Prior art keywords
steel
compound
steel tube
concrete
edge beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920251725.6U
Other languages
Chinese (zh)
Inventor
李迥
陈旦波
蒋成杰
陈永宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shunyuan Construction (group) Co Ltd
Original Assignee
Shunyuan Construction (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shunyuan Construction (group) Co Ltd filed Critical Shunyuan Construction (group) Co Ltd
Priority to CN201920251725.6U priority Critical patent/CN209854935U/en
Application granted granted Critical
Publication of CN209854935U publication Critical patent/CN209854935U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

A compound steel tube concrete corner post-steel beam node comprises a compound steel tube concrete column and two steel edge beam connecting pieces which are perpendicular to each other, wherein the compound steel tube concrete column consists of outer square large steel tubes, round small steel tubes, stiffening plates and concrete poured in gaps; two mutual perpendicular faces of the square large steel pipe on the outer side are respectively welded with two steel edge beam connecting pieces, the steel edge beam connecting pieces are connected with the steel edge beams in a riveting mode, wing plates connected with the steel edge beams and the square large steel pipe on the outer side are widened, and the node structure can be used for a seismic area frame structure with high seismic requirement.

Description

Compound concrete-filled steel tube corner post-steel beam joint
Technical Field
The utility model relates to a double entry steel pipe concrete corner post-girder steel node in the building engineering field mainly is applicable to industry and civil building structural design field.
Background
The structural design of the corner post is a core component of building frame plus structural design, particularly the anti-seismic design of a frame structure, and because the damage of the center post is greater than that of the beam in the earthquake process, the damage of the corner post is generally greater than that of the side post and the middle post, therefore, the anti-seismic design of the special frame structure in the structural design generally adopts a strong post, a weak beam, a strong corner post and a weak middle post.
At present, a hollow box-shaped square steel pipe is generally adopted for connecting a steel beam or a steel reinforced concrete beam, and a form that the steel pipe concrete column is connected with the steel beam or the steel reinforced concrete beam is also adopted, so that the bending resistance of the node is relatively good, but under the condition of earthquake action horizontal force, in order to ensure the integral rigidity of the structure, especially an earthquake area with high earthquake resistance requirement, the integral rigidity of the structure can be ensured only when the section of the steel pipe column or the steel pipe concrete column is designed to be large enough, the weight of the steel pipe column is inevitably large due to the design, the difficulty is increased for the construction and hoisting of the steel column, on one hand, the construction cost is increased, and meanwhile, the waste of construction steel is caused, and on the other hand, the use space of the building is damaged due to the increase of the section of.
Disclosure of Invention
In order to solve the problem of corner post earthquake resistance of the existing frame structure building, particularly the defects of the design of common steel pipe concrete columns in earthquake areas with high earthquake resistance requirements, and meet the requirements of construction units on the use functions of the building under the condition of economy and reasonableness as much as possible, the composite steel pipe concrete corner post-steel beam node comprises a composite steel pipe concrete column and two steel edge beam connecting pieces which are vertical to each other, wherein the composite steel pipe concrete column consists of outer square large steel pipes, round small steel pipes, stiffening plates and concrete poured in gaps, the outer square large steel pipes and the central round small steel pipes are concentric, the outer square large steel pipes and the central round small steel pipes are connected by the stiffening plates, the stiffening plates are respectively connected with the outer square large steel pipes and the central round small steel pipes in a welding manner, and the two mutually vertical surfaces of the outer square large steel pipes are respectively welded with the two steel edge beam connecting, the connecting mode between connecting piece and the steel limit is even adopts the riveting mode, the pterygoid lamina that the steel boundary beam and the square big steel pipe in the outside link up is widened, compound steel pipe concrete corner post-girder steel structure can be used for as the form of a structural joint in the building structure design, the space between the square big steel pipe in the outside and the circular little steel pipe in center and little steel pipe inner space concreting, after the concrete sets up and reaches intensity, it is a lot of more than ordinary post-beam node rigidity, can be used to the regional frame construction of earthquake that high antidetonation required.
Drawings
The present invention will be further explained with reference to the accompanying drawings.
FIG. 1 is a structural diagram of the connection between a composite steel pipe concrete column and a steel side beam
In the figure, 1-1 parts of square large steel pipes on the outer sides 1-2 parts of small steel pipes in the center 1-3 parts of round stiffening plates 1-4 parts of concrete 2-1 parts of steel edge beam wing plates 2-2 parts of steel edge beam web plates 2-3 parts of web plate riveting holes;
FIG. 2 top view of the apparatus
In the figure, 1-1 parts of square large steel pipes on the outer sides 1-2 parts of small steel pipes in the center round shape 1-3 parts of stiffening plates 1-4 parts of concrete 2-1 parts of steel edge beam connecting pieces 1.2-2 parts of steel edge beam connecting pieces 2.
Detailed Description
1. Selecting a circular steel pipe with a certain diameter and wall thickness according to a structural design calculation book;
2. selecting 4 stiffening steel plates according to the structural design calculation book, and cutting to meet the design requirements;
3. the 4 stiffening plates are respectively welded on the mutually vertical diameter-passing side surfaces of the round steel pipes;
4. selecting 4 square steel plates with certain length and thickness according to a structural design calculation book;
5. the 4 square steel plates are respectively welded on the outer sides of the frame stiffening plates, and the joint between the two connected steel plates is simultaneously welded, so that the compound steel pipe column is successfully processed;
6. processing the steel edge beam connecting piece of two adjacent side surfaces of the compound steel pipe column according to a structural design calculation book;
7. installing and fixing the compound steel pipe column at the corner part on site;
8. riveting, connecting and mounting the compound steel pipe column and the steel side beam;
9. concrete is poured in a gap between the inner round small steel pipe and the outer square large steel pipe, and the concrete is maintained to reach the strength required by the design.

Claims (2)

1. A compound steel tube concrete corner post-steel beam node is characterized by comprising a compound steel tube concrete column and two steel edge beam connecting pieces which are perpendicular to each other, wherein the compound steel tube concrete column consists of outer square large steel tubes, round small steel tubes, stiffening plates and concrete poured in gaps; two mutually perpendicular faces of the large square steel pipe on the outer side are respectively welded with two steel edge beam connecting pieces, and the connecting mode between the steel edge beam connecting pieces and the steel edge beams adopts a riveting mode.
2. The compound concrete filled steel tube corner-steel beam joint as claimed in claim 1, wherein the flanges of the steel edge beam connecting piece engaged with the outer square steel tube are widened to enhance the connection between the edge beam and the compound concrete filled steel tube corner.
CN201920251725.6U 2019-02-28 2019-02-28 Compound concrete-filled steel tube corner post-steel beam joint Expired - Fee Related CN209854935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920251725.6U CN209854935U (en) 2019-02-28 2019-02-28 Compound concrete-filled steel tube corner post-steel beam joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920251725.6U CN209854935U (en) 2019-02-28 2019-02-28 Compound concrete-filled steel tube corner post-steel beam joint

Publications (1)

Publication Number Publication Date
CN209854935U true CN209854935U (en) 2019-12-27

Family

ID=68932325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920251725.6U Expired - Fee Related CN209854935U (en) 2019-02-28 2019-02-28 Compound concrete-filled steel tube corner post-steel beam joint

Country Status (1)

Country Link
CN (1) CN209854935U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116290373A (en) * 2022-12-06 2023-06-23 同圆设计集团股份有限公司 Steel frame assembled house system of trapezoid concrete filled steel tubular column and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116290373A (en) * 2022-12-06 2023-06-23 同圆设计集团股份有限公司 Steel frame assembled house system of trapezoid concrete filled steel tubular column and construction method
CN116290373B (en) * 2022-12-06 2024-04-26 同圆设计集团股份有限公司 Steel frame assembled house system of trapezoid concrete filled steel tubular column and construction method

Similar Documents

Publication Publication Date Title
CN103276795B (en) Steel-concrete slab-column structure system
CN110725405A (en) Steel pipe concrete column H-shaped steel beam rigid connection node structure with tie bars and construction method
CN209854935U (en) Compound concrete-filled steel tube corner post-steel beam joint
CN107060112B (en) Comb-shaped connecting piece for connecting steel tube bundle concrete column and floor beam
CN211621953U (en) Prefabricated beam column connected node structure
CN104895221A (en) Assembled profile steel confined concrete shear wall structure
CN211396201U (en) Connection structure of embedded steel beam and prefabricated composite floor slab
CN112302210A (en) Assembled built-in corrugated steel plate reinforced concrete cross-section member and construction process
CN107780564A (en) A kind of assembled ribbing steel plate shear force wall
CN103967149A (en) Self-resetting line-shaped center supporting system for industrialized assembly type multistory and high-rise steel structures
CN209779860U (en) assembled steel frame structure node
CN203856069U (en) High-rise building steel structure
CN213897670U (en) Assembled cross-section member with built-in corrugated steel plate reinforced concrete
CN213539882U (en) Middle node of steel pipe concrete column H-shaped steel beam support pi-shaped connecting side column
CN213897669U (en) Prefabricated built-in corrugated steel plate reinforced concrete combined shear wall
CN201437613U (en) Steel beam integral feed-through type concrete-filled tubular column and steel beam connecting node
CN211774630U (en) Steel pipe concrete special-shaped column and I-shaped steel beam connection node structure
CN210767941U (en) Box steel column underpins node
CN113802741A (en) Pin shear connection assembly type beam-slab combination system based on orthogonal corrugated steel plate bending-resistant tie-bar composite floor slab
CN103866853B (en) The many high-rise assembling type steel structure frame systems of a kind of industrialized modular
CN113982108A (en) Prefabricated post and precast beam connected node and adopt beam column structure of this node
CN209854934U (en) Compound concrete filled steel tube side column-steel beam joint
CN108277918B (en) Assembled type toothed joint edge-punched steel sheet ribbed floor
CN106088398A (en) A kind of combined wall board
CN204510483U (en) Be suitable for the building node component of I-shaped chord member and box-shaped steel pipe web member X-type truss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191227

CF01 Termination of patent right due to non-payment of annual fee