CN212773532U - Concrete floating device for building construction - Google Patents
Concrete floating device for building construction Download PDFInfo
- Publication number
- CN212773532U CN212773532U CN202021495965.XU CN202021495965U CN212773532U CN 212773532 U CN212773532 U CN 212773532U CN 202021495965 U CN202021495965 U CN 202021495965U CN 212773532 U CN212773532 U CN 212773532U
- Authority
- CN
- China
- Prior art keywords
- leg
- connecting rod
- concrete
- telescopic connecting
- supporting leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The application relates to a floating device of concrete for construction. The concrete trowelling device for building construction comprises a first supporting leg, a second supporting leg, a telescopic connecting rod assembly and a trowelling machine; one end of the telescopic connecting rod assembly is connected with the first supporting leg, and the other end of the telescopic connecting rod assembly is connected with the second supporting leg; the trowelling machine is mounted on the telescopic connecting rod assembly and can move in the axial direction of the telescopic connecting rod assembly; the trowelling machine is used for trowelling the concrete area to be trowelled. The utility model provides a concrete floating device for construction is through treating the one side of floating the concrete region with first leg frame, with second leg frame hypothesis at the opposite side, then span telescopic connecting rod on treating floating the concrete region, floating through installing the trowelling machine on telescopic connecting rod, can be in order to realize that a trowelling machine can float the even floating of within range, compare manual operation, it is more accurate convenient.
Description
Technical Field
The application relates to the technical field of concrete floating, in particular to a concrete floating device for building construction.
Background
The existing concrete trowelling device is usually held by a user and then trowelling is carried out on concrete along with the trowelling device, and in the mode, the user needs to step on the concrete, and on the other hand, trowelling is carried out completely through observation of the user.
Therefore, in view of the above deficiencies, there is a need to provide a technical solution to overcome or at least alleviate at least one of the above-mentioned drawbacks of the prior art.
SUMMERY OF THE UTILITY MODEL
The technical problem that this application will be solved lies in, to the defect among the prior art, provides a floating device of concrete for construction.
In order to solve the technical problem, the application provides a concrete trowelling device for building construction, which comprises a first supporting leg, a second supporting leg, a telescopic connecting rod assembly and a trowelling machine; wherein the content of the first and second substances,
one end of the telescopic connecting rod is connected with the first supporting leg, and the other end of the telescopic connecting rod is connected with the second supporting leg;
the trowelling machine is mounted on the telescopic connecting rod and can move in the axial direction of the telescopic connecting rod;
the trowelling machine is used for trowelling the concrete area to be trowelled.
Optionally, the telescopic connecting rod is detachably connected with the first leg;
the telescopic connecting rod is detachably connected with the second supporting leg;
the trowelling machine is detachably connected with the telescopic connecting rod.
Optionally, the telescopic connecting rod assembly comprises:
a telescopic connecting rod;
the telescopic driving mechanism is installed at one end of the telescopic connecting rod and provided with a telescopic end, the telescopic end can move in the axial direction of the telescopic connecting rod, and the telescopic end is connected with the trowelling machine and used for driving the trowelling machine to move in the axial direction of the telescopic connecting rod.
Optionally, the concrete floating device for building construction includes:
the first supporting leg is provided with a universal wheel;
and universal wheels are arranged on the second supporting legs.
Optionally, a universal wheel on the first leg is detachably connected with the first leg;
the universal wheel on the second supporting leg is detachably connected with the second supporting leg.
Optionally, the concrete floating device for building construction further comprises a first supporting cylinder, the first supporting cylinder is installed on the first supporting leg, the first supporting cylinder has a jacking position, and in the jacking position, the first supporting cylinder jacks up the first supporting leg to support the first supporting leg.
Optionally, the concrete floating device for building construction further comprises a second supporting cylinder, the second supporting cylinder is installed on the second supporting leg, the second supporting cylinder has a jacking position, and in the jacking position, the second supporting cylinder jacks up the second supporting leg to support the second supporting leg.
Optionally, the concrete floating device for building construction further comprises a distance detection device, and the distance detection device is installed on the first support leg and the second support leg and is used for detecting the distance between the first support leg and the second support leg.
Optionally, the trowelling machine includes scraper blade and lifter, lifter one end with telescopic link subassembly is connected, the other end with the scraper blade is connected.
The utility model provides a concrete floating device for construction is through treating the one side of floating the concrete region with first leg frame, supposing the second leg frame at the opposite side of treating floating the concrete region, then span telescopic connection pole on treating floating the concrete region, floating through the trowelling machine of installing on telescopic connection pole, can be in order to realize the even floating of a trowelling machine within range of floating, compare manual operation, it is more accurate convenient.
Drawings
Fig. 1 is a schematic structural view of a concrete troweling apparatus for building construction according to a first embodiment of the present application.
The device comprises a first supporting leg 1, a second supporting leg 2, a telescopic connecting rod component 3, a trowelling machine 4, a telescopic connecting rod 31, a telescopic driving mechanism 32, a universal wheel 5, a first supporting cylinder 6 and a second supporting cylinder 7; a distance detection device 8; a scraper 41 and a lifting rod 42.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
Fig. 1 is a schematic structural view of a concrete troweling apparatus for building construction according to a first embodiment of the present application.
The concrete floating device for building construction shown in fig. 1 comprises a first supporting leg 1, a second supporting leg 2, a telescopic connecting rod assembly 3 and a floating machine 4; one end of the telescopic connecting rod component 3 is connected with the first supporting leg 1, and the other end of the telescopic connecting rod component is connected with the second supporting leg 2; the trowelling machine 4 is arranged on the telescopic connecting rod assembly 3 and can move in the axial direction of the telescopic connecting rod assembly 3; the troweling machine 4 is used for troweling the concrete area to be trowelled.
The utility model provides a concrete floating device for construction is through treating the one side of floating the concrete region with first leg frame, supposing the second leg frame at the opposite side of treating floating the concrete region, then span telescopic connection pole on treating floating the concrete region, floating through the trowelling machine of installing on telescopic connection pole, can be in order to realize the even floating of a trowelling machine within range of floating, compare manual operation, it is more accurate convenient.
In this embodiment, the telescopic connecting rod assembly 3 is detachably connected, e.g. bolted, plugged, etc., to the first leg 1.
In this embodiment, the telescopic connecting rod assembly 3 is detachably connected to the second leg 2; such as bolting, plugging, etc.
In this embodiment, trowel 4 is removably attached to telescoping boom assembly 3. Such as bolting, plugging, etc.
Referring to fig. 1, in this embodiment, the telescopic connecting rod assembly includes a telescopic connecting rod 31 and a telescopic driving mechanism 32, the telescopic driving mechanism 32 is installed at one end of the telescopic connecting rod 31, the telescopic driving mechanism 32 has a telescopic end, the telescopic end can move in the axial direction of the telescopic connecting rod, and the telescopic end is connected to the trowelling machine for driving the trowelling machine to move in the axial direction of the telescopic connecting rod.
In this embodiment, the telescopic rod is an electric telescopic rod, one end of which is connected with the first leg, and the other end of which is connected with the second leg.
In this embodiment, the telescopic rod is first adjusted in length when not mounted on the leg, and is not required to be adjusted in length after being placed on the leg.
In this embodiment, flexible actuating mechanism is the hydro-cylinder, and the hydro-cylinder includes cylinder body and hydro-cylinder telescopic link, and the one end and the trowelling machine of hydro-cylinder telescopic link are connected for drive the trowelling machine motion.
In the embodiment, the first support leg 1 is provided with a universal wheel 5; the second support leg 2 is provided with a universal wheel 5.
Through setting up the universal wheel, when treating to trowel concrete area bigger, for example when a rectangle, when first landing leg and the second landing leg of the concrete floating device of this application erect at width direction, can move at length direction through the universal wheel to a bit is trowelled.
In the embodiment, the universal wheel on the first leg 1 is detachably connected with the first leg; the castor on the second leg 2 is detachably connected to the second leg.
When the universal wheel is not needed to be used, the universal wheel can be detached.
Referring to fig. 1, in the present embodiment, the concrete screeding device for construction further includes a first support cylinder 6, and the first support cylinder 6 is installed on the first leg 1 and has a jack-up position in which the first support cylinder jacks up the first leg to support the first leg.
Referring to fig. 1, in the present embodiment, the concrete screeding device for construction further includes a second support cylinder 7, the second support cylinder 7 being mounted on the second leg 2, the second support cylinder 7 having a jack-up position in which the second support cylinder jacks up the second leg to support the second leg.
When in actual use, liftoff first landing leg jack-up through first support cylinder, the second support cylinder liftoff second landing leg jack-up to make whole concrete floating device for construction's weight all support on first support cylinder and second support cylinder, thereby prevent the concrete floating device for construction of this application from rocking when using.
In this embodiment, the concrete floating device for building construction further includes a distance detecting device 8 mounted on the first leg and/or the second leg for detecting a distance between the first leg and the second leg.
In this way, the distance of the first leg and the second leg can be detected, so that the length of the concrete area to be screeded in this direction is detected laterally.
In this embodiment, the trowelling machine 4 comprises a scraper 41 and a lifting rod 42, wherein one end of the lifting rod 42 is connected with the telescopic connecting rod component 3, and the other end is connected with the scraper 41.
The lifting rod can stretch out and draw back in the axial direction of lifting rod to change the height of scraper blade, thereby the thickness of adjustment trowelling.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present application, and not to limit the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions in the embodiments of the present application.
Claims (9)
1. A concrete trowelling device for building construction is characterized by comprising a first supporting leg (1), a second supporting leg (2), a telescopic connecting rod assembly (3) and a trowelling machine (4); wherein the content of the first and second substances,
one end of the telescopic connecting rod component (3) is connected with the first supporting leg (1), and the other end of the telescopic connecting rod component is connected with the second supporting leg (2);
the trowelling machine (4) is mounted on the telescopic connecting rod assembly (3) and can move in the axial direction of the telescopic connecting rod assembly (3);
the trowelling machine (4) is used for trowelling the concrete area to be trowelled.
2. The concrete screeding device for construction according to claim 1,
the telescopic connecting rod assembly (3) is detachably connected with the first supporting leg (1);
the telescopic connecting rod component (3) is detachably connected with the second supporting leg (2);
the trowelling machine (4) is detachably connected with the telescopic connecting rod component (3).
3. The concrete screeding device for construction according to claim 2, wherein the telescopic link rod assembly comprises:
a telescopic connecting rod (31);
flexible actuating mechanism (32), flexible actuating mechanism (32) are installed the one end of telescopic link (31), flexible actuating mechanism (32) have a flexible end, flexible end can telescopic link's axial direction upward movement, flexible end with trowelling machine is connected, is used for driving the trowelling machine is in telescopic link's axial direction upward movement.
4. The concrete screeding device for construction according to claim 3,
the first supporting leg (1) is provided with a universal wheel (5);
the second supporting leg (2) is provided with a universal wheel (5).
5. The concrete screeding device for building construction according to claim 4, characterized in that the universal wheel on said first leg (1) is detachably connected with said first leg;
the universal wheel on the second supporting leg (2) is detachably connected with the second supporting leg.
6. The concrete screeding device for building construction according to claim 5, further comprising a first support cylinder (6), said first support cylinder (6) being mounted on said first leg (1), said first support cylinder having a jack-up position in which said first support cylinder jacks up said first leg to support said first leg.
7. The concrete screeding device for construction according to claim 5, further comprising a second support cylinder (7), wherein said second support cylinder (7) is mounted on said second leg (2), said second support cylinder (7) having a jack-up position in which said second support cylinder jacks up said second leg to support said second leg.
8. The concrete screeding device for construction according to claim 7, further comprising a distance detecting device (8) mounted on the first leg and/or the second leg for detecting a distance between the first leg and the second leg.
9. The concrete trowelling device for building construction according to claim 8, characterized in that the trowelling machine (4) includes a scraper (41) and a lifting rod (42), and one end of the lifting rod (42) is connected to the telescopic connection rod assembly (3) and the other end is connected to the scraper (41).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021495965.XU CN212773532U (en) | 2020-07-24 | 2020-07-24 | Concrete floating device for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021495965.XU CN212773532U (en) | 2020-07-24 | 2020-07-24 | Concrete floating device for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212773532U true CN212773532U (en) | 2021-03-23 |
Family
ID=75038904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021495965.XU Active CN212773532U (en) | 2020-07-24 | 2020-07-24 | Concrete floating device for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212773532U (en) |
-
2020
- 2020-07-24 CN CN202021495965.XU patent/CN212773532U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110847620A (en) | Assembled wall body temporary connection fixed equipment | |
CN106703403B (en) | Formwork for placing and wall placing installation | |
CN212773532U (en) | Concrete floating device for building construction | |
CN103182733B (en) | Trowelling machine | |
CN209413294U (en) | A kind of beam form board mount for saving construction space | |
CN112196469B (en) | Pile expanding equipment for bridge pile foundation | |
CN207738398U (en) | A kind of architectural engineering Lifting Equipment | |
CN207944962U (en) | A kind of tunnel arch jacking regulating device | |
CN110485732A (en) | A kind of adjustable stair pour device | |
CN207423709U (en) | A kind of concrete rigidity detection device | |
KR100864593B1 (en) | An apparatus for seperating and moving form | |
CN210342669U (en) | Anti-bank activity reinforcing apparatus of cast in situ concrete | |
CN211201076U (en) | Device for enabling slicers to penetrate through construction holes | |
CN209942035U (en) | Fixing device of assembled side fascia | |
CN206418739U (en) | Plastering machine and its column jacking apparatus | |
CN208105867U (en) | A kind of large span hanging structure shuttering supporting adjustable jack | |
CN207144960U (en) | Side wall telescoping steel form | |
CN218881656U (en) | Concrete floating mechanism | |
CN219952747U (en) | Movable steel bar binding platform | |
CN214314281U (en) | A circuit supporting structure for municipal works | |
JPS6340609Y2 (en) | ||
CN219810795U (en) | Pile body strength detection structure | |
CN213952992U (en) | Civil engineering is with equipment template of drawing of patterns of being convenient for | |
CN216515640U (en) | Channel lateral wall support equipment for hydraulic engineering construction | |
CN204418681U (en) | The overall advance and retreat mold mechanism of a kind of band inner corner trim wall form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |