CN214993824U - Telescopic long-lead-hole pile driving device for bridge erecting pile driver - Google Patents

Telescopic long-lead-hole pile driving device for bridge erecting pile driver Download PDF

Info

Publication number
CN214993824U
CN214993824U CN202120977612.1U CN202120977612U CN214993824U CN 214993824 U CN214993824 U CN 214993824U CN 202120977612 U CN202120977612 U CN 202120977612U CN 214993824 U CN214993824 U CN 214993824U
Authority
CN
China
Prior art keywords
pile
pulley
frame
hammer
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120977612.1U
Other languages
Chinese (zh)
Inventor
杨树金
冯欣华
庞国达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Liyuan Hydraulic Machinery Co ltd
Original Assignee
Guangdong Liyuan Hydraulic Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Liyuan Hydraulic Machinery Co ltd filed Critical Guangdong Liyuan Hydraulic Machinery Co ltd
Priority to CN202120977612.1U priority Critical patent/CN214993824U/en
Application granted granted Critical
Publication of CN214993824U publication Critical patent/CN214993824U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a flexible long hole pile driver device that draws that bridge pile driver used, including the pile hammer, the stand pylon, pile frame mounting platform, the longitudinal movement frame, the top support frame, the hydraulic power head, flexible drilling rod, the spiral drilling tool, the vertical sliding connection of trailing flank of pile hammer and stand pylon, the top support frame, the vertical sliding connection of leading flank of hydraulic power head and stand pylon, flexible drilling rod includes outer pole, the inlayer pole, the flexible nestification of inlayer pole is in the inside of outer pole, the upper end and the top support frame swivelling joint of outer pole, the lower extreme of outer pole passes the guide pin bushing of hydraulic power head, and rather than swivelling joint, the inlayer pole passes the guide pin bushing and is connected with the spiral drilling tool. The utility model discloses utilize the longitudinal movement frame to remove to the front end of frame bridge crane, implement vertical unsettled pile, if meet the thick hardpan of pile sinking difficulty, utilize the spiral drilling tool to stretch out and draw back the hole, the mode of reuse hammering pile sinking carries out the pile sinking behind the hole of drawing for the engineering progress reduces construction cost.

Description

Telescopic long-lead-hole pile driving device for bridge erecting pile driver
Technical Field
The utility model relates to a pile foundation construction equipment technical field especially relates to a flexible long lead hole pile driver device that bridge crane used.
Background
The construction of the upper structural member of the existing highway, railway, pipeline and the like viaduct increasingly adopts a method of prefabricating in factories and then transporting to a site for assembly so as to accelerate the construction progress. The bridge girder erection machine is equipment for driving on a bridge track and placing a prefabricated beam piece on a prefabricated bridge pier, and the method requires that a lower pile foundation is constructed in advance, and the pile foundation needs an independent construction scheme to be constructed in advance. If the engineering geological conditions are complex or in rivers, seas and lakes, the pile foundation construction difficulty is large, the engineering progress is slow, and the construction cost is high by adopting additional equipment such as a piling ship, a temporary trestle and the like.
In order to solve these problems, the applicant patent of the present invention is a utility model patent with CN201921824290.6, which discloses a self-supporting pile driver, the self-supporting pile driver comprises a bridge erecting mechanism, a pile driving mechanism, a folding mechanism, the pile driving mechanism mounted on the bridge erecting mechanism through the folding mechanism comprises a column tower, an amplitude guide rail, a rotary support, an amplitude cylinder fixing seat, a movable bolt, a lifting winch, a lifting steel wire rope, a lifting pulley block, a pile driving hammer and a front guide rail, and the pile driving mechanism can only hammer a common precast pile on a soft soil layer foundation. However, in practical engineering, since the engineering has a high requirement on settlement control, a soil layer below a soft soil layer is required to be used as a bearing layer, so that the precast tubular pile generally needs to penetrate through a soft soil layer and a hard soil layer above the soft soil layer, generally a sandy soil layer, and when the thickness of the sandy soil layer is large (generally more than 10m), the pile sinking of the large-diameter tubular pile is very difficult no matter the hammering and static pressure pile sinking process is adopted due to the soil plug effect, particularly for the large-diameter tubular pile. For projects which generally need to cross thicker sandy soil layers (generally more than 10m) and have longer pile lengths (generally more than 40m), pile sinking by adopting a hammering process is very difficult.
Therefore, it is required to develop a pile driving pilot device for a bridge erecting machine, which is capable of performing a self-supporting pile driving in the air and performing a pile sinking operation in a thick hard soil layer, so as to increase a construction speed.
Disclosure of Invention
An object of the utility model is to foretell not enough, a flexible long lead hole pile driver device that bridge crane was used is provided, this flexible long lead hole pile driver device utilizes the longitudinal movement frame to move to the front end of bridge crane, implement vertical unsettled pile, if when meetting the thick hardpan of heavy pile difficulty, the spiral drilling tool of usable flexible drilling rod lower extreme stretches out and draws back whole journey long lead hole, recycle the mode of pile hammer hammering heavy pile behind the lead hole and carry out the pile foundation and sink the pile operation, accelerate the engineering progress, reduce construction cost.
The technical scheme is as follows:
a telescopic long-lead-hole pile driving device for a bridge pile driver comprises a pile hammer, a stand column tower, a pile frame mounting platform, a longitudinal moving frame, a top supporting frame, a hydraulic power head, a telescopic drill rod, a spiral drilling tool, a drop hammer winch, a drop drill winch, a drop hammer steel wire rope and a drop drill steel wire rope, wherein the pile frame mounting platform is transversely and slidably connected with the top surface of the longitudinal moving frame, the stand column tower vertically penetrates through the pile frame mounting platform and is fixedly connected with the pile frame tower, the pile hammer is vertically and slidably connected with the rear side surface of the stand column tower, the top supporting frame, the hydraulic power head and the front side surface of the stand column tower are vertically and slidably connected, the top supporting frame is positioned above the hydraulic power head, the hydraulic power head is provided with a guide sleeve, the telescopic drill rod comprises an outer layer rod and an inner layer rod, and the inner layer rod is telescopically nested in the outer layer rod, the upper end of the outer layer rod is rotatably connected with the top support frame, the lower end of the outer layer rod penetrates through the guide sleeve and is rotatably connected with the guide sleeve, and the inner layer rod telescopically penetrates through the guide sleeve and is connected with the upper end of the spiral drilling tool; the hoisting drill winch and the hoisting hammer winch are respectively installed on the pile frame installation platform and are respectively located on the left side and the right side of the upright post tower, the hoisting hammer winch is connected with the upper end of the pile hammer in a lifting driving mode through the hoisting hammer steel wire rope, and the hoisting drill winch is connected with the upper end of the inner-layer rod in a lifting driving mode through the hoisting hammer steel wire rope.
The pile frame mounting platform comprises a pile frame mounting platform body, and is characterized by further comprising a first supporting rod and a second supporting rod, wherein the first platform supporting frame and the second platform supporting frame are respectively mounted at two ends of the front side face of the pile frame mounting platform body, the lower end of the first supporting rod is hinged to the left side face of the upright tower frame, the upper end of the first supporting rod is hinged to the first platform supporting frame, the lower end of the second supporting rod is hinged to the right side face of the upright tower frame, and the upper end of the second supporting rod is hinged to the second platform supporting frame.
The support device is characterized by further comprising a first support oil cylinder and a second support oil cylinder, wherein the upper end of the first support rod is hinged to the first platform support frame through the first support oil cylinder, and the upper end of the second support rod is hinged to the second platform support frame through the second support oil cylinder.
The top pulley yoke comprises a drill rod pulley block and a drop hammer pulley block, the top pulley yoke is in a cross shape, the drill rod pulley block and the drop hammer pulley block are respectively positioned at the front end and the rear end of the top pulley yoke, the drop hammer steel wire rope is connected with the upper end of the pile hammer in a lifting driving mode through the drop hammer pulley block, and the drop drill steel wire rope is connected with the upper end of the inner layer rod in a lifting driving mode through the drill rod pulley block.
The top pulley frame further comprises a first transition guide pulley and a second transition guide pulley, the top pulley frame further comprises a first steering pulley, a second steering pulley, a third steering pulley and a fourth steering pulley, the first transition guide pulley and the second transition guide pulley are respectively arranged on the pile frame mounting platform and are positioned on the left side and the right side of the upright tower frame, the first steering pulley and the second steering pulley are respectively arranged on the left side and the right side of the top pulley frame, the third steering pulley and the fourth steering pulley are respectively arranged in the middle of the top pulley frame, one end of a hanging drill steel wire rope is connected with the hanging drill winch, the other end of the hanging drill steel wire rope sequentially bypasses the first transition guide pulley, the first steering pulley and the third steering pulley to be connected with the pulley block drill rod, one end of a hanging hammer steel wire rope is connected with the hanging hammer winch, and the other end of the hammock steel wire rope sequentially bypasses the second transition guide pulley, the second steering pulley and the fourth steering pulley to be connected with the hammock pulley block.
The tower frame comprises an upper stand column section, a stand column twisting section, a middle stand column section and a lower stand column section, the stand column tower frame is fixedly connected with the pile frame mounting platform through the stand column twisting section, the upper stand column section is connected with the upper end of the stand column twisting section, the lower stand column section is connected with the lower end of the stand column twisting section through the middle stand column section, and the working platform is mounted on the lower stand column section.
The upright post tower is a flower shelf type upright post or a cylinder type upright post.
The pile hoisting mechanism comprises a pile hoisting machine, a pile hoisting steel wire rope group and a lifting hook, the pile hoisting machine is installed on the pile frame installation platform, and the pile hoisting machine is connected with the lifting hook through the pile hoisting steel wire rope group.
Still include the sash weight slide rail, draw the hole slide rail, the sash weight slide rail is installed on the trailing flank of stand pylon, draw the hole slide rail to be installed on the leading flank of stand pylon, the pile hammer passes through the sash weight slide rail with the vertical sliding connection of trailing flank of stand pylon, top sprag frame, hydraulic power head pass through draw the hole slide rail with the vertical sliding connection of leading flank of stand pylon.
The pile frame mounting platform is connected with the longitudinal moving frame in a transverse driving mode through the transverse driving oil cylinder.
It should be noted that:
the foregoing references to "first and second …" do not denote any particular quantity or order, but rather are used to distinguish one name from another.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
The foregoing "lateral direction" is based on the left-right direction shown in the drawings, the foregoing "longitudinal direction" is based on the front-rear direction shown in the drawings, and the foregoing "vertical direction" is based on the vertical direction shown in the drawings.
The advantages or principles of the invention are explained below:
1. the utility model provides a flexible long lead hole pile driver that bridging pile driver was used, it includes pile hammer, stand pylon, pile pylon mounting platform, longitudinal movement frame, top support frame, hydraulic power head, flexible drilling rod, spiral drilling tool, hammer hoist engine, hammer wire rope, the front side installation flexible drilling rod and spiral drilling tool at stand pylon, flexible drilling rod and spiral drilling tool can realize pile foundation long lead hole, hydraulic power head is used for driving flexible drilling rod and spiral drilling tool to rotate, the pile hammer is installed to the rear side of stand pylon, the pile hammer is used for hammering pile sinking again behind pile foundation long lead hole, during the use, if meet the thick hardpan of pile sinking when, utilize the longitudinal movement frame to move the pile driver that contracts to the front end of bridge girder erection machine earlier, because pile pylon mounting platform and longitudinal movement frame's top surface lateral sliding connection, so that the pile frame mounting platform is transversely moved, the spiral drilling tool of the telescopic guide hole pile driving device is positioned right above the pile position of the construction pile foundation, the guide holes are aligned, then the hydraulic power head is used for driving the telescopic drilling rod to rotate, the telescopic drilling rod drives the spiral drilling tool to rotate, the telescopic drilling rod extends under the action of the spiral drilling tool and self weight, the whole-process long guide hole is formed in the pile position of the pile foundation, after the long guide hole of the pile foundation is completed, the hanging drill winch is started, the inner layer rod of the telescopic drilling rod is lifted, the telescopic drilling rod is contracted, the spiral drilling tool is lifted out of the pile hole, the telescopic long guide hole pile driving device is moved forwards by using the longitudinal moving frame, the pile driving hammer is positioned right above the pile position of the construction pile foundation, the pile driving hammer is hammered and aligned, then the lower end of the precast pile driving pipe pile to be constructed is inserted into the pile hole, the upper end of the precast pipe pile driving pipe pile to be constructed is placed below the pile driving hammer, the precast pipe pile driving hammer is sunk into the pile foundation, completing pile foundation construction; this flexible long lead hole pile driver device utilizes the longitudinal movement frame to remove to the front end of bridging machine, implements vertical unsettled pile, if when meetting the thick hardpan of pile sinking difficulty, the spiral drilling tool of usable flexible drilling rod lower extreme is flexible whole long lead hole, recycles the mode of pile hammer hammering pile sinking behind the lead hole and carries out pile foundation pile sinking operation for the engineering progress reduces construction cost.
2. The utility model discloses still include first bracing piece, second bracing piece, pile frame mounting platform, stand pylon, bracing piece three form a stable triangle-shaped bearing structure, make the pile draw hole device's overall structure more stable.
3. The utility model discloses still include first support cylinder, second support cylinder, utilize two support cylinders to adjust the support angle of two bracing pieces, simple structure, convenient to use.
4. The utility model discloses still include the top pulley yoke, the top pulley yoke includes drilling rod assembly pulley, drop hammer assembly pulley, and the drive is connected to the upper end of drop hammer wire rope through drop hammer assembly pulley and pile hammer, and the drop drill wire rope is connected through the upper end of drilling rod assembly pulley with the inlayer pole and is carried the drive, makes carrying of pile hammer and flexible drilling rod carry more laborsavingly.
5. The utility model discloses still include first transition leading pulley, second transition leading pulley, top pulley yoke still includes first diverting pulley, second diverting pulley, third diverting pulley, fourth diverting pulley, realizes wire rope's steering drive, simple structure, convenient to use through transition leading pulley and diverting pulley.
6. The utility model also comprises a working platform, the upright tower frame comprises an upright upper section, an upright twisting section, an upright middle section and an upright lower section, the working platform provides a man-standing platform for the installation operation of the precast tubular pile, and particularly provides a working platform for operators in the pile foundation construction in the rivers and lakes with complicated engineering geological conditions, thereby reducing the cost for erecting a temporary platform in the rivers and lakes and reducing the construction cost; the upright post tower is divided into a plurality of sections, so that various installation combinations of the upright post tower are facilitated, and in another embodiment, when the distance between the bridge girder erection machine and the ground is too short, the middle section of the upright post can be installed above the hinge section of the upright post, so that the lower part of the pile frame installation platform is shorter than the upper part, and the capability of the pile driving hole guiding device in adapting to various construction environments is improved. Preferably, the upright tower is a flower shelf type upright or a cylinder type upright. The flower-frame type upright post is of a truss structure formed by welding angle irons, and the cylindrical upright post is formed by connecting a plurality of sections of cylindrical steel pipes.
7. The utility model discloses still include pile hanging mechanism, pile hanging mechanism is used for supplementary below at the pile hammer of waiting to be under construction precast tubular pile to install.
8. The utility model discloses still including the sash weight slide rail, draw the hole slide rail, the pile hammer is through the trailing flank sliding connection of sash weight slide rail and stand pylon, and fore flank sliding connection of roof bracing frame, hydraulic power head through draw the hole slide rail and stand pylon makes the slip of pile hammer, roof bracing frame, hydraulic power head and stand pylon more smooth and easy.
9. The utility model discloses still include the transverse drive hydro-cylinder, pile frame mounting platform passes through its transverse movement on the longitudinal movement frame of transverse drive hydro-cylinder drive, simple structure, convenient to use.
Drawings
Fig. 1 is a schematic perspective view of a telescopic long-lead-hole piling device for a bridge erecting pile driver according to an embodiment of the present invention.
Fig. 2 is a partially enlarged schematic view of fig. 1-a.
Fig. 3 is a right side view of the telescopic long-lead-hole piling device for the bridge erecting pile driver according to the embodiment of the present invention.
Fig. 4 is a rear view of the telescopic long-lead-hole piling device for the bridge erecting pile driver according to the embodiment of the present invention.
Description of reference numerals:
10. a pile driving hammer 11, a hanging hammer hoist 12, a hanging hammer steel wire rope 13, a hanging hammer slide rail 20, a column tower 21, a column upper section 22, a column hinge section 23, a column middle section 24, a column lower section 31, a column frame mounting platform 311, a first platform support frame 312, a second platform support frame 32, a longitudinal moving frame 41, a hydraulic power head 42, a telescopic drill rod 421, an outer layer rod 422, an inner layer rod 43, a spiral drill 44, a hanging drill hoist 45, a hanging drill steel wire rope 46, a guide hole slide rail 50, a working platform 60, a hanging pile mechanism 61, a hanging pile hoist 62, a hanging pile steel wire rope group 63, a hook 71, a transverse driving oil cylinder 72, a bridge erecting machine 73, a pipe pile 81, a first support rod 82, a second support rod 83, a first support oil cylinder 84, a second support oil cylinder 85, a first transition guide pulley, 86. a second transition guide pulley, 90, a top pulley yoke, 91, a drill pipe pulley block, 92, a hammerhead pulley block, 93, a first diverting pulley, 94, a second diverting pulley, 95, a third diverting pulley, 96 and a fourth diverting pulley.
Detailed Description
The following describes embodiments of the present invention in detail.
Referring to fig. 1 to 4, the present invention provides a telescopic long-guiding-hole piling device for a bridge erecting pile driver, which comprises a pile hammer 10, a column tower 20, a pile frame mounting platform 31, a longitudinal moving frame 32, a top support frame, a hydraulic power head 41, a telescopic drill rod 42, a spiral drill 43, a hammer hoist 11, a hammer hoist 44, a hammer wire rope 12, a hammer wire rope 45, a pile frame mounting platform 31 and a top surface of the longitudinal moving frame 32 are transversely slidably connected, a column tower 20 vertically penetrates through the pile frame mounting platform 31 and is fixedly connected with the pile frame mounting platform, the pile hammer 10 and a rear side of the column tower 20 are vertically slidably connected, the top support frame, the hydraulic power head 41 and a front side of the column tower 20 are vertically slidably connected, the top support frame is located above the hydraulic power head 41, the hydraulic power head 41 has a guide sleeve, the telescopic drill rod 42 comprises an outer rod 421, a lower end of the pile hammer is fixedly connected with the column tower 20, and a lower end of the upper end of the lower end of the pile driver is connected with the lower end of the pile frame, the lower end of the pile frame, the lower end of, The inner rod 422 is telescopically nested inside the outer rod 421, the upper end of the outer rod 421 is rotatably connected with the top support frame, the lower end of the outer rod 421 penetrates through the guide sleeve and is rotatably connected with the guide sleeve, and the inner rod 422 telescopically penetrates through the guide sleeve and is connected with the upper end of the spiral drilling tool 43; the hanging drill winch 44 and the hanging hammer winch 11 are respectively arranged on the pile frame mounting platform 31 and are respectively positioned at the left side and the right side of the upright tower frame 20, the hanging hammer winch 11 is connected with the upper end lifting and pulling drive of the pile driving hammer 10 through a hanging hammer steel wire rope 12, and the hanging drill winch 44 is connected with the upper end lifting and pulling drive of the inner layer rod 422 through a hanging drill steel wire rope 45.
The front side surface of the upright tower 20 is provided with a telescopic drill rod 42 and a spiral drilling tool 43, the telescopic drill rod 42 and the spiral drilling tool 43 can realize long hole leading of a pile foundation, the hydraulic power head 41 is used for driving the telescopic drill rod 42 and the spiral drilling tool 43 to rotate, the rear side surface of the upright tower 20 is provided with the pile driving hammer 10, the pile driving hammer 10 is used for hammering a pile after the long hole leading of the pile foundation, when the pile driving hammer is used, if a thick hard soil layer with difficult pile sinking is met, the longitudinal moving frame 32 is firstly used for moving the lengthening hole leading pile driving device to the front end of the bridge girder erection machine 72, the pile frame erection platform 31 is transversely and slidably connected with the top surface of the longitudinal moving frame 32, so that the pile frame erection platform 31 is transversely moved, the spiral drilling tool 43 of the lengthening hole leading pile driving device is positioned right above the pile position of the construction pile foundation, the power head leading holes are aligned, then the hydraulic power head 41 is used for driving the telescopic drill rod 42 to rotate, and the telescopic drill rod 42 drives the spiral drilling tool 43 to rotate, the telescopic drill rod 42 is extended under the action of the spiral drill 43 and the dead weight, full-length hole leading is carried out on the pile position of the pile foundation, after the long hole leading of the pile foundation is finished, the hoisting drill winch 44 is started, the inner layer rod 422 of the telescopic drill rod 42 is lifted, the telescopic drill rod 42 is contracted, the spiral drill 43 is further lifted out of the pile hole, the longitudinal moving frame 32 is used for moving the telescopic long hole leading pile driving device forwards, the pile driving hammer 10 is located right above the pile position of the construction pile foundation, the pile driving hammer is hammered and aligned, then the lower end of the precast tubular pile 73 to be constructed is inserted into the pile hole, the upper end of the precast tubular pile 73 to be constructed is placed below the pile driving hammer 10, and the pile driving hammer 10 is used for sinking the precast tubular pile 73 to be constructed into the pile foundation, so that the pile foundation construction is finished; this flexible long lead hole pile driver device utilizes longitudinal movement frame 32 to remove to the front end of bridging machine 72, implements vertical unsettled pile, if when meetting the thick hardpan of pile sinking difficulty, the spiral drilling tool 43 of usable flexible drilling rod 42 lower extreme stretches out and draws the hole by a whole journey, recycles the mode that the pile hammer 10 hammering sunk the pile behind the draw hole and carries out the pile foundation pile sinking operation, reduces construction cost for the engineering progress.
The utility model discloses still include first bracing piece 81, second bracing piece 82, first supporting cylinder 83, second supporting cylinder 84, top pulley yoke 90, first transition leading pulley 85, second transition leading pulley 86, pile frame mounting platform 31 still includes first platform support frame 311, second platform support frame 312, first platform support frame 311, second platform support frame 312 installs the both ends at pile frame mounting platform 31 leading flank respectively, the lower extreme of first bracing piece 81 is articulated with the left surface of stand pylon 20, first supporting cylinder 83 is articulated with first platform support frame 311 through first supporting cylinder 83 in the upper end of first bracing piece 81, the lower extreme of second bracing piece 82 is articulated with the right flank of stand pylon 20, the upper end of second bracing piece 82 is articulated with second platform support frame 312 through second supporting cylinder 84. The pile frame mounting platform 31, the upright tower 20 and the support rod form a stable triangular support structure, so that the overall structure of the pile driving hole guiding device is more stable. The supporting angle of the two supporting rods is adjusted by the two supporting oil cylinders, the structure is simple, and the use is convenient.
The top pulley yoke 90 comprises a drill pipe pulley block 91 and a hanging hammer pulley block 92, the top pulley yoke 90 is in a cross shape, the drill pipe pulley block 91 and the hanging hammer pulley block 92 are respectively positioned at the front end and the rear end of the top pulley yoke 90, a hanging hammer steel wire rope 12 is connected with the upper end of the pile driving hammer 10 in a lifting driving mode through the hanging hammer pulley block 92, and a hanging drill steel wire rope 45 is connected with the upper end of the inner layer rod 422 in a lifting driving mode through the drill pipe pulley block 91. The hammer wire rope 12 is connected with the upper end lifting drive of the pile hammer 10 through a hammer pulley block 92, and the drill wire rope 45 is connected with the upper end lifting drive of the inner layer rod 422 through a drill rod pulley block 91, so that the lifting of the pile hammer 10 and the telescopic drill rod 42 is more labor-saving.
The top pulley frame 90 further comprises a first diverting pulley 93, a second diverting pulley 94, a third diverting pulley 95 and a fourth diverting pulley 96, the first transition guiding pulley 85 and the second transition guiding pulley 86 are respectively installed on the pile frame installation platform 31 and are positioned at the left side and the right side of the upright tower 20, the first diverting pulley 93 and the second diverting pulley 94 are respectively installed at the left side and the right side of the top pulley frame 90, the third diverting pulley 95 and the fourth diverting pulley 96 are respectively installed at the middle part of the top pulley frame 90, one end of the hanging drill steel wire rope 45 is connected with the hanging drill winch 44, the other end of the hanging drill steel wire rope 45 sequentially rounds the first transition guiding pulley 85, the first diverting pulley 93 and the third diverting pulley 95 and is connected with the drill pipe pulley block 91, one end of the hanging hammer steel wire rope 12 is connected with the hanging hammer hoist 11, and the other end of the hanging hammer steel wire rope 12 sequentially rounds the second transition guiding pulley 86, the second diverting pulley 94, the third diverting pulley 95 and the hanging hammer hoist steel wire rope 12, The second diverting pulley 94 and the fourth diverting pulley 96 are connected with the hammerhead pulley block 92. The transition guide pulley and the steering pulley are used for realizing steering driving of the steel wire rope, and the steel wire rope steering device is simple in structure and convenient to use.
Further, the utility model discloses still include work platform 50, pile hoist mechanism 60, drop hammer slide rail 13, draw hole slide rail 46, horizontal drive cylinder 71, stand pylon 20 includes stand upper segment 21, stand hank festival 22, festival 23 in the stand, stand lower segment 24, stand pylon 20 passes through stand hank festival 22 and pile frame mounting platform 31 fixed connection, stand upper segment 21 is connected with stand hank festival 22's upper end, stand lower segment 24 passes through in the stand to be connected with stand hank festival 22's lower extreme, work platform 50 installs under the stand on festival 24. The working platform 50 provides a man-standing platform for the installation operation of the precast tubular piles 73, and particularly provides the working platform 50 for operators in the construction of pile foundations in rivers, seas and lakes with complicated engineering geological conditions, so that the cost for erecting temporary platforms in the rivers, seas and lakes is reduced, and the construction cost is reduced; the upright tower 20 is divided into a plurality of sections to facilitate various installation combinations of the upright tower 20, and in another embodiment, when the distance from the bridge girder erection machine 72 to the ground is too short, the upright middle section 23 can be installed above the upright hinge section 22, so that the lower part of the pile frame installation platform 31 is shorter than the upper part, and the capability of the pile driving and hole guiding device to adapt to various construction environments is improved. Preferably, the mast tower 20 is a pergola mast or a cylinder mast (not shown). The flower-frame type upright post is a truss structure which is welded by angle iron and is shown in the attached drawing, and the cylindrical upright post is formed by connecting a plurality of sections of cylindrical steel pipes.
The pile hanging mechanism 60 comprises a pile hanging winch 61, a pile hanging steel wire rope group 62 and a lifting hook 63, the pile hanging winch 61 is installed on the pile frame installation platform 31, and the pile hanging winch 61 is connected with the lifting hook 63 through the pile hanging steel wire rope group 62. The pile driving mechanism 60 is used to assist in installing the precast tubular pile 73 to be constructed below the pile driving hammer 10.
The drop hammer slide rail 13 is installed on the rear side surface of the upright tower 20, the guide hole slide rail 46 is installed on the front side surface of the upright tower 20, the pile driving hammer 10 is vertically and slidably connected with the rear side surface of the upright tower 20 through the drop hammer slide rail 13, and the top support frame and the hydraulic power head 41 are vertically and slidably connected with the front side surface of the upright tower 20 through the guide hole slide rail 46. The sliding of the piling hammer 10, the top support frame, the hydraulic power head 41 and the upright tower 20 is smoother.
The pile mounting platform 31 is in transverse driving connection with the longitudinal moving frame 32 through a transverse driving oil cylinder 71. The pile frame mounting platform 31 is driven to transversely move on the longitudinal moving frame 32 through the transverse driving oil cylinder 71, and the pile frame mounting platform is simple in structure and convenient to use.
The above are only specific embodiments of the present invention, and the protection scope of the present invention is not limited thereby; any replacement and improvement made on the basis of not violating the conception of the utility model belong to the protection scope of the utility model.

Claims (10)

1. A telescopic long-lead-hole pile driving device for a bridge erecting pile driver is characterized by comprising a pile driving hammer, a stand column tower, a pile frame mounting platform, a longitudinal moving frame, a top supporting frame, a hydraulic power head, a telescopic drill rod, a spiral drilling tool, a hanging hammer winch, a hanging drill winch, a hanging hammer steel wire rope and a hanging drill steel wire rope, wherein the pile frame mounting platform is transversely and slidably connected with the top surface of the longitudinal moving frame, the stand column tower vertically penetrates through the pile frame mounting platform and is fixedly connected with the pile frame tower, the pile driving hammer is vertically and slidably connected with the rear side surface of the stand column tower, the top supporting frame, the hydraulic power head and the front side surface of the stand column tower are vertically and slidably connected, the top supporting frame is positioned above the hydraulic power head, the hydraulic power head is provided with a guide sleeve, the telescopic drill rod comprises an outer layer rod and an inner layer rod, and the inner layer rod is telescopically nested in the outer layer rod, the upper end of the outer layer rod is rotatably connected with the top support frame, the lower end of the outer layer rod penetrates through the guide sleeve and is rotatably connected with the guide sleeve, and the inner layer rod telescopically penetrates through the guide sleeve and is connected with the upper end of the spiral drilling tool; the hoisting drill winch and the hoisting hammer winch are respectively installed on the pile frame installation platform and are respectively located on the left side and the right side of the upright post tower, the hoisting hammer winch is connected with the upper end of the pile hammer in a lifting driving mode through the hoisting hammer steel wire rope, and the hoisting drill winch is connected with the upper end of the inner-layer rod in a lifting driving mode through the hoisting hammer steel wire rope.
2. The telescopic long lead hole pile driving device for the bridge pile driver as claimed in claim 1, further comprising a first support rod and a second support rod, wherein the pile frame mounting platform further comprises a first platform support frame and a second platform support frame, the first platform support frame and the second platform support frame are respectively mounted at two ends of the front side of the pile frame mounting platform, the lower end of the first support rod is hinged to the left side of the upright tower, the upper end of the first support rod is hinged to the first platform support frame, the lower end of the second support rod is hinged to the right side of the upright tower, and the upper end of the second support rod is hinged to the second platform support frame.
3. The telescopic long-lead piling device for the bridge piling machine according to claim 2, further comprising a first support cylinder and a second support cylinder, wherein the upper end of the first support rod is hinged to the first platform support frame through the first support cylinder, and the upper end of the second support rod is hinged to the second platform support frame through the second support cylinder.
4. The telescopic long-pilot-hole piling device for the bridge piling machine according to claim 1, further comprising a top pulley yoke, wherein the top pulley yoke comprises a drill pipe pulley block and a drop hammer pulley block, the top pulley yoke is cross-shaped, the drill pipe pulley block and the drop hammer pulley block are respectively positioned at the front end and the rear end of the top pulley yoke, the drop hammer steel wire rope is connected with the upper end lifting drive of the piling hammer through the drop hammer pulley block, and the drop drill steel wire rope is connected with the upper end lifting drive of the inner-layer rod through the drill pipe pulley block.
5. The telescopic long-lead pile driving device for the bridge pile driver as claimed in claim 4, further comprising a first transition guide pulley, a second transition guide pulley, and a top pulley frame, wherein the top pulley frame further comprises a first diverting pulley, a second diverting pulley, a third diverting pulley, and a fourth diverting pulley, the first transition guide pulley and the second transition guide pulley are respectively mounted on the pile frame mounting platform and located at the left and right sides of the column tower, the first diverting pulley and the second diverting pulley are respectively mounted at the left and right sides of the top pulley frame, the third diverting pulley and the fourth diverting pulley are respectively mounted at the middle part of the top pulley frame, one end of the hanging drill steel wire rope is connected with the hanging drill hoist, and the other end of the hanging drill steel wire rope sequentially passes around the first transition guide pulley, the first diverting pulley, the third diverting pulley, and the fourth diverting pulley, And the third steering pulley is connected with the drill pipe pulley block, one end of the drop hammer steel wire rope is connected with the drop hammer winch, and the other end of the drop hammer steel wire rope sequentially bypasses the second transition guide pulley, the second steering pulley and the fourth steering pulley and is connected with the drop hammer pulley block.
6. The pile driver with telescopic long lead holes for the bridge pile driver as claimed in any one of claims 1 to 5, further comprising a working platform, wherein the column tower comprises an upper column section, a hinge section, a middle column section and a lower column section, the column tower is fixedly connected with the pile frame mounting platform through the hinge section, the upper column section is connected with the upper end of the hinge section, the lower column section is connected with the lower end of the hinge section, and the working platform is mounted on the lower column section.
7. The telescopic long-lead pile driving device for the bridge pile driver as claimed in claim 6, wherein the column tower is a pergola column or a cylinder column.
8. The telescopic long pilot hole pile driving device for the bridge pile driver as claimed in any one of claims 1 to 5, further comprising a pile hoisting mechanism, wherein the pile hoisting mechanism comprises a pile hoisting winch, a pile hoisting steel wire rope set and a lifting hook, the pile hoisting winch is mounted on the pile frame mounting platform, and the pile hoisting winch is connected with the lifting hook through the pile hoisting steel wire rope set.
9. The telescopic long-lead hole pile driving device for the bridge pile driver as claimed in any one of claims 1 to 5, further comprising a hanging hammer slide rail and a lead hole slide rail, wherein the hanging hammer slide rail is mounted on the rear side surface of the upright tower, the lead hole slide rail is mounted on the front side surface of the upright tower, the pile driving hammer is vertically and slidably connected with the rear side surface of the upright tower through the hanging hammer slide rail, and the top support frame and the hydraulic power head are vertically and slidably connected with the front side surface of the upright tower through the lead hole slide rail.
10. The telescopic long-pilot-hole pile driving device for the bridge pile driver as claimed in any one of claims 1 to 5, further comprising a transverse driving cylinder, wherein the pile frame installation platform is in transverse driving connection with the longitudinal moving frame through the transverse driving cylinder.
CN202120977612.1U 2021-05-08 2021-05-08 Telescopic long-lead-hole pile driving device for bridge erecting pile driver Active CN214993824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120977612.1U CN214993824U (en) 2021-05-08 2021-05-08 Telescopic long-lead-hole pile driving device for bridge erecting pile driver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120977612.1U CN214993824U (en) 2021-05-08 2021-05-08 Telescopic long-lead-hole pile driving device for bridge erecting pile driver

Publications (1)

Publication Number Publication Date
CN214993824U true CN214993824U (en) 2021-12-03

Family

ID=79133742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120977612.1U Active CN214993824U (en) 2021-05-08 2021-05-08 Telescopic long-lead-hole pile driving device for bridge erecting pile driver

Country Status (1)

Country Link
CN (1) CN214993824U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114481834A (en) * 2021-12-07 2022-05-13 中铁工程机械研究设计院有限公司 Pile frame erection all-in-one machine and erection method
CN117905064A (en) * 2024-03-20 2024-04-19 如东恒正建设工程质量检测有限公司 Automatic piling equipment based on construction
CN118029893A (en) * 2024-04-11 2024-05-14 山河智能装备股份有限公司 Hole guiding pile pressing machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114481834A (en) * 2021-12-07 2022-05-13 中铁工程机械研究设计院有限公司 Pile frame erection all-in-one machine and erection method
CN117905064A (en) * 2024-03-20 2024-04-19 如东恒正建设工程质量检测有限公司 Automatic piling equipment based on construction
CN117905064B (en) * 2024-03-20 2024-05-24 如东恒正建设工程质量检测有限公司 Automatic piling equipment based on construction
CN118029893A (en) * 2024-04-11 2024-05-14 山河智能装备股份有限公司 Hole guiding pile pressing machine

Similar Documents

Publication Publication Date Title
CN214993824U (en) Telescopic long-lead-hole pile driving device for bridge erecting pile driver
CN113216176B (en) Bridge erecting and pile driving and hole guiding integrated machine and pile driving method thereof
CN110952552A (en) Large-diameter PHC precast tubular pile construction method and pile driver for implementing same
CN216515576U (en) Hole guiding, reaming and piling device for bridge erecting pile driver
CN110952550B (en) Suspended self-supporting pile driving method and pile driver
CN104563119A (en) Rotating type floating pile driving guide frame
CN210288383U (en) Rotary drilling and piling integrated machine
CN113152289B (en) Pile driving and beam erecting integrated construction method
CN102900360A (en) Combined type digging and drilling machine
CN211446913U (en) Pile driver for large-diameter PHC prefabricated pipe pile
CN111254837B (en) Construction method for building bridge by bridge crane fishing method
CN211446903U (en) Drilling, guiding and hammering integrated machine in PHC (prestressed high-strength concrete) pipe pile
CN211113627U (en) Unsettled self-supporting formula pile driver
CN113047179A (en) Pile and frame roof beam all-in-one
CN214940114U (en) Piling and hole guiding device for bridge erecting pile driver
CN204510221U (en) Rotary marine piling saddle
CN116856389A (en) Construction method of large-diameter and ultra-long filling pile in limited space
CN215441884U (en) Drilling and hammering integrated machine
CN215329387U (en) Pile and frame roof beam all-in-one
CN110952539A (en) Drilling, guiding and hammering integrated machine in PHC (prestressed high-strength concrete) pipe pile
CN202165011U (en) Combined type digging drill machine
JP2001248375A (en) Suspension mobile type pile driving device and pile driving method using it
CN212612030U (en) Pile bridge erection construction all-in-one
CN108952568B (en) Drilling machine
CN220486414U (en) Foundation improvement machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant