CN220638361U - Green prefabricated concrete component curing means for assembled building - Google Patents

Green prefabricated concrete component curing means for assembled building Download PDF

Info

Publication number
CN220638361U
CN220638361U CN202322198474.9U CN202322198474U CN220638361U CN 220638361 U CN220638361 U CN 220638361U CN 202322198474 U CN202322198474 U CN 202322198474U CN 220638361 U CN220638361 U CN 220638361U
Authority
CN
China
Prior art keywords
frame
mounting
green
fixed mounting
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322198474.9U
Other languages
Chinese (zh)
Inventor
周建亮
顾娟
罗也
吴玖江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Nanshai Prefabricated Building Technology Co ltd
Original Assignee
Jiangxi Nanshai Prefabricated Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Nanshai Prefabricated Building Technology Co ltd filed Critical Jiangxi Nanshai Prefabricated Building Technology Co ltd
Priority to CN202322198474.9U priority Critical patent/CN220638361U/en
Application granted granted Critical
Publication of CN220638361U publication Critical patent/CN220638361U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a green prefabricated concrete component curing device for an assembled building, which relates to the technical field of curing devices, and particularly relates to a green prefabricated concrete component curing device for an assembled building. This green prefabricated concrete member curing means for building can drive the lead screw through starting servo motor and rotate, utilizes the lead screw can drive the swivel nut and remove for the swivel nut drives the carrier frame and removes, utilizes pump line and shower nozzle to spray water, realizes the maintenance, can drive the carrier frame upset through rack and gear, can carry out comprehensive maintenance to the prefab, improves maintenance efficiency.

Description

Green prefabricated concrete component curing means for assembled building
Technical Field
The utility model relates to the technical field of curing devices, in particular to a green prefabricated concrete member curing device for an assembled building.
Background
The concrete prefabricated member refers to a concrete product produced by processing in a standardized and mechanical mode in a factory, the corresponding traditional cast-in-place concrete needs site molding, site pouring and site maintenance, the concrete prefabricated member is widely applied to the fields of construction, traffic, water conservancy and the like, plays an important role in national economy, patent number (CN202120643249. X) discloses a maintenance device for producing the concrete prefabricated member, wherein 'manual watering maintenance' is provided, so that the labor cost is higher and the multiple surfaces of the concrete prefabricated member cannot be maintained, thereby leading to lower working efficiency of the concrete prefabricated member, and most of the maintenance devices for producing the traditional concrete prefabricated member cannot recycle water flow after use, waste of resources is caused easily "and through basin, communicating pipeline, the valve, first flow pipe, the second flow pipe, third flow pipe and the cooperation of first nozzle and second nozzle is used, make the curing means of this concrete prefab production can carry out the water spray maintenance to a plurality of faces of concrete prefab, also make the curing means of this concrete prefab production's maintenance effect better when having reduced manpower expenditure, fine improvement the curing means of this concrete prefab production's work efficiency, but be difficult to carry out the maintenance to the bottom of prefab, need carry out the purpose that water spray maintenance just can realize comprehensive maintenance again after overturning, so can seriously influence maintenance efficiency, so here propose a green prefabricated concrete building and put forward the device of concrete prefab for solving above-mentioned problem.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a green prefabricated concrete component curing device for an assembled building, which solves the problems in the prior art.
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides a green prefabricated concrete member curing means for building, includes first mounting bracket, rack fixed mounting is in the middle part of first mounting bracket, the internally mounted of first mounting bracket has the gear, the mid-mounting of gear has the carriage, the front and back both sides of carriage all fixed mounting has the fixed frame, the internally mounted of fixed frame has the centre gripping arm, the internally mounted of fixed frame has the tight double-screw bolt that closes, the surface threaded connection of tight double-screw bolt has the tight bolt that closes, the inboard of first mounting bracket is provided with the header tank, be provided with the pump line in the inner chamber of header tank.
Optionally, the right side the side fixed mounting of first mounting bracket has the second mounting bracket, the front fixed mounting of second mounting bracket has servo motor, fixed mounting has the lead screw on servo motor's the output shaft, the surface threaded connection of lead screw has the swivel nut, one side and the gear swing joint of swivel nut are in the same place.
Optionally, the upside of header tank is provided with first mount, the upper surface fixed mounting of first mount has the second mount, one side fixed mounting of second mount has the frame that sways, the upper surface fixed mounting of second mount has the motor, fixed mounting has the actuating arm on the output shaft of motor, the surface of actuating arm is provided with the swing arm, the shower nozzle is installed to the other end of swing arm.
Optionally, both sides about the swivel nut are all fixed mounting has the stopper, the spout with stopper looks adaptation is seted up to the inboard of second mounting bracket.
Optionally, a fastening groove is formed in the middle of the clamping arm, the fastening stud is located in the fastening groove, and the width of the fastening stud is greater than that of the fastening groove by one to two centimeters.
Optionally, the inside of rocking frame has seted up and has swayd the groove, the rocking arm is installed in swayd the groove, the shower nozzle links together with first mount.
Optionally, the tooth groove of the rack is matched with the tooth groove of the gear, and the length of the rack is matched with the circumference of the gear.
The utility model provides a green prefabricated concrete component curing device for an assembled building, which has the following beneficial effects:
1. this green prefabricated concrete member curing means for building can drive the lead screw through starting servo motor and rotate, utilizes the lead screw can drive the swivel nut and remove for the swivel nut drives the carrier frame and removes, utilizes pump line and shower nozzle to spray water, realizes the maintenance, can drive the carrier frame upset through rack and gear, can carry out comprehensive maintenance to the prefab, improves maintenance efficiency.
2. This green prefabricated concrete member curing means for building can collect water through the header tank, can then to water reuse, can drive the actuating arm through the starter motor and rotate, can drive the arm of swaing and sway, and then make the shower nozzle drive the pump line and sway, can be abundant and comprehensive maintenance to the prefab.
Drawings
FIG. 1 is a schematic side view of the present utility model;
FIG. 2 is a schematic view of a second mounting frame of the present utility model;
FIG. 3 is a schematic view of a three-dimensional structure of a clamping arm of the present utility model;
FIG. 4 is a schematic view of a first mount of the present utility model;
fig. 5 is a schematic view of a structure of a swing frame of the present utility model.
In the figure: 1. a first mounting frame; 2. a rack; 3. a carrying frame; 4. a fixed frame; 5. a clamping arm; 6. tightly fastening the stud; 7. tightening the bolts; 8. a water collection tank; 9. a pump tube; 10. a first fixing frame; 11. the second fixing frame; 12. a swing frame; 13. a motor; 14. a driving arm; 15. swing arms; 16. a second mounting frame; 17. a servo motor; 18. a screw rod; 19. a screw sleeve; 20. a limiting block; 21. a gear; 22. a spray head.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1 to 4, the present utility model provides a technical solution: the utility model provides a green prefabricated concrete member curing means for building, including first mounting bracket 1, rack 2's tooth's socket and gear 21's tooth's socket looks adaptation, rack 2's length and gear 21's girth looks adaptation, can make the smooth and accurate upset one hundred eighty degrees of frame 3, rack 2 fixed mounting is in first mounting bracket 1's middle part, first mounting bracket 1's internally mounted has gear 21, gear 21's mid-mounting has the frame 3 of bearing, the standing groove has been seted up on the surface of frame 3, the prefabricated member is placed to the person of facilitating the use, the equal fixed mounting of both sides has fixed frame 4 around frame 3, fixed frame 4's internally mounted has centre gripping arm 5, the middle part of centre gripping arm 5 has been seted up and has been closed the groove, close the double-screw bolt 6 is in closed the groove, close the width of bolt 7 is greater than close the groove width one to two centimetres, close the bolt 7 through the screw down, make close between bolt 7 and the centre gripping arm 5 tight connection, utilize the frictional force between close bolt 7 and the centre gripping arm 5 can make centre gripping arm 5 carry out fixed frame 4, fixed frame 4's internally mounted has been seted up on the holding arm, fixed frame 6, fixed frame's internal mounting 6 has the water tank 9 to be closed with the water tank 8 through the screw-thread, the water tank 8 is set up with the water tank 8, the water tank is connected with the inner side 8 through the water tank, the water tank is recovered, the water tank is 8.
Referring to fig. 1 and 2, a second mounting frame 16 is fixedly mounted on the side surface of a first mounting frame 1 on the right side, a servo motor 17 is fixedly mounted on the front surface of the second mounting frame 16, a lead screw 18 is fixedly mounted on an output shaft of the servo motor 17, screw sleeves 19 are connected to the outer surfaces of the lead screws 18 in a threaded manner, limiting blocks 20 are fixedly mounted on the upper side and the lower side of the screw sleeves 19, sliding grooves matched with the limiting blocks 20 are formed in the inner side of the second mounting frame 16, the screw sleeves 19 can be limited by the limiting blocks 20, the screw sleeves 19 are further stable in moving, the screw sleeves 19 are prevented from rotating, one sides of the screw sleeves 19 are movably connected with gears 21, the screw sleeves 19 can drive a bearing frame 3 to move, and then the bearing frame 3 drives a prefabricated member to overturn.
Referring to fig. 1, 4 and 5, a first fixing frame 10 is arranged on the upper side of the water collecting tank 8, a through groove matched with the spray head 22 is formed in the middle of the first fixing frame 10, the spray head 22 can swing smoothly, a second fixing frame 11 is fixedly arranged on the upper surface of the first fixing frame 10, a swinging frame 12 is fixedly arranged on one side of the second fixing frame 11, a swinging groove is formed in the swinging frame 12, a swinging arm 15 is arranged in the swinging groove, the spray head 22 is connected with the first fixing frame 10, the spray head 22 can swing, the purpose of full maintenance is achieved, meanwhile, the maintenance efficiency can be effectively improved, a motor 13 is fixedly arranged on the upper surface of the second fixing frame 11, a driving arm 14 is fixedly arranged on an output shaft of the motor 13, a swinging arm 15 is arranged on the outer surface of the driving arm 14, and the spray head 22 is arranged on the other end of the swinging arm 15.
To sum up, this green prefabricated concrete member curing means for building, when using, firstly, need place the prefab at the inner chamber of carrying frame 3, then screw up and close bolt 7 and can make centre gripping arm 5 carry out spacingly to the prefab, then start motor 13 drives actuating arm 14 and rotate, utilize actuating arm 14 to drive swing arm 15 and sway, and then make shower nozzle 22 drive pump pipe 9 and sway and maintain, then need start servo motor 17 drive lead screw 18 and rotate, utilize lead screw 18 to drive swivel nut 19 and remove, make swivel nut 19 drive carrying frame 3 remove, utilize pump pipe 9 and shower nozzle 22 to spray water, realize the maintenance, can drive carrying frame 3 upset through rack 2 and gear 21, carry out comprehensive maintenance to the prefab, so can.
In the description of the present utility model, it should be noted that, directions or positional relationships indicated by terms such as "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are based on directions or positional relationships shown in the drawings, are merely for convenience of description and simplification of description, and do not indicate or imply that the apparatus or element to be referred to must have a specific direction, be constructed and operated in the specific direction, and thus should not be construed as limiting the present utility model; the terms "first," "second," "third," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "coupled," and the like are to be construed broadly, and may be fixedly coupled, detachably coupled, or integrally coupled, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a green prefabricated concrete member curing means for building, includes first mounting bracket (1), rack (2) fixed mounting is at the middle part of first mounting bracket (1), its characterized in that: the inside mounting of first mounting bracket (1) has gear (21), mid-mounting of gear (21) has and bears frame (3), both sides all fixed mounting has fixed frame (4) around bearing frame (3), the internally mounted of fixed frame (4) has centre gripping arm (5), the internally mounted of fixed frame (4) has tight double-screw bolt (6), the surface threaded connection who closes double-screw bolt (6) has tight bolt (7), the inboard of first mounting bracket (1) is provided with header tank (8), be provided with pump line (9) in the inner chamber of header tank (8).
2. The green fabricated building concrete precast member maintenance apparatus according to claim 1, wherein: the right side the side fixed mounting of first mounting bracket (1) has second mounting bracket (16), the front fixed mounting of second mounting bracket (16) has servo motor (17), fixed mounting has lead screw (18) on the output shaft of servo motor (17), the surface threaded connection of lead screw (18) has swivel nut (19), one side and gear (21) swing joint of swivel nut (19) are in the same place.
3. The green fabricated building concrete precast member maintenance apparatus according to claim 1, wherein: the upper side of header tank (8) is provided with first mount (10), the upper surface fixed mounting of first mount (10) has second mount (11), one side fixed mounting of second mount (11) has sways frame (12), the upper surface fixed mounting of second mount (11) has motor (13), fixed mounting has actuating arm (14) on the output shaft of motor (13), the surface of actuating arm (14) is provided with sways swing arm (15), shower nozzle (22) are installed to the other end of swaing arm (15).
4. The green-fabricated concrete precast-member curing apparatus for construction according to claim 2, wherein: limiting blocks (20) are fixedly arranged on the upper side and the lower side of the threaded sleeve (19), and sliding grooves matched with the limiting blocks (20) are formed in the inner side of the second mounting frame (16).
5. The green fabricated building concrete precast member maintenance apparatus according to claim 1, wherein: the middle part of the clamping arm (5) is provided with a fastening groove, the fastening stud (6) is positioned in the fastening groove, and the width of the fastening bolt (7) is larger than that of the fastening groove by one to two centimeters.
6. A green fabricated building concrete precast member maintenance apparatus according to claim 3, wherein: the inner part of the swinging frame (12) is provided with a swinging groove, the swinging arm (15) is arranged in the swinging groove, and the spray head (22) is connected with the first fixing frame (10).
7. The green fabricated building concrete precast member maintenance apparatus according to claim 1, wherein: the tooth grooves of the racks (2) are matched with the tooth grooves of the gears (21), and the lengths of the racks (2) are matched with the circumferences of the gears (21).
CN202322198474.9U 2023-08-16 2023-08-16 Green prefabricated concrete component curing means for assembled building Active CN220638361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322198474.9U CN220638361U (en) 2023-08-16 2023-08-16 Green prefabricated concrete component curing means for assembled building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322198474.9U CN220638361U (en) 2023-08-16 2023-08-16 Green prefabricated concrete component curing means for assembled building

Publications (1)

Publication Number Publication Date
CN220638361U true CN220638361U (en) 2024-03-22

Family

ID=90296821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322198474.9U Active CN220638361U (en) 2023-08-16 2023-08-16 Green prefabricated concrete component curing means for assembled building

Country Status (1)

Country Link
CN (1) CN220638361U (en)

Similar Documents

Publication Publication Date Title
CN210546595U (en) Cleaning device for building steel structure
CN112123542A (en) A curing means for production of reinforced concrete drain pipe
CN220638361U (en) Green prefabricated concrete component curing means for assembled building
CN111517721A (en) Corrosion-resistant reinforced concrete pipe and preparation method thereof
CN111910891A (en) Building wall whitewashes device
CN218255834U (en) Component formwork for casting concrete structure prefabricated plate
CN212733466U (en) Cleaning device for light steel building mold
CN211965256U (en) Hydraulic pipeline cleaning device for hydraulic engineering
CN110293095B (en) Concrete placement pipe belt cleaning device
CN212288097U (en) Combined spraying device capable of being used for improving maintenance efficiency of precast beam
CN211954936U (en) Take drawing of patterns equipment of self-cleaning function
CN211313404U (en) Concrete pouring support
CN220297633U (en) Cooling device for production of cable protection tube
CN202480223U (en) Cleaning machine
CN220111402U (en) Sewer pipeline surface processing paint spraying apparatus
CN219189759U (en) Building tubular product rust cleaning device
CN218168086U (en) Automatic cleaning mechanism
CN213480877U (en) Electrophoresis drying device for small-sized automobile accessories
CN220027441U (en) Uniform painting device
CN216457082U (en) Useless lubricating oil settling cask
CN112081270B (en) Maintenance equipment for structural shear wall
CN114083658B (en) Multifunctional curing structure for concrete prefabricated part
CN212896352U (en) Pile pulling device for constructional engineering
CN214739983U (en) Energy-saving concrete injection device
CN213137219U (en) Prefab pouring device for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant