CN216515174U - Fine adjustment operation platform for bridge decoration - Google Patents

Fine adjustment operation platform for bridge decoration Download PDF

Info

Publication number
CN216515174U
CN216515174U CN202123163578.3U CN202123163578U CN216515174U CN 216515174 U CN216515174 U CN 216515174U CN 202123163578 U CN202123163578 U CN 202123163578U CN 216515174 U CN216515174 U CN 216515174U
Authority
CN
China
Prior art keywords
horizontal
horizontal operation
operation plate
ruler
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123163578.3U
Other languages
Chinese (zh)
Inventor
王玉龙
王鑫
尹立佐
李岩
淡鹏飞
李敬郑航
朱雨言
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
China Railway 12th Bureau Group Construction and Installation Engineering Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
China Railway 12th Bureau Group Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, China Railway 12th Bureau Group Construction and Installation Engineering Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN202123163578.3U priority Critical patent/CN216515174U/en
Application granted granted Critical
Publication of CN216515174U publication Critical patent/CN216515174U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the field of bridge decoration installation construction, and particularly relates to a bridge decoration fine adjustment operating platform; the curtain wall horizontal operation plate comprises a rectangular horizontal operation plate, wherein one side of the horizontal operation plate is provided with a clamping portion used for being connected with the bottom of a box girder in an overhanging mode, and the other opposite side of the horizontal operation plate is provided with a hook used for being connected with a curtain wall transverse keel. The application of the bridge decoration fine adjustment operation platform can improve the mounting precision of the curtain wall grating, the telescopic ruler is arranged, and the horizontal distance between adjacent gratings is ensured by comparing the distance between the adjacent gratings, so that the gratings are linear and attractive, and secondary reworking is avoided; the safety factor is high, and the outer trilateral stainless steel baffle that establishes immediately of case roof beam of horizontal work board can effectively avoid the little article of construction to drop, has guaranteed that high altitude construction is safe, go on in order.

Description

Fine adjustment operation platform for bridge decoration
Technical Field
The utility model belongs to the field of bridge decoration installation construction, and particularly relates to a bridge decoration fine-tuning operation platform.
Background
With the rapid development of Chinese economy and the progress of science and technology, people have higher pursuits in the aspects of spiritual civilization, aesthetic appreciation and the like; in the building field, the method also becomes the primary target of a construction unit for finishing decoration with high quality, high standard and high efficiency. The landscape floating bridge project built by our company has many problems in the installation process of the curtain wall grating, the project amount is large, the construction period is short, the working surface is long, and only straight arm type aerial work platforms can be adopted on the site at two sides of the bridge body. The curtain wall grating is installed by using the straight arm type aerial work platform, the line type at the bottom of the grating is difficult to control, the installation efficiency of the grating in the original process is low, the line type is not attractive, the rework rate of the subsequent engineering is increased, and the whole construction period is delayed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to improve the mounting efficiency of the grating, avoid potential safety hazard caused by falling of small parts in the mounting process of the grating, reduce the secondary rework rate of the grating and provide redundant construction period for subsequent operation.
In order to achieve the purpose, the utility model provides a bridge decoration fine adjustment operating platform which comprises a rectangular horizontal operating plate, wherein one side of the horizontal operating plate is provided with a clamping part used for being in lap joint with a cornice at the bottom of a box girder, the other opposite side of the horizontal operating plate is provided with a hook used for being connected with a transverse keel of a curtain wall, the horizontal operating plate is fixedly connected with the hook through a hanger rod perpendicular to the horizontal operating plate, the horizontal operating plate is suspended on one side of the box girder through the hook and the clamping part, a positioning ruler is arranged on an operating surface of the horizontal operating plate, the positioning ruler is positioned on one side of the mounting position of a grid, and a scale line of the positioning ruler is parallel to the length direction of the box girder.
Further, one side of the horizontal operation plate is provided with an upper clamping plate and a lower clamping plate to form a clamping portion, the overhanging length of the lower clamping plate is longer than that of the upper clamping plate, the overhanging length of the upper clamping plate is equal to that of the cornice at the bottom of the box girder, and the height between the upper clamping plate and the lower clamping plate is equal to the thickness of the cornice at the bottom of the box girder.
Furthermore, baffles are arranged on three sides of the horizontal operation plate, which are positioned outside the box girder.
Furthermore, the positioning ruler is a horizontal telescopic ruler, a ruler box of the horizontal telescopic ruler is fixed on the horizontal operation plate, and the drawing direction of a telescopic inner ruler of the horizontal telescopic ruler is the same as the mounting direction of the grating.
Furthermore, a longitudinal beam is installed on the bottom surface of the horizontal operation plate, the longitudinal beam extends out from the lower portion of the horizontal operation plate, and the suspension rod is connected with the extending section of the longitudinal beam and attached to the horizontal operation plate.
Further, the overhanging length of the upper splint is 30mm, and the overhanging length of the lower splint is 50 mm.
Furthermore, the horizontal operation plate is a stainless steel plate, the baffle is welded on the horizontal operation plate, and the height of the baffle is 30 mm.
Furthermore, the horizontal operation plate is provided with two clamping parts and two hooks.
Compared with the prior art, the utility model has the advantages that:
1. the operation is convenient, and this device principle is simple, and single can operate has practiced thrift the cost of labor. Practice thrift the time limit for a project, the grid of former scheme construction one day only can accomplish 45 meters, after introducing this device, can accomplish 90 meters one day, and the time limit for a project saves half, has improved grid installation effectiveness greatly.
2. The grid mounting accuracy is improved. The clamping part is completely matched with the cornice at the bottom of the box girder, so that the flatness of the grating is ensured; the hook is hung on the transverse keel of the curtain wall, so that the whole horizontal operation plate is parallel to the box girder, and the verticality of the whole grid is ensured. This device is provided with the telescopic ruler, through comparing adjacent grid interval, has guaranteed the horizontal interval of adjacent grid, and then makes the grid line type pleasing to the eye, has avoided the secondary to rework.
3. The safety factor is high. The stainless steel baffle plates are vertically arranged on three sides outside the box girder of the horizontal operation plate, so that small construction objects placed on the horizontal operation plate can be effectively prevented from falling off in the construction process, and the safe and orderly high-altitude operation is guaranteed.
4. The finished product material is easy to protect. The clamping part and the hook have smooth surfaces, and the parallel box girders can be flexibly placed to move, so that the integral installation and the construction are convenient; meanwhile, the fine adjustment operation platform can be ensured not to be damaged due to operation reasons in the process of replacing the position, and the appearance quality is further influenced.
5. Easy preparation and simplified material selection. The device mainly adopts a welding process and is suitable for factory processing. The quality precision, the smoothness and the integrity of the fine adjustment operation platform can be ensured by factory processing. The disassembly is convenient, and the material is saved. The device can be recycled after the installation of the grating, and the waste of materials is avoided.
Drawings
Fig. 1 is a schematic view of the installation and use of the present invention.
Fig. 2 is a side view of the present invention.
In the figure: 1-horizontal operation plate; 2-a clamping part; 2.1-upper splint; 2.2-lower splint; 3-hooking; 4-a boom; 5-positioning a ruler; 6-a baffle plate; 7-longitudinal beams; 8-a grid; 9-a box girder; 9.1-bottom cornice; 10-curtain wall cross keel.
Detailed Description
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
As shown in fig. 1 and 2; the utility model provides a bridge is decorated and is finely tuned operation platform, horizontal operation board 1 including the rectangle, one side of horizontal operation board 1 is provided with and is used for cornicing lapped joint portion 2 with the case roof beam bottom, relative another side is provided with and is used for couple 3 be connected with curtain cross keel, horizontal operation board 1 is through fixed linking to each other rather than vertically jib 4 and couple 3, couple 3 and joint portion 2 all bear vertical effort, can not produce the long to component of perpendicular to case roof beam, when no exogenic action again, joint portion can not come off from the case roof beam bottom cornice, when high altitude construction, the incident that the platform falls can not take place. Hang horizontal operation board 1 in case roof beam one side through couple 3 and joint portion 2, the height of the operation face of horizontal operation board 1 this moment is the bottom elevation of grid promptly, during the grid installation, the bottom is fallen on horizontal operation board 1 and is accomplished high location promptly, install location chi 5 on the operation face of horizontal operation board 1, location chi 5 is located the mounted position one side of grid, its scale mark is parallel with the length of case roof beam, first grid installation is accomplished the back, use first grid as the benchmark, location chi 5 aligns with first grid, then the interval presets apart from installing the second grid, can control the grid interval.
The positioning ruler 5 is a horizontal telescopic ruler, a ruler box of the horizontal telescopic ruler is fixed on the horizontal operation plate 1, and the drawing direction of a telescopic inner ruler of the horizontal telescopic ruler is the same as the mounting direction of the grating.
Specifically, one side of the horizontal operation plate 1 is provided with an upper clamping plate and a lower clamping plate to form a clamping part 2, the overhanging length of the lower clamping plate 2.2 is longer than that of the upper clamping plate 2.1, the overhanging length of the upper clamping plate 2.1 is equal to that of the cornice at the bottom of the box girder, the height between the upper clamping plate and the lower clamping plate is equal to that of the cornice at the bottom of the box girder, the upper clamping plate and the lower clamping plate are respectively attached to the top surface and the bottom surface of the cornice at the bottom of the box girder, and the horizontal operation plate 1 is limited to be only horizontal. The overhanging length of the upper splint 2.1 is 30mm, and the overhanging length of the lower splint 2.2 is 50 mm. Lower plate 2.2 is longer, provides bigger laminating area, provides great counter-force for preventing 1 outer end downwarping of horizontal operation board simultaneously.
Baffle 6 is installed to trilateral being located the box girder on the horizontal operation board 1, can effectively avoid the little article of construction of placing on the horizontal operation board to drop in the work progress, has guaranteed that high altitude construction is safe, go on in order.
The bottom surface of the horizontal operation plate 1 is provided with a longitudinal beam 7, the longitudinal beam 7 extends out from the lower part of the horizontal operation plate 1, and the suspension rod 4 is connected with the extending section of the longitudinal beam 7 and is attached to the horizontal operation plate 1. The contact area of the suspension rod 4 and the horizontal operation plate 1 is increased through the longitudinal beam 7, so that the connection is firmer, and the distortion of the area, connected with the suspension rod 4, on the horizontal operation plate 1 due to uneven stress can be effectively limited.
The horizontal operation plate 1 is a stainless steel plate, the baffle 6 is welded on the horizontal operation plate 1, and the height of the baffle 6 is 30 mm.
Be provided with two joint portions 2 and two couples 3 on the horizontal operation board 1, two joint portions 2 and two couples 3 provide four point support for horizontal operation board 1, can effectively prevent to tumble because of manpower, or the inhomogeneous operation platform that leads to of material dispersion on the horizontal operation board 1.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (8)

1. The utility model provides a bridge decorates fine setting operation platform which characterized in that: horizontal operation board (1) including the rectangle, one side of horizontal operation board (1) is provided with and is used for cornicing lapped joint portion (2) with the case roof beam bottom, the opposite another side is provided with and is used for couple (3) be connected with curtain cross keel, horizontal operation board (1) is fixed continuous through jib (4) rather than vertically and couple (3), hang horizontal operation board (1) in case roof beam one side through couple (3) and joint portion (2), install positioning ruler (5) on the working face of horizontal operation board (1), positioning ruler (5) are located the mounted position one side of grid, its scale mark is parallel with the length of case roof beam to.
2. The bridge decoration fine-tuning operation platform of claim 1, wherein: horizontal operation board (1) one side install upper and lower splint and form a joint portion (2), the length of encorbelmenting of lower splint (2.2) is longer than the length of encorbelmenting of upper splint (2.1), the length of encorbelmenting of upper splint (2.1) equals the length that the box girder bottom was corniced, the height between upper and lower splint equals the thickness that the box girder bottom was corniced.
3. The bridge decoration fine-tuning operation platform of claim 1, wherein: baffle plates (6) are arranged on three sides of the horizontal operation plate (1) outside the box girder.
4. The bridge decoration fine-tuning operation platform of claim 2, wherein: the positioning ruler (5) is a horizontal telescopic ruler, a ruler box of the horizontal telescopic ruler is fixed on the horizontal operation plate (1), and the drawing direction of a telescopic inner ruler of the horizontal telescopic ruler is the same as the mounting direction of the grating.
5. The bridge decoration fine-tuning operation platform of claim 4, wherein: the bottom surface of the horizontal operation plate (1) is provided with a longitudinal beam (7), the longitudinal beam (7) extends out from the lower part of the horizontal operation plate (1), and the suspender (4) is connected with the extending section of the longitudinal beam (7) and is attached to the horizontal operation plate (1).
6. The bridge decoration fine-tuning operation platform of claim 2, wherein: the cantilever length of the upper splint (2.1) is 30mm, and the cantilever length of the lower splint (2.2) is 50 mm.
7. The bridge decoration fine-tuning operation platform of claim 3, wherein: the horizontal operation plate (1) is a stainless steel plate, the baffle (6) is welded on the horizontal operation plate (1), and the height of the baffle (6) is 30 mm.
8. The bridge decoration fine-tuning operation platform of claim 5, wherein: the horizontal operation plate (1) is provided with two clamping parts (2) and two hooks (3).
CN202123163578.3U 2021-12-16 2021-12-16 Fine adjustment operation platform for bridge decoration Active CN216515174U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123163578.3U CN216515174U (en) 2021-12-16 2021-12-16 Fine adjustment operation platform for bridge decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123163578.3U CN216515174U (en) 2021-12-16 2021-12-16 Fine adjustment operation platform for bridge decoration

Publications (1)

Publication Number Publication Date
CN216515174U true CN216515174U (en) 2022-05-13

Family

ID=81499195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123163578.3U Active CN216515174U (en) 2021-12-16 2021-12-16 Fine adjustment operation platform for bridge decoration

Country Status (1)

Country Link
CN (1) CN216515174U (en)

Similar Documents

Publication Publication Date Title
CN101575892B (en) Large-area lower edge nested aluminum plate curved hung ceiling with high punching rate and construction method thereof
CN105804305B (en) Corrugated metal plate ceiling system and its installation method
CN104612307A (en) Suspended ceiling system and construction method thereof
CN102979312A (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN203403674U (en) Adjustable stair steel form of instrument formula
CN112064856A (en) Suspended ceiling pre-hanging piece and floor structure of building with same
CN203213372U (en) F-shaped hanging piece and suspended ceiling system employing same
CN216515174U (en) Fine adjustment operation platform for bridge decoration
CN110792233A (en) Construction method of large aluminum-magnesium-manganese decorative roof panel
CN211257756U (en) Progressive overhanging structure aiming at complex outer vertical surface modeling
CN209369331U (en) A kind of plate device of floor
CN111305448A (en) Suspended ceiling for engineering construction
CN205637282U (en) Wave metal sheet furred ceiling
CN202467172U (en) Steel support structure connected with floor steel beam web
CN113193519B (en) Inner support type bridge frame for bridge, box girder and tunnel construction
CN212478587U (en) Frame structure for construction of curved surface clear water concrete roof
CN208396119U (en) A kind of double center of circle arrow saltire arch ceiling structures
CN210316538U (en) Aluminum mold supporting system for floor lower extension lintel
CN208202548U (en) Support system structure of transvers plate is exempted from a kind of beam slab post-cast strip
CN111648513A (en) Corrugated steel web honeycomb beam floor bearing plate and manufacturing method and using method thereof
CN111305501A (en) Flatness and verticality control technology for large-scale outer wall dry-hanging stone
CN111350302A (en) Aluminum veneer access hole structure, aluminum veneer ceiling system and construction method
CN212984292U (en) Structure platform unit body articulates structure
JPH0324760Y2 (en)
CN206752921U (en) Vertical bonding jumper shape dress decorations trellis system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant