CN208618399U - A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit - Google Patents
A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit Download PDFInfo
- Publication number
- CN208618399U CN208618399U CN201821163858.XU CN201821163858U CN208618399U CN 208618399 U CN208618399 U CN 208618399U CN 201821163858 U CN201821163858 U CN 201821163858U CN 208618399 U CN208618399 U CN 208618399U
- Authority
- CN
- China
- Prior art keywords
- end plate
- rod iron
- pipe pile
- concrete pipe
- reserved
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit, attachment device when being related to concrete pipe pile construction, between tubular pole.It includes first end plate and the second end plate, and 3~7 connectors are arranged in first end plate, pin clamp is opened up on connector, and rod iron anchor hole is reserved in first end plate, and rod iron anchor hole is reserved on the second end plate, opens up bolt hole on the second end plate.The utility model has the beneficial effect that is anchored at pile body both ends for first end plate and the second end plate by the rod iron anchor hole reserved on rod iron anchor hole and the second end plate reserved in first end plate using rod iron when use respectively, then by first end plate and the second end plate connection by way of connector is using buckle, connection speed is fast, the construction time is greatly reduced, improves construction efficiency.
Description
Technical field
A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit, when being related to concrete pipe pile construction, between tubular pole
Attachment device.
Background technique
With the deep development that China reforms and opens up to the outside world, every new technology of building engineering field, new process, new material also exist
The development of leap.In short several years, prestressed pipe pile foundation has obtained popularization energetically at home, especially coastal strand
Basis is founded a capital largely using pile for prestressed pipe in the road basis in area and room.At present pile for prestressed pipe connection frequently be
It is welded to connect, but consuming time is long, construction quality is difficult to control for welding.
Summary of the invention
It is fast that problem to be solved in the utility model provides a kind of connection speed aiming above insufficient, and quality of connection
Guaranteed concrete tubular pile attachment device.Its technical solution is as follows:
It includes first end plate and the second end plate, and 3~7 connectors are arranged in first end plate, open up on connector
Pin clamp reserves rod iron anchor hole in first end plate, and rod iron anchor hole is reserved on the second end plate, is opened up on the second end plate
Bolt hole.
The first end plate and the second end plate are connected by screw bolts.
First end plate and the second end plate are lockked using bolt.
First end plate and second 16~18mm of end plate thickness.
Compared with prior art, the utility model has the beneficial effect that
1, rod iron reserved on rod iron anchor hole and the second end plate reserved in first end plate is passed through using rod iron when using
First end plate and the second end plate are anchored at pile body both ends by anchor hole respectively, then by the by way of connector is using buckle
End plate and the second end plate connection, connection speed is fast, and the construction time is greatly reduced, and improves construction efficiency;
2, the utility model attachment device is connected using high-strength bolt, and quality of connection is guaranteed;
3, the utility model attachment device reduces welding sequence, to reduce the pollution to environment and construction personnel
Injury.
Detailed description of the invention
Fig. 1 is the utility model usage state diagram;
Fig. 2 is the utility model first end plate structural schematic diagram;
Fig. 3 is the second tip plate configurations of the utility model schematic diagram;
Fig. 4 is the utility model first end plate top view;
Fig. 5 is the utility model bolt arrangement schematic diagram;
Fig. 6 is the utility model latch structure schematic diagram;
Fig. 7 is 1-1 sectional view in Fig. 2.
Specific embodiment
Referring to FIG. 1 to FIG. 7, the utility model includes first end plate 1 and the second end plate 2, and 3~7 are arranged in first end plate 1
A connector 1a, opens up notch wherein and forms pin clamp 1c on some connector 1a, rod iron anchoring is reserved in first end plate 1
Hole 1b reserves rod iron anchor hole 2b on the second end plate 2, opens up bolt hole 2a on the second end plate 2.
The first end plate 1 and the second end plate 2 are quickly connected using special bolt 3 by bolt hole 2a.Bolt 3 uses
45# Steel material is made.
After the attachment device completes connection, first end plate 1 and the second end plate 2 are lockked by pin clamp 1c using bolt 4.
Bolt is made using Q235B section steel material.
The first end plate 1 and the second end plate 2 use Q235B shape steel plate, 16~18mm of end plate thickness.
Setting metal magazine 1d, metal magazine 1d and connector 1a form buckle structure in the first end plate 1.Connection dress
After setting docking, enter the nut of bolt 3 in metal magazine 1d, completes connection.
The utility model work progress is as follows:
1, when tubular pole is when factory is prefabricated, connecting hole is reserved at pile body both ends, and when construction is passed through in first end plate using rod iron
First end plate 1 and the second end plate 2 are distinguished anchor by the rod iron anchor hole 2b reserved on reserved rod iron anchor hole 1b and the second end plate
Gu at pile body both ends, and being equipped with corresponding special bolt 3 when leaving the factory;
2, in work progress, downwards by first end plate 1, pile body upwards, is sent into the soil body using equipment, outside by the second end plate 2
Leak 50cm pile crown.Special bolt 3 is installed in the bolt hole 2a on the second end plate 2 of tubular pole, using equipment by next section pipe
Stake is sling, and docks the connector 1a in next section first end plate 1 with the special bolt on the second end plate 2;
3, after completing docking, start slewing, make tubular pole with the rotation of the tubular pole center point of rotation, keep special bolt 3 complete
It is complete to enter in lock, then simple bolt 4 is put into pin clamp 1c, simple bolt 4 is welded with end plate.
4, continue pile follower after checking non-loosening, repeat above step, complete tube pile construction.
Claims (5)
1. a kind of pretensioned prestressed concrete pipe pile Quick Connect Kit, it is characterised in that including first end plate (1) and second
3~7 connectors (1a) are arranged on first end plate (1), pin clamp (1c) is opened up on connector (1a) for end plate (2), the
Rod iron anchor hole (1b) is reserved on end plate (1), rod iron anchor hole (2b) is reserved on the second end plate (2), in the second end plate (2)
On open up bolt hole (2a).
2. pretensioned prestressed concrete pipe pile Quick Connect Kit according to claim 1, it is characterised in that first end plate
(1) it is connected with the second end plate (2) using bolt (3).
3. pretensioned prestressed concrete pipe pile Quick Connect Kit according to claim 1, it is characterised in that use bolt
(4) first end plate (1) and the second end plate (2) are lockked.
4. pretensioned prestressed concrete pipe pile Quick Connect Kit according to claim 1, it is characterised in that first end plate
(1) and the second end plate (2) 16~18mm of thickness.
5. pretensioned prestressed concrete pipe pile Quick Connect Kit according to claim 1, it is characterised in that first end plate
(1) metal magazine (1d) is set in, metal magazine (1d) and connector (1a) form buckle structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821163858.XU CN208618399U (en) | 2018-07-20 | 2018-07-20 | A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821163858.XU CN208618399U (en) | 2018-07-20 | 2018-07-20 | A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208618399U true CN208618399U (en) | 2019-03-19 |
Family
ID=65706690
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821163858.XU Active CN208618399U (en) | 2018-07-20 | 2018-07-20 | A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208618399U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111910624A (en) * | 2020-07-08 | 2020-11-10 | 龙世金 | Inserted automatic locking prestressed concrete pile |
-
2018
- 2018-07-20 CN CN201821163858.XU patent/CN208618399U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111910624A (en) * | 2020-07-08 | 2020-11-10 | 龙世金 | Inserted automatic locking prestressed concrete pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106894523B (en) | Connecting joint of rectangular steel pipe concrete column and steel reinforced concrete beam | |
CN101298770B (en) | Bottom enlarging prestress conical pipe pile and construction method thereof | |
CN101851925A (en) | Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method | |
CN206467667U (en) | Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh | |
CN201512810U (en) | Retaining wall | |
CN108999281A (en) | A kind of novel precast concrete bean column node and its construction method | |
CN104790388B (en) | A kind of prefabricated pile mechanical connecting structure and attaching method thereof | |
CN208618399U (en) | A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit | |
CN111827279A (en) | Sawtooth-shaped tubular pile quick connector | |
CN102345292B (en) | A kind of composite prestressed uplift pile with enlarged footing | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN203080510U (en) | Pin-sleeved type pile joint | |
CN104563103A (en) | Composite-reinforcement partially-prestressed concrete solid square pile and production method thereof | |
CN104196023B (en) | A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device | |
CN211285579U (en) | Quick pile extension is to stake, anti-pulling concrete precast pile joint | |
CN206941588U (en) | A kind of simple positioning tool of steel-pipe pile spreading | |
CN106013200A (en) | Prefabricated assembly type strip foundation and construction technology | |
CN103498573B (en) | Set up the existing frame strengthening method of band frame bracing members | |
CN206205012U (en) | A kind of SMW engineering methods stake inclinometer pipe installation aiding device | |
CN212336001U (en) | Sawtooth-shaped tubular pile quick connector | |
CN205776152U (en) | Prestressed anchor waveform sheet pile retaining structure | |
CN209227902U (en) | Prefabricated concrete structure column steel pipe socket shell ring point | |
CN212506738U (en) | Semi-rigid hinge joint with prefabricated part dry connection and hinge first and then rigid | |
CN208618398U (en) | A kind of dedicated end plate of pile for prestressed pipe connection | |
CN205062813U (en) | But ground tackle of recovery type anchor rope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||