CN212802547U - Deformation joint pouring template - Google Patents

Deformation joint pouring template Download PDF

Info

Publication number
CN212802547U
CN212802547U CN202020597592.0U CN202020597592U CN212802547U CN 212802547 U CN212802547 U CN 212802547U CN 202020597592 U CN202020597592 U CN 202020597592U CN 212802547 U CN212802547 U CN 212802547U
Authority
CN
China
Prior art keywords
connecting sleeve
connecting rod
baffle
flexible part
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020597592.0U
Other languages
Chinese (zh)
Inventor
雷泽隆
庞文凯
张婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Renming Residential Industrial Technology Co ltd
Original Assignee
Sichuan Renming Residential Industrial Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Renming Residential Industrial Technology Co ltd filed Critical Sichuan Renming Residential Industrial Technology Co ltd
Priority to CN202020597592.0U priority Critical patent/CN212802547U/en
Application granted granted Critical
Publication of CN212802547U publication Critical patent/CN212802547U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to an engineering technical field is built in room, concretely relates to movement joint pouring template, including two relative baffles that set up, two be equipped with a plurality of flexible part between the baffle, flexible part includes connecting sleeve, connecting rod and mounting, the connecting sleeve with the connecting rod sets up respectively two on the baffle, the mounting sets up on the connecting sleeve, the mounting be used for with the connecting sleeve is fixed on the connecting rod. The utility model relates to a movement joint pouring template through setting up flexible part between two baffles, makes the interval between two baffles can carry out corresponding regulation according to the extension of flexible part with shortening to adapt to the needs of different movement joint widths, and then the two side templates of the movement joint of being convenient for install simultaneously, and the shaping is once pour in the pouring region of the two sides of movement joint, has improved the efficiency of construction, has reduced construction cost.

Description

Deformation joint pouring template
Technical Field
The utility model relates to an engineering technical field is built in the room, especially a movement joint pouring template.
Background
During the construction of a main structure of the building engineering, deformation joints are required to be reserved in a pouring area, the deformation joints are generally formed by pouring through two oppositely arranged templates, and the width of each deformation joint is not fixed and needs to be designed according to actual conditions.
Because the construction space is narrow and small, the distance between the templates on the two sides of the deformation joint is not easy to adjust, and the traditional pouring method is that the pouring areas on the two sides of the deformation joint are respectively poured, so that the templates are complex to install and disassemble, and the construction cost is also improved by repeated work of the concrete distribution vehicle.
In summary, a technical scheme is urgently needed at present to solve the technical problems that the distance between the deformation joint bilateral templates is not easy to adjust and the deformation joint bilateral templates cannot adapt to different deformation joint widths.
SUMMERY OF THE UTILITY MODEL
The invention of the utility model aims to: the deformation joint pouring template is provided for solving the technical problems that in the prior art, the distance between two side templates of a deformation joint is not easy to adjust and the width of different deformation joints cannot be adapted.
In order to realize the purpose, the utility model discloses a technical scheme be:
the utility model provides a template is pour to movement joint, includes two relative baffles that set up, two be equipped with the flexible part of a plurality of between the baffle, flexible part includes connecting sleeve, connecting rod and mounting, the connecting sleeve with the connecting rod sets up respectively two on the baffle, the mounting sets up on the connecting sleeve, the mounting be used for with the connecting sleeve is fixed on the connecting rod.
The utility model relates to a movement joint pouring template, through set up flexible part between two baffles, make the interval between two baffles can carry out corresponding regulation according to the extension of flexible part with shortening, wherein flexible part is including setting up the connecting sleeve on one of them baffle, and set up the connecting rod on another baffle, connecting sleeve and connecting rod adaptation, through the difference of the depth of insertion of connecting rod in the connecting sleeve, thereby make the interval between two baffles can obtain the adjustment, with the needs that adapt to different movement joint widths, and then the two side templates of the movement joint of being convenient for install simultaneously, the two side pouring region one shot forming of movement joint, construction efficiency is improved, construction cost is reduced.
As the utility model discloses a preferred scheme, the mounting is fastening bolt, be equipped with on the connecting sleeve lateral wall with the screw hole of fastening bolt adaptation. The fastening bolt is screwed into the threaded hole in the side wall of the connecting sleeve, and the fastening bolt is tightly propped against the connecting rod in the process of continuing screwing, so that the position of the connecting rod in the connecting sleeve is relatively fixed, and the fixing of the distance between the two baffles is realized.
As the utility model discloses a preferred scheme, the mounting is fastening nut, connecting sleeve one end is equipped with a plurality of opening along connecting sleeve's axis direction, fastening nut sets up connecting sleeve sets up open-ended one end. Through screw-thread fit between fastening nut and the connecting sleeve, be equipped with the external screw thread with the fastening nut adaptation on the connecting sleeve outer wall, the in-process that fastening nut screwed on the connecting sleeve extrudees the connecting sleeve, because set up the opening on the connecting sleeve, its one end of connecting rod can be hugged closely with the connecting rod outer wall when compressed tightly, and then has realized relatively fixed between connecting sleeve and the connecting rod.
As the preferred scheme of the utility model, be equipped with the side opening on the fastening nut. Through set up the side opening on fastening nut's lateral wall, can rotate fastening nut through inserting the dwang at the side opening, it is more laborsaving, it is more convenient to operate.
As the utility model discloses an optimal scheme, the baffle sets up to the cuboid structure, two be equipped with four between the baffle the flexible part, four flexible part sets up respectively on the four corners corner position of baffle. The baffle of cuboid structure can satisfy the demand of pouring of movement joint, sets up a telescopic part respectively in four corner positions of cuboid and is favorable to ensureing the connection between two baffles stable.
As the preferred proposal of the utility model, the connecting rod is provided with scale marks. On the one hand, the length of the connecting rod entering the connecting sleeve can be directly observed, so that the distance between the two baffles is determined, on the other hand, all telescopic parts can be adjusted to the same length, the two baffles are in a parallel state, the complicated measurement and adjustment steps are reduced, and the construction efficiency is improved.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model relates to a movement joint pouring template, through setting up the flexible part between two baffles, make the interval between two baffles can carry out corresponding regulation according to the extension and the shortening of flexible part to adapt to the needs of different movement joint widths, and then the bilateral template of the convenient movement joint is installed simultaneously, and the pouring area of the bilateral of movement joint is once poured and is formed, has improved the efficiency of construction, has reduced construction cost;
2. through set up the scale mark on the connecting rod, can directly observe the connecting rod and get into the length of connecting sleeve on the one hand to confirm the interval between two baffles, on the other hand is favorable to adjusting all flexible parts to same length, makes two baffles be in the parallel state, reduces loaded down with trivial details measurement and regulation step, has improved the efficiency of construction.
Drawings
Fig. 1 is a schematic structural view of a deformation joint casting formwork according to the present invention in example 1;
FIG. 2 is a schematic structural view of a deformation joint casting formwork according to the present invention in example 2;
FIG. 3 is a schematic view of the coupling sleeve of FIG. 2;
FIG. 4 is a schematic structural view of a casting form for deformation joints in the embodiment 3
The labels in the figure are: 1-baffle, 2-telescopic part, 21-connecting sleeve, 211-opening, 22-connecting rod, 221-graduation line, 23-fastening bolt, 24-fastening nut and 241-side hole.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
Example 1
As shown in fig. 1, the utility model relates to a movement joint pouring template, including two relative baffles 1 that set up, two be equipped with a plurality of telescopic part 2 between the baffle 1, telescopic part 2 includes connecting sleeve 21, connecting rod 22 and mounting, connecting sleeve 21 with connecting rod 22 sets up respectively two on the baffle 1, the mounting sets up on the connecting sleeve 21, the mounting be used for with connecting sleeve 21 is fixed on the connecting rod 22.
Specifically, the fixing piece is a fastening bolt 23, a threaded hole matched with the fastening bolt 23 is formed in the side wall of the connecting sleeve 21, the fastening bolt 23 is screwed into the threaded hole in the side wall of the connecting sleeve 21, and in the process of continuing screwing, the fastening bolt 23 is tightly pressed against the connecting rod 22, so that the position of the connecting rod 22 in the connecting sleeve 21 is relatively fixed, and further, the distance between the two baffles 1 is fixed;
baffle 1 sets up to the cuboid structure, two be equipped with four between the baffle 1 flexible part 2, four flexible part 2 sets up respectively on the four corners corner position of baffle 1, that is to say that flexible part 2 sets up on the position that is close to 1 corner of baffle, and the baffle 1 of cuboid structure can satisfy the demand of pouring of movement joint, sets up a flexible part 2 respectively in four corner positions of cuboid and is favorable to ensureing the connection stability between two baffles 1.
The utility model relates to a movement joint pouring template, through set up flexible part 2 between two baffles 1, make the interval between two baffles 1 can carry out corresponding regulation according to the extension of flexible part 2 and shorten, wherein flexible part 2 is including setting up the connecting sleeve 21 on one of them baffle 1, and set up the connecting rod 22 on another baffle 1, connecting sleeve 21 and connecting rod 22 adaptation, through the difference of the depth of insertion of connecting rod 22 in connecting sleeve 21, thereby make the interval between two baffles 1 can obtain the adjustment, with the needs that adapt to different movement joint widths, and then the two side templates of the movement joint of being convenient for are installed simultaneously, the regional one shot forming of pouring of the two sides of movement joint, construction efficiency is improved, construction cost is reduced.
Example 2
As shown in fig. 2 and fig. 3, in this embodiment, the difference from embodiment 1 is that the fixing member is a fastening nut 24, one end of the connecting sleeve 21 is provided with a plurality of openings 211 along the axial direction of the connecting sleeve 21, the fastening nut 24 is disposed at one end of the connecting sleeve 21 where the openings 211 are disposed, the fastening nut 24 and the connecting sleeve 21 are in threaded fit, an external thread adapted to the fastening nut 24 is disposed on the outer wall of the connecting sleeve 21, the fastening nut 24 presses the connecting sleeve 21 in the process of screwing on the connecting sleeve 21, and due to the provision of the openings 211 on the connecting sleeve 21, one end of the connecting rod 22 is tightly attached to the outer wall of the connecting rod 22 when being pressed, so that the connecting sleeve 21 and the connecting rod 22 are relatively fixed.
Further, be equipped with side opening 241 on fastening nut 24, through set up side opening 241 on fastening nut's 24 lateral wall, can rotate fastening nut 24 through inserting the dwang in side opening 241, it is more laborsaving, it is more convenient to operate.
Compared with the embodiment 1, in the embodiment, the fixing piece adopts the fastening nut 24, the fastening nut 24 can be always installed on the connecting sleeve 21, when the length of the telescopic component 2 needs to be adjusted, the fastening nut 24 is rotated anticlockwise to loosen the connecting sleeve 21, the fastening nut 24 is rotated clockwise after the adjustment is finished to compress the connecting sleeve 21, the adjustment is more convenient, and the component is not easy to lose.
Example 3
As shown in fig. 4, in the present embodiment, the difference from embodiment 1 is that the scale mark 221 is provided on the connecting rod 22, so that on one hand, the length of the connecting rod 22 entering the connecting sleeve 21 can be directly observed, and thus the distance between the two baffles 1 can be determined, and on the other hand, it is beneficial to adjust all the telescopic components 2 to the same length, so that the two baffles 1 are in a parallel state, thereby reducing the tedious measuring and adjusting steps, and improving the construction efficiency.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (4)

1. The utility model provides a movement joint pouring formwork, its characterized in that, including two baffle (1) of relative setting, two be equipped with a plurality of flexible part (2) between baffle (1), flexible part (2) are including connecting sleeve (21), connecting rod (22) and mounting, connecting sleeve (21) with connecting rod (22) set up two respectively on baffle (1), the mounting sets up on connecting sleeve (21), the mounting is used for with connecting sleeve (21) are fixed on connecting rod (22), the mounting is fastening nut (24), connecting sleeve (21) one end is equipped with a plurality of opening (211) along the axis direction of connecting sleeve (21), fastening nut (24) set up connecting sleeve (21) sets up the one end of opening (211).
2. A deformation joint pouring template according to claim 1, characterized in that a side hole (241) is formed in the fastening nut (24).
3. A deformation joint pouring formwork according to any one of claims 1-2, wherein the baffle plates (1) are arranged in a rectangular structure, four telescopic parts (2) are arranged between two baffle plates (1), and the four telescopic parts (2) are respectively arranged at the corner positions of four corners of the baffle plates (1).
4. A deformation joint casting formwork according to any one of claims 1-2, wherein scale marks (221) are arranged on the connecting rods (22).
CN202020597592.0U 2020-04-21 2020-04-21 Deformation joint pouring template Active CN212802547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020597592.0U CN212802547U (en) 2020-04-21 2020-04-21 Deformation joint pouring template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020597592.0U CN212802547U (en) 2020-04-21 2020-04-21 Deformation joint pouring template

Publications (1)

Publication Number Publication Date
CN212802547U true CN212802547U (en) 2021-03-26

Family

ID=75080344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020597592.0U Active CN212802547U (en) 2020-04-21 2020-04-21 Deformation joint pouring template

Country Status (1)

Country Link
CN (1) CN212802547U (en)

Similar Documents

Publication Publication Date Title
CN207633756U (en) A kind of angle and the adjustable building internal corner template of length
CN203222977U (en) Screeding template for plastering external corner
CN212802547U (en) Deformation joint pouring template
CN206458083U (en) A kind of adjustable building template
CN113374221A (en) Method for controlling flatness and verticality of plastering surface of aluminum die forming shear wall and building block
CN214785981U (en) Adjustable design steel form that falls board region
CN217079737U (en) Novel multi-functional regulation steel bar connector
CN216239723U (en) Exempt from to drawing structure template reinforcement
CN215594893U (en) Descending plate formwork device
CN110043033A (en) Aluminum alloy mould plate system accepts template pre-embedded device
CN111350350B (en) Broken bridge split connection rod piece of steel bar formwork integrated wall formwork
CN214034735U (en) Caisson hangs mould structure
CN210586851U (en) Reinforcing bar preflex instrument
CN205857709U (en) Air-conditioning template length governor motion and air-conditioning formwork support structure
CN210636802U (en) Wall body block terminal primary structure reserves fixed mould
CN205741887U (en) A kind of bridge abutment moulding plate with right angle regulatory function
CN221953534U (en) Assembled mould concatenation connection structure for building
CN209466454U (en) A kind of vertical muscle protective frame of PC component
CN208122295U (en) A kind of stupefied component of shuttering supporting steel
CN219705574U (en) Quick support die for street lamp base
CN219638404U (en) Device for improving accuracy of embedded electric box of secondary structure
CN219993119U (en) Supporting device for building stair templates
CN221346316U (en) Template fixing device for construction
CN219528028U (en) Shear wall connection structure
CN203919339U (en) A kind of concrete blinding slack adjuster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant