CN212956526U - Equipment for pre-breaking concrete pile head - Google Patents

Equipment for pre-breaking concrete pile head Download PDF

Info

Publication number
CN212956526U
CN212956526U CN202020104064.7U CN202020104064U CN212956526U CN 212956526 U CN212956526 U CN 212956526U CN 202020104064 U CN202020104064 U CN 202020104064U CN 212956526 U CN212956526 U CN 212956526U
Authority
CN
China
Prior art keywords
jack
reinforcement cage
annular hydraulic
pile head
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020104064.7U
Other languages
Chinese (zh)
Inventor
王俊伟
张峰
陈善波
黄玉良
张金龙
宣炳森
叶帅
刁明全
刘智超
徐胜祥
张伦飞
张晓光
金明瑞
姚锡
张金涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ding Hao
Xu Liangyou
Xu Shida
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020104064.7U priority Critical patent/CN212956526U/en
Application granted granted Critical
Publication of CN212956526U publication Critical patent/CN212956526U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of building pile foundations, and discloses a pre-arranged equipment for breaking concrete pile heads, which comprises a reinforcement cage (1), a jack group and an annular hydraulic pipe (4), wherein the annular hydraulic pipe (4) is arranged at the inner side of the reinforcement cage (1) where a pre-fracture surface (2) is positioned; the jack group includes two at least jacks (3), and jack (3) all list in steel reinforcement cage (1), and second wrapping layer (31) are cup jointed in jack (3) outside. The utility model provides an annular hydraulic pressure pipe has beneficial effect such as with low costs, recycle, environmental protection. For example, when the annular hydraulic pipe is made of a plastic pipe or filled with water, the cost is lower than that of the jack. And starting the annular hydraulic pipe, and breaking the concrete with the pre-section. Starting the jack group to generate upward pressure on the concrete with the fractured pre-fracture surface, so that the concrete on the upper side of the fractured pre-fracture surface can be conveniently lifted off; the construction difficulty of prying the concrete on the upper side of the pre-fracture surface is simplified, the working condition time is saved, and the occupational health and safety of workers are guaranteed.

Description

Equipment for pre-breaking concrete pile head
Technical Field
The utility model relates to a building pile basis technical field has especially related to an equipment of leading formula fracture concrete pile head.
Background
In the existing bridge cast-in-situ bored pile construction, the common method is as follows: chiseling by a small machine or cutting the pile head at the designed elevation position by a grinder, chiseling the protective layer concrete of the super-sealed pile head manually, stripping the main reinforcement from the lateral direction, and cleaning the pile head concrete in blocks. The traditional construction method has the following defects: (1) the construction efficiency is low. (3) The working environment is poor. The stripping of the main reinforcement protective layer takes longer time, more construction dust and large noise. (3) After cutting, the large concrete is difficult to transport out of the foundation pit. And (4) when the main reinforcement protective layer is stripped, the reinforcing steel bar is damaged, the bending deformation of the reinforcing steel bar is caused, the tensile strength is reduced, and the joint position becomes a weak point. (5) The cost is high. The pile head treatment time is long, so that the construction period of a foundation pit is long, and the costs of precipitation, water resistance, labor and machinery are high.
Disclosure of Invention
The utility model discloses shortcoming to among the prior art provides an equipment of formula fracture concrete pile head of putting earlier.
In order to solve the technical problem, the utility model discloses a following technical scheme can solve:
the equipment for the pre-arranged type broken concrete pile head comprises a reinforcement cage, a jack group and an annular hydraulic pipe, wherein the jack group is arranged on the reinforcement cage on the upper side of a pre-section, and the annular hydraulic pipe is arranged on the inner side of the reinforcement cage where the pre-section is located; a first wrapping layer is sleeved on the reinforcement cage on the upper side of the pre-fracture surface; the jack group includes two at least jacks, and the jack is connected in the steel reinforcement cage, and the jack outside cup joints the second and wraps up the layer.
Preferably, a fixing clamp is further provided, and the annular hydraulic pipe is fixed to the reinforcement cage through the fixing clamp.
Preferably, the annular hydraulic pipe is a plastic pipe or a metal pipe.
Preferably, the annular hydraulic tube is filled with water or oil.
Preferably, the jack is a solid jack or a hollow jack, the reinforcement cage comprises at least three reinforcements, and the solid jack or the hollow jack is arranged between the reinforcements.
Preferably, the jack is a solid jack or a hollow jack, and the solid jack or the hollow jack is arranged on the inner side or the outer side of the reinforcement cage.
Preferably, the jack is a hollow jack, the reinforcement cage comprises at least three reinforcements, and the hollow jack is sleeved on the reinforcements; a first wrapping layer is arranged between the hollow jack and the steel bar.
Preferably, the material of the first and second wrapping layers is a release medium. The first wrapping layer and the second wrapping layer are pearl cotton wrapping layers or plastic wrapping layers or paper pulp wrapping layers.
Preferably, the jacks are connected in series or in parallel.
Preferably, the jack group further comprises oil pipes, and the jacks are connected in series through the oil pipes.
The utility model provides an annular hydraulic pressure pipe has beneficial effect such as with low costs, recycle, environmental protection. For example, when the annular hydraulic pipe is made of a plastic pipe or filled with water, the cost is lower than that of the jack.
Utilize the utility model discloses a formula of putting earlier fracture concrete pile head's fracture device can conveniently separate the concrete at pile bolck design position automatic fracture, and then has improved follow-up pile head concrete separation work efficiency, practices thrift engineering construction cost, reduces environmental pollution, and guarantee workman occupational health safety reduces engineering safety risk, improves engineering quality.
The utility model discloses owing to adopted above technical scheme, have apparent technological effect: the annular hydraulic tube is activated to first apply pressure to the concrete surrounding it (i.e., the pre-fracture surface) to cause the pre-fracture surface concrete to break. Starting again, the hollow jack or the solid jack generates upward pressure on the concrete with the fractured pre-fracture surface, so that the concrete on the upper side of the fractured pre-fracture surface can be conveniently lifted off; the construction difficulty of prying the concrete on the upper side of the pre-fracture surface by workers is simplified, the working condition time is saved, the environmental pollution is reduced, and the occupational health safety of the workers is guaranteed.
The interlayer is arranged on the outer side of the reinforcement cage, so that the reinforcement cage and the concrete are separated by the interlayer, and the gripping force cannot be formed; when the concrete on the upper side of the pre-breaking layer is recycled, the concrete is easy to separate from the reinforcement cage. The outer side of the hollow jack or the solid jack is provided with a sleeve which is convenient to recover. The device of the utility model is compact in structure and convenient in operation.
Drawings
FIG. 1 is a schematic structural view of example 1.
Fig. 2 is a schematic illustration of the position of the pre-section.
FIG. 3 is a schematic structural view of embodiment 2.
FIG. 4 is a schematic structural view of embodiment 3.
FIG. 5 is a schematic structural view of example 4.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. As shown, 6 is a foundation or casing.
Example 1
A pre-arranged equipment for breaking a concrete pile head is shown in figures 1-2 and comprises a reinforcement cage 1, a jack group and an annular hydraulic pipe 4, wherein the jack group is arranged on the reinforcement cage 1 at the upper side of a pre-section 2, and the annular hydraulic pipe 4 is arranged at the inner side of the reinforcement cage 1 where the pre-section 2 is located; the reinforcement cage 1 on the upper side of the pre-fracture surface is sleeved with a first wrapping layer 11; jack group includes two at least jacks 3, and jack 3 connects in steel reinforcement cage 1, and 3 outsides of jack cup joint second parcel layer 31. The material of the first and second wrapping layers 11, 31 is a release medium.
A fixing clamp 41 is further arranged, and the annular hydraulic pipe 4 is fixed to the reinforcement cage 1 through the fixing clamp 41. The annular hydraulic pipe 4 is a plastic pipe or a metal pipe. The annular hydraulic pipe 4 is filled with water or oil.
The jack 3 is a solid jack or a hollow jack, the reinforcement cage 1 comprises at least three reinforcements 12, and the solid jack or the hollow jack is arranged between the reinforcements 12.
The jack group also comprises an oil pipe 5, and the jacks 3 are connected in series through the oil pipe 5.
Example 2
A pre-arranged equipment for breaking a concrete pile head is shown in figures 2-3 and comprises a reinforcement cage 1, a jack group and an annular hydraulic pipe 4, wherein the jack group is arranged on the reinforcement cage 1 on the upper side of a pre-section 2, and the annular hydraulic pipe 4 is arranged on the inner side of the reinforcement cage 1 where the pre-section 2 is located; the reinforcement cage 1 on the upper side of the pre-fracture surface is sleeved with a first wrapping layer 11; jack group includes two at least jacks 3, and jack 3 connects in steel reinforcement cage 1, and 3 outsides of jack cup joint second parcel layer 31. The material of the first and second wrapping layers 11, 31 is a release medium.
A fixing clamp 41 is further arranged, and the annular hydraulic pipe 4 is fixed to the reinforcement cage 1 through the fixing clamp 41. The annular hydraulic pipe 4 is a plastic pipe or a metal pipe. The annular hydraulic pipe 4 is filled with water or oil.
The jack 3 is a solid jack or a hollow jack, and the solid jack or the hollow jack is arranged on the inner side of the reinforcement cage 1. The jacks 3 are connected in series or in parallel.
Example 3
A pre-arranged equipment for breaking a concrete pile head is shown in figures 3-4 and comprises a reinforcement cage 1, a jack group and an annular hydraulic pipe 4, wherein the jack group is arranged on the reinforcement cage 1 at the upper side of a pre-section 2, and the annular hydraulic pipe 4 is arranged at the inner side of the reinforcement cage 1 where the pre-section 2 is located; the reinforcement cage 1 on the upper side of the pre-fracture surface is sleeved with a first wrapping layer 11; jack group includes two at least jacks 3, and jack 3 connects in steel reinforcement cage 1, and 3 outsides of jack cup joint second parcel layer 31. The material of the first and second wrapping layers 11, 31 is a release medium.
A fixing clamp 41 is further arranged, and the annular hydraulic pipe 4 is fixed to the reinforcement cage 1 through the fixing clamp 41. The annular hydraulic pipe 4 is a plastic pipe or a metal pipe. The annular hydraulic pipe 4 is filled with water or oil.
The jack 3 is a solid jack or a hollow jack, and the solid jack or the hollow jack is arranged outside the reinforcement cage 1. The jacks 3 are connected in series or in parallel.
Example 4
A pre-arranged equipment for breaking a concrete pile head is shown in figures 2 and 5 and comprises a reinforcement cage 1, a jack group and an annular hydraulic pipe 4, wherein the jack group is arranged on the reinforcement cage 1 on the upper side of a pre-fracture surface 2, and the annular hydraulic pipe 4 is arranged on the inner side of the reinforcement cage 1 where the pre-fracture surface 2 is located; the reinforcement cage 1 on the upper side of the pre-fracture surface is sleeved with a first wrapping layer 11; jack group includes two at least jacks 3, and jack 3 connects in steel reinforcement cage 1, and 3 outsides of jack cup joint second parcel layer 31. The material of the first and second wrapping layers 11, 31 is a release medium.
A fixing clamp 41 is further arranged, and the annular hydraulic pipe 4 is fixed to the reinforcement cage 1 through the fixing clamp 41. The annular hydraulic pipe 4 is a plastic pipe or a metal pipe. The annular hydraulic pipe 4 is filled with water or oil.
The jack 3 is a hollow jack, the reinforcement cage 1 comprises at least three reinforcements 12, and the hollow jack is sleeved on the reinforcements 12; a first wrapping layer 11 is arranged between the hollow jack and the reinforcing steel bar 12.
The jacks 3 are connected in series or in parallel.
In short, the above description is only a preferred embodiment of the present invention, and all the equivalent changes and modifications made in accordance with the claims of the present invention should be covered by the scope of the present invention.

Claims (10)

1. The utility model provides an equipment of leading formula fracture concrete pile head which characterized in that: the device comprises a reinforcement cage (1), a jack group and an annular hydraulic pipe (4), wherein the jack group is arranged on the reinforcement cage (1) on the upper side of a pre-fracture surface (2), and the annular hydraulic pipe (4) is arranged on the inner side of the reinforcement cage (1) where the pre-fracture surface (2) is located; a reinforcement cage (1) on the upper side of the pre-section is sleeved with a first wrapping layer (11); the jack group includes two at least jacks (3), and jack (3) are connected in steel reinforcement cage (1), and second wrapping layer (31) are cup jointed in jack (3) outside.
2. The pre-positioned apparatus for breaking concrete pile head according to claim 1, wherein: the steel bar cage is further provided with a fixing clamp (41), and the annular hydraulic pipe (4) is fixed on the steel bar cage (1) through the fixing clamp (41).
3. The pre-positioned apparatus for breaking concrete pile head according to claim 1, wherein: the annular hydraulic pipe (4) is a plastic pipe or a metal pipe.
4. The pre-positioned apparatus for breaking concrete pile head according to claim 1, wherein: the annular hydraulic pipe (4) is filled with water or oil.
5. The pre-positioned apparatus for breaking concrete pile head according to claim 1, wherein: the jack (3) is a solid jack or a hollow jack, the reinforcement cage (1) comprises at least three reinforcements (12), and the solid jack or the hollow jack is arranged between the reinforcements (12).
6. The pre-positioned apparatus for breaking concrete pile head according to claim 1, wherein: the jack (3) is a solid jack or a hollow jack, and the solid jack or the hollow jack is arranged on the inner side or the outer side of the reinforcement cage (1).
7. The pre-positioned apparatus for breaking concrete pile head according to claim 1, wherein: the jack (3) is a hollow jack, the reinforcement cage (1) comprises at least three reinforcements (12), and the hollow jack is sleeved on the reinforcements (12); a first wrapping layer (11) is arranged between the hollow jack and the reinforcing steel bar (12).
8. The pre-positioned apparatus for breaking concrete pile head according to claim 1, wherein: the materials of the first wrapping layer (11) and the second wrapping layer (31) are isolation media.
9. The pre-positioned apparatus for breaking concrete pile head according to claim 1, wherein: the jacks (3) are connected in series or in parallel.
10. The pre-positioned apparatus for breaking concrete pile head according to claim 9, wherein: the jack group also comprises an oil pipe (5), and the jacks (3) are connected in series through the oil pipe (5).
CN202020104064.7U 2020-01-17 2020-01-17 Equipment for pre-breaking concrete pile head Active CN212956526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020104064.7U CN212956526U (en) 2020-01-17 2020-01-17 Equipment for pre-breaking concrete pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020104064.7U CN212956526U (en) 2020-01-17 2020-01-17 Equipment for pre-breaking concrete pile head

Publications (1)

Publication Number Publication Date
CN212956526U true CN212956526U (en) 2021-04-13

Family

ID=75340502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020104064.7U Active CN212956526U (en) 2020-01-17 2020-01-17 Equipment for pre-breaking concrete pile head

Country Status (1)

Country Link
CN (1) CN212956526U (en)

Similar Documents

Publication Publication Date Title
CN109183783B (en) Breaking-free separated pile head of concrete filling pile
CN106055801B (en) A kind of determination method of Brace in Deep Footing Groove beam demolition blasting sequence
CN111236230A (en) Construction method of pre-arranged type fracture concrete pile head
CN212896560U (en) Guide rail marching type breaker
CN212956526U (en) Equipment for pre-breaking concrete pile head
CN103321242B (en) Subsection steel-bar-distribution prestressed concrete continuous wall and construction method thereof
CN212427098U (en) Preset fracture system of concrete pile head that breaks
CN113668529A (en) Construction method for breaking and removing pile head with template based on steel wedge-shaped gap
CN108979198A (en) A kind of skyscraper tears building machine open and its tears building method open
CN212477710U (en) Flexibly-mounted equipment for pre-broken concrete pile head
CN107401388B (en) Drilling machine stuck drill processing device and method
CN109403326B (en) Method for taking out reinforcement cage based on serious hole collapse of drilled pile
CN111877192A (en) Method for dismantling and recycling bridge hollow slab
CN113373926B (en) Separating device for pile head breaking and construction method
CN215165580U (en) Separating device for pile head breaking
CN109877136A (en) A kind of hydraulic recycling plant of high quantity of reinforcement waste concrete and its disassembling method
CN113502818A (en) Construction method of pile foundation pile head
CN206385532U (en) It is a kind of to be used for the piling template of CFG
CN105382056B (en) A kind of press arrangement for correcting large-diameter steel pipe longitudinal seam welding deformation
CN212359631U (en) Core bit is got in concrete drilling bored concrete pile defective pile restoration processing
CN210361895U (en) Prefabricated field opening and closing door type protective steel plate trolley
CN112962603A (en) Dismantling construction process for reinforced concrete cast-in-place pile
CN101392531A (en) Construction method for cutting and breaking reinforced concrete pile, column or ground beam
CN111424664A (en) Construction method for removing pile head of pre-fractured bored pile
CN111550190A (en) Core bit is got in concrete drilling bored concrete pile defective pile restoration processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210415

Address after: 311199 No.6-1 bianjiatang, Changming village, Pingyao Town, Yuhang District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang Lvke Transportation Technology Co.,Ltd.

Address before: 310000 room 4-1-1104, decui apartment, Xihu District, Hangzhou City, Zhejiang Province

Patentee before: Xu Shengxiang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240930

Address after: No. 2 Ganglong Road, Zhongshan District, Dalian City, Liaoning Province 116000

Patentee after: Xu Shida

Country or region after: China

Patentee after: Xu Liangyou

Patentee after: Ding Hao

Address before: 311199 No.6-1 bianjiatang, Changming village, Pingyao Town, Yuhang District, Hangzhou City, Zhejiang Province

Patentee before: Zhejiang Lvke Transportation Technology Co.,Ltd.

Country or region before: China