CN212832327U - Hoisting support for transporting and installing special-shaped precast concrete module - Google Patents
Hoisting support for transporting and installing special-shaped precast concrete module Download PDFInfo
- Publication number
- CN212832327U CN212832327U CN201922109064.6U CN201922109064U CN212832327U CN 212832327 U CN212832327 U CN 212832327U CN 201922109064 U CN201922109064 U CN 201922109064U CN 212832327 U CN212832327 U CN 212832327U
- Authority
- CN
- China
- Prior art keywords
- module
- auxiliary
- support
- hoisting
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a hoisting bracket used for transporting and installing a special-shaped precast concrete module; the method is characterized in that: the device comprises a basic frame, an auxiliary support and a lifting lug arranged at the top of the basic frame; the foundation frame specifically comprises four upright posts (3), and a bottom beam (2) and a top beam (4) which are respectively used for connecting the upright posts (3); the auxiliary support comprises a triangular steel frame (1), the number of the auxiliary supports is four, the auxiliary supports are respectively arranged on the side portion of each upright post (3), and every two auxiliary supports are symmetrically arranged and are parallel to each other. This hoisting support utilizes the all-round shroud of module that basic frame will be hoisted, avoids the emergence of the condition such as concrete extrusion, deformation fragmentation at whole hoist and mount in-process, can utilize basic frame to do the module support bracket concurrently before the prefabricated module location of dysmorphism simultaneously, can avoid hoist and mount process module to empty, the cracked scheduling problem of deformation to appear through its auxiliary support, ensures whole hoist and mount process safety.
Description
Technical Field
The utility model relates to a concrete construction field specifically is a hoisting support that is used for special-shaped precast concrete module to fall fortune, installation.
Background
Traditional building is mostly cast in situ concrete, and along with the development assembly type building of science and technology is more and more, and the heterosexual structure also develops thereupon, and the hoist and mount of concrete dysmorphism prefabricated module also becomes the common mode of assembly type building structure development. The common hoisting mode of the prefabricated modules is hoisting by utilizing the structural characteristics of the modules, hoisting by wrapping steel wire ropes or hoisting by prefabricating steel bar hoisting rings on the modules, but the hoisting mode adopted for large-sized special-shaped concrete modules has certain danger in the hoisting process.
Disclosure of Invention
An object of the utility model is to overcome above-mentioned defect, provide a hoisting support suitable for large-scale special-shaped precast concrete module is had bad luck, is installed.
In order to achieve the above object, the present invention is realized as follows:
a hoisting support for transporting and installing a special-shaped precast concrete module; the device comprises a base frame, an auxiliary support arranged on the outer side of the base frame and a lifting lug arranged on the top of the base frame; the foundation framework is of a box-type structure and specifically comprises four upright columns, and a bottom beam and a top beam which are respectively connected with the upright columns; the auxiliary support comprises a triangular steel frame, the number of the auxiliary supports is four, the auxiliary supports are respectively arranged on the side portion of each upright column, each two auxiliary supports are symmetrically arranged in a group, and the two groups of auxiliary supports are parallel to each other.
This hoisting support utilizes the all-round shroud of module that basic frame will be hoisted, avoids the emergence of the condition such as concrete extrusion, deformation fragmentation at whole hoist and mount in-process, can utilize basic frame to do the module support bracket concurrently before the prefabricated module location of dysmorphism simultaneously, can avoid hoist and mount process module to empty, the cracked scheduling problem of deformation to appear through its auxiliary support, ensures whole hoist and mount process safety.
Drawings
Fig. 1 is a schematic structural view of the hoisting bracket.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in fig. 1, a hoisting bracket for transporting and installing a special-shaped precast concrete module; the device comprises a base frame, an auxiliary support arranged on the outer side of the base frame and a lifting lug arranged on the top of the base frame; the foundation framework is of a box-type structure and specifically comprises four upright posts 3, and a bottom beam 2 and a top beam 4 which are respectively used for connecting the upright posts 3; the auxiliary support comprises a steel frame 1 in a triangular shape, the number of the auxiliary supports is four, the auxiliary supports are respectively arranged on the side portion of each upright post 3, each two auxiliary supports are symmetrically arranged in a group, and the two groups of auxiliary supports are parallel to each other.
This hoisting support is actually adopted following mode to consolidate: stiffening plates 6, 7 and 8 with the thickness of 20mm are arranged at the corresponding joint positions of the top beam 4, the bottom beam 2 and the upright post 3; the welding seams of the auxiliary support 1, the top beam 4, the bottom beam 2, the upright post 3 and the lifting lug 5 which are connected in pairs are all full penetration one-level welding seams.
The hoisting bracket should be sized in the following manner:
1. determining the outline dimension of the foundation frame according to the maximum length, width and height dimensions of the precast concrete module;
2. determining the length of parts except two sides of a foundation frame according to the aggregate size of the concrete special-shaped prefabricated modules, and determining the length of an auxiliary support according to the length of the outer parts, wherein the included angle of the auxiliary support is smaller than 45 degrees;
3. determining the position of a lifting lug 5 at the top of the basic frame according to the gravity center position of an object to be hoisted, welding the lifting lug 5 at the position of a middle web plate of the top beam 4, welding the lifting lug 5 with a full penetration weld of a double-sided groove of the top beam 4, symmetrically welding the lifting lug 5 relative to the gravity center position, welding the lifting lug 5 within the range of 1/4 at two ends of the top beam 4, and enabling the distance between the lifting lug and the side of the upright post 3 to;
4. PL200mm x 200 longitudinal stiffening plates 6 are welded at the connecting positions of the top beam 4 and the bottom beam 2 of the foundation frame and the upright posts 3, the thickness of the stiffening plates is not less than 20mm, fillet welds are welded, and the size of the weld angle is not less than 12 mm;
5. the distance between the bottom beam 2 of the foundation frame and the bottom of the hoisted concrete module is easy to be 200mm, the gap is supplemented by H-shaped steel, and the gap is connected with the bottom beam 2 of the foundation frame in a welding mode.
This hoisting support utilizes the all-round shroud of module that basic frame will be hoisted, avoids the emergence of the condition such as concrete extrusion, deformation fragmentation at whole hoist and mount in-process, can utilize basic frame to do the module support bracket concurrently before the prefabricated module location of dysmorphism simultaneously, can avoid hoist and mount process module to empty, the cracked scheduling problem of deformation to appear through its auxiliary support, ensures whole hoist and mount process safety.
Claims (1)
1. A hoisting support for transporting and installing a special-shaped precast concrete module; the method is characterized in that: the device comprises a base frame, an auxiliary support arranged on the outer side of the base frame and a lifting lug arranged on the top of the base frame; the foundation framework is of a box-type structure and specifically comprises four upright posts (3), and a bottom beam (2) and a top beam (4) which are respectively used for connecting the upright posts (3); the auxiliary support comprises a steel frame (1) in a triangular shape, the number of the auxiliary supports is four, the auxiliary supports are respectively arranged on the side portion of each upright post (3), each two auxiliary supports are symmetrically arranged, and the two groups of auxiliary supports are parallel to each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922109064.6U CN212832327U (en) | 2019-11-29 | 2019-11-29 | Hoisting support for transporting and installing special-shaped precast concrete module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922109064.6U CN212832327U (en) | 2019-11-29 | 2019-11-29 | Hoisting support for transporting and installing special-shaped precast concrete module |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212832327U true CN212832327U (en) | 2021-03-30 |
Family
ID=75112078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922109064.6U Active CN212832327U (en) | 2019-11-29 | 2019-11-29 | Hoisting support for transporting and installing special-shaped precast concrete module |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212832327U (en) |
-
2019
- 2019-11-29 CN CN201922109064.6U patent/CN212832327U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101391637B1 (en) | Constrution methoed for Prestressed Composite Truss girder using steel truss member | |
CN211143305U (en) | Steel structure building | |
CN109184189B (en) | Construction method for conical shell silo top structure of large-diameter silo | |
CN214194152U (en) | Assembled bracket supporting structure of upper beam construction template of cable-stayed bridge cable tower | |
CN102777050B (en) | Assembly type jig frame for longspan pipe truss roof girder | |
CN103696582A (en) | Method and structure for improving rigidity of reinforced concrete beam | |
CN212832327U (en) | Hoisting support for transporting and installing special-shaped precast concrete module | |
CN212336080U (en) | Assembled tower crane foundation structure | |
CN109267439B (en) | Efficient and stable three-layer viaduct and construction process thereof | |
CN215925689U (en) | Arch bridge steel pipe arch rib installing support | |
CN111254813A (en) | Steel and concrete combined bent cap and manufacturing method thereof | |
CN105817883B (en) | Hydraulic press frame group is carried out to method using mold | |
US11414880B2 (en) | Reinforcing structure of unexpired concrete building floors | |
CN213531407U (en) | Welding fixture device for hoisting segments of steel plate combined beam bridge | |
CN211619800U (en) | Novel hoisting equipment in narrow and small place | |
CN209854935U (en) | Compound concrete-filled steel tube corner post-steel beam joint | |
CN110878525B (en) | Double-layer steel box girder bridge installation method and combined support for installation | |
CN102888929A (en) | Shearing force prefabricated component for assembled-type hollow grid plate floor system structure | |
CN102888934A (en) | Shearing force prefabricated component for assembled-type hollow grid plate floor system structure | |
CN110905220A (en) | Installation and construction method of anti-buckling energy dissipation brace of reinforced concrete structure | |
CN205205664U (en) | Concrete king -post connection structure | |
CN111041989A (en) | Rapid installation method of prefabricated assembled bridge | |
CN110844804B (en) | Supporting construction method of ultra-long truss type tower crane attachment system | |
CN212613835U (en) | On-spot device of assembling fast of blast furnace material loading vestibule | |
CN112171160B (en) | Welding fixture device and clamping method for hoisting section of steel plate composite beam bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |