CN212984292U - Structure platform unit body articulates structure - Google Patents

Structure platform unit body articulates structure Download PDF

Info

Publication number
CN212984292U
CN212984292U CN202021304851.2U CN202021304851U CN212984292U CN 212984292 U CN212984292 U CN 212984292U CN 202021304851 U CN202021304851 U CN 202021304851U CN 212984292 U CN212984292 U CN 212984292U
Authority
CN
China
Prior art keywords
plate
vertical
transverse
hanging
unit body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021304851.2U
Other languages
Chinese (zh)
Inventor
蔡玲
李必武
乐俊
陆家淞
杨琴
吴梦春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Jiangho Curtain Wall System Engineering Co ltd
Jangho Group Co Ltd
Beijing Jangho Curtain Wall Co Ltd
Beijing Jangho Curtain Wall System Engineering Co Ltd
Original Assignee
Chengdu Jiangho Curtain Wall System Engineering Co ltd
Jangho Group Co Ltd
Beijing Jangho Curtain Wall System Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jiangho Curtain Wall System Engineering Co ltd, Jangho Group Co Ltd, Beijing Jangho Curtain Wall System Engineering Co Ltd filed Critical Chengdu Jiangho Curtain Wall System Engineering Co ltd
Priority to CN202021304851.2U priority Critical patent/CN212984292U/en
Application granted granted Critical
Publication of CN212984292U publication Critical patent/CN212984292U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A hanging structure of a structural slab staggering unit body comprises a building structure and a hanging piece; the building structure is provided with a pre-embedded plate, a first supporting plate is fixedly arranged on the outer side of the pre-embedded plate and comprises a first vertical plate and a first transverse plate, the first vertical plate is fixedly connected with the pre-embedded plate, long holes are formed in two sides of the first transverse plate, a second supporting plate is arranged on the top surface of the first transverse plate and comprises a second vertical plate and a second transverse plate, and the second transverse plate is fixedly connected with the first transverse plate through fixing bolts located in the long holes; the hanging piece comprises two third vertical plates, and a third transverse plate is arranged between the two third vertical plates; the top of the third vertical plate positioned above is provided with an inverted L-shaped hook plate, and the hook plate is hung at the top of the second vertical plate; the outer side face of the hook plate is provided with a horizontal adjusting plate, the middle of the adjusting plate is provided with a vertical adjusting bolt, and the bottom end of the adjusting bolt is abutted to the top face of the second vertical plate.

Description

Structure platform unit body articulates structure
Technical Field
The utility model belongs to the technical field of building curtain, especially a structure dislocation unit cell cube articulates structure.
Background
The unit curtain wall has the characteristics of high installation quality, high production efficiency, suitability for large-area engineering construction, convenience in cross operation and high construction speed, so that most of the unit curtain walls are suitable for high-rise and super high-rise curtain wall engineering. However, the existing unit body installation mode is more suitable for a simple structure with a straight construction surface and a flat structure, and the curtain wall is in the structure and has a concave-convex modeling, so that the requirements are difficult to meet, and the following defects are generally existed: 1. when the curtain wall with staggered structures is encountered, the requirements for installation and disassembly are difficult to meet; 2. for the unit bodies with small operation space and difficult hanging, the unit bodies can not be hoisted.
SUMMERY OF THE UTILITY MODEL
In view of the above problem, the utility model aims at providing a structure dislocation platform cell cube articulates structure, and it can improve the installation effectiveness, and the reduction of erection time satisfies the construction requirement.
In order to achieve the purpose, the utility model adopts the following technical proposal:
a hanging structure of a structural slab staggering unit body comprises a building structure and a hanging piece;
the outer vertical surface of the building structure is in a step shape and is provided with a convex surface and a concave surface; the convex surface is provided with an embedded plate, an L-shaped first supporting plate is fixedly arranged on the outer side of the embedded plate, the first supporting plate comprises a first vertical plate and a first transverse plate, the first vertical plate is fixedly connected with the embedded plate, two sides of the first transverse plate are provided with long holes, and the length direction of each long hole is perpendicular to the first vertical plate; the top surface of the first transverse plate is provided with an L-shaped second supporting plate, the second supporting plate comprises a second vertical plate and a second transverse plate, and the second transverse plate is fixedly connected with the first transverse plate through a fixing bolt positioned in the long hole;
the hanging piece is Z-shaped integrally and comprises two third vertical plates, and a third transverse plate is arranged between the two third vertical plates; the third vertical plate positioned above is opposite to the convex surface, and the third vertical plate positioned below is opposite to the concave surface; the top of the third vertical plate positioned above is provided with an inverted L-shaped hook plate, and the hook plate is hung at the top of the second vertical plate; the outer side face of the hook plate is provided with a horizontal adjusting plate, the middle of the adjusting plate is provided with a vertical adjusting bolt, and the bottom end of the adjusting bolt is abutted to the top face of the second vertical plate.
Furthermore, the third riser that is located the top is connected with the fossil fragments fixed connection of building upper curtain, the third riser that is located the below is connected with the fossil fragments of building lower floor's curtain.
Further, an aluminum plate is arranged between the building upper curtain wall and the building lower curtain wall.
Furthermore, the hook plate is provided with a hanging hole.
The utility model has the advantages that: the utility model discloses structure dislocation platform cell cube articulates structure, and it can improve the installation effectiveness, and reduction of erection time satisfies the construction requirement, is applicable to the curtain of structure dislocation platform, has solved the problem that operating space is little, hang the difficulty.
Drawings
Fig. 1 is a side view of the structure slab staggering unit body hanging structure of the utility model.
Fig. 2 is a sectional view taken in the direction of a-a in fig. 1.
Fig. 3 is a top view of the structure slab staggering unit body hanging structure of the present invention.
Detailed Description
The invention is further illustrated by the following figures and examples.
As shown in fig. 1-3, the utility model provides a structure slab staggering unit body hanging structure, which comprises a building structure 1 and a hanging piece 2.
The building structure 1 has a stepped outer facade with a convex surface 11 and a concave surface 12. This convex surface 11 is equipped with pre-buried board 13, and this pre-buried board 13 outside is fixed and is equipped with the first backup pad 14 of L type, and this first backup pad 14 includes first riser 141 and first diaphragm 142, fixed connection (for example welding) between this first riser 141 and this pre-buried board 13, and this first diaphragm 142 both sides are equipped with slot hole 143, and the length direction of this slot hole 143 is perpendicular with this first riser 141. The top surface of the first horizontal plate 142 is provided with an L-shaped second supporting plate 15, the second supporting plate 15 includes a second vertical plate 151 and a second horizontal plate 152, and the second horizontal plate 152 is fixedly connected with the first horizontal plate 142 through a fixing bolt 153 located in the long hole 143. The first support plate 14 and the second support plate 15 form a U-shaped groove structure.
The hanging part 2 is Z-shaped integrally and comprises two third vertical plates 21, and a third transverse plate 22 is arranged between the two vertical plates. The third riser 21 located above is opposite to the convex surface 11, and the third riser 21 located below is opposite to the concave surface 12. The top of the third vertical plate 21 above is provided with an inverted-L-shaped hook plate 23, and the hook plate 23 is hung on the top of the second vertical plate 151. The hook plate 23 is provided with a lifting hole 24, which is convenient for lifting. This couple board 23 lateral surface is equipped with horizontally regulating plate 25, and this regulating plate 25 middle part is equipped with vertical adjusting bolt 26, and this adjusting bolt 26's bottom offsets with this second riser 151 top surface.
The in-out position of the hanging piece 2 can be adjusted by adjusting the fixing bolt 153; the height of the hanging piece 2 can be adjusted by adjusting the adjusting bolt 26; the horizontal position of the hanging piece 2 can be adjusted by adjusting the position of the hook plate 23 on the second vertical plate 151.
In this embodiment, the third vertical plate 21 located above is fixedly connected with the keel of the building upper curtain wall 3 through an adapter, and the third vertical plate 21 located below is connected with the keel of the building lower curtain wall 4 through a bolt. Preferably, an aluminum plate 5 is arranged between the building upper curtain wall 3 and the building lower curtain wall 4 to shield the hanging part 2.
The utility model has the characteristics as follows:
firstly, the hanging and connecting piece 2 can penetrate through a keel (top cross beam) of the building upper curtain wall 3 to serve as a hanging piece of a unit body, so that a floor can be spanned, and the problem that a staggered platform structure is difficult to install is solved; secondly, the on-site hanging cable passes through the hanging hole 24 on the hanging piece 2 and can be hung to a proper position, so that the problem that the staggered platform structure is difficult to hoist is solved; thirdly, the fixing bolt 153 is adjusted to be in a proper position when the fixing bolt enters and exits, and then the hanging and connecting piece 2 is hung on the second supporting plate 15, so that the mounting process is convenient; fourthly, the vertical height of the adjusting bolt 26 is adjusted to meet the requirement of installation height, and the adjusting distance is large, safe and reliable.
The above embodiments are merely illustrative of the principles and effects of the present invention, and are not to be construed as limiting the invention. The present invention can be modified in many ways without departing from the spirit and scope of the present invention, and those skilled in the art can modify or change the above embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which may be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (4)

1. A hanging structure of a structural slab staggering unit body is characterized by comprising a building structure and a hanging piece;
the outer vertical surface of the building structure is in a step shape and is provided with a convex surface and a concave surface; the convex surface is provided with an embedded plate, an L-shaped first supporting plate is fixedly arranged on the outer side of the embedded plate, the first supporting plate comprises a first vertical plate and a first transverse plate, the first vertical plate is fixedly connected with the embedded plate, two sides of the first transverse plate are provided with long holes, and the length direction of each long hole is perpendicular to the first vertical plate; the top surface of the first transverse plate is provided with an L-shaped second supporting plate, the second supporting plate comprises a second vertical plate and a second transverse plate, and the second transverse plate is fixedly connected with the first transverse plate through a fixing bolt positioned in the long hole;
the hanging piece is Z-shaped integrally and comprises two third vertical plates, and a third transverse plate is arranged between the two third vertical plates; the third vertical plate positioned above is opposite to the convex surface, and the third vertical plate positioned below is opposite to the concave surface; the top of the third vertical plate positioned above is provided with an inverted L-shaped hook plate, and the hook plate is hung at the top of the second vertical plate; the outer side face of the hook plate is provided with a horizontal adjusting plate, the middle of the adjusting plate is provided with a vertical adjusting bolt, and the bottom end of the adjusting bolt is abutted to the top face of the second vertical plate.
2. The structure dislocation unit body hanging structure according to claim 1, wherein: the third riser that is located the top is connected with the fossil fragments fixed connection of building upper curtain, the third riser that is located the below is connected with the fossil fragments of building lower floor's curtain.
3. The structure dislocation unit body hanging structure according to claim 2, wherein: and an aluminum plate is arranged between the building upper curtain wall and the building lower curtain wall.
4. The structure dislocation unit body hanging structure according to claim 1, wherein: the hook plate is provided with a hanging hole.
CN202021304851.2U 2020-07-06 2020-07-06 Structure platform unit body articulates structure Active CN212984292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021304851.2U CN212984292U (en) 2020-07-06 2020-07-06 Structure platform unit body articulates structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021304851.2U CN212984292U (en) 2020-07-06 2020-07-06 Structure platform unit body articulates structure

Publications (1)

Publication Number Publication Date
CN212984292U true CN212984292U (en) 2021-04-16

Family

ID=75425708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021304851.2U Active CN212984292U (en) 2020-07-06 2020-07-06 Structure platform unit body articulates structure

Country Status (1)

Country Link
CN (1) CN212984292U (en)

Similar Documents

Publication Publication Date Title
CN112064856A (en) Suspended ceiling pre-hanging piece and floor structure of building with same
CN212984292U (en) Structure platform unit body articulates structure
CN211200882U (en) Steel construction conversion layer furred ceiling
CN112196156A (en) Unit curtain wall plate anti-drop hanging joint and construction method thereof
CN202272607U (en) Traction machine base and installation tool of traction machine
CN208202294U (en) Furred ceiling conversion layer structure
CN215626237U (en) Hanging crane rail mounting mechanism for net rack roof
CN210507901U (en) Assembled wall module
CN210086725U (en) Assembled for building externally-hung wallboard fossil fragments convenient to installation
CN220580578U (en) Various steel sheet wallboard installation cage of steel construction factory building
CN219431096U (en) Buckle plate for connecting with suspension type wedge-shaped sliding lifting self-locking keel
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN218714237U (en) Hanging connection structure between overhanging eave and outdoor ceiling
CN213330082U (en) Hoisting system for mounting assembled metal curtain wall ceiling board
CN220014415U (en) Combined installation structure of hanging basket hanging mechanism pressing beam L-shaped clamping plate
CN218058159U (en) Adjustable suspension crane track hanging bracket
CN216515174U (en) Fine adjustment operation platform for bridge decoration
CN220336399U (en) Profile steel construction platform for high-altitude overhanging
CN213391146U (en) Anti-falling support mounting structure for elevator shaft steel structure frame
CN217353145U (en) Suspended ceiling convenient to assemble and install
CN220845069U (en) Dedicated balance gallows of prefabricated component
CN216474283U (en) Pier stud structure and suspension type rail transit system
CN214114645U (en) Adjustable lifting support for constructional engineering
CN108999322B (en) Dry-hanging stone system and installation method thereof
CN204788608U (en) Seat formula multisection components of a whole that can function independently truck scale

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant