CN212613772U - Rubber square stop for building engineering construction - Google Patents

Rubber square stop for building engineering construction Download PDF

Info

Publication number
CN212613772U
CN212613772U CN202021263098.7U CN202021263098U CN212613772U CN 212613772 U CN212613772 U CN 212613772U CN 202021263098 U CN202021263098 U CN 202021263098U CN 212613772 U CN212613772 U CN 212613772U
Authority
CN
China
Prior art keywords
square
size
engineering construction
connecting rod
rubber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021263098.7U
Other languages
Chinese (zh)
Inventor
朱艳嫦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021263098.7U priority Critical patent/CN212613772U/en
Application granted granted Critical
Publication of CN212613772U publication Critical patent/CN212613772U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a rubber square stop that building engineering construction used, keep off the body including the side, the outside fixed mounting that the side kept off the body has steel reinforcement skeleton, positioning channel has been seted up to the one end that the side kept off the body, connecting channel has been seted up in the outside that the side kept off the body, movable mounting has the removal foot rest in the connecting channel, the other end fixed mounting that the side kept off the body has positioning fixture block, the constant head tank has been seted up in the connecting channel, the inboard fixed mounting that the side kept off the body has the balancing weight, movable mounting has the connecting rod in the constant head tank, movable mounting has the installation pivot between connecting rod and the removal foot rest, the lower extreme movable mounting of connecting rod has the removal truckle, the lower extreme reservation that the. This rubber side shelves that building engineering construction was used, whole device simple structure can be better simultaneously remove work to reduce the cost of work, reduce the loss to natural resources simultaneously, improve the speed and the efficiency of work.

Description

Rubber square stop for building engineering construction
Technical Field
The utility model relates to a building engineering technical field specifically is a rubber side's shelves that building engineering construction used.
Background
The building engineering is the engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation activities of the lines, pipes and equipment matched with them, meeting the requirements of people on production, living, study and public activities, is the engineering entity which is used for planning, surveying, designing, constructing, completing and completing various technical works of new construction, reconstruction or extension of the building constructions and the auxiliary facilities and the installation engineering of the lines, pipes and equipment matched with them, also refers to the construction engineering of various buildings and buildings, also called the construction workload, the investment amount of the part must be added with engineering materials, the construction can be realized through the construction activities, the construction engineering is a part of the construction engineering, and the scope of the construction engineering is relatively narrow compared with the scope of the construction engineering.
However, when carrying out construction on the existing market, need keep off the work of protection through the side, but most side keeps off and all adopts wooden structural design, has increased the consumption of the natural resource when using, but the side that uses iron or concrete structure keeps off not only self weight great, and the inconvenient work of nailing has increased the degree of difficulty of work, when needs carry out the position and remove simultaneously, need carry out work with the help of extra mechanical equipment, the cost of work has been improved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a rubber square stop of building engineering construction usefulness to propose in solving above-mentioned background art on the current market when carrying out the construction, need keep off the work of protecting through the side, but most side keeps off and all adopts wooden structural design, increased the consumption of the natural resources when using, increased the degree of difficulty of work, when needs carry out the position removal simultaneously, need carry out work with the help of extra mechanical equipment, the problem of the cost of work has been improved.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a rubber square stop that building engineering construction used, keeps off the body including the side, the outside fixed mounting that the side kept off the body has steel skeleton, positioning channel has been seted up to the one end that the side kept off the body, connecting channel has been seted up in the outside that the side kept off the body, movable mounting has the removal foot rest in the connecting channel, the other end fixed mounting that the side kept off the body has positioning fixture block, the constant head tank has been seted up in the connecting channel, the inboard fixed mounting that the side kept off the body has the balancing weight, movable mounting has the connecting rod in the constant head tank, movable mounting has the installation pivot between connecting rod and the removal foot rest, the lower extreme movable mounting of connecting rod has the removal truckle, the lower.
Preferably, the square baffle body is in a rectangular structural design of circular arc shape all around, the size of the steel reinforcement framework on the square baffle body is matched with the size of the square baffle body, and the size of the positioning clamping groove and the size of the positioning clamping block on the square baffle body are matched with each other, and the square baffle body is similar in shape.
Preferably, the connecting clamping grooves are symmetrically provided with two groups on the square baffle body, the connecting clamping grooves are designed in a rectangular structure, and the size of the positioning groove in each connecting clamping groove is smaller than that of the corresponding connecting clamping groove.
Preferably, the movable foot rest is designed to be of a trapezoidal structure, and the size of the movable foot rest is matched with that of the connecting rod.
Preferably, the connecting rods are symmetrically arranged on the square gear body in four, and the size of the connecting rods is matched with that of the square gear body.
Preferably, the number of the guide holes is four, and the size of the guide holes is matched with that of the connecting rods.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the rubber square rail for the construction of the building engineering is additionally provided with the internal movable trundles capable of carrying out storage work, so that the rubber square rail can be conveniently moved when used, can be better used and can reduce the difficulty of work;
2. the rubber square bar for construction of the building engineering is additionally provided with the connectors capable of performing mutual connection work, so that mutual connection and fixation can be better performed when the rubber square bar is used, and the work efficiency and speed are improved;
3. this rubber side shelves that building engineering construction was used, whole device simple structure conveniently carries out the work of using, simultaneously can be better remove work to reduce the cost of work, reduce the loss to natural resources simultaneously, improve the speed and the efficiency of work.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the overall structure of the present invention;
fig. 3 is a schematic view of the internal structure of the present invention.
In the figure: 1. a square gear body; 2. a steel reinforcement cage; 3. positioning the clamping groove; 4. a connecting clamping groove; 5. moving the foot rest; 6. positioning a fixture block; 7. positioning a groove; 8. moving the caster; 9. a balancing weight; 10. a connecting rod; 11. installing a rotating shaft; 12. and (4) a guide hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a rubber square stop for construction of building engineering comprises a square stop body 1, wherein a steel reinforcement framework 2 is fixedly mounted on the outer side of the square stop body 1, a positioning clamping groove 3 is formed in one end of the square stop body 1, a connecting clamping groove 4 is formed in the outer side of the square stop body 1, a movable foot stool 5 is movably mounted in the connecting clamping groove 4, a positioning clamping block 6 is fixedly mounted at the other end of the square stop body 1, a positioning groove 7 is formed in the connecting clamping groove 4, a balancing weight 9 is fixedly mounted on the inner side of the square stop body 1, a connecting rod 10 is movably mounted in the positioning groove 7, a mounting rotating shaft 11 is movably mounted between the connecting rod 10 and the movable foot stool 5, a movable caster 8 is movably mounted at the lower end of the connecting rod 10;
furthermore, the square baffle body 1 is designed into a rectangular structure with circular arc-shaped periphery, the size of the steel reinforcement framework 2 on the square baffle body 1 is matched with that of the square baffle body 1, and the size of the positioning clamping groove 3 on the square baffle body 1 is matched with that of the positioning clamping block 6, so that the square baffle body is similar in shape and can be better installed and connected;
furthermore, two groups of connecting clamping grooves 4 are symmetrically arranged on the square baffle body 1, the connecting clamping grooves 4 are designed in a rectangular structure, and the size of a positioning groove 7 in each connecting clamping groove 4 is smaller than that of each connecting clamping groove 4, so that the square baffle can be better fixed;
furthermore, the movable foot rest 5 is designed to be of a trapezoidal structure, and the size of the movable foot rest 5 is matched with that of the connecting rod 10, so that the movable work is facilitated;
furthermore, four connecting rods 10 are symmetrically arranged on the square gear body 1, and the size of each connecting rod 10 is matched with that of the square gear body 1, so that the working difficulty can be reduced;
further, the symmetry of guiding hole 12 is provided with four on square fender body 1, and the mutual adaptation of size of guiding hole 12 and the size of connecting rod 10 can guarantee to carry out the during operation, and the overall stability of device.
The working principle is as follows: at first, select suitable position to fix whole device, through stepping on downwards and remove foot rest 5, drive connecting rod 10 and caster 8 and stretch out from guiding hole 12, the rethread cooperation each other carries out the removal work in the position, after the removal work is accomplished, can also make up through the mutual connection of positioning card groove 3 and positioning card block 6, better satisfying the use needs, work of using is carried out through outside framework of steel reinforcement 2 and inside balancing weight 9, whole device simple structure, the work of conveniently using, the work of removing that simultaneously can be better, and reduce the cost of work, reduce the loss to natural resources simultaneously, improve the speed and the efficiency of work.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a rubber side's shelves that building engineering construction used, includes the side and keeps off the body, its characterized in that: the utility model discloses a square fender body, including square fender body, connecting groove, movable mounting has the removal foot rest in the connecting groove, the other end fixed mounting that the side kept off the body has the positioning fixture block, the constant head tank has been seted up in the connecting groove, connecting groove has been seted up in the outside of square fender body, movable mounting has the removal foot rest in the connecting groove, the other end fixed mounting that the side kept off the body has the positioning fixture block, the constant head tank has been seted up in the connecting groove, the inboard fixed mounting that the side kept off the body has the balancing weight, movable mounting has the connecting rod in the constant head tank, movable mounting has the installation pivot between connecting.
2. The rubber square bar for constructional engineering construction according to claim 1, wherein: the square baffle body is of a rectangular structural design in a circular arc shape, the size of a steel bar framework on the square baffle body is matched with the size of the square baffle body, and the size of a positioning clamping groove and the size of a positioning clamping block on the square baffle body are matched with each other, and the square baffle body is similar in shape.
3. The rubber square bar for constructional engineering construction according to claim 1, wherein: the connecting clamping grooves are symmetrically arranged on the square baffle body in two groups, are designed in a rectangular structure, and are smaller than the connecting clamping grooves in size.
4. The rubber square bar for constructional engineering construction according to claim 1, wherein: the movable foot rest is designed to be of a trapezoidal structure, and the size of the movable foot rest is matched with that of the connecting rod.
5. The rubber square bar for constructional engineering construction according to claim 1, wherein: the connecting rod symmetry is provided with four on the side keeps off the body, and the size of connecting rod and the mutual adaptation of size of side fender body.
6. The rubber square bar for constructional engineering construction according to claim 1, wherein: the side keeps off the body and is provided with four guiding holes symmetrically, and the size of guiding hole and the mutual adaptation of size of connecting rod.
CN202021263098.7U 2020-07-01 2020-07-01 Rubber square stop for building engineering construction Active CN212613772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021263098.7U CN212613772U (en) 2020-07-01 2020-07-01 Rubber square stop for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021263098.7U CN212613772U (en) 2020-07-01 2020-07-01 Rubber square stop for building engineering construction

Publications (1)

Publication Number Publication Date
CN212613772U true CN212613772U (en) 2021-02-26

Family

ID=74757604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021263098.7U Active CN212613772U (en) 2020-07-01 2020-07-01 Rubber square stop for building engineering construction

Country Status (1)

Country Link
CN (1) CN212613772U (en)

Similar Documents

Publication Publication Date Title
CN212613772U (en) Rubber square stop for building engineering construction
CN212317425U (en) Firm tower type scaffold
CN209760874U (en) Reinforced supporting structure for constructional engineering
CN210682752U (en) Electric wire coiling mechanism for construction
CN208899333U (en) A kind of space curved surface suspension cable beam-ends cable guide pipe positioning device
CN210342734U (en) Support column for prefabricated building
CN213359377U (en) Building templates support frame
CN211816949U (en) Wood frame module for archaizing building construction
CN210194906U (en) Concrete formwork for fabricated building
CN112302190A (en) Node structure of H-shaped steel beam steel tube concrete column
CN217557920U (en) Guardrail for construction worker
CN219197220U (en) Building construction ladder
CN216503148U (en) Column-beam joint welding tool
CN218802114U (en) Electromechanical pipeline auxiliary installation device
CN215486024U (en) Swift clearance formula location direction steel sleeve
CN213745281U (en) Multi-line pipeline fixing device
CN215048064U (en) Pedestal capable of being hoisted in beam storage area of precast beam field
CN210468663U (en) Cable tray structure for laying cable
CN218091892U (en) Portable scaffold for repairing ancient buildings
CN218051424U (en) Auxiliary positioning device for constructional engineering
CN220538686U (en) Detachable cofferdam
CN210907846U (en) Full-power straightening device for reinforcing steel bars
CN209855059U (en) House construction steel bar connecting device
CN217205316U (en) Reinforced support template for house building engineering
CN213391456U (en) Pylon is with assembling structure with high-efficient locate function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant