer top surface platform.Need according in two aerial positions and fixture when GPS system is debugged The coordinate of heart shop position three carries out relative position modeling in plane, by terrain information and needs piling point position display in control In system, piling machine can in real time show prefabricated tubular pile center point coordinate when working, so as to carry out intelligentized photovoltaic pile tube Piling.In addition, the antenna of GPS system second is arranged on above high-frequency hydraulic hammer, while being responsible for real-time monitoring tubular stake top portion Absolute altitude, so as to realize being precisely controlled for the plan-position to photovoltaic foundation piling work, stake top absolute altitude and inclination angle.
In another embodiment, photovoltaic piling machine of the present utility model can be on the basis of existing crawler type rotary drilling rig Changed a social system, removed the rotary digging bit part on original rotary drilling rig, made into high-frequency hydraulic hammer 6, it is logical with master winch system 3 Cross steel wire rope 7 to connect, fixture 8 is bolted with high-frequency hydraulic hammer 6, so as to piling machine of the present utility model can expire Sufficient concrete pipe pile foundation and steel pile foundation are constructed, and piling range of application is wider, meanwhile, with reference to ripe intelligently guiding control system System uses GNSS location technologies, sensor technology and software engineering, and the high-precision intelligent of GPS/BDS is guided into control system In photovoltaic piling machine, GPS high accuracy photovoltaic foundation piling works are realized, in the present embodiment, piling machine adopts GPS positioning system, Automatic location function is realized, the work of pile foundation point position early stage unwrapping wire is eliminated, the piling precision in plane reaches 10mm, The absolute altitude precision of pile tube can reach 20mm, need the mapping worker of early stage specialty to carry out lineman relative to old-fashioned piling machine Make, effectively save manpower expenditure, while improve piling efficiency, and beat with absolute altitude relative in old-fashioned piling machine plane Stake precision is 30~50mm, and piling precision of the present utility model significantly gets a promotion.Meanwhile, controlled by high-precision intelligent guiding Piling process, guides operation, piling machine to realize 24h all weather operations with night work, greatly improve work without the need for personnel Industry efficiency, effectively shortens the duration, and old-fashioned piling machine can only operation on daytime.
In another kind of embodiment, slide rail is vertically offered on the brill mast lateral wall of photovoltaic piling machine, on the slide rail Slide block is provided with, the slide block is limited on the slide rail and moves, and the lateral wall of the slide block is fixed with the vibration hammer, also It is to say that vibration hammer is slidably connected with slide rail by slide block with the brill mast, meanwhile, the upper end of the brill mast is provided with master winch System 3 and secondary hoisting system 2, the master winch system is connected by steel wire rope with vibration hammer upper end, during piling, by controlling master Controlling the height and position of vibration hammer, vibration hammer is limited on the brill mast and is vertically moved, come hoisting system by slide block The height and position of adjustment pile tube, and piling operation is carried out, the secondary hoisting system is connected by steel wire rope with the pile tube, pile tube During installation, pile tube is lifted into vibration hammer lower end by the secondary hoisting system so that pile tube upper end is docked with fixture, realize pile tube with The fixation of vibration hammer, during piling, pile tube keeps being connected with pair hoisting system, on the one hand for strengthening pile tube and vibration hammer Connective stability, prevent from being come off from fixture, on the other hand, reduce pile tube rocking during piling, improve piling essence Degree.
On the brill mast, the mobile route in short transverse is the brill for vibration hammer vertical movement in the present embodiment The height of mast, mobile range is bigger, so as to the piling machine in the present embodiment is suitable for the long reachable 11.5m of stake, beats relative to old-fashioned Ram machine construction length is 6 meters or so, improves the photovoltaic pile tube piling length that can be driven piles.
Meanwhile, piling machine has elevator pressurization, enhanced feature, and master winch system coordinates high-frequency hydraulic hammer, is applied to Plus-pressure on pile tube, power is promoted to can reach 8t, pressurization, to lift speed adjustable, maximum up to 0.85m/s, and relative to old-fashioned Piling machine pile pulling operational difficulties are loaded down with trivial details, and piling machine piling of the present utility model is in hgher efficiency.
In another kind of embodiment, spring is arranged with the brill mast on the slide rail top, for further improving vibration The lower pressure of hammer, improves the lower pressure of piling and piling efficiency, and the upper end of the spring is fixed on the top of the brill mast, under spring Hold as free end, while the spring is on the mobile route of the slide block, when vibration hammer rises to brill by main winch During mast upper end, slide block compression spring, when vibration hammer moves down piling, spring release, improve vibration hammer downstream rate and Lower pressure, further increases piling efficiency.
In another kind of embodiment, the brill mast bottom is provided with several extension springs, the lower end of the extension spring and the brill mast Bottom connects, and the upper end of the extension spring is connected with slider bottom, and during the extension spring nature, the upper end of extension spring is less than described The bottom of slide rail, it is to avoid hinder the descending process of piling, the extension spring is parallel with mast is bored, and extension spring is used to further improve vibration The lower pressure of hammer, improves the lower pressure of piling and piling efficiency, and the extension spring works as vibration hammer on the mobile route of the slide block When rising to brill mast upper end by main winch, sliding block pull extension spring, when vibration hammer moves down piling, extension spring retraction is carried The downstream rate and lower pressure of high vibration hammer, further increases piling efficiency.
In another kind of embodiment, offer on the slide block and vertically offer chute, the chute is fastened on the slide rail Upper movement, on the chute inwall beam is provided with, and for reducing pile tube and collision on the ground generation during piling are absorbed Vibrations, and then the vibrations of piling machine body are reduced, the comfortableness taken on the one hand is improve, while point of driving piles is difficult because of vibrations Deviate, improve piling precision, be fixed with the outer wall of the beam and lead boots, the boots of leading are limited on the slide rail mobile leading Boots serve good guide effect, reduce frictional resistance of the slide block on slide rail.
From the above mentioned, piling machine of the present utility model combines ripe intelligently guiding control system, and piling machine is fixed using GPS Position system, realizes automatic location function, eliminates the work of pile foundation point position early stage unwrapping wire, realizes GPS location high accuracy Piling precision reaches 10mm in high efficiency photovoltaic piling work, plane, and absolute altitude precision reaches 20mm, and before old-fashioned piling machine needs The mapping worker of phase specialty is carried out in setting-out work, and plane and absolute altitude precision is 30-50mm;Meanwhile, piling machine can meet Concrete pipe pile foundation and steel pile foundation are constructed, and are suitable for stake long up to 11.5m;And old-fashioned piling machine construction length is 6 meters or so; Further, piling machine can realize 24h all weather operations with night work, greatly improve operating efficiency;And old-fashioned piling machine Can only operation on daytime;Also, piling machine has elevator pressurization, enhanced feature, plus-pressure, promotion power are 8t, pressurize, lift speed It is adjustable, it is maximum up to 0.85m/s;And old-fashioned piling machine pile pulling operational difficulties are loaded down with trivial details;Finally, piling machine uses the mode pair for clamping Pile foundation end is fixed, and greatly improves hammer force, and hammer force meets the project construction of different soil property situations up to 48t; And old-fashioned piling machine carries out piling construction using the principle that high frequency impacts stake top, pile body is easily damaged.
Although embodiment of the present utility model is disclosed as above, it is not restricted in specification and embodiment Listed utilization, it can be applied to completely various suitable fields of the present utility model, for those skilled in the art, Other modification is easily achieved, therefore under the universal limited without departing substantially from claim and equivalency range, this reality Specific details is not limited to new and shown here as the legend with description.

Claims (10)

1. a kind of photovoltaic piling machine with hi-Fix, it is characterised in that include:
Mobile platform, is provided with rotating mechanism;
Mast is bored, it is arranged on the rotating mechanism, on the brill mast first antenna is provided with;
Vibration hammer, its vertical sliding motion is arranged on the brill mast, and the vibration hammer is high-frequency hydraulic hammer, under the vibration hammer End is provided with the fixture for fixing pile tube, and the vibration hammer top is provided with the second antenna, second antenna and the folder Tool is not on same vertical line.
2. there is as claimed in claim 1 the photovoltaic piling machine of hi-Fix, it is characterised in that the mobile platform is shoe Belt mobile platform, 360 ° of the rotating mechanism is freely rotatably arranged on the mobile platform.
3. there is as claimed in claim 2 the photovoltaic piling machine of hi-Fix, it is characterised in that the brill mast is vertically arranged On the rotating mechanism, the first antenna is arranged on the side wall of the brill mast.
4. there is as claimed in claim 3 the photovoltaic piling machine of hi-Fix, it is characterised in that on the brill mast lateral wall Slide rail is vertically offered, slide block is provided with the slide rail, the slide block is limited on the slide rail and moves, outside the slide block Side wall is fixed with the vibration hammer.
5. there is as claimed in claim 4 the photovoltaic piling machine of hi-Fix, it is characterised in that the upper end of the brill mast sets Master winch system and secondary hoisting system are equipped with, the master winch system is connected by steel wire rope with vibration hammer upper end, the secondary volume Raise system to be connected with the pile tube by steel wire rope.
6. there is as claimed in claim 5 the photovoltaic piling machine of hi-Fix, it is characterised in that the fixture passes through bolt It is connected with the vibration hammer, the jaws of the fixture is opened up down, the pile tube upper end is vertically folded in the jaws, described The lower surface of the vibration hammer is supported by the fixture in the upper end of pile tube.
7. there is as claimed in claim 6 the photovoltaic piling machine of hi-Fix, it is characterised in that on the mobile platform also Control system is provided with, the control system is connected with the communication of the first antenna, the second antenna and ground base station.
8. there is as claimed in claim 7 the photovoltaic piling machine of hi-Fix, it is characterised in that the institute on the slide rail top State and spring is arranged with brill mast, the upper end of the spring is fixed on the top of the brill mast, and the spring is in the slide block Mobile route on.
9. there is as claimed in claim 7 the photovoltaic piling machine of hi-Fix, it is characterised in that the brill mast bottom is arranged There are several extension springs, the lower end of the extension spring is connected with the brill mast bottom, and the upper end of the extension spring is connected with slider bottom, institute When stating extension spring nature, the upper end of extension spring is less than the bottom of the slide rail.
10. there is as claimed in claim 7 the photovoltaic piling machine of hi-Fix, it is characterised in that open up on the slide block Having vertically offer chute, and the chute is fastened on the slide rail and moves, and on the chute inwall beam is provided with, described Be fixed with the outer wall of beam and lead boots, it is described lead boots and be limited on the slide rail move.
CN201621123883.6U 2016-10-14 2016-10-14 Photovoltaic pile driver with hi -Fix Expired - Fee Related CN206128066U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621123883.6U CN206128066U (en) 2016-10-14 2016-10-14 Photovoltaic pile driver with hi -Fix

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621123883.6U CN206128066U (en) 2016-10-14 2016-10-14 Photovoltaic pile driver with hi -Fix

Publications (1)

Publication Number Publication Date
CN206128066U true CN206128066U (en) 2017-04-26

Family

ID=58573423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621123883.6U Expired - Fee Related CN206128066U (en) 2016-10-14 2016-10-14 Photovoltaic pile driver with hi -Fix

Country Status (1)

Country Link
CN (1) CN206128066U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284351A (en) * 2016-10-14 2017-01-04 江苏聚亿智能科技有限公司 There is the photovoltaic piling machine of hi-Fix

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284351A (en) * 2016-10-14 2017-01-04 江苏聚亿智能科技有限公司 There is the photovoltaic piling machine of hi-Fix

Similar Documents

Publication Publication Date Title
CN108843857B (en) Municipal pipeline construction device and construction method
CN106284351A (en) There is the photovoltaic piling machine of hi-Fix
CN106677811A (en) Tunnel automatic construction equipment and construction method
CN201707453U (en) Auxiliary device for radar nondestructive detection used in wall of tunnel
CN214993824U (en) Telescopic long-lead-hole pile driving device for bridge erecting pile driver
CN110656890B (en) Deepwater geological drilling casing, casing hoisting system and casing hoisting method
CN206128066U (en) Photovoltaic pile driver with hi -Fix
CN201882805U (en) Underground self-moving type multifunctional assembling machine
CN207609374U (en) Lift self-travel type full-sleeve full-rotation drill
CN110552359B (en) Support hanging basket type high and steep slope anchoring construction method
CN202417302U (en) Vibrating drilling type impact digging drilling machine
CN202626989U (en) Large-diameter stepping type guide frame with steel pile casing
US9797199B1 (en) High speed precision guide device for creating holes for piles or other support members
CN214463879U (en) Portable engineering reconnaissance rig that fetches earth
CN110552357B (en) Tower crane type high and steep slope anchoring construction method
CN110552358B (en) Construction equipment for anchoring tower crane type high and steep slope
CN2401594Y (en) Drop hammer pile driver
CN105604060B (en) Dam breaking opening pile jetting machine and pile jetting method thereof
CN211813313U (en) Crawler-type lifting vehicle for coal mine
CN110552627B (en) Support hanging basket type high and steep slope anchor and use construction equipment
CN102155017A (en) Construction method of lifting arm frame-type pile machine and adopted device
CN206550613U (en) A kind of special mounting platform of drag conveyor chute
CN204252122U (en) A kind of self-propelled automatic lifting full circle swinging integrally constructs machine
CN206512706U (en) One kind can tuning it is multi-functional it is middle pick fetch earth plant stake device
CN214940114U (en) Piling and hole guiding device for bridge erecting pile driver

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20211014

CF01 Termination of patent right due to non-payment of annual fee