CN212896352U CN202020840379.8U CN202020840379U CN212896352U CN 212896352 U CN212896352 U CN 212896352U CN 202020840379 U CN202020840379 U CN 202020840379U CN 212896352 U CN212896352 U CN 212896352U
Authority
CN
China
Prior art keywords
fixed mounting
fixed
movable
pulling device
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020840379.8U
Other languages
Chinese (zh)
Inventor
侯俊峰
刘怀坤
葛经纬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020840379.8U priority Critical patent/CN212896352U/en
Application granted granted Critical
Publication of CN212896352U publication Critical patent/CN212896352U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a pile pulling device for building engineering, including fixed mounting bracket, fixed mounting bracket's lower extreme fixed mounting has the caster of removal, fixed mounting bracket's outside fixed mounting has the cover of removal, fixed mounting has the fixed bolster in the fixed mounting bracket, fixed mounting bracket's inboard movable mounting has fixed cover, fixed mounting bracket's upper end fixed mounting has the gear box, the outside movable mounting of gear box has driving motor, the inboard movable mounting of gear box has drive gear, drive gear's one end movable mounting has the drive connecting rod, drive gear's inboard movable mounting has connecting screw, the outside movable mounting of fixed cover has clamping motor, movable mounting has the installation fixture block in the fixed cover. This pile pulling device for building engineering conveniently carries out the work of using, the work of using that simultaneously can be better reduces the degree of difficulty of work, improves the speed and the efficiency of work, and the smooth going on of help work.

Description

Pile pulling device for constructional engineering
Technical Field
The utility model relates to a building engineering technical field specifically is a pile pulling device for building engineering.
Background
With the continuous aggravation of the competition of the construction engineering industry, the co-purchasing integration and capital operation among large-scale construction engineering enterprises are becoming more and more frequent, the excellent construction engineering production enterprises in China increasingly pay more attention to the research on the industry market, in particular to the deep research on the industry development environment and product purchasers, the construction engineering refers to an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the various house buildings, particularly high-rise buildings at present, most of soft soil foundations of the buildings are pile foundations, wherein the pile foundations play a significant role in the current construction industry, and the application of the pile foundations is also greatly popularized.
However, the existing market has a certain service life due to buildings, and part of the area needs to be modified by old cities. New building construction can set up new pile foundation, new old foundation influences the construction of new foundation this moment, this tubular pile that just needs to inlay in soil clears up, the work of pulling out the stake has been increased through the top at the pile body under the general condition, but when carrying out work now, can't guarantee that the stress to the pile body is even, the creak sound tensile resistance of concrete pile body is relatively poor simultaneously, the degree of difficulty of work has been increased, the speed and the efficiency of work have been reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pile pulling device for building engineering to propose in solving above-mentioned background art because the building has certain service life on the existing market, in addition partial area is owing to need old city to reform transform. New building construction can set up new pile foundation, new old foundation influences the construction of new foundation this moment, this tubular pile that just needs to inlay in soil clears up, the work of pulling out the stake has been increased through the top at the pile body under the general condition, but when carrying out work now, can't guarantee that the stress to the pile body is even, the creak sound tensile resistance of concrete pile body is relatively poor simultaneously, the degree of difficulty of work has been increased, the problem of operating speed and efficiency has been reduced.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pile pulling device for building engineering, includes fixed mounting bracket, fixed mounting bracket's lower extreme fixed mounting has the caster that removes, fixed mounting bracket's outside fixed mounting has the cover that removes, fixed mounting bracket internal fixed mounting has the fixed bolster, fixed mounting bracket's inboard movable mounting has fixed cover, fixed mounting bracket's upper end fixed mounting has the gear box, the outside movable mounting of gear box has driving motor, the inboard movable mounting of gear box has drive gear, drive gear's one end movable mounting has the drive connecting rod, drive gear's inboard movable mounting has connecting screw, the outside movable mounting of fixed cover has the tight motor of clamp, movable mounting has the installation fixture block in the fixed cover.
Preferably, the fixed mounting frame is designed to be a concave structure, two groups of movable trundles and movable sleeves are symmetrically arranged on the fixed mounting frame, the size of each movable sleeve is matched with that of each fixed sleeve, and the two fixed sleeves are symmetrically arranged in the fixed mounting frame.
Preferably, the fixing sleeve is designed to be of a rectangular structure, the fixing sleeve is symmetrically provided with two clamping motors, the fixing sleeve is symmetrically provided with two mounting fixture blocks, and one end of each mounting fixture block is fixedly provided with an adjusting mounting fixture block.
Preferably, two driving gears are symmetrically arranged in the fixed mounting frame, and the driving gears and the driving connecting rods are meshed and connected with each other.
Preferably, the connecting screw rods are symmetrically arranged in the fixed mounting frame, and the connecting screw rods are in threaded connection with the fixed sleeve.
Preferably, the driving connecting rod is symmetrically provided with two lifting worms, and the size of the driving connecting rod is matched with that of the connecting screw rod.
Compared with the prior art, the beneficial effects of the utility model are that:
1. according to the pile pulling device for the building engineering, the driving motor and the driving screw rod which can perform high-degree movement work are additionally arranged, so that the whole lifting device can be helped to work synchronously, the pile pulling work can be better performed, and the working speed and efficiency can be helped to be improved;
2. the pile pulling device for the building engineering is additionally provided with a double-layer fixing structure, and can better fix the pile body by working through the driving motor, so that the stability of fixing the pile body is ensured, and the stress of the pile body is more uniform;
3. this pile pulling device for building engineering, whole device simple structure conveniently carries out the work of using, the work of using that simultaneously can be better reduces the degree of difficulty of work, improves the speed and the efficiency of work, and the smooth going on of help work.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic front view of the present invention;
FIG. 3 is a schematic view of the internal structure of the present invention;
fig. 4 is a schematic view of the structure of the fixing sleeve of the present invention.
In the figure: 1. fixing the mounting rack; 2. moving the caster; 3. moving the sleeve; 4. fixing a bracket; 5. fixing a sleeve; 6. a gear case; 7. a drive motor; 8. a drive gear; 9. a drive link; 10. connecting a screw rod; 11. clamping the motor; 12. mounting a clamping block; 13. a lifting worm; 14. and adjusting the mounting fixture block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a pile pulling device for constructional engineering comprises a fixed mounting frame 1, wherein movable trundles 2 are fixedly mounted at the lower end of the fixed mounting frame 1, a movable sleeve 3 is fixedly mounted at the outer side of the fixed mounting frame 1, a fixed support 4 is fixedly mounted in the fixed mounting frame 1, a fixed sleeve 5 is movably mounted at the inner side of the fixed mounting frame 1, a gear box 6 is fixedly mounted at the upper end of the fixed mounting frame 1, a driving motor 7 is movably mounted at the outer side of the gear box 6, a driving gear 8 is movably mounted at the inner side of the gear box 6, a driving connecting rod 9 is movably mounted at one end of the driving gear 8, a connecting screw 10 is movably mounted at the inner side of the driving gear 8, a clamping motor 11 is movably;
furthermore, the fixed mounting frame 1 is designed to be of a concave structure, two groups of movable trundles 2 and two groups of movable sleeves 3 are symmetrically arranged on the fixed mounting frame 1, the sizes of the movable sleeves 3 and the fixed sleeves 5 are matched with each other, and the fixed sleeves 5 are symmetrically arranged in the fixed mounting frame 1, so that the mutual mounting work can be better carried out;
furthermore, the fixing sleeve 5 is designed to be rectangular, two clamping motors 11 are symmetrically arranged on the fixing sleeve 5, two mounting fixture blocks 12 are symmetrically arranged in the fixing sleeve 5, and one end of each mounting fixture block 12 is fixedly provided with an adjusting mounting fixture block 14, so that the adjusting work can be better carried out;
furthermore, two driving gears 8 are symmetrically arranged in the fixed mounting frame 1, and the driving gears 8 and the driving connecting rods 9 are meshed and connected with each other, so that the transmission work of performance can be better carried out;
furthermore, two connecting screw rods 10 are symmetrically arranged in the fixed mounting frame 1, and the connecting screw rods 10 and the fixed sleeve 5 are in threaded connection with each other, so that the stability of the whole device can be improved;
furthermore, two lifting worms 13 are symmetrically arranged on the driving connecting rod 9, and the size of the driving connecting rod 9 and the size of the connecting screw rod 10 are matched with each other, so that the use work can be better carried out.
The working principle is as follows: at first, carry out the adjustment work on the position to fixed mounting bracket 1 through removing truckle 2, it drives fixed cover 5 and carries out the adjustment work on the position to drive connecting rod 9 cooperation drive gear 8 through driving motor 7, it adjusts installation fixture block 14 to drive through clamp motor 11 and lets installation fixture block 12 carry out the adjustment work on the position, later rethread installation fixture block 12 carries out the work of fixing to the pile body, carry out the work of pressing from both sides tightly through clamp motor 11, rethread driving motor 7 drives connecting screw 10 and carries out the work of pulling out the stake, whole device simple structure, the work of conveniently using, the work of using that can be better simultaneously, reduce the degree of difficulty of work, improve the speed and the efficiency of work, help work going on smoothly.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pile pulling device for building engineering, includes fixed mounting frame, its characterized in that: the utility model discloses a driving device, including fixed mounting bracket, fixed mounting bracket's lower extreme fixed mounting has the trundle of removal, fixed mounting bracket's outside fixed mounting has the cover of removal, fixed mounting bracket's inboard movable mounting has fixed cover, fixed mounting bracket's upper end fixed mounting has the gear box, the outside movable mounting of gear box has driving motor, the inboard movable mounting of gear box has drive gear, drive gear's one end movable mounting has the drive connecting rod, drive gear's inboard movable mounting has connecting screw, the outside movable mounting of fixed cover has the clamp motor, movable mounting has the installation fixture block in the fixed cover.
2. The pile pulling device for the building engineering according to claim 1, characterized in that: the fixed mounting frame is designed to be a concave structure, two groups of movable trundles and movable sleeves are symmetrically arranged on the fixed mounting frame, the size of each movable sleeve and the size of each fixed sleeve are matched with each other, and the fixed sleeves are symmetrically arranged in the fixed mounting frame.
3. The pile pulling device for the building engineering according to claim 1, characterized in that: the fixing sleeve is designed to be of a rectangular structure, two clamping motors are symmetrically arranged on the fixing sleeve, two mounting fixture blocks are symmetrically arranged in the fixing sleeve, and one end of each mounting fixture block is fixedly provided with an adjusting mounting fixture block.
4. The pile pulling device for the building engineering according to claim 1, characterized in that: two driving gears are symmetrically arranged in the fixed mounting frame, and the driving gears and the driving connecting rod are connected in an engaged mode.
5. The pile pulling device for the building engineering according to claim 1, characterized in that: the connecting screw rods are symmetrically arranged in the fixed mounting frame, and the connecting screw rods are in threaded connection with the fixed sleeve.
6. The pile pulling device for the building engineering according to claim 1, characterized in that: two lifting worms are symmetrically arranged on the driving connecting rod, and the size of the driving connecting rod is matched with that of the connecting screw rod.
CN202020840379.8U 2020-05-19 2020-05-19 Pile pulling device for constructional engineering Expired - Fee Related CN212896352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020840379.8U CN212896352U (en) 2020-05-19 2020-05-19 Pile pulling device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020840379.8U CN212896352U (en) 2020-05-19 2020-05-19 Pile pulling device for constructional engineering

Publications (1)

Publication Number Publication Date
CN212896352U true CN212896352U (en) 2021-04-06

Family

ID=75263804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020840379.8U Expired - Fee Related CN212896352U (en) 2020-05-19 2020-05-19 Pile pulling device for constructional engineering

Country Status (1)

Country Link
CN (1) CN212896352U (en)

Similar Documents

Publication Publication Date Title
CN211010166U (en) Pipeline installation locating support for water conservancy and hydropower
CN212896352U (en) Pile pulling device for constructional engineering
CN214939284U (en) Bevel gear formula is basic mode clamping mechanism for civil engineering
CN210766297U (en) Highway engineering film paving device
CN210713833U (en) Combined type clip-shaped water stop split screw for reinforcing cement formwork
CN215785899U (en) Left-right co-bending type numerical control pipe bending machine
CN206071604U (en) A kind of trestle is with can hang template system under cross sliding type
CN211714593U (en) Fixing device for producing composite layer of building template
CN220889573U (en) Temporary surrounding and blocking mechanism for subway deep foundation pit construction
CN112140027B (en) Fixing frame for producing double-flat-wall steel-plastic composite winding drain pipe
CN2856262Y (en) Support frame of formwork
CN220638361U (en) Green prefabricated concrete component curing means for assembled building
CN214995974U (en) Aluminum alloy building templates subsides circular arc template device
CN212613772U (en) Rubber square stop for building engineering construction
CN217949141U (en) Auxiliary installation tool for inspection well adjusting ring
CN214194910U (en) Green's utilizes cistern based on rainwater
CN216225948U (en) Electric power calandria pull throughs
CN213539734U (en) Civil engineering fundamental mode mounting fixture
CN216181569U (en) Concrete drain pipe production auxiliary stand
CN217899049U (en) Pipeline positioning support for water supply and drainage engineering
CN117661706B (en) Concrete calandria assembly fixture and assembly method thereof
CN217665700U (en) Carbon steel three-way pipe forming device
CN210395189U (en) Movable ecological road guardrail
CN210468663U (en) Cable tray structure for laying cable
CN219946712U (en) Foundation-free concrete stirring equipment convenient to install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210406

CF01 Termination of patent right due to non-payment of annual fee